CN220186051U - Hydraulic engineering construction pipeline installation shock mount - Google Patents

Hydraulic engineering construction pipeline installation shock mount Download PDF

Info

Publication number
CN220186051U
CN220186051U CN202321515274.5U CN202321515274U CN220186051U CN 220186051 U CN220186051 U CN 220186051U CN 202321515274 U CN202321515274 U CN 202321515274U CN 220186051 U CN220186051 U CN 220186051U
Authority
CN
China
Prior art keywords
shock
rod
plate
absorbing
water conservancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321515274.5U
Other languages
Chinese (zh)
Inventor
周龙
董海斌
郭永利
周斌卿
韩凌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan State Construction Engineering Project Management Co.,Ltd.
Original Assignee
Inner Mongolia Zhicui Technology Information Consultation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Zhicui Technology Information Consultation Co ltd filed Critical Inner Mongolia Zhicui Technology Information Consultation Co ltd
Priority to CN202321515274.5U priority Critical patent/CN220186051U/en
Application granted granted Critical
Publication of CN220186051U publication Critical patent/CN220186051U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

本实用新型涉及水利施工技术领域,具体为一种水利工程施工管道安装减震座,包括底座,所述底座的顶部螺纹连接有外框,所述外框的内部固定连接有底板,所述底板的外表面螺纹连接有夹板,所述夹板的靠内一侧卡接有压板,所述压板的底部活动连接有托板,改良后的水利工程施工管道安装减震座,通过增加卡接和套接等多种连接方式,节省了拆装时间,利用各个零件分段式组合,可以在后期维护中针对性的进行零件更换,减少维修成本,同时利用可活动的固定套环可以根据管道直径大小调整宽度,在减震的同时使其更贴合管道,利用弹簧和减震柱有效减少来自各个方位的晃动压力,还能根据安装高度差调整设备高度,扩大了可接受安装误差范围,有更好的通用性。

The utility model relates to the technical field of water conservancy construction, specifically a shock-absorbing seat for water conservancy project construction pipeline installation, which includes a base. The top of the base is threadedly connected to an outer frame, and the interior of the outer frame is fixedly connected to a bottom plate. The bottom plate The outer surface of the clamping plate is threadedly connected with a clamping plate. The inner side of the clamping plate is clamped with a pressure plate. The bottom of the clamping plate is movably connected with a supporting plate. The improved water conservancy project construction pipeline is equipped with a shock-absorbing seat. By adding clamping and sleeve Various connection methods such as joints save disassembly and assembly time. By using the segmented combination of each part, parts can be replaced in a targeted manner during later maintenance, reducing maintenance costs. At the same time, the movable fixed collar can be used to adjust the size of the pipe according to the diameter of the pipe. Adjust the width to make it more suitable for the pipe while absorbing shock. The spring and shock-absorbing column are used to effectively reduce the shaking pressure from all directions. The height of the equipment can also be adjusted according to the installation height difference, which expands the acceptable installation error range and provides more Good versatility.

Description

一种水利工程施工管道安装减震座A kind of shock-absorbing seat for water conservancy project construction pipeline installation

技术领域Technical field

本实用新型涉及水利施工技术领域,具体为一种水利工程施工管道安装减震座。The utility model relates to the technical field of water conservancy construction, and is specifically a shock-absorbing seat for installing pipelines in water conservancy project construction.

背景技术Background technique

水利工程是用于控制和调配自然界的地表水和地下水,达到除害兴利目的而修建的工程,也称为水工程,只有修建水利工程,才能控制水流,防止洪涝灾害,并进行水量的调节和分配,以满足人民生活和生产对水资源的需要,水利工程中主要依靠水利管道对水流进行疏导,因此就需要对水利工程施工管道进行安装固定。Water conservancy projects are projects built to control and allocate surface water and groundwater in nature to achieve the purpose of eliminating harm and promoting benefits. They are also called water projects. Only by constructing water conservancy projects can we control water flow, prevent floods, and regulate water volume. and distribution to meet the needs of people's life and production for water resources. Water conservancy projects mainly rely on water conservancy pipelines to guide water flow, so it is necessary to install and fix water conservancy project construction pipelines.

但是在实际使用时,水利管道在使用中会长时间的承受较大的重量,而水流的大小会改变承重的力度,从而导致管道晃动,造成损坏,严重影响水利管道的使用寿命,同时管道固定装置不能根据实际管道直径大小进行调节,使用不便,同时由于很多减震装置拆装不便,而且检修更换零部件都是较大的整体,存在过度损耗增加了维护成本。However, in actual use, water conservancy pipes will bear a large weight for a long time during use, and the size of the water flow will change the load-bearing strength, causing the pipes to shake and cause damage, seriously affecting the service life of the water conservancy pipes. At the same time, the pipes are fixed The device cannot be adjusted according to the actual pipe diameter, making it inconvenient to use. At the same time, because many shock absorbing devices are inconvenient to disassemble and assemble, and the parts for maintenance and replacement are relatively large wholes, there is excessive loss and increases maintenance costs.

发明人在实现本实用新型的过程中发现现有技术存在如下问题:1、现有减震设备拆装不便,对装置进行检修更换时,需要整体更换,存在过度损耗和浪费;2、现有设备在安装固定时,无法根据管道直径大小调节,且面对误差高度无法有效补正。In the process of realizing the present utility model, the inventor found that the existing technology has the following problems: 1. The existing shock-absorbing equipment is inconvenient to disassemble and assemble. When the device is inspected and replaced, the entire device needs to be replaced, resulting in excessive loss and waste; 2. When the equipment is installed and fixed, it cannot be adjusted according to the diameter of the pipe, and the error height cannot be effectively corrected.

实用新型内容Utility model content

本实用新型的目的在于提供一种水利工程施工管道安装减震座,以解决上述背景技术中提出的拆装不便,更换成本高,调节范围小,通用性不高问题。为实现上述目的,本实用新型提供如下技术方案:一种水利工程施工管道安装减震座,包括底座,所述底座的顶部螺纹连接有外框,所述外框的内部固定连接有底板,所述底板的外表面螺纹连接有夹板,所述夹板的靠内一侧卡接有压板,所述压板的底部活动连接有托板,所述托板的顶部固定连接有固定座,所述固定座的一端套接有拉杆,所述拉杆的一端转动连接有转座,所述转座的侧面固定连接有活动块,所述活动块的内部活动连接有活动杆,所述活动杆的底部套接有支撑杆,所述支撑杆的底部套接有减震框,所述减震框的底部固定连接有固定板,所述活动杆的外表面活动连接有卡块,所述活动杆的顶部套接有套块,所述套块的侧面套接有连接杆,所述连接杆的一端固定连接有套环。The purpose of this utility model is to provide a shock-absorbing seat for installing water conservancy project construction pipelines to solve the problems of inconvenient disassembly and assembly, high replacement costs, small adjustment range, and low versatility proposed in the above background technology. In order to achieve the above purpose, the present utility model provides the following technical solution: a water conservancy project construction pipeline installation shock absorbing seat, including a base, the top of the base is threadedly connected to an outer frame, and the interior of the outer frame is fixedly connected to a bottom plate, so The outer surface of the bottom plate is threadedly connected with a splint, and the inner side of the splint is connected with a pressure plate. The bottom of the pressure plate is movably connected with a support plate, and the top of the support plate is fixedly connected with a fixed seat. The fixed seat One end of the pull rod is sleeved with a pull rod, one end of the pull rod is rotatably connected to a swivel base, a movable block is fixedly connected to the side of the swivel base, a movable rod is movably connected to the inside of the movable block, and the bottom of the movable rod is socketed There is a support rod, the bottom of the support rod is sleeved with a shock-absorbing frame, the bottom of the shock-absorbing frame is fixedly connected with a fixed plate, the outer surface of the movable rod is movably connected with a clamping block, and the top of the movable rod is sleeved A sleeve block is connected, a connecting rod is sleeved on the side of the sleeve block, and a collar is fixedly connected to one end of the connecting rod.

进一步优选的,所述夹板与底板之间设计有螺纹孔,夹板与托板之间设计有滑轨结构。Further preferably, a threaded hole is designed between the clamping plate and the bottom plate, and a slide rail structure is designed between the clamping plate and the supporting plate.

进一步优选的,所述夹板与压板之间设计有卡槽结构。Further preferably, a slot structure is designed between the clamping plate and the pressure plate.

进一步优选的,所述支撑杆与减震框之间设计有避震杆结构,且支撑杆底部与避震杆固定连接。Further preferably, a shock-absorbing rod structure is designed between the support rod and the shock-absorbing frame, and the bottom of the support rod is fixedly connected to the shock-absorbing rod.

进一步优选的,所述套块侧面设计有带螺纹转杆,且螺纹转杆一端与连接杆固定连接。Further preferably, the side of the sleeve block is designed with a threaded rotating rod, and one end of the threaded rotating rod is fixedly connected to the connecting rod.

进一步优选的,所述套环设计为分离式结构。Further preferably, the collar is designed as a separate structure.

与现有技术相比,本实用新型的有益效果:Compared with the existing technology, the beneficial effects of this utility model are:

本实用新型中,通过增加卡接和套接等多种连接方式,节省了拆装时间,利用各个零件分段式组合,可以在后期维护中针对性的进行零件更换,减少维修成本。In this utility model, by adding multiple connection methods such as snap-in and socket connection, disassembly and assembly time is saved, and by utilizing the segmented combination of each part, parts can be replaced in a targeted manner during later maintenance, thereby reducing maintenance costs.

本实用新型中,通过利用可活动的固定套环可以根据管道直径大小调整宽度,在减震的同时使其更贴合管道,利用弹簧和减震柱有效减少来自各个方位的晃动压力,还能根据安装高度差调整设备高度,扩大了可接受安装误差范围,有更好的通用性。In this utility model, the width can be adjusted according to the diameter of the pipe by using the movable fixed collar, so that it can fit the pipe more closely while absorbing the shock. The spring and the shock-absorbing column can effectively reduce the shaking pressure from all directions, and can also Adjusting the equipment height according to the installation height difference expands the acceptable installation error range and has better versatility.

附图说明Description of drawings

图1为本实用新型正视内部结构示意图;Figure 1 is a front view of the internal structure of the utility model;

图2为本实用新型俯视内部结构示意图;Figure 2 is a schematic diagram of the internal structure of the utility model viewed from above;

图3为本实用新型正视结构示意图。Figure 3 is a schematic front view of the structure of the utility model.

图中:1、底座;2、外框;3、底板;4、夹板;5、压板;6、托板;7、固定座;8、拉杆;9、转座;10、活动块;11、活动杆;12、支撑杆;13、减震框;14、固定板;15、卡块;16、套块;17、连接杆;18、套环。In the picture: 1. Base; 2. Frame; 3. Base plate; 4. Plywood; 5. Pressure plate; 6. Support plate; 7. Fixed seat; 8. Tie rod; 9. Swivel seat; 10. Movable block; 11. Movable rod; 12. Support rod; 13. Shock-absorbing frame; 14. Fixed plate; 15. Clamp block; 16. Set block; 17. Connecting rod; 18. Collar.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术工作人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example. Based on the embodiments of the present utility model, all other embodiments obtained by workers of ordinary skill in the art without creative efforts fall within the scope of protection of the present utility model.

请参阅图1至图3,本实用新型提供一种技术方案:一种水利工程施工管道安装减震座,包括底座1,底座1的顶部螺纹连接有外框2,外框2的内部固定连接有底板3,底板3的外表面螺纹连接有夹板4,夹板4的靠内一侧卡接有压板5,压板5的底部活动连接有托板6,托板6的顶部固定连接有固定座7,固定座7的一端套接有拉杆8,拉杆8的一端转动连接有转座9,转座9的侧面固定连接有活动块10,活动块10的内部活动连接有活动杆11,活动杆11的底部套接有支撑杆12,支撑杆12的底部套接有减震框13,减震框13的底部固定连接有固定板14,活动杆11的外表面活动连接有卡块15,活动杆11的顶部套接有套块16,套块16的侧面套接有连接杆17,连接杆17的一端固定连接有套环18。Please refer to Figures 1 to 3. The present utility model provides a technical solution: a water conservancy project construction pipeline installation shock-absorbing seat, including a base 1. The top of the base 1 is threadedly connected to an outer frame 2, and the interior of the outer frame 2 is fixedly connected. There is a bottom plate 3. The outer surface of the bottom plate 3 is threadedly connected with a clamping plate 4. The inner side of the clamping plate 4 is clamped with a pressure plate 5. The bottom of the pressure plate 5 is movably connected with a supporting plate 6, and the top of the supporting plate 6 is fixedly connected with a fixing seat 7. , one end of the fixed base 7 is sleeved with a pull rod 8, one end of the pull rod 8 is rotatably connected to a swivel base 9, the side of the swivel base 9 is fixedly connected to a movable block 10, and the inside of the movable block 10 is movably connected to a movable rod 11. The movable rod 11 A support rod 12 is connected to the bottom of the support rod 12, a shock-absorbing frame 13 is connected to the bottom of the supporting rod 12, a fixed plate 14 is fixedly connected to the bottom of the shock-absorbing frame 13, a clamping block 15 is movably connected to the outer surface of the movable rod 11, and the movable rod 11 The top of 11 is sleeved with a sleeve block 16, the side of the sleeve block 16 is sleeved with a connecting rod 17, and one end of the connecting rod 17 is fixedly connected with a collar 18.

本实施例中,如图1所示,夹板4与底板3之间设计有螺纹孔,夹板4与托板6之间设计有滑轨结构,需要说明的是,通过夹板4滑块在托板6滑道内滑动至底板3上方,利用螺丝固定增加了稳定性,同时安装固定便利。In this embodiment, as shown in Figure 1, a threaded hole is designed between the splint 4 and the base plate 3, and a slide rail structure is designed between the splint 4 and the supporting plate 6. It should be noted that the sliding block of the plying plate 4 is used on the supporting plate. 6 slides in the slide to the top of the bottom plate 3, and is fixed with screws to increase stability and facilitate installation and fixation.

本实施例中,如图1所示,夹板4与压板5之间设计有卡槽结构,需要说明的是,通过夹板4前端卡接在压板5内,方便固定的同时,还有很好的稳定性,同时节省了螺丝的安装时间。In this embodiment, as shown in Figure 1, a slot structure is designed between the clamping plate 4 and the pressing plate 5. It should be noted that the front end of the clamping plate 4 is clamped in the pressing plate 5, which not only facilitates fixation, but also has good Stability while saving screw installation time.

本实施例中,如图1所示,支撑杆12与减震框13之间设计有避震杆结构,且支撑杆12底部与避震杆固定连接,需要说明的是,通过支撑杆12与避震杆固定连接,使得上下晃动时产生的重力变化由避震杆吸收,不会影响到支撑杆12与减震框13即主体的连接稳定性,减少因晃动产生的结构松动。In this embodiment, as shown in Figure 1, a shock-absorbing rod structure is designed between the supporting rod 12 and the shock-absorbing frame 13, and the bottom of the supporting rod 12 is fixedly connected to the shock-absorbing rod. It should be noted that through the supporting rod 12 and The shock absorber rod is fixedly connected, so that the change in gravity caused by the up and down shaking is absorbed by the shock absorber rod, which will not affect the connection stability of the support rod 12 and the shock absorbing frame 13, that is, the main body, and reduce the structural loosening caused by the shaking.

本实施例中,如图1所示,套块16侧面设计有带螺纹转杆,且螺纹转杆一端与连接杆17固定连接,需要说明的是,通过连接杆17一端固定连接由的带螺纹转杆,可以在调整套环18直径时,转动螺纹转杆,推动连接杆17前后移动,可以贴合固定管道。In this embodiment, as shown in Figure 1, the side of the sleeve block 16 is designed with a threaded rotating rod, and one end of the threaded rotating rod is fixedly connected to the connecting rod 17. It should be noted that the threaded rotating rod is fixedly connected through one end of the connecting rod 17. When adjusting the diameter of the collar 18, the rotating rod can be rotated to push the connecting rod 17 forward and backward to fit and fix the pipe.

本实施例中,如图1所示,套环18设计为分离式结构,需要说明的时,通过分离式结构方便管道插入和贴合固定,调整内圈直径大小。In this embodiment, as shown in Figure 1 , the collar 18 is designed as a separate structure. If necessary, the separate structure facilitates the insertion and fitting of the pipe, and the adjustment of the diameter of the inner ring.

本实用新型的使用方法和优点:该水利工程施工管道安装减震座在使用时,工作过程如下:Usage methods and advantages of this utility model: When the shock-absorbing seat installed on the water conservancy project construction pipeline is in use, the working process is as follows:

如图1、图2和图3所示,首先把底座1放置在指定位置,支撑杆12和减震框13连接的固定板14贴合托板6放置好,夹板4沿着托板6侧面的轨道滑动覆盖在底板3上,同时卡接在压板5内,螺丝固定好后,把活动块10套接在活动杆11外,活动块10侧面的转座9内的拉杆8拉伸套接在固定座7一端,根据高度拉伸活动杆11,同时卡块15贴合活动块10卡住活动杆11,螺丝固定好,把套块16放置在活动杆11顶部插入套环18侧面的连接杆17,拧动一端的螺纹转杆调整套环18直径大小,盖上外框2螺丝固定好。As shown in Figure 1, Figure 2 and Figure 3, first place the base 1 at the designated position, the fixed plate 14 connected to the support rod 12 and the shock absorbing frame 13 is placed close to the supporting plate 6, and the splint 4 is along the side of the supporting plate 6 The track slides and covers the bottom plate 3, and is clamped in the pressure plate 5 at the same time. After the screws are fixed, the movable block 10 is sleeved outside the movable rod 11, and the pull rod 8 in the turntable 9 on the side of the movable block 10 is stretched and sleeved. At one end of the fixed seat 7, stretch the movable rod 11 according to the height. At the same time, the clamping block 15 fits the movable block 10 to block the movable rod 11. The screws are fixed. Place the sleeve block 16 on the top of the movable rod 11 and insert it into the connection on the side of the collar 18. Rod 17, turn the threaded rotating rod at one end to adjust the diameter of the collar 18, cover the outer frame and fix it with 2 screws.

以上显示和描述了本实用新型的基本原理、主要特征和本实用新型的优点。本行业的技术工作人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的仅为本实用新型的优选例,并不用来限制本实用新型,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。The basic principles, main features and advantages of the present utility model are shown and described above. Skilled workers in this industry should understand that the present utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions are only preferred examples of the present utility model and are not used to limit the present utility model. Under the premise of maintaining the spirit and scope of the new invention, the present utility model will have various changes and improvements, and these changes and improvements will all fall within the scope of the claimed utility model. The protection scope of the present utility model is defined by the appended claims and their equivalents.

Claims (6)

1.一种水利工程施工管道安装减震座,包括底座(1),其特征在于:所述底座(1)的顶部螺纹连接有外框(2),所述外框(2)的内部固定连接有底板(3),所述底板(3)的外表面螺纹连接有夹板(4),所述夹板(4)的靠内一侧卡接有压板(5),所述压板(5)的底部活动连接有托板(6),所述托板(6)的顶部固定连接有固定座(7),所述固定座(7)的一端套接有拉杆(8),所述拉杆(8)的一端转动连接有转座(9),所述转座(9)的侧面固定连接有活动块(10),所述活动块(10)的内部活动连接有活动杆(11),所述活动杆(11)的底部套接有支撑杆(12),所述支撑杆(12)的底部套接有减震框(13),所述减震框(13)的底部固定连接有固定板(14),所述活动杆(11)的外表面活动连接有卡块(15),所述活动杆(11)的顶部套接有套块(16),所述套块(16)的侧面套接有连接杆(17),所述连接杆(17)的一端固定连接有套环(18)。1. A shock-absorbing seat for water conservancy project construction pipeline installation, including a base (1), characterized in that: the top of the base (1) is threadedly connected to an outer frame (2), and the inner part of the outer frame (2) is fixed A bottom plate (3) is connected, and a splint (4) is threadedly connected to the outer surface of the bottom plate (3). A pressure plate (5) is clamped on the inner side of the splint (4). The pressure plate (5) A support plate (6) is movably connected to the bottom, and a fixed base (7) is fixedly connected to the top of the supporting plate (6). One end of the fixed base (7) is sleeved with a pull rod (8), and the pull rod (8) ) is rotatably connected to a swivel base (9) at one end, a movable block (10) is fixedly connected to the side of the swivel base (9), and a movable rod (11) is movably connected to the inside of the movable block (10). A support rod (12) is connected to the bottom of the movable rod (11), a shock-absorbing frame (13) is connected to the bottom of the support rod (12), and a fixed plate is fixedly connected to the bottom of the shock-absorbing frame (13). (14), the outer surface of the movable rod (11) is movably connected with a clamping block (15), the top of the movable rod (11) is sleeved with a sleeve block (16), and the side of the sleeve block (16) A connecting rod (17) is connected to the sleeve, and a collar (18) is fixedly connected to one end of the connecting rod (17). 2.根据权利要求1所述的一种水利工程施工管道安装减震座,其特征在于:所述夹板(4)与底板(3)之间设计有螺纹孔,且夹板(4)与托板(6)之间设计有滑轨结构。2. A shock-absorbing seat for water conservancy project construction pipeline installation according to claim 1, characterized in that: a threaded hole is designed between the splint (4) and the bottom plate (3), and the splint (4) and the supporting plate (6) A slide rail structure is designed between them. 3.根据权利要求1所述的一种水利工程施工管道安装减震座,其特征在于:所述夹板(4)与压板(5)之间设计有卡槽结构。3. A shock-absorbing seat for water conservancy project construction pipeline installation according to claim 1, characterized in that: a slot structure is designed between the clamping plate (4) and the pressure plate (5). 4.根据权利要求1所述的一种水利工程施工管道安装减震座,其特征在于:所述支撑杆(12)与减震框(13)之间设计有避震杆结构,且支撑杆(12)底部与避震杆固定连接。4. A shock-absorbing seat for water conservancy project construction pipeline installation according to claim 1, characterized in that: a shock-absorbing rod structure is designed between the support rod (12) and the shock-absorbing frame (13), and the support rod (12) The bottom is fixedly connected to the shock absorber rod. 5.根据权利要求1所述的一种水利工程施工管道安装减震座,其特征在于:所述套块(16)侧面设计有带螺纹转杆,且螺纹转杆一端与连接杆(17)固定连接。5. A shock-absorbing seat for water conservancy project construction pipeline installation according to claim 1, characterized in that: the side of the sleeve block (16) is designed with a threaded rotating rod, and one end of the threaded rotating rod is connected to the connecting rod (17) Fixed connection. 6.根据权利要求1所述的一种水利工程施工管道安装减震座,其特征在于:所述套环(18)设计为分离式结构。6. A shock-absorbing seat for water conservancy project construction pipeline installation according to claim 1, characterized in that: the collar (18) is designed as a separate structure.
CN202321515274.5U 2023-06-14 2023-06-14 Hydraulic engineering construction pipeline installation shock mount Active CN220186051U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321515274.5U CN220186051U (en) 2023-06-14 2023-06-14 Hydraulic engineering construction pipeline installation shock mount

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321515274.5U CN220186051U (en) 2023-06-14 2023-06-14 Hydraulic engineering construction pipeline installation shock mount

Publications (1)

Publication Number Publication Date
CN220186051U true CN220186051U (en) 2023-12-15

Family

ID=89099582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321515274.5U Active CN220186051U (en) 2023-06-14 2023-06-14 Hydraulic engineering construction pipeline installation shock mount

Country Status (1)

Country Link
CN (1) CN220186051U (en)

Similar Documents

Publication Publication Date Title
CN108071742A (en) A pipe support and hanger for different pipe diameters
CN211948760U (en) A drainage pipe reinforcement structure for water conservancy and hydropower projects
CN210361119U (en) Novel balance valve installation device
CN209385809U (en) A kind of building heat distribution pipeline attachment device
CN210153396U (en) A rail transit combined support and hanger with shock absorption
CN217422400U (en) Antidetonation support suitable for different pipelines
CN206742055U (en) A kind of frequency conversion high pressure skeleton erection scaffolding
CN211083118U (en) Pipeline suspension device based on unsettled usefulness of buildding
CN214197568U (en) Pipeline laying frame for hydraulic engineering
CN207702139U (en) A kind of support device convenient for pressure pipeline detection
CN211398801U (en) Support device for gas conveying pipeline
CN221704635U (en) Pipeline support frame for hydraulic engineering
CN210739573U (en) Slidable formula pipeline gallows
CN217056583U (en) A pipeline support device with limit function for laying rainwater and sewage pipelines
CN218208167U (en) A joint structure for indoor drainage in the reconstruction of old buildings
CN220957144U (en) Drain pipe supporting structure
CN220910688U (en) Wall-hanging device for building water supply pipeline
CN216763522U (en) High-efficiency energy-saving differential pressure type pneumatic ash conveying equipment
CN223120862U (en) Novel building water supply and drainage pipeline connection device
CN210693102U (en) A railway signal shock-absorbing power cabinet
CN206764915U (en) A kind of glass reinforced plastic pipe fixing device
CN221922278U (en) A kind of overhead support structure of natural gas pipeline
CN210687370U (en) Compensation device for connecting water supply and drainage pipeline
CN221348205U (en) Building construction drainage pipeline clamp
CN219388911U (en) Pipeline forming structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20250428

Address after: No. 227-8, South Street, Luhua Town, Heishui County, Aba Tibetan and Qiang Autonomous Prefecture, Sichuan Province, China 623500

Patentee after: Sichuan State Construction Engineering Project Management Co.,Ltd.

Country or region after: China

Address before: 014010 Software Park Building B105-173, Rare Earth Development Zone, Baotou City, Inner Mongolia Autonomous Region

Patentee before: INNER MONGOLIA ZHICUI TECHNOLOGY INFORMATION CONSULTATION Co.,Ltd.