Construction is with reference pole
Technical Field
The utility model relates to the technical field of a marker post, in particular to a marker post for construction.
Background
The construction measurement is directly used for engineering construction, is not only a construction guide, but also penetrates through the whole construction process, and the construction measurement is needed from the working procedures of site leveling, building positioning, foundation construction to wall construction, building component installation and the like to enable the sizes and positions of all parts of the building to meet the design requirements.
Publication No.: CN215335377U relates to the field of bridge construction. The marker post for bridge construction comprises a base and a measuring tube connected to the top of the base, wherein a marker post capable of lifting and a marker post lifting assembly for driving the marker post to lift are arranged in the measuring tube; one side of the measuring tube is connected with a connecting plate, the bottom of the connecting plate is connected with a connecting rope and a vertical measuring ruler matched with the connecting rope, and the bottom of the connecting rope is connected with a first balancing weight; the two sides at two ends of the base are respectively connected with lifting grooves, each lifting groove is internally and respectively connected with a vertically arranged and rotatable screw rod, a slide rod parallel to the screw rod and a threaded plate, the threaded plates are arranged on the corresponding screw rods through threaded sleeves, the slide rod slides through the corresponding threaded plates, one end of each threaded plate extends out of the lifting groove to be connected with a vertically arranged supporting rod, and the top of the screw rod is connected with a base lifting motor for driving the screw rod to rotate. The utility model provides a bridge construction is with stake can fix the stake of vertical arrangement and height-adjusting in order to measure.
The applicant has found that there are some disadvantages to this post in use: through the meshing of gear and rack, drive the sighting rod and rise in survey intraductal to this extension measuring length, but because survey pipe and sighting rod between the space great, outside air's dust gets into survey intraductally through survey pipe top easily, because survey pipe length is longer moreover, the clearance is very inconvenient.
Therefore, the utility model designs a construction marker post to solve the problems in the prior art.
Disclosure of Invention
The utility model aims to provide a construction marker post for solving the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: a construction pole, comprising: the bottom box, department installs the measuring tube in the middle of the top of bottom box, be equipped with the fixed establishment that improves stability in the bottom box, the bottom of measuring tube rotates and installs the lead screw, there is the marker post lateral wall top of lead screw through screw thread slidable mounting, the bottom of lead screw runs through in the bottom box and is connected with elevator motor's output, the top of measuring tube is equipped with the ash blocking mechanism that reduces outside dust impurity and get into in the measuring tube.
Preferably, electric push rods are arranged at two ends below the outer side walls of two sides of the bottom box, and the output ends of the electric push rods are connected with universal wheels.
Preferably, a level gauge is arranged above one end of the bottom box.
Preferably, the fixing mechanism comprises four electric cylinders, the four electric cylinders are respectively arranged at four corners of the top of the bottom box, the output end of each electric cylinder is connected with a lifting block, a driving motor is arranged on one side of the top of each lifting block, the output end of each driving motor is connected with a threaded cone which is rotatably arranged with the lifting block, and a through hole which is in penetrating connection with the threaded cone is arranged at the bottom of the bottom box.
Preferably, the U-shaped plate which is connected with the lifting block in a sliding way is arranged on the inner wall of the bottom box.
Preferably, the ash blocking mechanism comprises an ash blocking plate, the ash blocking plate is hinged to one side of the top of the measuring tube, an arc-shaped barrel is arranged above one side wall of the measuring tube, an arc-shaped rod is connected in a sliding manner in the arc-shaped barrel, the top of the arc-shaped rod is connected with the top of the ash blocking plate, the bottom of the arc-shaped rod is connected with the measuring tube through a spring, and the spring is located in the arc-shaped barrel.
Compared with the prior art, the utility model has the following beneficial effects:
according to the utility model, through the arrangement of the screw rod and the lifting motor, the lifting motor drives the screw rod to rotate, the marker post is in threaded connection with the screw rod, so that the screw rod is lifted, the marker post is in sliding connection with the inner wall of the measuring tube, the gap is smaller, the condition that dust enters the measuring tube through the gap is greatly reduced, meanwhile, when the length is not required to be prolonged, the arc-shaped rod drives the ash blocking plate to block the top of the measuring tube through the restoring force of the spring, the sealing effect is achieved, and the condition that the dust enters the measuring tube is further reduced.
Drawings
FIG. 1 is a schematic view in front cross-section of the present utility model;
FIG. 2 is an enlarged schematic view of the structure A of FIG. 1 according to the present utility model;
fig. 3 is a schematic front view of the present utility model.
In the figure: 1. a bottom box; 2. a measuring tube; 3. a fixing mechanism; 4. an electric push rod; 5. a universal wheel; 6. a level gauge; 7. a screw rod; 8. a target; 9. a lifting motor; 10. an ash blocking mechanism; 301. an electric cylinder; 302. a lifting block; 303. a driving motor; 304. a thread cone; 305. a through hole; 306. a U-shaped plate; 101. an ash blocking plate; 102. an arc-shaped barrel; 103. an arc-shaped rod; 104. and (3) a spring.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, an embodiment of the present utility model is provided: a construction pole, comprising: the measuring tube 2 is installed to department in the middle of the top of the base box 1, be equipped with in the base box 1 and improve stable fixed establishment 3, the lead screw 7 is installed in the bottom rotation of measuring tube 2, there is the marker post 8 through screw thread slidable mounting in the lateral wall top of lead screw 7, the bottom of lead screw 7 runs through in the base box 1 and is connected with elevator motor 9's output, the top of measuring tube 2 is equipped with the ash blocking mechanism 10 that reduces outside dust impurity and get into in the measuring tube 2, elevator motor 9 drives lead screw 7 and just reverse the rotation, drive marker post 8 and go up and down, the inner wall sliding connection of marker post 8 and measuring tube 2, the space between is less, reducible dust gets into in the measuring tube 2.
Referring to fig. 1, in this embodiment: electric putter 4 is all installed at the below both ends of the lateral wall of base tank 1 both sides, and electric putter 4's output is connected with universal wheel 5, and when needs remove, electric putter 4 drive universal wheel 5 decline and ground contact, be convenient for remove the target.
Referring to fig. 3, in the present embodiment: a level gauge 6 is arranged above one end of the bottom box 1, and a worker can determine whether the marker post is level with the ground by observing the level gauge 6.
Referring to fig. 1, in this embodiment: the fixing mechanism 3 comprises four electric cylinders 301, the four electric cylinders 301 are respectively arranged at four corners of the top of the bottom box 1, the output ends of the electric cylinders 301 are connected with lifting blocks 302, driving motors 303 are arranged on one side of the top of the lifting blocks 302, the output ends of the driving motors 303 are connected with threaded cones 304 rotatably arranged with the lifting blocks 302, through holes 305 penetrating through the threaded cones 304 are formed in the bottom of the bottom box 1, after a measuring point is reached, the driving motors 303 drive the threaded cones 304 to rotate, meanwhile, the electric cylinders 301 drive the lifting blocks 302 to descend, the threaded cones 304 are enabled to descend and rotate into the ground, and the integral stability of a marker post value can be improved.
Referring to fig. 1, in this embodiment: the inner wall of the bottom box 1 is provided with a U-shaped plate 306 which is in sliding connection with the lifting block 302, and the U-shaped plate 306 limits the lifting block 302.
Referring to fig. 3, in the present embodiment: the ash blocking mechanism 10 comprises an ash blocking plate 101, the ash blocking plate 101 is hinged to one side of the top of the measuring tube 2, an arc-shaped barrel 102 is arranged above one side wall of the measuring tube 2, an arc-shaped rod 103 is connected in a sliding mode in the arc-shaped barrel 102, the top of the arc-shaped rod 103 is connected with the top of the ash blocking plate 101, the bottom of the arc-shaped rod 103 is connected with the measuring tube 2 through a spring 104, the spring 104 is located in the arc-shaped barrel 102, when the marker post 8 stretches out and contacts with the ash blocking plate 101, the ash blocking plate 101 is enabled to automatically open in an upward rotating mode, the ash blocking plate 101 drives the arc-shaped rod 103 to stretch into the arc-shaped barrel 102 and squeeze the spring 104, when the marker post 8 stretches back into the measuring tube 2, the arc-shaped rod 103 stretches out through the restoring force of the spring 104, the ash blocking plate 101 is driven to rotate downwards, the top of the measuring tube 2 is sealed, and dust entering the measuring tube 2 is further reduced.
Working principle: the elevating motor 9 drives the screw rod 7 to rotate to enable the marker post 8 to extend out of the measuring tube 2 for measuring the extension length, the top of the marker post 8 is in contact with the ash blocking plate 101, the ash blocking plate 101 is enabled to rotate and drive the arc rod 103 to enter the arc barrel 102 and simultaneously extrude the spring 104, after the marker post 8 descends into the measuring tube 2, the top of the marker post 8 leaves the ash blocking plate 101, the arc rod 103 extends out of the arc barrel 102 through the restoring force of the spring 104, the ash blocking plate 101 is enabled to rotate to block the top of the measuring tube 2, dust entering the measuring tube 2 can be reduced, and the content which is not described in detail in the specification belongs to the prior art known to the person skilled in the art.
Although the present utility model has been described with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements and changes may be made without departing from the spirit and principles of the present utility model.