CN220184576U - Civil engineering construction support - Google Patents
Civil engineering construction support Download PDFInfo
- Publication number
- CN220184576U CN220184576U CN202321579469.6U CN202321579469U CN220184576U CN 220184576 U CN220184576 U CN 220184576U CN 202321579469 U CN202321579469 U CN 202321579469U CN 220184576 U CN220184576 U CN 220184576U
- Authority
- CN
- China
- Prior art keywords
- base
- connecting rod
- pedal
- chute
- civil engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Handcart (AREA)
Abstract
Description
技术领域Technical field
本实用新型涉及脚手架领域,尤其涉及一种土木工程建筑施工支架。The utility model relates to the field of scaffolding, in particular to a construction support for civil engineering buildings.
背景技术Background technique
土木工程建筑施工支架也称脚手架,是用于土木工程建筑施工的辅助支撑架,是施工过程中常用的建筑设备之一,通常会使用施工支架对操作工人或者物料进行支撑,操作工人站在支架上进行高空作业,便于进行施工工作。Civil engineering building construction supports, also called scaffolding, are auxiliary supports used in civil engineering construction. They are one of the commonly used construction equipment during the construction process. Construction supports are usually used to support operators or materials, and operators stand on the supports. Carry out high-altitude operations to facilitate construction work.
现有技术中的建筑施工支架通常会设置升降组件,以便于施工人员对施工现场不同高度的位置进行施工,现有的升降组件通常通过电机驱动螺纹杆转动踏板进行升降,而螺杆与踏板之间仅通过螺纹进行支撑,缺少了对踏板的其它支撑加固结构,降低了安全性,当施工人员高空作业时,施工人员来回走动或者放置物料会使得踏板产生晃动,存在安全隐患,因此,提出一种土木工程建筑施工支架。Building construction supports in the prior art are usually equipped with lifting components to facilitate construction workers at different heights of the construction site. The existing lifting components are usually lifted and lowered by a motor driving a threaded rod to turn a pedal, and there is a gap between the screw and the pedal. Supporting only through threads lacks other support and reinforcement structures for the pedals, which reduces safety. When construction workers work at high altitudes, walking back and forth or placing materials will cause the pedals to shake, posing a safety hazard. Therefore, a method is proposed Civil engineering building construction supports.
实用新型内容Utility model content
本实用新型的目的是为了解决上述技术中的任意一种问题,从而提出一种土木工程建筑施工支架,包括底座,所述底座顶部四个角处均设有导柱,四根导柱上活动安装有踏板,踏板的四个角处均设有通孔,用于与导柱的连接,所述底座与踏板底部通过升降组件进行连接,所述底座顶部的一端两侧对称设有两个第一连接座,底座顶部的另一端两侧对称设有两个第一滑槽,底座的顶部中心位置设有固定座,底座的底部四个角处均设有万向轮,万向轮内设有刹车片,所述踏板底部的一端两侧堆成设有两个第二连接座,踏板底部的另一端两侧对称设有两个第二滑槽,所述第一连接座和第二连接座的竖直位置相同,所述第一滑槽和第二滑槽的竖直位置相同,所述升降组件包括第一连杆、第二连杆、安装座、滑块、电机和螺杆。The purpose of this utility model is to solve any of the problems in the above-mentioned technologies, thereby proposing a civil engineering building construction support, which includes a base. Guide pillars are provided at the four corners of the top of the base, and the four guide pillars are movable. A pedal is installed, and through holes are provided at the four corners of the pedal for connection with the guide pillars. The base and the bottom of the pedal are connected through a lifting assembly. One end of the top of the base is symmetrically provided with two thirds on both sides. A connecting base, two first chutes are symmetrically provided on both sides of the other end of the top of the base, a fixed base is provided at the center of the top of the base, universal wheels are provided at the four corners of the bottom of the base, and there is a universal wheel inside. There are brake pads, one end of the bottom of the pedal is stacked with two second connection seats on both sides, and the other end of the bottom of the pedal is symmetrically provided with two second chute, the first connection seat and the second connection seat The vertical positions of the seats are the same, and the vertical positions of the first chute and the second chute are the same. The lifting assembly includes a first connecting rod, a second connecting rod, a mounting base, a slide block, a motor and a screw rod.
进一步的,所述滑块的数量为四个,分别滑动安装在两个第一滑槽和两个第二滑槽内,所述安装座的两侧与第一滑槽内的两个滑块固定连接。Further, the number of the slide blocks is four, which are slidably installed in the two first chute and the two second chute respectively. The two sides of the mounting base are in contact with the two slide blocks in the first chute. Fixed connection.
进一步的,所述第一连杆的一端与第一连接座转动连接,另一端与第二滑槽内的滑块转动连接,所述第二连杆的一端与第二连接座转动连接,另一端与第一滑槽内的滑块转动连接。Further, one end of the first connecting rod is rotationally connected to the first connecting seat, the other end is rotationally connected to the slide block in the second chute, one end of the second connecting rod is rotationally connected to the second connecting seat, and the other end is rotationally connected to the second connecting seat. One end is rotatably connected to the slide block in the first chute.
进一步的,所述第一连杆的中部与第二连杆的中部转动连接。Further, the middle part of the first connecting rod is rotationally connected to the middle part of the second connecting rod.
进一步的,所述电机固定安装在底座的顶部一侧,所述螺杆一端转动安装在固定座上,螺杆中部与安装座螺纹连接。Further, the motor is fixedly mounted on the top side of the base, one end of the screw is rotatably mounted on the fixed base, and the middle part of the screw is threadedly connected to the mounting base.
进一步的,所述电机的输出端与螺杆固定连接。Further, the output end of the motor is fixedly connected to the screw.
有益效果:本实用新型通过设置升降组件,在使用时,通过启动电机带动螺杆转动,从而带动安装座进行移动,安装座两侧的滑块带动第二连杆沿着第二连接座进行转动,而第二连杆的中部与第一连杆的中部转动连接,从而带动第一连杆沿着第一连接座进行转动,第一连杆会带动与其连接的滑块在第二滑槽内进行滑动,进而实现踏板在导柱上进行上下滑动,从而达到了调节踏板高度的效果,同时通过在踏板两侧均设置有第一连杆和第二连杆进行支撑,对踏板的支撑稳定性更好,改善了施工人员在踏板上走动时踏板的受力情况,通过四根导柱对踏板升降时起到导向限位作用,使踏板仅能进行竖向运动,支撑稳定性更好,有效避免施工人员在踏板上走动时踏板发生晃动的情况,方便施工人员对施工现场不同高度和位置进行施工。Beneficial effects: The utility model is provided with a lifting component. When in use, the starting motor drives the screw to rotate, thereby driving the mounting base to move. The sliders on both sides of the mounting base drive the second connecting rod to rotate along the second connecting base. The middle part of the second connecting rod is rotationally connected to the middle part of the first connecting rod, thereby driving the first connecting rod to rotate along the first connecting seat. The first connecting rod will drive the slider connected to it to rotate in the second chute. Slide, thereby allowing the pedal to slide up and down on the guide post, thereby achieving the effect of adjusting the height of the pedal. At the same time, the first connecting rod and the second connecting rod are provided on both sides of the pedal for support, which improves the support stability of the pedal. Well, it improves the stress on the pedal when construction workers walk on it. The four guide pillars play a guiding and limiting role when the pedal is raised and lowered, so that the pedal can only move vertically, and the support stability is better, effectively avoiding The pedals shake when construction workers walk on them, which facilitates construction workers at different heights and locations on the construction site.
附图说明Description of drawings
图1是本实用新型的整体结构示意图;Figure 1 is a schematic diagram of the overall structure of the utility model;
图2是本实用新型底座的结构示意图;Figure 2 is a schematic structural diagram of the base of the utility model;
图3是本实用新型踏板的结构示意图;Figure 3 is a schematic structural diagram of the pedal of the present invention;
附图标记:底座1;导柱101;第一连接座102;第一滑槽103;固定座104;踏板2;围栏201;通孔202;第二滑槽203;第二连接座204;门框3;把手301;安装座5;滑块501;第一连杆6;第二连杆7;电机8;万向轮9。Reference signs: base 1; guide post 101; first connecting seat 102; first chute 103; fixed seat 104; pedal 2; fence 201; through hole 202; second chute 203; second connecting seat 204; door frame 3; handle 301; mounting base 5; slider 501; first connecting rod 6; second connecting rod 7; motor 8; universal wheel 9.
实施方式Implementation
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example.
下文的公开提供了许多不同的实施例或例子用来实现本实用新型的不同结构。为了简化本实用新型的公开,下文中对特定例子的部件和设置进行描述。当然,它们仅仅为示例,并且目的不在于限制本实用新型。The following disclosure provides many different embodiments or examples for implementing different structures of the present invention. In order to simplify the disclosure of the present invention, the components and arrangements of specific examples are described below. Of course, they are only examples and are not intended to limit the invention.
下面,参考附图描述根据本实用新型实施例的土木工程建筑施工支架,如图1至图3所示,土木工程建筑施工支架包括底座1,所述底座1顶部四个角处均设有导柱101,四根导柱101上活动安装有踏板2,踏板2的四个角处均设有通孔202,用于与导柱101的连接,所述底座1与踏板2底部通过升降组件进行连接,所述底座1顶部的一端两侧对称设有两个第一连接座102,底座1顶部的另一端两侧对称设有两个第一滑槽103,底座1的顶部中心位置设有固定座104,底座1的底部四个角处均设有万向轮9,万向轮9内设有刹车片,所述踏板2底部的一端两侧堆成设有两个第二连接座204,踏板2底部的另一端两侧对称设有两个第二滑槽203,所述第一连接座102和第二连接座204的竖直位置相同,所述第一滑槽103和第二滑槽203的竖直位置相同,所述升降组件包括第一连杆6、第二连杆7、安装座5、滑块501、电机8和螺杆801。Below, the civil engineering building construction bracket according to the embodiment of the present invention is described with reference to the accompanying drawings. As shown in Figures 1 to 3, the civil engineering building construction bracket includes a base 1, and guides are provided at the four corners of the top of the base 1. Column 101, pedals 2 are movably installed on the four guide columns 101. Through holes 202 are provided at the four corners of the pedals 2 for connection with the guide columns 101. The base 1 and the bottom of the pedals 2 are connected through lifting components. connection, one end of the top of the base 1 is provided with two first connecting seats 102 symmetrically on both sides, the other end of the top of the base 1 is provided with two first chute 103 symmetrically on both sides, and a fixed position is provided at the center of the top of the base 1 The base 104 is provided with universal wheels 9 at the four corners of the bottom of the base 1. The universal wheels 9 are provided with brake pads. Two second connecting seats 204 are stacked on both sides of one end of the bottom of the pedal 2. The other end of the bottom of the pedal 2 is provided with two second chute 203 symmetrically on both sides. The vertical positions of the first connecting seat 102 and the second connecting seat 204 are the same. The first chute 103 and the second chute are 203 has the same vertical position. The lifting assembly includes a first link 6, a second link 7, a mounting base 5, a slider 501, a motor 8 and a screw 801.
优选的,滑块501的数量为四个,分别滑动安装在两个第一滑槽103和两个第二滑槽203内,所述安装座5的两侧与第一滑槽103内的两个滑块501固定连接。Preferably, the number of slide blocks 501 is four, which are slidably installed in two first slide grooves 103 and two second slide grooves 203 respectively. The two sides of the mounting base 5 are connected with the two sides of the first slide groove 103 Each slider 501 is fixedly connected.
优选的,第一连杆6的一端与第一连接座102转动连接,另一端与第二滑槽203内的滑块501转动连接,所述第二连杆7的一端与第二连接座102转动连接,另一端与第一滑槽103内的滑块501转动连接。Preferably, one end of the first connecting rod 6 is rotationally connected to the first connecting seat 102, and the other end is rotationally connected to the slide block 501 in the second chute 203. One end of the second connecting rod 7 is connected to the second connecting seat 102. The other end is rotatably connected to the slider 501 in the first chute 103 .
优选的,第一连杆6的中部与第二连杆7的中部转动连接。Preferably, the middle part of the first connecting rod 6 is rotationally connected to the middle part of the second connecting rod 7 .
优选的,电机8固定安装在底座1的顶部一侧,所述螺杆801一端转动安装在固定座104上,螺杆801中部与安装座5螺纹连接。Preferably, the motor 8 is fixedly mounted on the top side of the base 1, one end of the screw 801 is rotatably mounted on the fixed base 104, and the middle part of the screw 801 is threadedly connected to the mounting base 5.
优选的,电机8的输出端与螺杆801固定连接,电机8通过连通外部电源使得进行通电。Preferably, the output end of the motor 8 is fixedly connected to the screw 801, and the motor 8 is energized by connecting to an external power source.
在具体的实施例中:在使用时,通过启动电机8带动螺杆801转动,螺杆801带动与其螺纹连接的安装座5进行移动,安装座5两侧的固定连接的滑块501带动第二连杆7沿着第二连接座204进行转动,而第二连杆7的中部与第一连杆6的中部转动连接,从而带动第一连杆6沿着第一连接座102进行转动,第一连杆6会带动与其连接的滑块501在踏板2底部的第二滑槽204内进行滑动,进而实现踏板2在导柱101上进行上下滑动,从而达到了调节踏板2高度的效果,同时通过在踏板2两侧均设置有第一连6杆和第二连杆7进行支撑,对踏板2的支撑稳定性更好,改善了施工人员在踏板2上走动时踏板2的受力情况,通过四根导柱的设置对踏板升降时起到导向限位作用,使踏板仅能进行竖向运动,支撑稳定性更好,有效避免施工人员在踏板上走动时踏板发生晃动的情况,方便施工人员对施工现场不同高度和位置进行施工。In a specific embodiment: when in use, the starting motor 8 drives the screw 801 to rotate, the screw 801 drives the mounting base 5 threadedly connected with it to move, and the fixedly connected sliders 501 on both sides of the mounting base 5 drive the second connecting rod. 7 rotates along the second connecting seat 204, and the middle part of the second connecting rod 7 is rotationally connected with the middle part of the first connecting rod 6, thereby driving the first connecting rod 6 to rotate along the first connecting seat 102. The rod 6 will drive the slider 501 connected to it to slide in the second chute 204 at the bottom of the pedal 2, thereby allowing the pedal 2 to slide up and down on the guide post 101, thus achieving the effect of adjusting the height of the pedal 2. At the same time, by The first connecting rod 6 and the second connecting rod 7 are provided on both sides of the pedal 2 for support, which provides better support stability to the pedal 2 and improves the stress on the pedal 2 when the construction workers walk on the pedal 2. Through the four The setting of a guide post plays a guiding and limiting role when the pedal is raised and lowered, so that the pedal can only move vertically, and the support stability is better, effectively preventing the pedal from shaking when the construction workers walk on the pedal, and making it easier for the construction workers to Construction is carried out at different heights and locations on the construction site.
在具体的实施例中:在使用时,通过万向轮9对底座1进行移动,将底座1移动到施工位置后,踩下万向轮9上的刹车片,从而达到了对底座1进行固定的效果,提高了稳定性,避免施工人员在踏板2上移动时带动底座进行移动,对踏板上的施工人员进行保护。In a specific embodiment: during use, the base 1 is moved through the universal wheel 9. After the base 1 is moved to the construction position, the brake pads on the universal wheel 9 are stepped on, thereby fixing the base 1. The effect is to improve stability, prevent construction workers from driving the base to move when moving on the pedal 2, and protect the construction workers on the pedal.
工作原理:在使用时,通过万向轮9对底座1进行移动,将底座1移动到施工位置后,踩下万向轮9上的刹车片,从而达到了对底座1进行固定的效果,提高了稳定性,避免施工人员在踏板2上移动时带动底座进行移动,对踏板上的施工人员进行保护,当需要对踏板2的高度进行调节时,通过启动电机8带动螺杆801转动,螺杆801带动与其螺纹连接的安装座5进行移动,安装座5两侧的固定连接的滑块501带动第二连杆7沿着第二连接座204进行转动,而第二连杆7的中部与第一连杆6的中部转动连接,从而带动第一连杆6沿着第一连接座102进行转动,第一连杆6会带动与其连接的滑块501在踏板2底部的第二滑槽204内进行滑动,进而实现踏板2在导柱101上进行上下滑动,从而达到了调节踏板2高度的效果,同时通过在踏板2两侧均设置有第一连杆6和第二连杆7进行支撑,对踏板2的支撑稳定性更好,改善了施工人员在踏板2上走动时踏板2的受力情况,通过四根导柱的设置对踏板升降时起到导向限位作用,使踏板仅能进行竖向运动,支撑稳定性更好,有效避免施工人员在踏板上走动时踏板发生晃动的情况,方便施工人员对施工现场不同高度和位置进行施工。Working principle: When in use, the base 1 is moved through the universal wheel 9. After moving the base 1 to the construction position, step on the brake pads on the universal wheel 9 to achieve the effect of fixing the base 1 and improve In order to ensure stability, the construction workers are prevented from driving the base to move when moving on the pedal 2, and the construction workers on the pedal are protected. When the height of the pedal 2 needs to be adjusted, the starting motor 8 is used to drive the screw 801 to rotate, and the screw 801 drives the The mounting base 5 threadedly connected to it moves, and the fixedly connected sliders 501 on both sides of the mounting base 5 drive the second connecting rod 7 to rotate along the second connecting base 204, and the middle part of the second connecting rod 7 is connected to the first connecting rod 7. The middle part of the rod 6 is rotationally connected, thereby driving the first connecting rod 6 to rotate along the first connecting seat 102. The first connecting rod 6 will drive the slider 501 connected to it to slide in the second chute 204 at the bottom of the pedal 2. , thereby realizing the pedal 2 to slide up and down on the guide post 101, thereby achieving the effect of adjusting the height of the pedal 2. At the same time, the first connecting rod 6 and the second connecting rod 7 are provided on both sides of the pedal 2 to support the pedal. The support stability of 2 is better, which improves the stress on the pedal 2 when the construction workers walk on the pedal 2. The setting of four guide pillars plays a guiding and limiting role when the pedal is raised and lowered, so that the pedal can only move vertically. Movement and support stability are better, effectively preventing the pedal from shaking when construction workers walk on the pedal, and making it convenient for construction workers to perform construction at different heights and locations on the construction site.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321579469.6U CN220184576U (en) | 2023-06-20 | 2023-06-20 | Civil engineering construction support |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321579469.6U CN220184576U (en) | 2023-06-20 | 2023-06-20 | Civil engineering construction support |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN220184576U true CN220184576U (en) | 2023-12-15 |
Family
ID=89110126
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202321579469.6U Expired - Fee Related CN220184576U (en) | 2023-06-20 | 2023-06-20 | Civil engineering construction support |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN220184576U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118327267A (en) * | 2024-05-30 | 2024-07-12 | 中国二十二冶集团有限公司 | Liftable construction frame with convenient positioning |
-
2023
- 2023-06-20 CN CN202321579469.6U patent/CN220184576U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118327267A (en) * | 2024-05-30 | 2024-07-12 | 中国二十二冶集团有限公司 | Liftable construction frame with convenient positioning |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN209261234U (en) | A kind of truss floor support plate automatic assembling apparatus | |
| CN213418569U (en) | Supporting structure of novel coincide floor of steel construction building | |
| CN114908674A (en) | Deformable construction platform for highway bridge | |
| CN112064793A (en) | Assembled steel structure building beam column connecting and mounting system and connecting and mounting process | |
| JPH10339033A (en) | Concrete multistory building construction device and construction method for concrete oblique post | |
| CN112922352B (en) | Construction and assembly method for light steel structure prefabricated house | |
| CN111472534B (en) | A steel operating platform for assisting the lifting of super-high-rise steel bars | |
| CN216616946U (en) | A kind of anti-fall device for steel structure engineering construction | |
| CN218581129U (en) | Construction platform is removed in installation of stand cantilever beam | |
| CN215479056U (en) | A hydraulic elevator with a slow-down device | |
| CN218024902U (en) | Steel case roof beam hoist device for construction | |
| CN215395122U (en) | Tool charging tray lift platform with stop gear | |
| CN210884982U (en) | An upper module gantry composition unit for escalator | |
| CN203377138U (en) | Elevation-type disconnecting link operation mechanism carrying platform capable of realizing four-direction adjustment | |
| CN112591636A (en) | High-strength hanger platform based on steel grating | |
| CN109680713B (en) | A precision-adjustable gallery trolley | |
| CN113982240A (en) | Construction work platform is built in room | |
| CN223135614U (en) | Lifting platform for building construction | |
| CN223445187U (en) | Lifting device for building decoration construction | |
| CN221165731U (en) | Light steel structure lifting device | |
| CN118327267B (en) | Easily positioned lifting construction frame | |
| CN220502551U (en) | A construction unloading device | |
| CN221646603U (en) | Safety fence for elevator maintenance operation | |
| CN221739614U (en) | Elevator maintenance device | |
| CN223661315U (en) | A safe construction lifting platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20231215 |