CN220203394U - Steel structure installation operation device for climbing formwork - Google Patents

Steel structure installation operation device for climbing formwork Download PDF

Info

Publication number
CN220203394U
CN220203394U CN202321618613.2U CN202321618613U CN220203394U CN 220203394 U CN220203394 U CN 220203394U CN 202321618613 U CN202321618613 U CN 202321618613U CN 220203394 U CN220203394 U CN 220203394U
Authority
CN
China
Prior art keywords
platform
steel structure
telescopic
structure installation
telescopic rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321618613.2U
Other languages
Chinese (zh)
Inventor
于泰
李建峰
侯景强
安磊
曾繁良
邓亚萍
周芸芸
牛宇琛
李伟庆
雷启鑫
刘志鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202321618613.2U priority Critical patent/CN220203394U/en
Application granted granted Critical
Publication of CN220203394U publication Critical patent/CN220203394U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to the technical field of auxiliary construction, and aims to provide a steel structure installation and operation device for a climbing formwork, which solves the problem that a special building cannot be completely covered by the climbing formwork and the construction efficiency is affected in the prior art. The utility model discloses a steel structure installation operating device for a climbing formwork, which comprises an automatic lifting platform and a pressure alarm device, wherein the automatic lifting platform comprises: the pedal platform is arranged in a sliding mode, the lower end of the pedal platform is connected with a horizontal telescopic rod, the lower end of the horizontal telescopic rod is provided with a vertical rod telescopic box, one end of the horizontal telescopic rod is a telescopic end far away from the pedal platform, and the other end of the horizontal telescopic rod is fixed with an end part fixer; the pressure alarm device comprises a platform pressure alarm device and a fixed end alarm arranged on the end fixer. By installing the automatic steel structure installing platform on the climbing formwork, the steel structure is directly installed on the climbing formwork without additionally erecting a frame body, so that the construction procedure is reduced, and the actual construction quality of the site is enhanced.

Description

Steel structure installation operation device for climbing formwork
Technical Field
The utility model relates to the technical field of auxiliary construction, in particular to a steel structure installation and operation device for a climbing formwork.
Background
In the existing building construction technology, the climbing form is hung below a floor slab through a formwork system, and the formwork is removed and erected layer by layer. In practical use, the climbing form has some disadvantages, firstly, the operation is complex in the construction process of the climbing form, and more factors need to be considered. The climbing form needs to be disassembled and erected for many times, and many difficulties and risks exist. For example, the template has high flatness requirement, and is not easy to generate dislocation and bushing plates; the template is firmly tied and cannot collapse; the constructor needs to master the whole process very well, and meanwhile needs to pay attention to coordination and communication, so that the construction efficiency and quality are ensured.
Secondly, the construction speed of the climbing formwork is relatively slow. Because the climbing form needs to be disassembled and erected for a plurality of times, each time the climbing form is disassembled and erected, a certain time is needed. In addition, because of the safety factors, each progress has certain limit, and the construction efficiency is relatively low.
In addition, certain potential safety hazards exist in the construction process of the climbing form. The climbing formwork needs to be hung and detached continuously, the operation space is narrow, and dangers such as high-altitude falling and object throwing exist. The constructor needs to pay attention to the safety all the time and obeys relevant regulations and standards so as to ensure the safety of the construction process.
Meanwhile, the climbing form is mainly used for building high-rise building bodies and is generally divided into an inner climbing form and an outer climbing form, but for some special-shaped buildings, the inner space of the special-shaped building cannot be completely covered by the climbing form, and for the area, a frame body is often required to be erected for steel structure installation and other works, so that the high-efficiency construction and building on site are not facilitated.
Disclosure of Invention
The utility model aims to provide a steel structure installation and operation device for a climbing formwork, which aims to solve the problem that a special building cannot be completely covered by the climbing formwork and the construction efficiency is affected in the prior art.
In order to achieve the above purpose, the specific technical scheme of the steel structure installation operating device for the climbing form is as follows:
a steel construction installation operating means for climbing form, including automatic lift platform and pressure alarm device, automatic lift platform includes: the pedal platform is arranged in a sliding mode, the lower end of the pedal platform is connected with a horizontal telescopic rod, the lower end of the horizontal telescopic rod is provided with a vertical rod telescopic box, one end of the horizontal telescopic rod is a telescopic end far away from the pedal platform, and the other end of the horizontal telescopic rod is fixed with an end fixer; the pressure alarm device comprises a platform pressure alarm device and a fixed end alarm arranged on the end fixer.
Further, the horizontal telescopic rod comprises a telescopic cross rod and a track groove, and the track groove used for facilitating sliding of the pedal platform is formed in the upper end of the telescopic cross rod.
Further, a built-in telescopic vertical rod is arranged in the vertical rod telescopic box, and the telescopic vertical rod is telescopic at the lower end of the vertical rod telescopic box.
Further, one side of the end fixing device is provided with a fixing end clamping device.
Further, the platform pressure alarm device comprises a pedal platform position and a platform end position, wherein the platform end position is provided with the pressure alarm device.
Further, the end part fixer is fixed with H-shaped steel on the climbing formwork.
The steel structure installation and operation device for the climbing form has the following advantages:
by automatic flexible platform and pressure alarm device constitution, can carry out steel structure installation operation in no creeping formwork region, have construction convenient and fast, dismantle convenient, fix a position accurately, characteristics such as reuse, this application is through installing automatic steel structure mounting platform on the creeping formwork, can directly carry out steel structure installation on the creeping formwork, need not additionally to set up the support body, and the time saving is saved, reduces construction procedure, practices thrift the time limit for a project, strengthens on-the-spot actual construction quality.
Drawings
FIG. 1 is a schematic diagram of a structure provided by the present utility model;
FIG. 2 is a contracted view of the pedal provided by the utility model;
FIG. 3 is an enlarged view of the structure provided by the present utility model;
FIG. 4 is an enlarged view of the portion A provided by the present utility model;
fig. 5 is a use state diagram provided by the present utility model.
In the figure: 1. a horizontal telescopic rod; 11. a telescopic cross bar; 12. a track groove; 2. a pole setting expansion box; 21. a telescopic upright rod; 3. a pedal platform; 4. an end holder; 41. a fixed end tightener; 42. fixed end alarm
Detailed Description
The present utility model will be described in further detail with reference to the drawings and examples, in order to make the objects, technical solutions and advantages of the present utility model more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the utility model.
Referring to fig. 1 to 5, the present utility model provides a steel structure installation and operation device for a climbing formwork, including an automatic lifting platform and a pressure alarm device, the automatic lifting platform includes: the pedal platform 3 is arranged in a sliding manner, the lower end of the pedal platform 3 is connected with the horizontal telescopic rod 1, the lower end of the horizontal telescopic rod 1 is provided with the vertical rod telescopic box 2, one end of the horizontal telescopic rod 1 is a telescopic end far away from the pedal platform 3, and the other end of the horizontal telescopic rod 1 is fixed with the end part fixer 4; the pressure alarm device comprises a platform pressure alarm device and a fixed end alarm 42, wherein the fixed end alarm 42 is arranged on the end fixer 4.
The horizontal telescopic rod 1 can be automatically telescopic according to the actual construction condition. The end part fixing device 4 is used for fixing an automatic lifting platform to the climbing formwork H-shaped steel upright rod, and the operating platform can vertically adjust the end part fixing device 4 according to the actual situation of the site.
The step platform 3 is a folding step platform 3.
Through setting up automatic flexible platform and pressure alarm device's setting, can carry out steel structure installation operation in no creeping formwork region, realize will install automatic steel structure mounting platform on the creeping formwork, can directly carry out steel structure installation on the creeping formwork, need not to additionally set up the support body to realize saving time and saving labour, reduce the procedure and reduce the construction procedure, practice thrift the time limit for a project, strengthen the purpose of on-the-spot actual construction quality.
Preferably, the horizontal telescopic rod 1 comprises a telescopic cross rod 11 and a track groove 12, and the upper end of the telescopic cross rod 11 is provided with the track groove 12 for facilitating the sliding of the pedal platform 3.
The track groove 12 of the pedal platform 3 can facilitate the pedal platform 3 to be paved or folded along the track of the telescopic rod in an oblique sliding manner, and meanwhile, the sliding track is arranged on the horizontal telescopic rod 1, so that the pedal platform 3 can be automatically paved and retracted along the track.
Preferably, a built-in telescopic upright rod 21 is arranged in the upright rod telescopic box 2, and the telescopic upright rod 21 stretches out and draws back at the lower end of the upright rod telescopic box 2.
The telescopic upright rod 21 can extend out from the lower end of the hand-held part of the upright rod telescopic box 2, so that the telescopic upright rod can be used and retracted at any time, and an upright rod is arranged at intervals during use, so that the stability of the platform is enhanced.
Preferably, the end holder side is provided with a fixed end tightener 41.
The stability of the device in use is further improved by providing the fixed end tightener 41 on the side of the end-holder 4.
Preferably, the platform pressure alarm device is arranged at the pedal platform 3 position and the platform end position.
The alarm device is set with a rated value, and when the operating weight exceeds the rated value, an alarm is triggered, so that accidents caused by overweight due to the fact that a worker does not know the weight which can be born when in operation are effectively prevented.
To sum up, when using this device, will pre-buried creeping formwork pipeline is fixed on the building through climbing formwork attaches the pre-buried steel bushing of wall device earlier, and with the reinforcing bar head welded fastening between two pre-buried pipes of every position and between pre-buried pipe and the wall body reinforcing bar, the off tracking when preventing to pour the concrete. When operation platform vertical movement runs into climbing form platform, can move operation platform to the top, this application then adjusts required length by folding footboard platform 3 according to the actual required condition, telescopic pole setting 21 also can stretch out and draw back along with the actual conditions, consequently, this application can carry out steel structure installation operation in no climbing form region, it is convenient and fast to have the construction, dismantle convenient, location is accurate, characteristics such as can reuse, through installing automatic steel structure mounting platform on the climbing form, can directly carry out steel structure installation on the climbing form, need not to additionally set up the support body, the time saving saves labour, reduce the construction procedure, save the time limit for a project, strengthen on-the-spot actual construction quality.
The foregoing description of the preferred embodiments of the utility model is not intended to be limiting, but rather is intended to cover all modifications, equivalents, and alternatives falling within the spirit and principles of the utility model.

Claims (7)

1. A steel construction installation operating means for creeping formwork, its characterized in that includes automatic lift platform and pressure alarm device, and automatic lift platform includes: the pedal comprises a pedal platform (3) which is arranged in a sliding manner, wherein the lower end of the pedal platform (3) is connected with a horizontal telescopic rod (1), a vertical rod telescopic box (2) is arranged at the lower end of the horizontal telescopic rod (1), one end of the horizontal telescopic rod (1) is a telescopic end far away from the pedal platform (3), and the other end of the horizontal telescopic rod is fixed with an end part fixer (4); the pressure alarm device comprises a platform pressure alarm device and a fixed end alarm (42) arranged on the end fixer (4).
2. The steel structure installation operation device for a climbing form according to claim 1, wherein the horizontal telescopic rod (1) comprises a telescopic cross rod (11) and a track groove (12), and the track groove (12) for facilitating sliding of the pedal platform (3) is arranged at the upper end of the telescopic cross rod (11).
3. The steel structure installation operation device for a climbing form according to claim 1, wherein a built-in telescopic upright (21) is arranged in the upright telescopic box (2), and the telescopic upright (21) stretches out and draws back at the lower end of the upright telescopic box (2).
4. A steel structure installation and operation device for a climbing form according to claim 1, wherein the end holder (4) is provided with a fixed end tightener (41) on one side.
5. The steel structure installation operation device for a climbing form according to claim 1, wherein the pressure alarm device comprises a pressure alarm device arranged at a pedal platform (3) position and a platform end position.
6. A steel structure installation and operation device for a climbing form according to claim 1, characterized in that the end holder (4) is fixed to the H-section steel on the climbing form.
7. A steel structure installation and operation device for climbing form according to claim 3, characterized in that the pole extension box (2) is provided with one said extension pole (21) at intervals.
CN202321618613.2U 2023-06-25 2023-06-25 Steel structure installation operation device for climbing formwork Active CN220203394U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321618613.2U CN220203394U (en) 2023-06-25 2023-06-25 Steel structure installation operation device for climbing formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321618613.2U CN220203394U (en) 2023-06-25 2023-06-25 Steel structure installation operation device for climbing formwork

Publications (1)

Publication Number Publication Date
CN220203394U true CN220203394U (en) 2023-12-19

Family

ID=89150212

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321618613.2U Active CN220203394U (en) 2023-06-25 2023-06-25 Steel structure installation operation device for climbing formwork

Country Status (1)

Country Link
CN (1) CN220203394U (en)

Similar Documents

Publication Publication Date Title
CN101435276B (en) Hydraulic lifting and positioning device for steel beam at top of silo structure and construction method thereof
CN204098463U (en) Builder's jack
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
WO2013185277A1 (en) Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN210659228U (en) Movable single-side formwork system for subway construction
CN115788012A (en) Hydraulic climbing formwork integral climbing and sliding device and method suitable for inclined wall construction
CN220203394U (en) Steel structure installation operation device for climbing formwork
CN102777037A (en) Simple and practical hoisting construction method of long-span steel girder
CN203452375U (en) Hydraulic self-jacking oblique creeping formwork
CN113235913A (en) Construction equipment and method for hanging, splicing and lifting building vertical template
CN215630118U (en) Movable aluminum mould board piping lane pours shaping structure in succession
CN201943350U (en) Supporting steel frame for die holder of high-altitude large span overhanging structure
CN215717173U (en) Construction equipment for hanging, splicing and lifting vertical templates of building
CN207598256U (en) A kind of piping lane low-cost die vehicle
CN208981355U (en) A kind of packaged type scaffold
CN203238589U (en) Formwork trolley applied to inverted siphon project
CN217206470U (en) A steel pipe bent frame platform truck for tunnel widen section secondary lining
CN218028889U (en) Jacking hydraulic climbing formwork
CN215407463U (en) Retractable pump line strutting arrangement
CN218933831U (en) A construction structures for high mound processing
CN113668852B (en) Parapet wall formwork structure of steel structure roof and construction method thereof
CN218668524U (en) Overhanging gutter aluminum alloy template supporting system
CN221031305U (en) Overhanging operation platform device
CN218621822U (en) Stores pylon assembled operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant