CN220427382U - A kind of construction steel bar welding clamping device - Google Patents

A kind of construction steel bar welding clamping device Download PDF

Info

Publication number
CN220427382U
CN220427382U CN202321859498.8U CN202321859498U CN220427382U CN 220427382 U CN220427382 U CN 220427382U CN 202321859498 U CN202321859498 U CN 202321859498U CN 220427382 U CN220427382 U CN 220427382U
Authority
CN
China
Prior art keywords
fixedly connected
workbench
fixed plate
steel bar
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202321859498.8U
Other languages
Chinese (zh)
Inventor
陈培果
白远韬
陈攀吉
吕鹏楠
段俊
杨李
杨强
王洪俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Huashi Enterprises Co Ltd
Original Assignee
China Huashi Enterprises Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huashi Enterprises Co Ltd filed Critical China Huashi Enterprises Co Ltd
Priority to CN202321859498.8U priority Critical patent/CN220427382U/en
Application granted granted Critical
Publication of CN220427382U publication Critical patent/CN220427382U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The utility model discloses a welding clamping device for building construction steel bars, which belongs to the technical field of steel bar welding and comprises a supporting plate, a workbench and a transmission assembly, wherein the workbench is arranged at the upper end of the supporting plate, the transmission assembly is arranged in the workbench, and the transmission assembly comprises a transmission bin which is arranged in the workbench.

Description

一种建筑施工钢筋焊接夹紧装置A construction steel bar welding clamping device

技术领域Technical field

本实用新型涉及钢筋焊接技术领域,更具体地说,它涉及一种建筑施工钢筋焊接夹紧装置。The utility model relates to the technical field of steel bar welding, and more specifically, to a construction steel bar welding clamping device.

背景技术Background technique

钢筋焊接是用电焊设备将钢筋沿轴向接长或交叉联接。钢筋焊接质量与钢材的可焊性、焊接工艺有关。可焊性与钢筋含碳、锰、钛等合金元素有关。现有的建筑钢筋焊接辅助夹紧装置只具备夹紧焊接的功能,需要人为的对钢筋焊接端进行校准,经常不能够准确的对准钢筋的焊接端,同时不能够对焊接后产生的焊接废渣进行处理收纳。Steel bar welding is to use electric welding equipment to lengthen steel bars in the axial direction or cross-connect them. The welding quality of steel bars is related to the weldability of the steel and the welding process. Weldability is related to the steel bar containing carbon, manganese, titanium and other alloying elements. The existing construction steel bar welding auxiliary clamping device only has the function of clamping and welding. It requires manual calibration of the welding end of the steel bar. It is often unable to accurately align the welding end of the steel bar. At the same time, it cannot control the welding waste generated after welding. Process and store.

实用新型内容Utility model content

要解决的技术问题Technical issues to be solved

针对现有技术存在的不足,本实用新型的目的在于提供一种建筑施工钢筋焊接夹紧装置,其具有精准的对接钢筋的焊接端口和对焊接产生的废渣进行处理收纳的特点。In view of the shortcomings of the existing technology, the purpose of this utility model is to provide a construction steel bar welding clamping device, which has the characteristics of accurately docking the welding port of the steel bar and processing and storing the waste residue generated by the welding.

技术方案Technical solutions

为实现上述目的,本实用新型提供了一种建筑施工钢筋焊接夹紧装置,包括支撑板、工作台和传动组件,所述工作台设置在支撑板的上端,所述传动组件设置在工作台内部,所述传动组件包括传动仓,所述传动仓开设在工作台内部,所述传动仓内壁固定连接有第一正反电机,所述第一正反电机的另一端固定连接有第一螺纹柱,所述第一螺纹柱的另一端固定连接有转轴,所述传动仓内壁固定连接有轴承,所述转轴的另一端穿设在轴承中,所述第一螺纹柱表面螺纹连接有螺纹帽,所述螺纹帽侧面固定连接有固定块,所述传动仓表面开设有活动槽,所述固定块穿设在活动槽中,所述固定块侧面固定连接有第一固定板,所述第一固定板的上表面固定连接有限位凹槽,所述限位凹槽共两组,并且呈对称设置在第一固定板上表面,所述第一固定板下表面固定连接有第一滑块,所述工作台上表面开设有第一滑槽,所述第一滑块滑动连接在第一滑槽中,所述第一滑块和第一滑槽各有两组,并且对称设置在第一固定板下端。In order to achieve the above purpose, the utility model provides a construction steel bar welding clamping device, which includes a support plate, a workbench and a transmission assembly. The workbench is provided at the upper end of the support plate, and the transmission assembly is disposed inside the workbench. , the transmission assembly includes a transmission compartment, the transmission compartment is located inside the workbench, the inner wall of the transmission compartment is fixedly connected with a first forward and reverse motor, and the other end of the first forward and reverse motor is fixedly connected with a first threaded column , the other end of the first threaded column is fixedly connected to a rotating shaft, the inner wall of the transmission chamber is fixedly connected to a bearing, the other end of the rotating shaft is inserted into the bearing, and the surface of the first threaded column is threadedly connected to a threaded cap, A fixed block is fixedly connected to the side of the threaded cap, a movable groove is provided on the surface of the transmission chamber, the fixed block is penetrated in the movable groove, a first fixed plate is fixedly connected to the side of the fixed block, and the first fixed plate is fixedly connected to the side of the fixed block. The upper surface of the plate is fixedly connected with limiting grooves. There are two sets of limiting grooves, and they are symmetrically arranged on the upper surface of the first fixed plate. The lower surface of the first fixed plate is fixedly connected with a first slider, so A first chute is provided on the upper surface of the workbench, and the first slide block is slidingly connected in the first chute. There are two groups of the first slide block and the first chute, and they are symmetrically arranged on the first fixed The lower end of the board.

使用本技术方案的一种建筑施工钢筋焊接夹紧装置时,通过设置控制开关和传动组件,当人们对钢筋进行焊接时,通过控制开关控制第一正反电机运作,从而带动第一螺纹柱的转动,从而带动转轴和轴承的运作,在第一正反电机、第一螺纹柱、转轴和轴承的配合下,从而带动螺纹帽和第一固定块的同步运动,在第一滑块和第一滑槽的配合下,从而使该装置定向移动,从而实现两根钢筋的对接,避免人们手动对接钢筋的焊接端,提升了该装置焊接精准性,增加了实用性。When using the construction steel bar welding clamping device of this technical solution, a control switch and a transmission assembly are provided. When people weld the steel bars, the control switch controls the operation of the first forward and reverse motor, thereby driving the first threaded column. Rotate, thereby driving the operation of the rotating shaft and bearing. With the cooperation of the first forward and reverse motor, the first threaded column, the rotating shaft and the bearing, thereby driving the synchronous movement of the threaded cap and the first fixed block, the first slide block and the first With the cooperation of the chute, the device can move directionally to realize the docking of two steel bars, avoiding people from manually docking the welding ends of the steel bars, improving the welding accuracy of the device and increasing its practicality.

进一步地,所述固定块上表面固定连接有滑杆,所述滑杆表面套有滑套,所述滑套侧面固定连接有连接块,所述固定块上表面固定连接有支撑柱,所述支撑柱表面开设有限位槽,所述连接块穿设在限位槽中,所述连接块和限位槽各两组,并且呈对称设置在工作台两端。Further, the upper surface of the fixed block is fixedly connected to a sliding rod, the surface of the sliding rod is covered with a sliding sleeve, the side of the sliding sleeve is fixedly connected to a connecting block, the upper surface of the fixed block is fixedly connected to a support column, and the A limiting groove is provided on the surface of the support column, and the connecting block is inserted into the limiting groove. There are two sets of connecting blocks and two limiting grooves, and they are symmetrically arranged at both ends of the workbench.

进一步地,所述连接块的另一端固定连接有挤压板,所述挤压板的上表面固定连接有螺纹管,所述螺纹管内部螺纹连接有第二螺纹柱,所述第二螺纹柱的另一端固定连接有第二正反电机,所述支撑柱上端固定连接有第二固定板,所述第二正反电机固定连接在第二固定板下表面。Further, an extrusion plate is fixedly connected to the other end of the connecting block, a threaded pipe is fixedly connected to the upper surface of the extrusion plate, and a second threaded column is threadedly connected to the inside of the threaded pipe. The second threaded column is A second forward and reverse motor is fixedly connected to the other end of the support column, a second fixed plate is fixedly connected to the upper end of the support column, and the second forward and reverse motor is fixedly connected to the lower surface of the second fixed plate.

进一步地,所述工作台上表面固定连接有夹持组件,所述夹持组件包括第三固定板,所述第三固定板设置在工作台上表面,所述第三固定板上表面固定连接有限位板,所述限位板表面穿设有拉栓,所述拉栓表面套接有弹簧,所述拉栓的另一端固定连接有夹板,所述夹板共有两组,另一组所述夹板固定连接在第三固定板上表面。Further, a clamping assembly is fixedly connected to the upper surface of the workbench. The clamping assembly includes a third fixed plate. The third fixed plate is provided on the upper surface of the workbench. The upper surface of the third fixed plate is fixedly connected to the upper surface of the workbench. There is a limit plate. A pull bolt is provided on the surface of the limit plate. A spring is connected to the surface of the pull bolt. The other end of the pull bolt is fixedly connected with a splint. There are two sets of said splints, and the other set of said splints is The splint is fixedly connected to the upper surface of the third fixing plate.

进一步地,所述工作台表面开设有漏槽,所述工作台的下端设置有废渣仓,所述支撑板的侧面开设有第二滑槽,所述废渣仓侧面固定连接有第二滑块,所述第二滑块滑动连接在第二滑槽中,所述工作台侧面固定连接有控制开关。Further, a drain groove is provided on the surface of the workbench, a waste slag bin is provided at the lower end of the workbench, a second chute is provided on the side of the support plate, and a second slider is fixedly connected to the side of the waste slag bin. The second slide block is slidingly connected in the second chute, and a control switch is fixedly connected to the side of the workbench.

有益效果beneficial effects

综上所述,本实用新型具有以下有益效果:To sum up, the present utility model has the following beneficial effects:

1、该一种建筑施工钢筋焊接夹紧装置,通过设置控制开关和传动组件,当人们对钢筋进行焊接时,通过控制开关控制第一正反电机运作,从而带动第一螺纹柱的转动,从而带动转轴和轴承的运作,在第一正反电机、第一螺纹柱、转轴和轴承的配合下,从而带动螺纹帽和第一固定块的同步运动,在第一滑块和第一滑槽的配合下,从而使该装置定向移动,从而实现两根钢筋的对接,避免人们手动对接钢筋的焊接端,提升了该装置焊接精准性,增加了实用性;1. This kind of building construction steel bar welding clamping device is equipped with a control switch and a transmission assembly. When people weld the steel bars, the control switch controls the operation of the first forward and reverse motor, thereby driving the rotation of the first threaded column, thereby Drive the operation of the rotating shaft and the bearing, with the cooperation of the first forward and reverse motor, the first threaded column, the rotating shaft and the bearing, thereby driving the synchronous movement of the threaded cap and the first fixed block, and the first sliding block and the first chute. With the cooperation, the device can move directionally to realize the docking of two steel bars, avoiding people from manually docking the welding ends of the steel bars, improving the welding accuracy of the device and increasing the practicality;

2、该一种建筑施工钢筋焊接夹紧装置,通过设置控制开关和第二正反电机,当人们需要对钢筋进行夹紧时,将钢筋放入限位凹槽中,通过控制开关控制第二正反电机运作,从而带动第二螺纹柱转动,从而带动螺纹管运作,从而带动与螺纹管固定连接的挤压板的升降,在连接块、滑杆和滑套的配合下,使挤压板稳定的定向升降,在第二正反电机、挤压板和限位凹槽的配合下,从而对钢筋进行夹紧固定,避免了在焊接时钢筋发生错位;2. This kind of construction steel bar welding clamping device is equipped with a control switch and a second forward and reverse motor. When people need to clamp the steel bar, the steel bar is put into the limit groove and the second forward and reverse motor is controlled by the control switch. The forward and reverse motors operate, thereby driving the second threaded column to rotate, thereby driving the threaded pipe to operate, thereby driving the extrusion plate fixedly connected to the threaded pipe to rise and fall. With the cooperation of the connecting block, sliding rod and sliding sleeve, the extrusion plate Stable directional lifting, with the cooperation of the second forward and reverse motor, extrusion plate and limit groove, clamps and fixes the steel bars to avoid dislocation of the steel bars during welding;

3、该一种建筑施工钢筋焊接夹紧装置,通过设置废渣仓,当人们在钢筋焊接结束后会产生焊接废渣,该建筑施工钢筋焊接夹紧装置工作台表面开设有漏槽,下端设置有废渣仓,焊接结束后焊接废渣会通过漏槽掉入废渣仓,人们可在第二滑块和第二滑槽的配合下将废渣仓取下进行清理,避免焊接废渣破坏工作环境。3. This kind of construction steel bar welding clamping device is equipped with a waste slag bin. When people finish welding the steel bars, welding waste will be produced. The workbench of the construction steel bar welding clamping device has a drain groove on the surface, and a waste slag is provided at the lower end. After the welding is completed, the welding slag will fall into the waste slag bin through the drain. People can remove the waste slag bin for cleaning with the cooperation of the second slider and the second chute to avoid welding slag from damaging the working environment.

附图说明Description of the drawings

为了更清楚的说明本实用新型具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术中描述所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一种实施方式,对于本领域普通技术人员来说,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly explain the specific embodiments of the present invention or the technical solutions in the prior art, the following will briefly introduce the drawings needed to describe the specific embodiments or the prior art. Obviously, the figures in the following description The accompanying drawings are only one embodiment of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without exerting creative efforts.

图1为本实用新型正视立体剖视的结构示意图;Figure 1 is a schematic structural diagram of the utility model in a front three-dimensional cross-section;

图2为本实用新型新型正视立体的结构示意图;Figure 2 is a schematic structural diagram of the utility model in front view;

图3为本实用新型中传动组件立体剖视的结构示意图;Figure 3 is a schematic structural diagram of a three-dimensional cross-section of the transmission assembly in the present utility model;

图4为本实用新型夹持组件的结构示意图。Figure 4 is a schematic structural diagram of the clamping assembly of the present invention.

附图中的标记为:The markings in the attached picture are:

1、支撑板;2、工作台;3、传动组件;301、传动仓;302、第一正反电机;303、第一螺纹柱;304、转轴;305、轴承;306、螺纹帽;4、固定块;5、第一固定板;6、限位凹槽;7、第一滑块;8、第一滑槽;9、滑杆;10、滑套;11、连接块;12、支撑柱;13、限位槽;14、挤压板;15、第二螺纹管;16、第二螺纹柱;17、第二正反电机;18、第二固定板;19、夹持组件;1901、第三固定板;1902、限位板;1809、拉栓;1904、弹簧;1905、夹板;20、漏槽;21、废渣仓;22、第二滑槽;23、第二滑块;24、控制开关。1. Support plate; 2. Workbench; 3. Transmission components; 301. Transmission compartment; 302. First forward and reverse motor; 303. First threaded column; 304. Rotating shaft; 305. Bearing; 306. Threaded cap; 4. Fixed block; 5. First fixed plate; 6. Limiting groove; 7. First sliding block; 8. First chute; 9. Slide rod; 10. Sliding sleeve; 11. Connecting block; 12. Support column ; 13. Limit groove; 14. Extrusion plate; 15. Second threaded pipe; 16. Second threaded column; 17. Second forward and reverse motor; 18. Second fixed plate; 19. Clamping component; 1901. Third fixed plate; 1902, limit plate; 1809, pull bolt; 1904, spring; 1905, splint; 20, drain; 21, waste bin; 22, second chute; 23, second slider; 24, Control switch.

具体实施方式Detailed ways

为使本实用新型实现的技术手段、创作特征、达成目的与功效易于明白了解,下面对本实用新型具体实施方式中的技术方案进行清楚、完整的描述,以进一步阐述本实用新型,显然,所描述的具体实施方式仅仅是本实用新型的一部分实施方式,而不是全部的样式。In order to make it easy to understand the technical means, creative features, objectives and effects of the present utility model, the technical solutions in the specific embodiments of the present utility model are clearly and completely described below to further elaborate on the present utility model. Obviously, the description The specific implementations are only part of the implementations of the present utility model, rather than all styles.

实施例:Example:

以下结合附图1-4对本实用新型作进一步详细说明。The utility model will be further described in detail below with reference to the accompanying drawings 1-4.

请参阅图1-4,本实用新型提供一种技术方案一种建筑施工钢筋焊接夹紧装置,包括支撑板1、工作台2和传动组件3,工作台2设置在支撑板1的上端,传动组件3设置在工作台2内部,传动组件3包括传动仓301,传动仓301开设在工作台2内部,传动仓301内壁固定连接有第一正反电机302,第一正反电机302的另一端固定连接有第一螺纹柱303,第一螺纹柱303的另一端固定连接有转轴304,传动仓301内壁固定连接有轴承305,转轴304的另一端穿设在轴承305中,第一螺纹柱303表面螺纹连接有螺纹帽306,螺纹帽306侧面固定连接有固定块4,传动仓301表面开设有活动槽,固定块4穿设在活动槽中,固定块4侧面固定连接有第一固定板5,第一固定板5的上表面固定连接有限位凹槽6,限位凹槽6共两组,并且呈对称设置在第一固定板5上表面,第一固定板5下表面固定连接有第一滑块7,工作台2上表面开设有第一滑槽8,第一滑块7滑动连接在第一滑槽8中,第一滑块7和第一滑槽8各有两组,并且对称设置在第一固定板5下端。Please refer to Figures 1-4. The present utility model provides a technical solution, a construction steel bar welding clamping device, which includes a support plate 1, a workbench 2 and a transmission assembly 3. The workbench 2 is arranged on the upper end of the support plate 1, and the transmission assembly Component 3 is arranged inside the workbench 2. The transmission assembly 3 includes a transmission compartment 301. The transmission compartment 301 is located inside the workbench 2. A first forward and reverse motor 302 is fixedly connected to the inner wall of the transmission compartment 301. The other end of the first forward and reverse motor 302 is fixedly connected. A first threaded column 303 is fixedly connected. The other end of the first threaded column 303 is fixedly connected with a rotating shaft 304. The inner wall of the transmission chamber 301 is fixedly connected with a bearing 305. The other end of the rotating shaft 304 is inserted into the bearing 305. The first threaded column 303 A threaded cap 306 is threaded on the surface, and a fixing block 4 is fixedly connected to the side of the threaded cap 306. A movable groove is provided on the surface of the transmission chamber 301, and the fixed block 4 is penetrated in the movable groove. The first fixing plate 5 is fixedly connected to the side of the fixed block 4. , the upper surface of the first fixed plate 5 is fixedly connected with the limiting groove 6, there are two sets of limiting grooves 6, and are symmetrically arranged on the upper surface of the first fixed plate 5, and the lower surface of the first fixed plate 5 is fixedly connected with the first fixed plate 5. A slider 7, a first slider 8 is provided on the upper surface of the workbench 2, the first slider 7 is slidingly connected in the first slider 8, there are two sets of the first slider 7 and the first slider 8, and They are symmetrically arranged at the lower end of the first fixing plate 5 .

通过采用上述技术方案,该一种建筑施工钢筋焊接夹紧装置,通过设置控制开关24和传动组件3,当人们对钢筋进行焊接时,通过控制开关24控制第一正反电机302运作,从而带动第一螺纹柱303的转动,从而带动转轴304和轴承305的运作,在第一正反电机302、第一螺纹柱303、转轴304和轴承305的配合下,从而带动螺纹帽306和第一固定块4的同步运动,在第一滑块7和第一滑槽8的配合下,从而使该装置定向移动,从而实现两根钢筋的对接,避免人们手动对接钢筋的焊接端,提升了该装置焊接精准性,增加了实用性。By adopting the above technical solution, this construction steel bar welding clamping device is provided with a control switch 24 and a transmission assembly 3. When people weld the steel bars, the control switch 24 is used to control the operation of the first forward and reverse motor 302, thereby driving The rotation of the first threaded column 303 drives the operation of the rotating shaft 304 and the bearing 305. With the cooperation of the first forward and reverse motor 302, the first threaded column 303, the rotating shaft 304 and the bearing 305, the threaded cap 306 and the first fixed The synchronous movement of the block 4, with the cooperation of the first slide block 7 and the first chute 8, causes the device to move directionally, thereby realizing the docking of the two steel bars, avoiding people from manually docking the welded ends of the steel bars, and improving the device Welding accuracy increases practicality.

具体的,固定块4上表面固定连接有滑杆9,滑杆9表面套有滑套10,滑套10侧面固定连接有连接块11,固定块4上表面固定连接有支撑柱12,支撑柱12表面开设有限位槽13,连接块11穿设在限位槽13中,连接块11和限位槽13各两组,并且呈对称设置在工作台2两端。Specifically, a sliding rod 9 is fixedly connected to the upper surface of the fixed block 4. A sliding sleeve 10 is covered on the surface of the sliding rod 9. A connecting block 11 is fixedly connected to the side of the sliding sleeve 10. A supporting column 12 is fixedly connected to the upper surface of the fixed block 4. The supporting column A limiting groove 13 is provided on the surface of the workbench 12, and the connecting block 11 is inserted into the limiting groove 13. There are two groups of connecting blocks 11 and limiting grooves 13, and they are symmetrically arranged at both ends of the workbench 2.

具体的,连接块11的另一端固定连接有挤压板14,挤压板14的上表面固定连接有螺纹管15,螺纹管15内部螺纹连接有第二螺纹柱16,第二螺纹柱16的另一端固定连接有第二正反电机17,支撑柱12上端固定连接有第二固定板18,第二正反电机17固定连接在第二固定板18下表面。Specifically, the other end of the connecting block 11 is fixedly connected to the extrusion plate 14, and the upper surface of the extrusion plate 14 is fixedly connected to the threaded pipe 15. The inside of the threaded pipe 15 is threadedly connected to the second threaded column 16, and the second threaded column 16 is threadedly connected. The second forward and reverse motor 17 is fixedly connected to the other end, the upper end of the support column 12 is fixedly connected to the second fixing plate 18 , and the second forward and reverse motor 17 is fixedly connected to the lower surface of the second fixing plate 18 .

通过采用上述技术方案,该一种建筑施工钢筋焊接夹紧装置,通过设置控制开关24和第二正反电机17,当人们需要对钢筋进行夹紧时,将钢筋放入限位凹槽6中,通过控制开关24控制第二正反电机17运作,从而带动第二螺纹柱16转动,从而带动螺纹管15运作,从而带动与螺纹管15固定连接的挤压板14的升降,在连接块11、滑杆9和滑套10的配合下,使挤压板15稳定的定向升降,在第二正反电机17、挤压板14和限位凹槽6的配合下,从而对钢筋进行夹紧固定,避免了在焊接时钢筋发生错位。By adopting the above technical solution, this construction steel bar welding clamping device is provided with a control switch 24 and a second forward and reverse motor 17. When people need to clamp the steel bars, the steel bars are put into the limiting groove 6 , the operation of the second forward and reverse motor 17 is controlled by the control switch 24, thereby driving the rotation of the second threaded column 16, thereby driving the operation of the threaded pipe 15, thereby driving the lifting of the extrusion plate 14 fixedly connected to the threaded pipe 15, at the connecting block 11 , the cooperation of the sliding rod 9 and the sliding sleeve 10 makes the extrusion plate 15 move up and down stably and in a directional manner, and with the cooperation of the second forward and reverse motor 17, the extrusion plate 14 and the limit groove 6, the steel bars are clamped. Fixed to avoid dislocation of steel bars during welding.

具体的,工作台2上表面固定连接有夹持组件19,夹持组件19包括第三固定板1901,第三固定板1901设置在工作台2上表面,第三固定板1901上表面固定连接有限位板1902,限位板1902表面穿设有拉栓1903,拉栓1903表面套接有弹簧1904,拉栓1903的另一端固定连接有夹板1905,夹板1905共有两组,另一组夹板1905固定连接在第三固定板1901上表面。Specifically, a clamping component 19 is fixedly connected to the upper surface of the workbench 2. The clamping component 19 includes a third fixing plate 1901. The third fixing plate 1901 is provided on the upper surface of the workbench 2. The upper surface of the third fixing plate 1901 is fixedly connected to a limited number. The position plate 1902 has a pull bolt 1903 on the surface of the limit plate 1902. A spring 1904 is connected to the surface of the pull bolt 1903. The other end of the pull bolt 1903 is fixedly connected with a splint 1905. There are two sets of splints 1905, and the other set of splints 1905 is fixed. Connected to the upper surface of the third fixed plate 1901.

具体的,工作台2表面开设有漏槽20,工作台2的下端设置有废渣仓21,支撑板1的侧面开设有第二滑槽22,废渣仓21侧面固定连接有第二滑块23,第二滑块23滑动连接在第二滑槽22中,工作台2侧面固定连接有控制开关24。Specifically, a drain groove 20 is provided on the surface of the workbench 2, a waste slag bin 21 is provided at the lower end of the workbench 2, a second chute 22 is provided on the side of the support plate 1, and a second slider 23 is fixedly connected to the side of the waste slag bin 21. The second slider 23 is slidably connected in the second chute 22 , and a control switch 24 is fixedly connected to the side of the workbench 2 .

通过采用上述技术方案,该一种建筑施工钢筋焊接夹紧装置,通过设置废渣仓21,当人们在钢筋焊接结束后会产生焊接废渣,该建筑施工钢筋焊接夹紧装置工作台2表面开设有漏槽20,下端设置有废渣仓21,焊接结束后焊接废渣会通过漏槽20掉入废渣仓21,人们可在第二滑块23和第二滑槽22的配合下将废渣仓21取下进行清理,避免焊接废渣破坏工作环境。By adopting the above technical solution, this construction steel bar welding clamping device is provided with a waste slag bin 21. When people complete the steel bar welding, welding waste will be produced. The workbench 2 of the construction steel bar welding clamping device is provided with a drain on the surface. Trough 20 has a waste slag bin 21 at the lower end. After welding, the welding waste will fall into the waste slag bin 21 through the chute 20. People can remove the waste slag bin 21 with the cooperation of the second slider 23 and the second chute 22. Clean up to prevent welding waste from damaging the working environment.

本实用新型的工作原理为:在使用该建筑施工钢筋焊接夹紧装置时,人们首先将该装置连接外部电源,其次将一根钢筋放入限位凹槽6中,人们通过控制开关24控制第二正反电机17运作,从而带动第二螺纹柱16的转动,在第二螺纹柱16和螺纹管15的配合下,从而使挤压板14进行挤压升降,在滑杆9、滑套10和连接块11的配合下,从而使挤压板15进行定向移动,从而对限位凹槽6内的钢筋进行挤压固定,从而保证在焊接时钢筋处于固定状态,当挤压板14到达所需位置时通过控制开关24停止即可,再将另一根钢筋放在夹板1908中,通过拉动拉栓1903来控制弹簧1904的收缩,在拉栓1903、弹簧1904和夹板1905的配合下对第二根钢筋进行固定,当人们对两根钢筋进行焊接时,可以通过控制开关24控制第一正反电机302运作,在第一螺纹柱303和螺纹帽306的配合下,使得连接着固定块4的挤压装置进行移动,在第一滑块7和第一滑槽8的配合下,使得该装置进行定向移动,从而实现两根钢筋焊接端的对接,当人们在钢筋焊接结束时产生的焊接废渣会通过漏槽20掉入废渣仓21中,人们在第二滑块23和第二滑槽22的配合下,可将废渣仓21取出清理,从而避免废渣对工作环境造成破坏。The working principle of the utility model is: when using the building construction steel bar welding clamping device, people first connect the device to an external power supply, and then put a steel bar into the limit groove 6, and people control the third steel bar through the control switch 24. The two forward and reverse motors 17 operate to drive the rotation of the second threaded column 16. With the cooperation of the second threaded column 16 and the threaded pipe 15, the extrusion plate 14 is pressed and lifted, and the sliding rod 9 and the sliding sleeve 10 With the cooperation of the connecting block 11, the extrusion plate 15 moves in a direction, thereby extruding and fixing the steel bars in the limiting groove 6, thereby ensuring that the steel bars are in a fixed state during welding. When the extrusion plate 14 reaches the desired location, When the position is required, just stop it by controlling the switch 24, then place another steel bar in the splint 1908, control the contraction of the spring 1904 by pulling the pull bolt 1903, and adjust the third steel bar with the cooperation of the pull bolt 1903, spring 1904 and splint 1905. The two steel bars are fixed. When people weld the two steel bars, the operation of the first forward and reverse motor 302 can be controlled through the control switch 24. With the cooperation of the first threaded column 303 and the threaded cap 306, the fixing block 4 is connected. The extrusion device moves, and with the cooperation of the first slider 7 and the first chute 8, the device moves directionally, thereby realizing the docking of the welding ends of the two steel bars. When people end the welding of the steel bars, the welding waste generated The waste will fall into the waste bin 21 through the chute 20. With the cooperation of the second slider 23 and the second chute 22, people can take out the waste bin 21 and clean it, thereby preventing the waste from causing damage to the working environment.

本具体实施例仅仅是对本实用新型的解释,其并不是对本实用新型的限制,本领域技术人员在阅读完本说明书后可以根据需要对本实施例做出没有创造性贡献的修改,但只要在本实用新型的权利要求范围内都受到专利法的保护。This specific embodiment is only an explanation of the present utility model, and it is not a limitation of the present utility model. Those skilled in the art can make modifications to this embodiment without creative contribution as needed after reading this description. However, as long as the present utility model is used, All new types of patents are protected by patent law within the scope of their claims.

Claims (5)

1.一种建筑施工钢筋焊接夹紧装置,包括支撑板(1)、工作台(2)和传动组件(3),其特征在于:所述工作台(2)设置在支撑板(1)的上端,所述传动组件(3)设置在工作台(2)内部,所述传动组件(3)包括传动仓(301),所述传动仓(301)开设在工作台(2)内部,所述传动仓(301)内壁固定连接有第一正反电机(302),所述第一正反电机(302)的另一端固定连接有第一螺纹柱(303),所述第一螺纹柱(303)的另一端固定连接有转轴(304),所述传动仓(301)内壁固定连接有轴承(305),所述转轴(304)的另一端穿设在轴承(305)中,所述第一螺纹柱(303)表面螺纹连接有螺纹帽(306),所述螺纹帽(306)侧面固定连接有固定块(4),所述传动仓(301)表面开设有活动槽,所述固定块(4)穿设在活动槽中,所述固定块(4)侧面固定连接有第一固定板(5),所述第一固定板(5)的上表面固定连接有限位凹槽(6),所述限位凹槽(6)共两组,并且呈对称设置在第一固定板(5)上表面,所述第一固定板(5)下表面固定连接有第一滑块(7),所述工作台(2)上表面开设有第一滑槽(8),所述第一滑块(7)滑动连接在第一滑槽(8)中,所述第一滑块(7)和第一滑槽(8)各有两组,并且对称设置在第一固定板(5)下端。1. A construction steel bar welding clamping device, including a support plate (1), a workbench (2) and a transmission assembly (3), characterized in that: the workbench (2) is arranged on the support plate (1) At the upper end, the transmission assembly (3) is arranged inside the workbench (2). The transmission assembly (3) includes a transmission compartment (301). The transmission compartment (301) is located inside the workbench (2). A first forward and reverse motor (302) is fixedly connected to the inner wall of the transmission compartment (301), and a first threaded column (303) is fixedly connected to the other end of the first forward and reverse motor (302). The first threaded column (303) ) is fixedly connected to a rotating shaft (304), and the inner wall of the transmission chamber (301) is fixedly connected to a bearing (305). The other end of the rotating shaft (304) is inserted into the bearing (305), and the first A threaded cap (306) is threadedly connected to the surface of the threaded column (303). A fixed block (4) is fixedly connected to the side of the threaded cap (306). A movable groove is provided on the surface of the transmission chamber (301). The fixed block (4) 4) It is installed in the movable groove, the side of the fixed block (4) is fixedly connected with the first fixed plate (5), and the upper surface of the first fixed plate (5) is fixedly connected with the limiting groove (6), There are two sets of limiting grooves (6), which are symmetrically arranged on the upper surface of the first fixed plate (5), and the first slider (7) is fixedly connected to the lower surface of the first fixed plate (5). A first chute (8) is provided on the upper surface of the workbench (2), and the first slide block (7) is slidingly connected in the first chute (8). The first slide block (7) and There are two groups of first chute (8) each, and they are symmetrically arranged at the lower end of the first fixed plate (5). 2.根据权利要求1所述的一种建筑施工钢筋焊接夹紧装置,其特征在于:所述固定块(4)上表面固定连接有滑杆(9),所述滑杆(9)表面套有滑套(10),所述滑套(10)侧面固定连接有连接块(11),所述固定块(4)上表面固定连接有支撑柱(12),所述支撑柱(12)表面开设有限位槽(13),所述连接块(11)穿设在限位槽(13)中,所述连接块(11)和限位槽(13)各两组,并且呈对称设置在工作台(2)两端。2. A construction steel bar welding clamping device according to claim 1, characterized in that: a sliding rod (9) is fixedly connected to the upper surface of the fixed block (4), and the surface of the sliding rod (9) is covered There is a sliding sleeve (10), a connecting block (11) is fixedly connected to the side of the sliding sleeve (10), a support column (12) is fixedly connected to the upper surface of the fixed block (4), and the surface of the support column (12) A limiting slot (13) is provided, and the connecting block (11) is inserted into the limiting slot (13). There are two groups of connecting blocks (11) and limiting slots (13), and they are symmetrically arranged in the working position. Both ends of the platform (2). 3.根据权利要求2所述的一种建筑施工钢筋焊接夹紧装置,其特征在于:所述连接块(11)的另一端固定连接有挤压板(14),所述挤压板(14)的上表面固定连接有螺纹管(15),所述螺纹管(15)内部螺纹连接有第二螺纹柱(16),所述第二螺纹柱(16)的另一端固定连接有第二正反电机(17),所述支撑柱(12)上端固定连接有第二固定板(18),所述第二正反电机(17)固定连接在第二固定板(18)下表面。3. A construction steel bar welding clamping device according to claim 2, characterized in that: the other end of the connecting block (11) is fixedly connected to an extrusion plate (14), and the extrusion plate (14) ) is fixedly connected to a threaded pipe (15) on its upper surface, a second threaded column (16) is threadedly connected to the inside of the threaded pipe (15), and a second positive threaded column (16) is fixedly connected to the other end of the second threaded column (16). Counter motor (17), the upper end of the support column (12) is fixedly connected to a second fixed plate (18), and the second forward and reverse motor (17) is fixedly connected to the lower surface of the second fixed plate (18). 4.根据权利要求1所述的一种建筑施工钢筋焊接夹紧装置,其特征在于:所述工作台(2)上表面固定连接有夹持组件(19),所述夹持组件(19)包括第三固定板(1901),所述第三固定板(1901)设置在工作台(2)上表面,所述第三固定板(1901)上表面固定连接有限位板(1902),所述限位板(1902)表面穿设有拉栓(1903),所述拉栓(1903)表面套接有弹簧(1904),所述拉栓(1903)的另一端固定连接有夹板(1905),所述夹板(1905)共有两组,另一组所述夹板(1905)固定连接在第三固定板(1901)上表面。4. A construction steel bar welding clamping device according to claim 1, characterized in that: a clamping component (19) is fixedly connected to the upper surface of the workbench (2), and the clamping component (19) It includes a third fixed plate (1901). The third fixed plate (1901) is arranged on the upper surface of the workbench (2). The upper surface of the third fixed plate (1901) is fixedly connected to the limiting plate (1902). A pull bolt (1903) is pierced through the surface of the limiting plate (1902). A spring (1904) is sleeved on the surface of the pull bolt (1903). The other end of the pull bolt (1903) is fixedly connected with a splint (1905). There are two sets of said splints (1905), and the other set of said splints (1905) is fixedly connected to the upper surface of the third fixed plate (1901). 5.根据权利要求1所述的一种建筑施工钢筋焊接夹紧装置,其特征在于:所述工作台(2)表面开设有漏槽(20),所述工作台(2)的下端设置有废渣仓(21),所述支撑板(1)的侧面开设有第二滑槽(22),所述废渣仓(21)侧面固定连接有第二滑块(23),所述第二滑块(23)滑动连接在第二滑槽(22)中,所述工作台(2)侧面固定连接有控制开关(24)。5. A construction steel bar welding clamping device according to claim 1, characterized in that: a drain groove (20) is provided on the surface of the workbench (2), and a lower end of the workbench (2) is provided with a Waste slag bin (21). A second chute (22) is provided on the side of the support plate (1). A second slider (23) is fixedly connected to the side of the waste slag bin (21). The second slider (23) is slidingly connected in the second chute (22), and a control switch (24) is fixedly connected to the side of the workbench (2).
CN202321859498.8U 2023-07-15 2023-07-15 A kind of construction steel bar welding clamping device Expired - Fee Related CN220427382U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321859498.8U CN220427382U (en) 2023-07-15 2023-07-15 A kind of construction steel bar welding clamping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321859498.8U CN220427382U (en) 2023-07-15 2023-07-15 A kind of construction steel bar welding clamping device

Publications (1)

Publication Number Publication Date
CN220427382U true CN220427382U (en) 2024-02-02

Family

ID=89695266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321859498.8U Expired - Fee Related CN220427382U (en) 2023-07-15 2023-07-15 A kind of construction steel bar welding clamping device

Country Status (1)

Country Link
CN (1) CN220427382U (en)

Similar Documents

Publication Publication Date Title
CN111347080A (en) Positioning type drilling device capable of easily adjusting drilling position
CN214558256U (en) Laser butt welding device convenient for accurate positioning for pipe machining
CN102019487B (en) A retractable pipe head automatic welding machine
CN101774104B (en) Floating regulating and clamping device for center of a welding tube
CN221658432U (en) A steel structure butt welding adjustment device
CN117565003A (en) Integrated turnover machine for manufacturing steel structure
CN220427382U (en) A kind of construction steel bar welding clamping device
CN210679194U (en) Automatic lifting drilling device for engineering construction
CN221435510U (en) Automatic welding device for circular seam of pipe elbow
CN204639523U (en) For the bracket system of mobile bus pipe
CN221185288U (en) Butt joint construction mechanism for gas pipelines
CN118951521A (en) A multifunctional welding machine
CN215208145U (en) Mechanical lifting type engineering machinery transfer device
CN116586855A (en) Bearing structure of a welding robot
CN214721751U (en) Curtain metal aluminum plate welding equipment
CN105689448A (en) Planar rectification device for silicon-steel post
CN210060287U (en) Rear-sweeping active-lifting hollowed-out logistics roller welding mechanism
CN112643280B (en) Automatic fixing and clamping device for production and processing of low-voltage power distribution cabinet
CN209998454U (en) A kind of automatic cutting device in the production process of cold-drawn steel pipe
CN217019105U (en) Be applied to tubule pipeline welding with device of keeping silent
CN211191798U (en) Reinforcing bar cutting equipment's for building fixed establishment
CN210756127U (en) Positioning device for welding conical barrel
CN223185814U (en) Double-sided welding stainless steel composite plate welding equipment
CN219986586U (en) Welding device for electrical engineering
CN216028701U (en) Steel pipe cutting device for preventing steel slag from falling to inner wall of pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20240202