CN220353358U - Work frame that construction was used - Google Patents

Work frame that construction was used Download PDF

Info

Publication number
CN220353358U
CN220353358U CN202322048526.4U CN202322048526U CN220353358U CN 220353358 U CN220353358 U CN 220353358U CN 202322048526 U CN202322048526 U CN 202322048526U CN 220353358 U CN220353358 U CN 220353358U
Authority
CN
China
Prior art keywords
frame
ladder
work
building construction
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322048526.4U
Other languages
Chinese (zh)
Inventor
黄如军
潘虎
陈利军
郭霞
王凤英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Shencai Architectural Decoration Engineering Co ltd
Original Assignee
Shandong Shencai Architectural Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Shencai Architectural Decoration Engineering Co ltd filed Critical Shandong Shencai Architectural Decoration Engineering Co ltd
Priority to CN202322048526.4U priority Critical patent/CN220353358U/en
Application granted granted Critical
Publication of CN220353358U publication Critical patent/CN220353358U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a working frame for building construction, which comprises a main frame, wherein a long shell is arranged on the front surface of the main frame.

Description

Work frame that construction was used
Technical Field
The utility model relates to the technical field of work frames, in particular to a work frame for building construction.
Background
The work frame is one of the indispensable devices in the construction work, and the staff carries out construction work through climbing the work frame through moving the work frame to suitable position, in the work progress, the staff need use the instrument, has the reason that traditional device is not perfect enough, does not have the facility of conveniently removing the instrument to the work frame, and is more troublesome, and a work frame that construction was used can provide the solution for above-mentioned problem.
Patent document: KR2019980038206U rotatable work rack, "including work rack, rotates around the available work rack while placing the object to be processed in the welding work rack is configured to be rotatable right to a position required when the spot welding gun is in the left-right direction and the front-rear direction. In order to weld objects effectively, it is an object to make you help to improve work efficiency. In order to achieve the above object, the wheel (1) is provided with a lower support (2), the lower support (2) being above an upper support (3), the upper support being rotatably mounted on both left and right sides, the upper support being rotatably mounted as a top end on the top and bottom (3), and being constituted by a base plate 5, the base plate 5 being combined with a plurality of clamp plates 4". The above publications mainly disclose the problem that the work frame can be rotated to a proper position, and the object can be effectively welded, thereby improving the work efficiency.
The existing working frame generally needs a worker to carry a construction tool on the working frame, and then climbs on the working frame to carry out construction work, so that the worker cannot conveniently move the tool to the working frame, the climbing difficulty of the worker is increased, and the danger of the worker is increased.
Disclosure of Invention
The utility model aims to provide a working frame for building construction, which can solve the technical problem that in the prior art, a construction tool is inconvenient to move to the working frame.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the working frame for building construction comprises a main frame, wherein a long shell is arranged on the front surface of the main frame;
the pulley is installed to the inboard of long shell, the supporting shoe is installed to the inboard of pulley, the square frame is installed to one side of supporting shoe, place the board is installed to the bottom of square frame, the limit piece is installed to one side of square frame, the one end of tying up the rope is run through to the inside of limit piece, the cylinder is installed to the inboard of rope, the inside of cylinder runs through and installs the center pole, and the center pole is located the front of body frame, the pull ring is installed to the other end of rope.
Preferably, a working plate is mounted on the inner side of the main frame.
Preferably, the bottom of the main frame is provided with a bottom frame, the bottom frame is positioned on the back surface of the long shell, and the bottom of the bottom frame is provided with four rollers.
Preferably, two guardrails are arranged at the top of the main frame, and four support rods are arranged at the inner sides of the guardrails.
Preferably, the front surface of the underframe is provided with a fixing rod, and the fixing rod is positioned at the inner side of the pull ring.
Preferably, the short block is installed to the bottom of body frame, and a short bolt is installed respectively to the both sides of short block, and the kicking block is installed in the outside of short bolt, and the ladder pole is installed to the bottom of kicking block, installs six terraces between two ladder poles, and the screw thread piece is installed to one side of ladder pole, and the screw thread is installed in the inside run through screw thread of screw thread piece.
Preferably, the inside of the ladder bar is provided with the blocking blocks, the bottoms of the two blocking blocks are provided with the extension ladder, the extension ladder is positioned at the bottoms of the two ladder bars, and two sides of the extension ladder are respectively provided with a round hole.
Compared with the prior art, the utility model has the following beneficial effects:
1. according to the utility model, the placing plate is arranged, the tool is placed on the top of the placing plate by a worker, the tool is positioned on the inner side of the square frame, the worker moves the pull ring out of the fixing rod, pulls the pull ring and the rope, enables the rope to generate friction force with the roller under the action of external force, enables the roller to rotate around the center rod under the action of external force, enables the rope to drive the square frame to move upwards through the side blocks, enables the square frame to drive the pulley to move along the inner side of the long shell through the supporting block, and enables the pulley to generate friction force with the inner side of the long shell, so that the pulley is convenient for the worker to pull the rope to move the square frame in cooperation with the roller, the square frame and the placing plate can drive the tool to move upwards, the worker winds the excessive rope on the outer side of the fixing rod after moving the square frame to a proper position, and sleeves the pull ring on the outer side of the fixing rod, and fixes the square frame by utilizing the friction force of the rope and the fixing rod.
2. According to the utility model, the ladder rod is installed, the staff rotates the ladder rod, so that the ladder rod can drive the top block to rotate by taking the short bolt as the center under the action of external force, the ladder rod and the ladder plate are inclined to a proper degree, the staff screws the bolt, the bolt moves under the support of the screw thread block, the bolt can move out of the inner side of the round hole and does not fix the extension ladder, the extension ladder moves downwards under the action of self gravity, the extension ladder can drive the blocking block to move, the blocking block can be contacted with the bottom of the ladder rod to fix the extension ladder, the staff releases the ladder rod, the extension ladder is fixed under the support of the underframe, and the staff can climb up the working frame through the ladder rod and the ladder plate when carrying out building construction work, so that convenience can be provided for the staff.
Drawings
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is a block diagram of the present utility model;
FIG. 3 is a schematic view of a drum structure according to the present utility model;
FIG. 4 is a schematic view of an extension ladder of the present utility model;
fig. 5 is a schematic perspective view of a short block according to the present utility model.
In the figure: 1. a main frame; 2. a work plate; 3. a chassis; 4. a roller; 5. guard bars; 6. a support rod; 7. a long shell; 8. a pulley; 9. a support block; 10. a block; 11. placing a plate; 12. edge blocks; 13. a rope; 14. a roller; 15. a central rod; 16. a pull ring; 17. a fixed rod; 18. short blocks; 19. a short bolt; 20. a top block; 21. a ladder bar; 22. a ladder plate; 23. a screw block; 24. a bolt; 25. a block; 26. an extension ladder; 27. and a round hole.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be noted that the directions or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific direction, be configured and operated in the specific direction, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "provided," "connected," and the like are to be construed broadly, and may be fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
Referring to fig. 1, a work frame for construction is shown;
including body frame 1, work board 2 is installed to the inboard of body frame 1, chassis 3 is installed to the bottom of body frame 1, and chassis 3 is located the back of long shell 7, four gyro wheels 4 are installed to the bottom of chassis 3, two guardrails 5 are installed at the top of body frame 1, four bracing pieces 6 are installed to the inboard of guardrail 5, gyro wheel 4 can support for chassis 3 under the support on ground, thereby make chassis 3 can carry out fixed support to body frame 1, make body frame 1 can provide fixed support for work board 2, make the staff can creep to the top of work board 2 and carry out construction work, the support of guardrail 5 body frame 1 can protect the staff, bracing piece 6 can improve the stability of guardrail 5, the staff promotes chassis 3, make chassis 3 can drive gyro wheel 4 and ground under the effect of external force produce frictional force, thereby make gyro wheel 4 roll on ground, thereby can make things convenient for the staff to promote the device and remove.
Referring to fig. 1, 2 and 3, a work frame for building construction;
comprising a long shell 7, a pulley 8 is arranged on the inner side of the long shell 7, a supporting block 9 is arranged on the inner side of the pulley 8, a square frame 10 is arranged on one side of the supporting block 9, a placing plate 11 is arranged at the bottom of the square frame 10, a side block 12 is arranged on one side of the square frame 10, one end of a rope 13 is bound in a penetrating manner in the side block 12, a roller 14 is arranged on the inner side of the rope 13, a center rod 15 is arranged in the penetrating manner in the roller 14, the center rod 15 is positioned on the front surface of the main frame 1, a pull ring 16 is arranged on the other end of the rope 13, a fixing rod 17 is arranged on the front surface of the main frame 3, the fixing rod 17 is positioned on the inner side of the pull ring 16, the square frame 10 can prevent a tool from moving out of the top of the placing plate 11 under the fixed support of the placing plate 11, the center rod 15 can support the roller 14 under the external force, the fixing rod 17 can provide support for the rope 13 and the pull ring 16 under the fixed support of the main frame 1, the staff places the tool on the top of the placing plate 11, the tool is positioned on the inner side of the square frame 10, the staff removes the pull ring 16 from the fixing rod 17, pulls the pull ring 16 and the rope 13, enables the rope 13 to generate friction force with the roller 14 under the action of external force, enables the roller 14 to rotate by taking the central rod 15 as the center under the action of external force, enables the rope 13 to drive the square frame 10 to move upwards through the side block 12, enables the square frame 10 to drive the pulley 8 to move along the inner side of the long shell 7 through the supporting block 9, enables the pulley 8 to generate friction force with the inner side of the long shell 7, enables the pulley 8 to cooperate with the roller 14 to facilitate the staff to pull the rope 13 to move the square frame 10, enables the square frame 10 and the placing plate 11 to drive the tool to move upwards, winds a plurality of ropes 13 on the outer side of the fixing rod 17 after the staff moves the square frame 10 to a proper position, and with pull ring 16 cover in the outside of dead lever 17, utilize the frictional force of rope 13 and dead lever 17 to fix square frame 10, the staff when using the work frame to carry out construction work, the device can make things convenient for the staff to remove the instrument to the work frame on to can provide convenience for the work of staff.
Referring to fig. 1, 4 and 5, a work frame for building construction;
including body frame 1, the short piece 18 is installed to the bottom of body frame 1, a short bolt 19 is installed respectively to the both sides of short piece 18, the kicking block 20 is installed in the outside of short bolt 19, thereby the ladder bar 21 is installed to the bottom of kicking block 20, install six ladder boards 22 between two ladder bars 21, screw thread piece 23 is installed to one side of ladder bar 21, screw thread piece 23's inside runs through screw thread and installs bolt 24, the chock 25 is installed to the inboard of ladder bar 21, extension ladder 26 is installed to the bottom of two chocks 25, and extension ladder 26 is located the bottom of two ladder bars 21, a round hole 27 has been seted up respectively to the both sides of extension ladder 26, short piece 18 can be fixed to two short bolts 19 under the fixed bolster of body frame 1, thereby make short bolt 19 can support the kicking block 20 rotate under the effect of external force, make ladder bar 21 can drive the kicking block 20 and rotate with short bolt 19 as the center, make ladder bar 21 and bolt 22 slope to suitable degree, the staff twists 24, make ladder bar 24 can make the screw thread piece 23 move out under the effect of ladder bar 21 and can not extend the fixed support bar 26 under the effect of extension ladder bar 26, thereby the fixed support bar 25 can be extended to the fixed bottom of ladder bar 25, can be extended to the fixed bottom of the people under the fixed support bar 26, can be extended under the effect of the fixed support bar 25, thereby the fixed support bar can be extended by the fixed to the fixed bottom of the people can be extended under the fixed support bar 26, and can be extended under the effect of the screw thread of the bottom of the ladder bar 25, the people can be moved down the centre.
Working principle: before using the device, whether the device has a problem affecting the use should be checked, when a worker needs to use the device, the worker places tools on the top of the placement plate 11 and the inner side of the box 10, moves the pull ring 16 out of the fixing rod 17, pulls the pull ring 16 and the rope 13 to move the box 10 and the placement plate 11 to a proper height, winds the redundant rope 13 on the outer side of the fixing rod 17, then sleeves the pull ring 16 on the outer side of the fixing rod 17 for fixing, rotates the ladder rod 21, moves the two bolts 24 out of the inner sides of the corresponding round holes 27, and puts down the ladder rod 21 to fix the extension ladder 26 on the underframe 3, so that the worker climbs up the work frame by stepping on the extension ladder 26 and the ladder plate 22.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. The utility model provides a work frame that construction was used, includes body frame (1), its characterized in that: the front of the main frame (1) is provided with a long shell (7);
the utility model discloses a cable structure, including long shell (7), supporting shoe (9), square frame (10), limit piece (12) are installed to the inboard of long shell (7), supporting shoe (9) are installed to the inboard of pulley (8), square frame (10) are installed to one side of supporting shoe (9), place board (11) are installed to the bottom of square frame (10), limit piece (12) are installed to one side of square frame (10), one end of rope (13) has been tied in the inside run-through of limit piece (12), cylinder (14) are installed to the inboard of rope (13), center rod (15) are installed in the inside run-through of cylinder (14), and center rod (15) are located the front of body frame (1), pull ring (16) are installed to the other end of rope (13).
2. A work frame for building construction according to claim 1, wherein: the working plate (2) is arranged on the inner side of the main frame (1).
3. A work frame for building construction according to claim 2, wherein: the bottom of body frame (1) is installed chassis (3), and chassis (3) are located the back of long shell (7), and four gyro wheels (4) are installed to the bottom of chassis (3).
4. A work frame for building construction according to claim 3, wherein: two guardrails (5) are arranged at the top of the main frame (1), and four supporting rods (6) are arranged on the inner sides of the guardrails (5).
5. A work frame for building construction according to claim 3, wherein: the front surface of the underframe (3) is provided with a fixing rod (17), and the fixing rod (17) is positioned at the inner side of the pull ring (16).
6. A work frame for building construction according to claim 2, wherein: the novel ladder is characterized in that the short block (18) is arranged at the bottom of the main frame (1), the short bolts (19) are respectively arranged at two sides of the short block (18), the top block (20) is arranged at the outer side of the short bolt (19), the ladder bars (21) are arranged at the bottom of the top block (20), six ladder plates (22) are arranged between the two ladder bars (21), the threaded block (23) is arranged at one side of the ladder bars (21), and bolts (24) are arranged in the threaded block (23) in a penetrating mode.
7. A work frame for building construction according to claim 6, wherein: the inner sides of the ladder bars (21) are provided with blocking blocks (25), the bottoms of the two blocking blocks (25) are provided with extension ladders (26), the extension ladders (26) are positioned at the bottoms of the two ladder bars (21), and two sides of the extension ladders (26) are respectively provided with a round hole (27).
CN202322048526.4U 2023-08-01 2023-08-01 Work frame that construction was used Active CN220353358U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322048526.4U CN220353358U (en) 2023-08-01 2023-08-01 Work frame that construction was used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322048526.4U CN220353358U (en) 2023-08-01 2023-08-01 Work frame that construction was used

Publications (1)

Publication Number Publication Date
CN220353358U true CN220353358U (en) 2024-01-16

Family

ID=89485294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322048526.4U Active CN220353358U (en) 2023-08-01 2023-08-01 Work frame that construction was used

Country Status (1)

Country Link
CN (1) CN220353358U (en)

Similar Documents

Publication Publication Date Title
CN212129843U (en) Construction equipment scaffold
CN110805249A (en) Indoor scaffold with protection structure
CN220353358U (en) Work frame that construction was used
CN112343318B (en) Anti-tilting scaffold for building
CN212404892U (en) Simple trolley for anti-collision wall construction
CN213112308U (en) Movable hoist fixing device
CN213951973U (en) Adjustable construction platform
CN210620019U (en) Anti-slip safety protection device of gantry crane
CN212154108U (en) Wall-attached type anti-tilting and anti-falling support
CN209970667U (en) Roller type photovoltaic glass assembly platform
CN210483116U (en) Steel construction high altitude construction temporarily prevents railing
CN221627586U (en) Building aluminum alloy scaffold convenient to dismantle and install
CN221421700U (en) Bridge upright post construction operation platform
CN213175027U (en) Assembled cement telegraph pole
CN215331322U (en) Civil construction is indoor with scaffold
CN216197128U (en) Civil engineering is with protection rail
CN214692987U (en) A safe platform of walking for maintenance of tower crane
CN221073416U (en) Repair platform attached to suspension casting box girder
CN218522190U (en) Movable quick-release operation platform suitable for high-altitude edge-facing operation
CN218114605U (en) Adjustable cable reel fixed bolster
CN215441540U (en) Subway sound barrier installation is with operation platform that can fast assembly remove
CN210341651U (en) High-tower column longitudinal tie beam prestress construction platform
CN214659889U (en) Insulating ladder that stability is good
CN211949481U (en) Novel scaffold for building construction
CN210505352U (en) A machines and tools for construction of LOFT steel construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant