CN220133334U - A prefabricated integrated bathroom wall panel structure - Google Patents

A prefabricated integrated bathroom wall panel structure Download PDF

Info

Publication number
CN220133334U
CN220133334U CN202321681837.8U CN202321681837U CN220133334U CN 220133334 U CN220133334 U CN 220133334U CN 202321681837 U CN202321681837 U CN 202321681837U CN 220133334 U CN220133334 U CN 220133334U
Authority
CN
China
Prior art keywords
wall panel
groove
plate
column
flat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202321681837.8U
Other languages
Chinese (zh)
Inventor
丁泽成
王文广
周东珊
魏雪纯
钟亮
林显杨
董陆慧
李晓
张雅梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN202321681837.8U priority Critical patent/CN220133334U/en
Application granted granted Critical
Publication of CN220133334U publication Critical patent/CN220133334U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Residential Or Office Buildings (AREA)

Abstract

本实用新型提供一种装配式整体卫浴墙板结构,涉及装修设计技术领域,包括第一平接墙板、第二平接墙板、第一阴角墙板、第二阴角墙板、第一阳角墙板、第二阳角墙板、平接件、阴角连接件以及阳角连接件。本实用新型结构简单,分别通过平接件、阴角连接件和阳角连接件等连接件完成两块墙板的连接,两块墙板的连接只需要一个连接件即可完成,安装前可以将连接件与其中一个墙板进行预制,安装快捷简单,且两块墙板之间受到限位下进行安装,稳定性好。

The utility model provides an assembled integrated bathroom wall panel structure, which relates to the technical field of decoration design and includes a first flat wall panel, a second flat wall panel, a first internal corner wall panel, a second internal corner wall panel, and a third internal corner wall panel. A first external corner wall panel, a second external corner wall panel, a flat joint, an internal corner connector and an external corner connector. The utility model has a simple structure. The connection between two wall panels is completed through flat connectors, internal corner connectors, external corner connectors and other connectors. The connection between the two wall panels only requires one connector. Before installation, you can The connecting piece is prefabricated with one of the wall panels, and the installation is quick and easy. The installation is done with the space between the two wall panels limited, and the stability is good.

Description

一种装配式整体卫浴墙板结构A prefabricated integrated bathroom wall panel structure

技术领域Technical field

本实用新型涉及装修设计技术领域,尤其是,本实用新型涉及一种装配式整体卫浴墙板结构。The utility model relates to the technical field of decoration design. In particular, the utility model relates to an assembled integral bathroom wall panel structure.

背景技术Background technique

目前的装饰行业正在向着工业化模块化安装的方向发展,一般来说,墙面装饰是室内设计中普遍采用的装饰方法,可以增加室内空间的层次感,起到美化装饰的作用。The current decoration industry is developing in the direction of industrialized modular installation. Generally speaking, wall decoration is a commonly used decoration method in interior design, which can increase the layering of indoor space and play a role in beautifying decoration.

建筑室内墙面装饰目前大部分还采用传统的湿法施工,湿法施工中墙板通常是用水泥砂浆从上往下铺贴,因此无需考虑顶部收边问题,墙板与原始墙面之间由水泥砂浆填充,这样很容易造成墙板与原始墙的连接不平整,还增加了施工人员的工作量,费时费力,所以装配式安装的墙板结构现在越来越受到欢迎,例如中国专利发明专利CN112095853A提供一种装配式卫浴墙板系统及安装方法,属于建筑装饰技术领域。该装配式卫浴墙板系统及安装方法包括墙板组件、可调节底框装置、阴角装置、平接装置。上述发明中将阴角装置安装于位于墙面阴角处的可调节底框装置顶端,将平接装置一端安装于位于墙面平接处的可调节底框装置顶端,安装简便。Currently, most interior wall decorations in buildings still adopt traditional wet construction. In wet construction, wall panels are usually laid from top to bottom with cement mortar, so there is no need to consider the problem of top edge closing. The gap between the wall panels and the original wall Filled with cement mortar, this can easily cause the connection between the wall panel and the original wall to be uneven. It also increases the workload of the construction personnel and is time-consuming and labor-intensive. Therefore, prefabricated wall panel structures are becoming more and more popular, such as Chinese patented inventions. Patent CN112095853A provides an assembled bathroom wall panel system and installation method, which belongs to the field of building decoration technology. The assembled bathroom wall panel system and installation method include wall panel components, an adjustable bottom frame device, an inner corner device, and a flat joint device. In the above invention, the inner corner device is installed on the top of the adjustable bottom frame device located at the inner corner of the wall, and one end of the flat joint device is installed on the top of the adjustable bottom frame device located at the flat joint of the wall. The installation is simple.

但是上述卫浴墙板系统依然存在以下问题:结构复杂,墙板的安装需要用到多个子母件进行搭接固定,使得墙板之间搭接时,由于墙板本身重量和安装视线的限制,拼接十分困难,而且墙板与墙板之间无法进行有效的滑动调节,安装稳定性差。However, the above-mentioned bathroom wall panel system still has the following problems: the structure is complex, and the installation of the wall panels requires the use of multiple sub-assemblies for overlapping and fixing. When the wall panels are overlapped, due to the weight of the wall panels themselves and the limitations of the installation line of sight, The splicing is very difficult, and there is no effective sliding adjustment between wall panels, resulting in poor installation stability.

因此为了解决上述问题,设计一种合理高效的适用于装配式卫浴底盒的地漏结构对我们来说是很有必要的。Therefore, in order to solve the above problems, it is necessary for us to design a reasonable and efficient floor drain structure suitable for the assembled bathroom bottom box.

实用新型内容Utility model content

本实用新型的目的在于提供一种装配式整体卫浴墙板结构,其结构简单,分别通过平接件、阴角连接件和阳角连接件等连接件完成两块墙板的连接,两块墙板的连接只需要一个连接件即可完成,安装前可以将连接件与其中一个墙板进行预制,安装快捷简单,且两块墙板之间受到限位下进行安装,稳定性好。The purpose of this utility model is to provide a prefabricated integrated bathroom wall panel structure, which has a simple structure. Two wall panels are connected through flat connectors, internal corner connectors, external corner connectors and other connectors. The connection of the panels only requires one connector. The connector can be prefabricated with one of the wall panels before installation. The installation is quick and simple, and the installation is done with the space between the two wall panels limited, so the stability is good.

为达到上述目的,本实用新型采用如下技术方案得以实现的:In order to achieve the above purpose, the present utility model adopts the following technical solutions to achieve:

一种装配式整体卫浴墙板结构,包括第一平接墙板、第二平接墙板、第一阴角墙板、第二阴角墙板、第一阳角墙板、第二阳角墙板、平接件、阴角连接件以及阳角连接件,所述第一平接墙板靠近所述第二平接墙板的一端设置有第一凹槽和设置于所述第一凹槽远离所述第二平接墙板的一侧的第二凹槽,所述第二平接墙板靠近所述第一平接墙板的一端设置有第三凹槽,所述平接件包括第一插柱和设置于所述第一插柱端部的第二插柱,所述第一阴角墙板靠近所述第二阴角墙板的一端设置有第四凹槽,所述第二阴角墙板靠近所述第一阴角墙板的一端设置有第五凹槽,所述阴角连接件包括第一板和与所述第一板垂直设置的第二板,所述第一板上设置有用于插入至所述第四凹槽内的第一伸出柱,所述第二板上设置有用于插入至所述第五凹槽内的第二伸出柱,所述第一阳角墙板靠近所述第二阳角墙板的一端设置有第七凹槽,所述第二阳角墙板靠近所述第一阳角墙板的一端设置有第八凹槽,所述阳角连接件包括第一接板和第二接板,所述第一接板上设置有用于插入至所述第七凹槽内的第一柱,所述第二接板上设置有用于插入至所述第八凹槽内的第二柱。An assembled integrated bathroom wall panel structure, including a first flat wall panel, a second flat wall panel, a first female corner wall panel, a second female corner wall panel, a first male corner wall panel, and a second male corner wall panel. Wall panels, flat joints, female corner connectors and male corner connectors. The first flat wall panel is provided with a first groove at one end close to the second flat wall panel and is provided in the first groove. a second groove on the side away from the second flat joint wall panel; a third groove is provided on one end of the second flat joint wall panel close to the first flat joint wall panel; the flat joint member It includes a first inserting post and a second inserting post provided at the end of the first inserting post, and a fourth groove is provided at one end of the first female corner wall panel close to the second female corner wall panel, and the A fifth groove is provided at one end of the second female corner wall panel close to the first female corner wall panel. The female corner connector includes a first plate and a second plate arranged perpendicularly to the first plate. The first board is provided with a first protruding post for inserting into the fourth groove, and the second board is provided with a second protruding post for being inserted into the fifth groove. A seventh groove is provided at one end of the first external corner wall panel close to the second external corner wall panel, and an eighth groove is provided at one end of the second external corner wall panel close to the first external corner wall panel. The male corner connector includes a first connecting plate and a second connecting plate. The first connecting plate is provided with a first post for inserting into the seventh groove. The second connecting plate is provided with a useful The second column is inserted into the eighth groove.

作为本实用新型的优选,所述第一平接墙板、第二平接墙板、第一阴角墙板、第二阴角墙板、第一阳角墙板、第二阳角墙板侧面均设置有装饰板。As a preferred option of the present invention, the first flat wall panel, the second flat wall panel, the first female corner wall panel, the second female corner wall panel, the first male corner wall panel, and the second male corner wall panel There are decorative panels on the sides.

作为本实用新型的优选,所述第一凹槽、第二凹槽和第三凹槽均为长条槽,且所述第一凹槽、第二凹槽和第三凹槽的延伸方向均与所述第一平接墙板靠近所述第二平接墙板的一端的端面平行。As a preferred feature of the present invention, the first groove, the second groove and the third groove are all elongated grooves, and the extending directions of the first groove, the second groove and the third groove are all the same. It is parallel to the end surface of one end of the first flat wall panel close to the second flat wall panel.

作为本实用新型的优选,所述第一插柱上设置有用于阻挡所述第一平接墙板和第二平接墙板的阻隔板,所述阻隔板远离所述装饰板的一端设置有与所述第一平接墙板平行的限位板,所述限位板上设置有用于与所述第一平接墙板连接的第一螺钉和用于方便所述第一螺钉安装的第一螺钉孔。As a preferred feature of the present invention, the first inserting post is provided with a barrier plate for blocking the first flat wall panel and the second flat wall panel, and an end of the barrier plate away from the decorative panel is provided with a A limiting plate parallel to the first flat wall panel. The limiting plate is provided with a first screw for connecting to the first flat wall panel and a third screw for facilitating the installation of the first screw. One screw hole.

作为本实用新型的优选,所述第四凹槽远离所述第二阴角墙板的一侧设置有第六凹槽,所述第一伸出柱远离所述第一板的一端设置有用于插入至所述第六凹槽内的第三伸出柱;所述第七凹槽远离所述第二阳角墙板的一侧设置有第九凹槽,所述第一柱远离所述第一接板的一端设置有用于插入至所述第九凹槽内的第三柱。As a preferred option of the present invention, a sixth groove is provided on one side of the fourth groove away from the second female corner wall panel, and a sixth groove is provided on one end of the first extending column away from the first plate. A third protruding column inserted into the sixth groove; a ninth groove is provided on the side of the seventh groove away from the second corner wall panel, and the first column is located away from the third One end of a connecting plate is provided with a third post for inserting into the ninth groove.

作为本实用新型的优选,所述第一凹槽和第三凹槽均等于所述第一插柱的宽度,所述第一插柱的长度大于所述第一凹槽的深度,所述第二插柱的宽度大于所述第一插柱的宽度,所述第二插柱的宽度等于所述第二凹槽的宽度;所述第六凹槽的宽度大于所述第四凹槽的宽度,所述第三伸出柱的宽度等于所述第六凹槽的宽度;所述第九凹槽的宽度大于所述第七凹槽的宽度,所述第三柱的宽度等于所述第九凹槽的宽度。As a preferred option of the present invention, the first groove and the third groove are equal to the width of the first insertion post, the length of the first insertion post is greater than the depth of the first groove, and the third insertion post is equal to the width of the first insertion post. The width of the second insertion pillar is greater than the width of the first insertion pillar, the width of the second insertion pillar is equal to the width of the second groove; the width of the sixth groove is greater than the width of the fourth groove , the width of the third protruding column is equal to the width of the sixth groove; the width of the ninth groove is greater than the width of the seventh groove, and the width of the third column is equal to the width of the ninth groove. The width of the groove.

作为本实用新型的优选,所述第三伸出柱内设置有第三中空腔,所述第一伸出柱内设置有第一中空腔,所述第二伸出柱内设置有第二中空腔,所述第三柱内设置有第三内腔,所述第一柱内设置有第一内腔,所述第二柱内设置有第二内腔,所述第一插柱内设置有第一空腔,所述第二插柱内设置有第二空腔。As a preferred feature of the present invention, a third hollow cavity is provided in the third extending column, a first hollow cavity is provided in the first extending column, and a second hollow cavity is provided in the second extending column. cavity, a third inner cavity is provided in the third column, a first inner cavity is provided in the first column, a second inner cavity is provided in the second column, and a first inner cavity is provided in the first insertion column. A first cavity, and a second cavity is provided in the second inserting column.

作为本实用新型的优选,所述第一板远离所述第二板的一端设置有与所述第二板平行的第一限位板,所述第二板远离所述第一板的一端设置有与所述第一板平行的第二限位板,所述第一柱和第二柱垂直设置,所述第一接板靠近所述第二接板的一端设置有与所述第二接板平行的第一引导板,所述第二接板靠近所述第一接板的一端设置有与所述第一接板平行的第二引导板。As a preferred feature of the present invention, an end of the first plate away from the second plate is provided with a first limiting plate parallel to the second plate, and an end of the second plate away from the first plate is provided There is a second limiting plate parallel to the first plate, the first column and the second column are arranged vertically, and an end of the first connecting plate close to the second connecting plate is provided with the second connecting plate. The first guide plate is parallel to the first guide plate. The second connecting plate is provided with a second guide plate parallel to the first connecting plate at one end close to the first connecting plate.

作为本实用新型的优选,所述第一限位板上设置有用于与所述第一阴角墙板连接的第二螺钉和用于方便所述第二螺钉安装的第二螺钉孔,所述第一引导板上设置有用于与所述第一阳角墙板连接的第三螺钉和用于方便所述第三螺钉安装的第三螺钉孔。As a preferred feature of the present invention, the first limiting plate is provided with a second screw for connecting to the first internal corner wall panel and a second screw hole for facilitating the installation of the second screw. The first guide plate is provided with a third screw for connecting to the first external corner wall panel and a third screw hole for facilitating the installation of the third screw.

作为本实用新型的优选,所述平接件、阴角连接件以及阳角连接件均为一体成型件。As a preferred option of the present invention, the flat connector, the internal corner connector and the external corner connector are all integrally formed components.

本实用新型一种装配式整体卫浴墙板结构的有益效果在于:结构简单,分别通过平接件、阴角连接件和阳角连接件等连接件完成两块墙板的连接,两块墙板的连接只需要一个连接件即可完成,安装前可以将连接件与其中一个墙板进行预制,安装快捷简单,且两块墙板之间受到限位下进行安装,稳定性好。The beneficial effects of the assembled integrated bathroom wall panel structure of this utility model are: the structure is simple, and the connection of two wall panels is completed through flat connectors, internal corner connectors, external corner connectors and other connectors. The connection can be completed with only one connector. The connector can be prefabricated with one of the wall panels before installation. The installation is quick and simple, and the installation is carried out with the space between the two wall panels limited, and the stability is good.

附图说明Description of drawings

图1为本实用新型一种装配式整体卫浴墙板结构的一个实施例的整体结构示意图;Figure 1 is a schematic diagram of the overall structure of an embodiment of a prefabricated integrated bathroom wall panel structure of the present invention;

图2为本实用新型一种装配式整体卫浴墙板结构的一个实施例中的平接件的结构示意图;Figure 2 is a schematic structural diagram of a flat joint in an embodiment of an assembled integrated bathroom wall panel structure of the present invention;

图3为本实用新型一种装配式整体卫浴墙板结构的一个实施例中的第一平接墙板和第二平接墙板的结构示意图;Figure 3 is a schematic structural diagram of the first flat wall panel and the second flat wall panel in an embodiment of the assembled integrated bathroom wall panel structure of the present invention;

图4为本实用新型一种用于整体卫浴墙板的阴角拼接结构的一个实施例中的阴角连接件的结构示意图;Figure 4 is a schematic structural diagram of the inner corner connector in one embodiment of the inner corner splicing structure for integral bathroom wall panels of the present invention;

图5为本实用新型一种用于整体卫浴墙板的阴角拼接结构的一个实施例中的第一阴角墙板和第二阴角墙板的结构示意图;Figure 5 is a schematic structural diagram of the first internal corner wall panel and the second internal corner wall panel in one embodiment of the internal corner splicing structure for integral bathroom wall panels of the present invention;

图6为本实用新型一种用于整体卫浴墙板的阳角拼接结构的一个实施例中的阳角连接件的结构示意图;Figure 6 is a schematic structural diagram of the external corner connector in one embodiment of the external corner splicing structure for integral bathroom wall panels of the present invention;

图7为本实用新型一种用于整体卫浴墙板的阳角拼接结构的一个实施例中的第一阳角墙板和第二阳角墙板的结构示意图;Figure 7 is a schematic structural diagram of the first external corner wall panel and the second external corner wall panel in one embodiment of the external corner splicing structure for integral bathroom wall panels of the present invention;

图中:1、平接件,11、第一插柱,111、第一空腔,12、第二插柱,121、第二空腔,13、阻隔板,14、限位板,141、第一螺钉,142、第一螺钉孔,2、阴角连接件,21、第一板,211、第一伸出柱,212、第一限位板,213、第三伸出柱,214、第二螺钉,215、第二螺钉孔,22、第二板,221、第二伸出柱,222、第二限位板,23、加强板,24、填缝块,3、阳角连接件,31、第一接板,311、第一柱,312、第一引导板,313、第三柱,314、第三螺钉,315、第三螺钉孔,32、第二接板,321、第二柱,322、第二引导板,33、第三接板,34、填缝条, 71、第一平接墙板,711、第一凹槽,712、第二凹槽,72、第二平接墙板,721、第三凹槽,73、第一阴角墙板,731、第四凹槽,732、第六凹槽,74、第二阴角墙板,741、第五凹槽,75、第一阳角墙板,751、第七凹槽,752、第九凹槽,76、第二阳角墙板,761、第八凹槽,77、装饰板。In the figure: 1. Flat connector, 11. First inserting post, 111. First cavity, 12. Second inserting post, 121. Second cavity, 13. Barrier plate, 14. Limiting plate, 141. The first screw, 142. The first screw hole, 2. Internal angle connector, 21. The first plate, 211. The first extending column, 212. The first limiting plate, 213. The third extending column, 214. The second screw, 215. The second screw hole, 22. The second plate, 221. The second extending column, 222. The second limiting plate, 23. Reinforcement plate, 24. Caulking block, 3. External corner connector , 31. The first connecting plate, 311. The first column, 312. The first guide plate, 313. The third column, 314. The third screw, 315. The third screw hole, 32. The second connecting plate, 321. Second column, 322, second guide plate, 33, third connecting plate, 34, caulking strip, 71, first flat wall panel, 711, first groove, 712, second groove, 72, second Flat joint wall panel, 721, third groove, 73, first internal corner wall panel, 731, fourth groove, 732, sixth groove, 74, second internal corner wall panel, 741, fifth groove , 75. The first external corner wall panel, 751. The seventh groove, 752. The ninth groove, 76. The second external corner wall panel, 761. The eighth groove, 77. Decorative board.

具体实施方式Detailed ways

以下是本实用新型的具体实施例,对本实用新型的技术方案作进一步的描述,但本实用新型并不限于这些实施例。The following are specific embodiments of the present utility model to further describe the technical solutions of the present utility model, but the present utility model is not limited to these embodiments.

现在将参照附图来详细描述本实用新型的各种示例性实施例。应注意到:除非另外具体说明,否则在这些实施例中阐述的模块和步骤的相对布置和步骤不限制本实用新型的范围。Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that the relative arrangement of the modules and steps set forth in these embodiments does not limit the scope of the present invention unless otherwise specifically stated.

同时,应当明白,为了便于描述,附图中的流程并不仅仅是单独进行,而是多个步骤相互交叉进行。At the same time, it should be understood that, for convenience of description, the processes in the drawings are not just performed individually, but multiple steps are performed interleaved with each other.

在本实用新型的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,或者是本实用新型产品使用时惯常摆放的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”等仅用于区分描述,而不能理解为指示或暗示相对重要性。In the description of the present utility model, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner" and "outer" The orientations or positional relationships indicated are based on the orientations or positional relationships shown in the drawings, or the orientations or positional relationships that are commonly placed when the product of the present invention is used. They are only for the convenience of describing the present invention and simplifying the description, rather than Indicating or implying that the device or component must have a specific orientation, be constructed and operate in a specific orientation, it cannot be construed as a limitation on the present invention. In addition, the terms "first", "second", etc. are only used to differentiate descriptions and are not to be understood as indicating or implying relative importance.

以下对至少一个示例性实施例的描述实际上仅仅是说明性的,决不作为对本实用新型及其应用或使用的任何限制。The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the invention, its application or uses.

对于相关领域普通技术人员已知的技术、方法及系统可能不作详细讨论,但在适当情况下,技术、方法及系统应当被视为授权说明书的一部分。Technologies, methods and systems known to those of ordinary skill in the relevant fields may not be discussed in detail, but where appropriate, the technologies, methods and systems should be considered part of the authorization specification.

实施例一:如图1至7所示,仅仅为本实用新型的其中一个的实施例,一种装配式整体卫浴墙板结构,包括第一平接墙板71、第二平接墙板72、第一阴角墙板73、第二阴角墙板74、第一阳角墙板75、第二阳角墙板76、平接件1、阴角连接件2以及阳角连接件3,所述第一平接墙板71靠近所述第二平接墙板72的一端设置有第一凹槽711和设置于所述第一凹槽711远离所述第二平接墙板72的一侧的第二凹槽712,所述第二平接墙板72靠近所述第一平接墙板71的一端设置有第三凹槽721,所述平接件1包括第一插柱11和设置于所述第一插柱11端部的第二插柱12,所述第一阴角墙板73靠近所述第二阴角墙板74的一端设置有第四凹槽731,所述第二阴角墙板74靠近所述第一阴角墙板73的一端设置有第五凹槽741,所述阴角连接件2包括第一板21和与所述第一板21垂直设置的第二板22,所述第一板21上设置有用于插入至所述第四凹槽731内的第一伸出柱211,所述第二板22上设置有用于插入至所述第五凹槽741内的第二伸出柱221,所述第一阳角墙板75靠近所述第二阳角墙板76的一端设置有第七凹槽751,所述第二阳角墙板76靠近所述第一阳角墙板75的一端设置有第八凹槽761,所述阳角连接件3包括第一接板31和第二接板32,所述第一接板31上设置有用于插入至所述第七凹槽751内的第一柱311,所述第二接板32上设置有用于插入至所述第八凹槽761内的第二柱321。Embodiment 1: As shown in Figures 1 to 7, which is only one of the embodiments of the present utility model, an assembled integral bathroom wall panel structure includes a first flat wall panel 71 and a second flat wall panel 72 , the first female corner wall panel 73, the second female corner wall panel 74, the first male corner wall panel 75, the second male corner wall panel 76, the flat connector 1, the female corner connector 2 and the male corner connector 3, The first flat wall panel 71 is provided with a first groove 711 at one end close to the second flat wall panel 72 and an end of the first groove 711 away from the second flat wall panel 72 . The second groove 712 on the side of the second flat wall panel 72 is provided with a third groove 721 at one end close to the first flat wall panel 71. The flat joint member 1 includes a first inserting post 11 and a The second inserting post 12 is provided at the end of the first inserting post 11. The first female corner wall panel 73 is provided with a fourth groove 731 at one end close to the second female corner wall panel 74. The second inner corner wall panel 74 is provided with a fifth groove 741 at one end close to the first inner corner wall panel 73 . The inner corner connector 2 includes a first plate 21 and a third plate perpendicular to the first plate 21 . Two plates 22. The first plate 21 is provided with a first protruding column 211 for inserting into the fourth groove 731. The second plate 22 is provided with a first protruding column 211 for inserting into the fifth groove. 741 inside the second protruding column 221, the first external corner wall panel 75 is provided with a seventh groove 751 at one end close to the second external corner wall panel 76, and the second external corner wall panel 76 is adjacent to the second external corner wall panel 76. An eighth groove 761 is provided at one end of the first external corner wall panel 75. The external corner connector 3 includes a first connecting plate 31 and a second connecting plate 32. The first connecting plate 31 is provided with a slot for inserting To the first post 311 in the seventh groove 751 , the second connecting plate 32 is provided with a second post 321 for inserting into the eighth groove 761 .

在本实用新型中,卫浴内铺设墙板,每一个墙板都是平面板,那么可能存在平接、阴角连接和阳角连接这几个情况,那么墙板就包括平接墙板、阴角墙板以及阳角墙板,两个平接墙板通过平接件1进行连接,记为第一平接墙板71和第二平接墙板72;两个阴角墙板通过阴角连接件2进行连接,记为第一阴角墙板73和第二阴角墙板74;两个阳角墙板通过阳角连接件3进行连接,记为第一阳角墙板75和第二阳角墙板76。In the present utility model, wall panels are laid in the bathroom, and each wall panel is a flat panel. Then there may be flat connection, internal angle connection and external angle connection. Then the wall panels include flat connection wall panels, internal angle connection, etc. Corner wall panels and male corner wall panels, the two flat wall panels are connected through the flat joint 1, marked as the first flat wall panel 71 and the second flat wall panel 72; the two female corner wall panels are connected through the female corner The connector 2 is connected, which is marked as the first female corner wall panel 73 and the second female corner wall panel 74; the two male corner wall panels are connected through the male corner connector 3, which is marked as the first male corner wall panel 75 and the second female corner wall panel 74. Two Yang corner wall panels 76.

首先是第一平接墙板71和第二平接墙板72通过平接件1连接的结构,第一平接墙板71和第二平接墙板72的端面通过平接件1进行对齐连接,完成第一平接墙板71和第二平接墙板72的平接。First, there is a structure in which the first flat wall panel 71 and the second flat wall panel 72 are connected through the flat joint 1. The end surfaces of the first flat wall panel 71 and the second flat wall panel 72 are aligned through the flat joint 1. The connection is completed to complete the flat connection of the first flat wall panel 71 and the second flat wall panel 72 .

在这里,所述第一平接墙板71靠近所述第二平接墙板72的一端设置有第一凹槽711和设置于所述第一凹槽711远离所述第二平接墙板72的一侧的第二凹槽712,所述第二平接墙板72靠近所述第一平接墙板71的一端设置有第三凹槽721,第一平接墙板71上形成一个T型槽,第二凹槽712位于第一凹槽711的底部,且第二凹槽712的宽度大于第一凹槽711的宽度;而第二平接墙板72上仅仅形成一个一字型槽,第三凹槽721的宽度等于第一凹槽711的宽度,需要注意的是,在第一平接墙板71和第二平接墙板72对齐时,第一凹槽711和第三凹槽721应当也刚好对齐;Here, a first groove 711 is provided at one end of the first flat wall panel 71 close to the second flat wall panel 72 and a first groove 711 is provided at an end of the first groove 711 away from the second flat wall panel. 72, a third groove 721 is provided at one end of the second flat wall panel 72 close to the first flat wall panel 71, and a third groove 721 is formed on the first flat wall panel 71. T-shaped groove, the second groove 712 is located at the bottom of the first groove 711, and the width of the second groove 712 is greater than the width of the first groove 711; and only a straight shape is formed on the second flat wall panel 72 groove, the width of the third groove 721 is equal to the width of the first groove 711. It should be noted that when the first flat wall panel 71 and the second flat wall panel 72 are aligned, the first groove 711 and the third flat wall panel 721 are aligned. Grooves 721 should also line up just right;

所述平接件1包括第一插柱11和设置于所述第一插柱11端部的第二插柱12,所述第一凹槽711和第三凹槽721均等于所述第一插柱11的宽度,所述第一插柱11的长度大于所述第一凹槽711的深度,所述第二插柱12的宽度大于所述第一插柱11的宽度,所述第二插柱12的宽度等于所述第二凹槽712的宽度,当然第二插柱12的厚度也等于第二凹槽712的深度。The flat connector 1 includes a first plug 11 and a second plug 12 provided at the end of the first plug 11. The first groove 711 and the third groove 721 are both equal to the first plug 11. The width of the inserting post 11, the length of the first inserting post 11 is greater than the depth of the first groove 711, the width of the second inserting post 12 is greater than the width of the first inserting post 11, the second The width of the insertion post 12 is equal to the width of the second groove 712 , and of course the thickness of the second insertion post 12 is also equal to the depth of the second groove 712 .

那么在第一平接墙板71和第二平接墙板72平接时,步骤如下:Then when the first flat wall panel 71 and the second flat wall panel 72 are flat connected, the steps are as follows:

将平接件1安装在第一平接墙板71上,使得第二插柱12插入至第二凹槽712内,且第一插柱11的一部分也位于第一凹槽711内,由于第一插柱11的长度大于所述第一凹槽711的深度,使得第一插柱11会有一部分从第一凹槽711处伸出;Install the flat joint 1 on the first flat wall panel 71 so that the second inserting post 12 is inserted into the second groove 712 and a part of the first inserting post 11 is also located in the first groove 711. The length of an inserting post 11 is greater than the depth of the first groove 711, so that a part of the first inserting post 11 protrudes from the first groove 711;

将第二平接墙板72靠近第三凹槽721的一侧向第一平接墙板71靠近第一凹槽711的一侧位移,直至第一插柱11凸出第一凹槽711的部分插入至第三凹槽721内,此时第一凹槽711和第三凹槽721刚好被第一插柱11限位下对齐,使得第一平接墙板71和第二平接墙板72也对齐进行平接安装。Displace the side of the second flat wall panel 72 close to the third groove 721 toward the side of the first flat wall panel 71 close to the first groove 711 until the first inserting post 11 protrudes from the first groove 711 . Partially inserted into the third groove 721, at this time, the first groove 711 and the third groove 721 are just aligned under the restriction of the first inserting post 11, so that the first flat wall panel 71 and the second flat wall panel 72 is also aligned for flush installation.

然后是第一阴角墙板73和第二阴角墙板74通过阴角连接件2连接的结构,第一阴角墙板73和第二阴角墙板74的端面进行垂直连接,完成第一阴角墙板73和第二阴角墙板74的阴角连接,而第一阴角墙板73和第二阴角墙板74间的连接依靠所述阴角连接件2进行连接;Then there is a structure in which the first inner corner wall panel 73 and the second inner corner wall panel 74 are connected through the inner corner connector 2. The end surfaces of the first inner corner wall panel 73 and the second inner corner wall panel 74 are vertically connected to complete the first An inner corner wall panel 73 and a second inner corner wall panel 74 are connected at an inner corner, and the connection between the first inner corner wall panel 73 and the second inner corner wall panel 74 relies on the inner corner connector 2;

所述第一阴角墙板73靠近所述第二阴角墙板74的一端设置有第四凹槽731,所述第二阴角墙板74靠近所述第一阴角墙板73的一端设置有第五凹槽741,由于第一阴角墙板73和第二阴角墙板74垂直连接,那么第四凹槽731和第五凹槽741也是垂直设置;A fourth groove 731 is provided at one end of the first female corner wall panel 73 close to the second female corner wall panel 74 , and one end of the second female corner wall panel 74 is close to the first female corner wall panel 73 A fifth groove 741 is provided. Since the first female corner wall panel 73 and the second female corner wall panel 74 are vertically connected, the fourth groove 731 and the fifth groove 741 are also vertically arranged;

所述阴角连接件2包括第一板21和与所述第一板21垂直设置的第二板22,所述第一板21上设置有用于插入至所述第四凹槽731内的第一伸出柱211,所述第二板22上设置有用于插入至所述第五凹槽741内的第二伸出柱221,所述第一伸出柱211与第一板21垂直,第二伸出柱221与第二板22垂直,那么当第一伸出柱211插入至第四凹槽731内,且第二伸出柱221插入至第五凹槽741内时,第一阴角墙板73和第二阴角墙板74刚好可以垂直连接The inner corner connector 2 includes a first plate 21 and a second plate 22 arranged perpendicularly to the first plate 21. The first plate 21 is provided with a third plate for inserting into the fourth groove 731. An extending column 211. The second plate 22 is provided with a second extending column 221 for inserting into the fifth groove 741. The first extending column 211 is perpendicular to the first plate 21. The two extending pillars 221 are perpendicular to the second plate 22, then when the first extending pillar 211 is inserted into the fourth groove 731, and the second extending pillar 221 is inserted into the fifth groove 741, the first internal angle The wall panel 73 and the second inner corner wall panel 74 can just be connected vertically.

所述第四凹槽731远离所述第二阴角墙板74的一侧设置有第六凹槽732,所述第一伸出柱211远离所述第一板21的一端设置有用于插入至所述第六凹槽732内的第三伸出柱213,所述第六凹槽732的宽度大于所述第四凹槽731的宽度,所述第三伸出柱213的宽度等于所述第六凹槽732的宽度,所述第三伸出柱213的厚度等于第六凹槽732的深度。A sixth groove 732 is provided on one side of the fourth groove 731 away from the second female corner wall panel 74 , and a sixth groove 732 is provided on one end of the first protruding column 211 away from the first plate 21 for inserting into The width of the third protruding column 213 in the sixth groove 732 is greater than the width of the fourth groove 731, and the width of the third protruding column 213 is equal to the width of the third protruding column 213. The width of the sixth groove 732 and the thickness of the third extending post 213 are equal to the depth of the sixth groove 732 .

在这里,第三伸出柱213与第一板21之间的间距等于第四凹槽731的深度,第二伸出柱221的长度等于第五凹槽741的深度,所述第一伸出柱211的宽度等于所述第四凹槽731的宽度,所述第二伸出柱221的宽度等于所述第五凹槽741的宽度。Here, the distance between the third protruding column 213 and the first plate 21 is equal to the depth of the fourth groove 731, the length of the second protruding column 221 is equal to the depth of the fifth groove 741, and the first protruding column 213 is equal to the depth of the fifth groove 741. The width of the post 211 is equal to the width of the fourth groove 731 , and the width of the second protruding post 221 is equal to the width of the fifth groove 741 .

那么,当第三伸出柱213位于第六凹槽732内时,第一板21刚好与第一阴角墙板73靠近第一板21的端面接触连接,以及当第二伸出柱221抵住至第五凹槽741的槽底时,第二板22也刚好与第二阴角墙板74靠近第二板22的端面接触连接。Then, when the third extending column 213 is located in the sixth groove 732, the first plate 21 is just in contact with the end surface of the first female corner wall panel 73 close to the first plate 21, and when the second extending column 221 is against When reaching the bottom of the fifth groove 741 , the second plate 22 is just in contact with the end surface of the second female corner wall plate 74 close to the second plate 22 .

还有,所述第一板21远离所述第二板22的一端设置有与所述第二板22平行的第一限位板212,第一限位板212刚好与第一阴角墙板73的背面接触连接,所述第二板22远离所述第一板21的一端设置有与所述第一板21平行的第二限位板222,第二限位板222刚好与第二阴角墙板74的背面接触连接。In addition, the end of the first plate 21 away from the second plate 22 is provided with a first limiting plate 212 parallel to the second plate 22. The first limiting plate 212 is just in line with the first inner corner wall panel. 73, the second plate 22 is provided with a second limiting plate 222 parallel to the first plate 21 at one end away from the first plate 21, and the second limiting plate 222 is just in contact with the second female end. The back contact connection of the corner wall panel 74 is made.

那么在第一阴角墙板73和第二阴角墙板74阴角连接时,步骤如下:Then when the first inner corner wall panel 73 and the second inner corner wall panel 74 are connected at the inner corner, the steps are as follows:

将阴角连接件2安装在第一阴角墙板73上,使得第三伸出柱213位于第六凹槽732内,且第一伸出柱211位于第四凹槽731内,此时第一板21刚好与第一阴角墙板73的端面接触连接,第一限位板212刚好与第一阴角墙板73的背面接触连接;Install the inner corner connector 2 on the first inner corner wall panel 73 so that the third extending column 213 is located in the sixth groove 732 and the first extending column 211 is located in the fourth groove 731. At this time, the third extending column 213 is located in the fourth groove 731. One plate 21 is just in contact with the end surface of the first female corner wall panel 73, and the first limiting plate 212 is just in contact with the back surface of the first female corner wall panel 73;

将第二阴角墙板74靠近第五凹槽741的一侧向阴角连接件2靠近第二板22的一侧位移,直至第二伸出柱221插入至第五凹槽741内,此时第二限位板222刚好与第二阴角墙板74的背面接触连接。Displace the side of the second female corner wall panel 74 close to the fifth groove 741 toward the side of the female corner connector 2 close to the second plate 22 until the second protruding column 221 is inserted into the fifth groove 741. At this time, the second limiting plate 222 is just in contact with the back surface of the second female corner wall panel 74 .

这样在第一限位板212和第二限位板222的限位下,第一阴角墙板73和第二阴角墙板74对接完毕完成阴角连接,且由于具有第一伸出柱211和第二伸出柱221的限位,第一阴角墙板73和第二阴角墙板74不易向远离墙体的方向脱落倒塌。In this way, under the restriction of the first limiting plate 212 and the second limiting plate 222, the first inner corner wall panel 73 and the second inner corner wall panel 74 are docked to complete the inner corner connection, and due to the first protruding column, 211 and the second extending column 221, the first inner corner wall panel 73 and the second inner corner wall panel 74 are not easy to fall off and collapse in the direction away from the wall.

最后是第一阳角墙板75和第二阳角墙板76通过阳角连接件3连接的结构,第一阳角墙板75和第二阳角墙板76的端面进行垂直连接,完成第一阳角墙板75和第二阳角墙板76的阳角连接,而第一阳角墙板75和第二阳角墙板76间的连接依靠所述阳角连接件3进行连接。Finally, there is a structure in which the first external corner wall panel 75 and the second external corner wall panel 76 are connected through the external corner connector 3. The end surfaces of the first external corner wall panel 75 and the second external corner wall panel 76 are vertically connected to complete the third An external corner wall panel 75 and a second external corner wall panel 76 are connected at an external corner, and the connection between the first external corner wall panel 75 and the second external corner wall panel 76 relies on the external corner connector 3 .

所述第一阳角墙板75靠近所述第二阳角墙板76的一端设置有第七凹槽751,所述第二阳角墙板76靠近所述第一阳角墙板75的一端设置有第八凹槽761,由于第一阳角墙板75和第二阳角墙板76垂直连接,那么第七凹槽751和第八凹槽761也是垂直设置;所述阳角连接件3包括第一接板31和与所述第一接板31连接的第二接板32,所述第一接板31上设置有用于插入至所述第七凹槽751内的第一柱311,所述第二接板32上设置有用于插入至所述第八凹槽761内的第二柱321,第二柱321与第一柱311垂直,那么当第一柱311插入至第七凹槽751内,且第二柱321插入至第八凹槽761内时,第一阳角墙板75和第二阳角墙板76刚好可以垂直连接。A seventh groove 751 is provided at one end of the first external corner wall panel 75 close to the second external corner wall panel 76 , and at one end of the second external corner wall panel 76 close to the first external corner wall panel 75 An eighth groove 761 is provided. Since the first external corner wall panel 75 and the second external corner wall panel 76 are vertically connected, the seventh groove 751 and the eighth groove 761 are also vertically arranged; the external corner connector 3 It includes a first connecting plate 31 and a second connecting plate 32 connected to the first connecting plate 31. The first connecting plate 31 is provided with a first column 311 for inserting into the seventh groove 751, The second connecting plate 32 is provided with a second column 321 for inserting into the eighth groove 761. The second column 321 is perpendicular to the first column 311. Then when the first column 311 is inserted into the seventh groove 751, and when the second column 321 is inserted into the eighth groove 761, the first external corner wall panel 75 and the second external corner wall panel 76 can just be connected vertically.

另外,所述第七凹槽751远离所述第二阳角墙板76的一侧设置有第九凹槽752,所述第一柱311远离所述第一接板31的一端设置有用于插入至所述第九凹槽752内的第三柱313,所述第九凹槽752的宽度大于所述第七凹槽751的宽度,所述第三柱313的宽度等于所述第九凹槽752的宽度,所述第三柱313的厚度等于第九凹槽752的深度。In addition, a ninth groove 752 is provided on the side of the seventh groove 751 away from the second external corner wall panel 76 , and an end for inserting the first column 311 away from the first connecting plate 31 is provided. To the third pillar 313 in the ninth groove 752, the width of the ninth groove 752 is greater than the width of the seventh groove 751, and the width of the third pillar 313 is equal to the width of the ninth groove. The width of the third pillar 313 is equal to the depth of the ninth groove 752 .

需要注意的是,当第三柱313位于第九凹槽752内时,第一接板31刚好与第一阳角墙板75靠近第一接板31的端面接触连接,以及,第二柱321的长度等于第八凹槽761的深度,所述第二柱321的宽度等于所述第八凹槽761的宽度,使得当第二柱321抵住至第八凹槽761的槽底时,第二接板32也刚好与第二阳角墙板76靠近第二接板32的端面接触连接。It should be noted that when the third column 313 is located in the ninth groove 752, the first connecting plate 31 is just in contact with the end surface of the first male corner wall panel 75 close to the first connecting plate 31, and the second column 321 The length of is equal to the depth of the eighth groove 761, and the width of the second column 321 is equal to the width of the eighth groove 761, so that when the second column 321 is against the bottom of the eighth groove 761, the The second connecting plate 32 is also just in contact with the end surface of the second male corner wall panel 76 close to the second connecting plate 32 .

还有,所述第一接板31靠近所述第二接板32的一端设置有与所述第二接板32平行的第一引导板312,第一引导板312刚好与第一阳角墙板75的背面接触连接,所述第二接板32靠近所述第一接板31的一端设置有与所述第一接板31平行的第二引导板322,第二引导板322刚好与第二阳角墙板76的背面接触连接。In addition, an end of the first connecting plate 31 close to the second connecting plate 32 is provided with a first guide plate 312 parallel to the second connecting plate 32. The first guide plate 312 is just in contact with the first external corner wall. The back side of the plate 75 is in contact connection. One end of the second connecting plate 32 close to the first connecting plate 31 is provided with a second guide plate 322 parallel to the first connecting plate 31. The second guide plate 322 is just in line with the first connecting plate 31. The back sides of the two positive corner wall panels 76 are contact-connected.

那么在第一阳角墙板75和第二阳角墙板76阳角连接时,步骤如下:Then when the first external corner wall panel 75 and the second external corner wall panel 76 are connected at the external corners, the steps are as follows:

将阳角连接件3安装在第一阳角墙板75上,使得第三柱313位于第九凹槽752内,且第一柱311位于第七凹槽751内,此时第一接板31刚好与第一阳角墙板75的端面接触连接,第一引导板312刚好与第一阳角墙板75的背面接触连接;Install the external corner connector 3 on the first external corner wall panel 75 so that the third column 313 is located in the ninth groove 752 and the first column 311 is located in the seventh groove 751. At this time, the first connecting plate 31 Just in contact with the end surface of the first male corner wall panel 75, the first guide plate 312 just in contact with the back surface of the first male corner wall panel 75;

将第二阳角墙板76靠近第八凹槽761的一侧向阳角连接件3靠近第二接板32的一侧位移,直至第二柱321插入至第八凹槽761内,此时第二接板32与第二阳角墙板76的端面接触连接,且第二引导板322刚好与第二阳角墙板76的背面接触连接。Displace the side of the second sun corner wall panel 76 close to the eighth groove 761 toward the side of the sun corner connector 3 close to the second connecting plate 32 until the second column 321 is inserted into the eighth groove 761. At this time, The second connecting plate 32 is in contact with the end surface of the second male corner wall panel 76 , and the second guide plate 322 is just in contact with the back surface of the second male corner wall panel 76 .

这样在第一引导板312和第二引导板322的限位下,第一阳角墙板75和第二阳角墙板76对接完毕完成阳角连接,且由于具有第一柱311和第二柱321的限位,第一阳角墙板75和第二阳角墙板76不易向远离墙体的方向脱落倒塌。In this way, under the restriction of the first guide plate 312 and the second guide plate 322, the first external corner wall panel 75 and the second external corner wall panel 76 are docked to complete the external corner connection, and due to the first column 311 and the second external corner wall panel 76 Due to the limitation of the column 321, the first corner wall panel 75 and the second corner wall panel 76 are not likely to fall off and collapse in a direction away from the wall.

实施例二,仍如图1至3所示,仅为本实用新型的其中一个实施例,在实施例一的基础上,本实用新型一种装配式整体卫浴墙板结构中,在墙板平接结构处还有以下设置:Embodiment 2, still shown in Figures 1 to 3, is only one embodiment of the present utility model. On the basis of Embodiment 1, in the assembled integral bathroom wall panel structure of the present utility model, the flat surface of the wall panel is There are also the following settings at the connection structure:

所述第一凹槽711、第二凹槽712和第三凹槽721均为长条槽,且所述第一凹槽711、第二凹槽712和第三凹槽721的延伸方向均与所述第一平接墙板71靠近所述第二平接墙板72的一端的端面平行。The first groove 711, the second groove 712 and the third groove 721 are all elongated grooves, and the extending directions of the first groove 711, the second groove 712 and the third groove 721 are in line with The end surface of one end of the first flat wall panel 71 close to the second flat wall panel 72 is parallel.

最好是第一凹槽711和第二凹槽712的长度等于第一平接墙板71的长度,使得平接件1与第一平接墙板71连接时,第二插柱12可以从第二凹槽712的端部进行滑动插入。Preferably, the length of the first groove 711 and the second groove 712 is equal to the length of the first flat wall panel 71, so that when the flat connector 1 is connected to the first flat wall panel 71, the second inserting post 12 can be connected from The end of the second groove 712 is slidably inserted.

以及,所述第一插柱11上设置有用于阻挡所述第一平接墙板71和第二平接墙板72的阻隔板13,阻隔板13与第一插柱11垂直设置,需要注意的是,当第二插柱12位于第二凹槽712内时,阻隔板13靠近第二插柱12的一侧刚好与第一平接墙板71靠近第二平接墙板72的端面接触,阻隔板13起到将第一平接墙板71和第二平接墙板72之间分开,当第二平接墙板72靠近第一平接墙板71的端面与阻隔板13远离第二插柱12的一侧接触时,第一平接墙板71和第二平接墙板72刚好形成一个固定的平接接缝。In addition, the first plug 11 is provided with a blocking plate 13 for blocking the first flat wall panel 71 and the second flat wall panel 72. The blocking plate 13 is arranged perpendicularly to the first plug 11. It should be noted that What is important is that when the second inserting post 12 is located in the second groove 712, the side of the blocking plate 13 close to the second inserting post 12 is just in contact with the end surface of the first flat wall panel 71 close to the second flat wall panel 72 , the barrier plate 13 serves to separate the first flat wall panel 71 and the second flat wall panel 72. When the end surface of the second flat wall panel 72 is close to the first flat wall panel 71 and the barrier plate 13 is far away from the When one side of the two plug posts 12 are in contact, the first flat wall panel 71 and the second flat wall panel 72 just form a fixed flat joint.

在这里,所述第一平接墙板71和第二平接墙板72侧面均设置有装饰板77,最好是阻隔板13向装饰板77方向延伸,但是阻隔板13不会凸出装饰板,而是稍微低于装饰板77外侧面,也就是所述阻隔板13的长度小于所述第一平接墙板71和装饰板77的厚度之和,这样后期可以在阻隔板13处使用美缝胶进行填充,这样,可以形成均匀的墙缝(可美缝),墙面连接更美观。Here, the first flat wall panel 71 and the second flat wall panel 72 are both provided with decorative panels 77 on their sides. It is preferable that the barrier plate 13 extends in the direction of the decorative panel 77, but the barrier plate 13 does not protrude from the decoration. board, but slightly lower than the outer side of the decorative board 77 , that is, the length of the barrier board 13 is less than the sum of the thicknesses of the first flat wall panel 71 and the decorative board 77 , so that it can be used at the barrier board 13 later. Fill it with Seam Glue, so that even wall seams (Kemei Seams) can be formed, and the wall connection will be more beautiful.

还有,所述阻隔板13远离所述装饰板77的一端设置有与所述第一平接墙板71平行的限位板14,准确的说,限位板14垂直于阻隔板13设置,且限位板14同时向阻隔板13的两侧进行延伸设置,分别与第一平接墙板71和第二平接墙板72远离装饰板77的一侧进行接触连接,起到对第一平接墙板71和第二平接墙板72的限位作用。In addition, the end of the barrier plate 13 away from the decorative plate 77 is provided with a limiting plate 14 parallel to the first flat wall panel 71. To be precise, the limiting plate 14 is arranged perpendicular to the barrier plate 13. And the limiting plate 14 is extended to both sides of the barrier plate 13 at the same time, and is in contact with the side of the first flat wall panel 71 and the second flat wall panel 72 away from the decorative panel 77 respectively, so as to protect the first flat wall panel 71 and the second flat wall panel 72 . The limiting function of the flat connecting wall panel 71 and the second flat connecting wall panel 72.

在这里,所述限位板14上设置有用于与所述第一平接墙板71连接的第一螺钉141和用于方便所述第一螺钉141安装的第一螺钉孔142。Here, the limiting plate 14 is provided with first screws 141 for connecting to the first flat wall panel 71 and first screw holes 142 for facilitating the installation of the first screws 141 .

那么在平接件1与第一平接墙板71连接时,将第二插柱12插入至第二凹槽712内,此时第一插柱11的一部分位于第一凹槽711内,阻隔板13刚好与第一平接墙板71的端面连接,限位板14与第一平接墙板71背面连接;Then when the flat connector 1 is connected to the first flat wall panel 71, insert the second plug 12 into the second groove 712. At this time, a part of the first plug 11 is located in the first groove 711, blocking The plate 13 is just connected to the end surface of the first flat wall panel 71, and the limiting plate 14 is connected to the back of the first flat wall panel 71;

并且在第二平接墙板72与第一平接墙板71连接时,可以先使得第二平接墙板72背面与限位板14进行接触,然后将第二平接墙板72向第一平接墙板71方向滑动,直至第一平接墙板71和第二平接墙板72平接完成;And when the second flat wall panel 72 is connected to the first flat wall panel 71, the back side of the second flat wall panel 72 can be brought into contact with the limiting plate 14, and then the second flat wall panel 72 can be moved toward the third flat wall panel 72. The first flat wall panel 71 slides in one direction until the first flat wall panel 71 and the second flat wall panel 72 are flatly connected;

这样不仅安装快捷简单,且两块墙板之间受到安装快捷简单,且两块墙板之间受到限位板14、阻隔板13以及第一插柱11的限位下进行安装,平整度高,稳定性好。In this way, not only is the installation fast and simple, but also the installation between the two wall panels is quick and simple, and the installation between the two wall panels is limited by the limiting plate 14, the blocking plate 13 and the first inserting post 11, and the flatness is high. , good stability.

所述限位板14端部为弧形设置,方便第二平接墙板72背面可以与限位板14接触并滑动。The end of the limiting plate 14 is arranged in an arc shape, so that the back side of the second flat wall panel 72 can contact and slide with the limiting plate 14 .

以及,所述第一插柱11内设置有第一空腔111,所述第二插柱12内设置有第二空腔121,不仅更方便第一插柱11和第二插柱12分别插入至第一凹槽711和第二凹槽712,而且在第二平接墙板72与第一平接墙板71平接之后,可以预防热胀冷缩对墙板进行损坏。In addition, the first insertion post 11 is provided with a first cavity 111, and the second insertion post 12 is provided with a second cavity 121, which is not only more convenient for inserting the first insertion post 11 and the second insertion post 12 respectively. to the first groove 711 and the second groove 712, and after the second flat wall panel 72 is flatly connected to the first flat wall panel 71, damage to the wall panel due to thermal expansion and contraction can be prevented.

最后,所述平接件1为一体成型件,整个结构预制完成即可使用,强度更高,安装更方便。Finally, the flat joint 1 is an integrally formed part, and the entire structure is ready for use after being prefabricated, with higher strength and easier installation.

实施例三,仍如图1、4、5所示,仅为本实用新型的其中一个实施例,在实施例一的基础上,本实用新型一种装配式整体卫浴墙板结构中,在墙板阴角连接结构处还有以下设置:Embodiment 3, still shown in Figures 1, 4, and 5, is only one embodiment of the present utility model. On the basis of Embodiment 1, in the assembled integral bathroom wall panel structure of the present utility model, the wall panel is There are also the following settings at the inner corner connection structure of the plate:

所述第一伸出柱211内设置有第一中空腔,所述第二伸出柱221内设置有第二中空腔,使得第一伸出柱211和第二伸出柱221具有一定弹性形变能力,更方便插入至第四凹槽和第五凹槽,而且在第二阴角墙板74与第一阴角墙板73平接之后,可以预防热胀冷缩对墙板进行损坏。The first extending column 211 is provided with a first hollow cavity, and the second extending column 221 is provided with a second hollow cavity, so that the first extending column 211 and the second extending column 221 have a certain elastic deformation. ability, it is more convenient to insert into the fourth groove and the fifth groove, and after the second inner corner wall panel 74 and the first inner corner wall panel 73 are connected flatly, damage to the wall panels caused by thermal expansion and cold contraction can be prevented.

同样的,所述第三伸出柱213内设置有第三中空腔,方便第三伸出柱213插入至第六凹槽内也可以避免热胀冷缩的损坏。Similarly, a third hollow cavity is provided in the third extending column 213 to facilitate the insertion of the third extending column 213 into the sixth groove and to avoid damage caused by thermal expansion and contraction.

所述第四凹槽731和第六凹槽732均为长条槽,且所述第四凹槽731和第六凹槽732的延伸方向均与所述第一阴角墙板73靠近所述第一板21的一端的端面平行,最好是第四凹槽731和第六凹槽732的长度等于第一阴角墙板73的长度,使得阴角连接件2安装在第一阴角墙板73上时,第三伸出柱213可以从第六凹槽732的端部进行滑动插入,同时第一伸出柱211也从第四凹槽731的端部进行滑动插入。The fourth groove 731 and the sixth groove 732 are elongated grooves, and the extending directions of the fourth groove 731 and the sixth groove 732 are close to the first female corner wall panel 73 . The end surface of one end of the first plate 21 is parallel, and preferably the length of the fourth groove 731 and the sixth groove 732 is equal to the length of the first female corner wall panel 73, so that the female corner connector 2 is installed on the first female corner wall. When on the plate 73 , the third protruding post 213 can be slidably inserted from the end of the sixth groove 732 , and at the same time, the first protruding post 211 can also be slidably inserted from the end of the fourth groove 731 .

同样的,第五凹槽741也是长条槽,第五凹槽741的延伸方向与所述第二阴角墙板74靠近所述第二板22的一端的端面平行。Similarly, the fifth groove 741 is also a long groove, and the extending direction of the fifth groove 741 is parallel to the end surface of one end of the second female corner wall panel 74 close to the second plate 22 .

还有,所述第一限位板212上设置有用于与所述第一阴角墙板73连接的第二螺钉214和用于方便所述第二螺钉214安装的第二螺钉孔215。In addition, the first limiting plate 212 is provided with second screws 214 for connecting to the first female corner wall panel 73 and second screw holes 215 for facilitating the installation of the second screws 214 .

以及,所述第一板21远离所述第二板22的一端和第二板22远离所述第一板21的一端通过加强板23连接。Moreover, one end of the first plate 21 away from the second plate 22 and an end of the second plate 22 away from the first plate 21 are connected through a reinforcing plate 23 .

在本实用新型中,所述第一阴角墙板73和第二阴角墙板74侧面均设置有装饰板77,所述第一限位板212位于所述第一阴角墙板73远离所述装饰板77的一侧,所述第二限位板222位于所述第二阴角墙板74远离所述装饰板77的一侧。In the present utility model, the first inner corner wall panel 73 and the second inner corner wall panel 74 are both provided with decorative plates 77 on their sides, and the first limiting plate 212 is located away from the first inner corner wall panel 73 On one side of the decorative panel 77 , the second limiting plate 222 is located on the side of the second female corner wall panel 74 away from the decorative panel 77 .

当然,所述第一板21和所述第二板22连接处设置有填缝块24,所述填缝块24至少有一部分为弧形,准确的说,填缝块24靠近第一限位板212的第一侧边与第一限位板212平行,且第一侧边与第一限位板212之间的间距等于第一阴角墙板73和装饰板77的厚度之和,使得第一侧边可以与第一阴角墙板73的装饰板77外侧连接;同样的,填缝块24靠近第二限位板222的第二侧边可以与第二阴角墙板74的装饰板77外侧连接,在第一侧边和第二侧边远离加强板23的一侧则是弧线的,作为第一阴角墙板73和第二阴角墙板74阴角连接的过渡位置的美观设置。Of course, a caulking block 24 is provided at the connection between the first plate 21 and the second plate 22. At least a part of the caulking block 24 is arc-shaped. To be precise, the caulking block 24 is close to the first limiting position. The first side of the board 212 is parallel to the first limiting plate 212, and the distance between the first side and the first limiting plate 212 is equal to the sum of the thicknesses of the first inner corner wall panel 73 and the decorative panel 77, such that The first side can be connected to the outside of the decorative panel 77 of the first internal corner wall panel 73; similarly, the second side of the caulking block 24 close to the second limiting plate 222 can be connected to the decorative panel of the second internal corner wall panel 74. The outside of the plate 77 is connected, and the first side and the second side are curved on the side away from the reinforcing plate 23, which serves as the transition position for the inner corner connection of the first inner corner wall panel 73 and the second inner corner wall panel 74. beautiful setting.

最后,所述阴角连接件2为一体成型件,整个结构预制完成即可使用,强度更高,安装更方便。Finally, the inner corner connector 2 is an integrally formed part, and the entire structure is ready for use after being prefabricated, with higher strength and easier installation.

实施例四,仍如图1、6、7所示,仅为本实用新型的其中一个实施例,在实施例一的基础上,本实用新型一种装配式整体卫浴墙板结构中,在墙板阳角连接结构处还有以下设置:Embodiment 4, still shown in Figures 1, 6, and 7, is only one embodiment of the present utility model. On the basis of Embodiment 1, in the assembled integral bathroom wall panel structure of the present utility model, the wall panel is There are also the following settings at the connection structure of the positive corner of the plate:

所述第一柱311内设置有第一内腔,所述第二柱321内设置有第二内腔,使得第一柱311和第二柱321具有一定弹性形变能力,更方便插入至第七凹槽和第八凹槽,而且在第二阳角墙板76与第一阳角墙板75平接之后,可以预防热胀冷缩对墙板进行损坏。The first column 311 is provided with a first inner cavity, and the second column 321 is provided with a second inner cavity, so that the first column 311 and the second column 321 have a certain elastic deformation ability, making it easier to insert into the seventh column. groove and the eighth groove, and after the second external corner wall panel 76 is flatly connected with the first external corner wall panel 75, damage to the wall panel caused by thermal expansion and cold contraction can be prevented.

同样的,所述第三柱313内设置有第三内腔,方便第三柱313插入至第九凹槽内也可以避免热胀冷缩的损坏。Similarly, a third inner cavity is provided in the third column 313 to facilitate the insertion of the third column 313 into the ninth groove and avoid damage due to thermal expansion and contraction.

所述第七凹槽751和第九凹槽752均为长条槽,最好是第七凹槽751和第九凹槽752的长度等于第一阳角墙板75的长度,使得阳角连接件3安装在第一阳角墙板75上时,第三柱313可以从第九凹槽752的端部进行滑动插入,同时第一柱311也从第七凹槽751的端部进行滑动插入。The seventh groove 751 and the ninth groove 752 are both elongated grooves. Preferably, the length of the seventh groove 751 and the ninth groove 752 is equal to the length of the first external corner wall panel 75 so that the external corners are connected. When the component 3 is installed on the first corner wall panel 75, the third column 313 can be slid and inserted from the end of the ninth groove 752, and at the same time, the first column 311 can also be slid and inserted from the end of the seventh groove 751. .

同样的,第八凹槽761也是长条槽,第八凹槽761的延伸方向与所述第二阳角墙板76靠近所述第二接板32的一端的端面平行。Similarly, the eighth groove 761 is also a long groove, and the extending direction of the eighth groove 761 is parallel to the end surface of one end of the second external corner wall panel 76 close to the second connecting plate 32 .

还有,所述第一引导板312上设置有用于与所述第一阳角墙板75连接的第三螺钉314和用于方便所述第三螺钉314安装的第三螺钉孔315。In addition, the first guide plate 312 is provided with a third screw 314 for connecting to the first external corner wall panel 75 and a third screw hole 315 for facilitating the installation of the third screw 314 .

以及,所述第一接板31远离所述第二接板32的一端和第二接板32远离所述第一接板31的一端通过第三接板33连接。Moreover, one end of the first connecting plate 31 away from the second connecting plate 32 and an end of the second connecting plate 32 away from the first connecting plate 31 are connected through a third connecting plate 33 .

在本实用新型中,所述第一阳角墙板75和第二阳角墙板76侧面均设置有装饰板77,所述第一引导板312位于所述第一阳角墙板75远离所述装饰板77的一侧,所述第二引导板322位于所述第二阳角墙板76远离所述装饰板77的一侧。In the present utility model, the first and second external corner wall panels 75 and 76 are both provided with decorative panels 77 on their sides, and the first guide plate 312 is located away from the first external corner wall panel 75 . On one side of the decorative panel 77 , the second guide plate 322 is located on the side of the second corner wall panel 76 away from the decorative panel 77 .

当然,所述第一接板31和所述第三接板33连接处设置有填缝条34,所述填缝条34至少有一部分为弧形,使得在第一阳角墙板75和第二阳角墙板76阳角连接时,填缝条34刚好位于第一阳角墙板75和第二阳角墙板76的装饰板77之间,且具有圆弧外侧,为第一阳角墙板75和第二阳角墙板76阳角连接的过渡位置的美观设置。Of course, a caulking strip 34 is provided at the connection between the first connecting plate 31 and the third connecting plate 33. At least a part of the caulking strip 34 is arc-shaped, so that between the first external corner wall panel 75 and the third When the two external corner wall panels 76 are connected at the external corners, the caulking strip 34 is just located between the decorative panel 77 of the first external corner wall panel 75 and the second external corner wall panel 76, and has an arc outside, which is the first external corner. The beautiful arrangement of the transition position of the external corner connection between the wall panel 75 and the second external corner wall panel 76.

最后,所述阳角连接件3为一体成型件,整个结构预制完成即可使用,强度更高,安装更方便。Finally, the external angle connector 3 is an integrally formed part, and the entire structure can be used after being prefabricated, with higher strength and easier installation.

本实用新型一种装配式整体卫浴墙板结构,其结构简单,分别通过平接件、阴角连接件和阳角连接件等连接件完成两块墙板的连接,两块墙板的连接只需要一个连接件即可完成,安装前可以将连接件与其中一个墙板进行预制,安装快捷简单,且两块墙板之间受到限位下进行安装,稳定性好。The utility model is a prefabricated integrated bathroom wall panel structure. The structure is simple. The connection between two wall panels is completed through flat connectors, internal corner connectors, external corner connectors and other connectors. The connection between the two wall panels only requires It only requires one connector to complete. The connector can be prefabricated with one of the wall panels before installation. The installation is quick and simple, and the installation is done with the space between the two wall panels limited, so the stability is good.

本实用新型不局限于上述具体的实施方式,本实用新型可以有各种更改和变化。凡是依据本实用新型的技术实质对以上实施方式所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围。The present utility model is not limited to the above-mentioned specific embodiments, and the utility model can have various modifications and changes. Any modifications, equivalent substitutions, improvements, etc. made to the above embodiments based on the technical essence of the present utility model shall be included in the protection scope of the present utility model.

Claims (10)

1.一种装配式整体卫浴墙板结构,其特征在于:包括第一平接墙板(71)、第二平接墙板(72)、第一阴角墙板(73)、第二阴角墙板(74)、第一阳角墙板(75)、第二阳角墙板(76)、平接件(1)、阴角连接件(2)以及阳角连接件(3),所述第一平接墙板(71)靠近所述第二平接墙板(72)的一端设置有第一凹槽(711)和设置于所述第一凹槽(711)远离所述第二平接墙板(72)的一侧的第二凹槽(712),所述第二平接墙板(72)靠近所述第一平接墙板(71)的一端设置有第三凹槽(721),所述平接件(1)包括第一插柱(11)和设置于所述第一插柱(11)端部的第二插柱(12),所述第一阴角墙板(73)靠近所述第二阴角墙板(74)的一端设置有第四凹槽(731),所述第二阴角墙板(74)靠近所述第一阴角墙板(73)的一端设置有第五凹槽(741),所述阴角连接件(2)包括第一板(21)和与所述第一板(21)垂直设置的第二板(22),所述第一板(21)上设置有用于插入至所述第四凹槽(731)内的第一伸出柱(211),所述第二板(22)上设置有用于插入至所述第五凹槽(741)内的第二伸出柱(221),所述第一阳角墙板(75)靠近所述第二阳角墙板(76)的一端设置有第七凹槽(751),所述第二阳角墙板(76)靠近所述第一阳角墙板(75)的一端设置有第八凹槽(761),所述阳角连接件(3)包括第一接板(31)和第二接板(32),所述第一接板(31)上设置有用于插入至所述第七凹槽(751)内的第一柱(311),所述第二接板(32)上设置有用于插入至所述第八凹槽(761)内的第二柱(321)。1. A prefabricated integrated bathroom wall panel structure, characterized by: including a first flat wall panel (71), a second flat wall panel (72), a first female corner wall panel (73), a second female wall panel Corner wall panel (74), first male corner wall panel (75), second male corner wall panel (76), flat joint (1), female corner connector (2) and male corner connector (3), A first groove (711) is provided at one end of the first flat wall panel (71) close to the second flat wall panel (72) and is disposed in the first groove (711) away from the second flat wall panel (71). A second groove (712) on one side of the second flat wall panel (72), and a third recess is provided on one end of the second flat wall panel (72) close to the first flat wall panel (71). Slot (721), the flat joint (1) includes a first inserting post (11) and a second inserting post (12) provided at the end of the first inserting post (11), the first internal corner A fourth groove (731) is provided at one end of the wall panel (73) close to the second internal corner wall panel (74), and the second internal corner wall panel (74) is close to the first internal corner wall panel (74). A fifth groove (741) is provided at one end of 73), and the inner corner connector (2) includes a first plate (21) and a second plate (22) arranged perpendicularly to the first plate (21), The first plate (21) is provided with a first protruding column (211) for inserting into the fourth groove (731), and the second plate (22) is provided with a first protruding column (211) for inserting into the fourth groove (731). The second protruding column (221) in the fifth groove (741), the end of the first external corner wall panel (75) close to the second external corner wall panel (76) is provided with a seventh groove ( 751), the second external corner wall panel (76) is provided with an eighth groove (761) at one end close to the first external corner wall panel (75), and the external corner connector (3) includes a first A connecting plate (31) and a second connecting plate (32). The first connecting plate (31) is provided with a first column (311) for inserting into the seventh groove (751). The second connecting plate (32) is provided with a second column (321) for inserting into the eighth groove (761). 2.根据权利要求1所述的一种装配式整体卫浴墙板结构,其特征在于:所述第一平接墙板(71)、第二平接墙板(72)、第一阴角墙板(73)、第二阴角墙板(74)、第一阳角墙板(75)、第二阳角墙板(76)侧面均设置有装饰板(77)。2. An assembled integrated bathroom wall panel structure according to claim 1, characterized in that: the first flat wall panel (71), the second flat wall panel (72), the first internal corner wall Decorative panels (77) are provided on the sides of the board (73), the second female corner wall panel (74), the first male corner wall panel (75), and the second male corner wall panel (76). 3.根据权利要求1所述的一种装配式整体卫浴墙板结构,其特征在于:所述第一凹槽(711)、第二凹槽(712)和第三凹槽(721)均为长条槽,且所述第一凹槽(711)、第二凹槽(712)和第三凹槽(721)的延伸方向均与所述第一平接墙板(71)靠近所述第二平接墙板(72)的一端的端面平行。3. An assembled integrated bathroom wall panel structure according to claim 1, characterized in that: the first groove (711), the second groove (712) and the third groove (721) are all A long groove, and the extension directions of the first groove (711), the second groove (712) and the third groove (721) are all close to the first flat wall panel (71) and the third groove. The end faces of one end of the two flat wall panels (72) are parallel. 4.根据权利要求2所述的一种装配式整体卫浴墙板结构,其特征在于:所述第一插柱(11)上设置有用于阻挡所述第一平接墙板(71)和第二平接墙板(72)的阻隔板(13),所述阻隔板(13)远离所述装饰板(77)的一端设置有与所述第一平接墙板(71)平行的限位板(14),所述限位板(14)上设置有用于与所述第一平接墙板(71)连接的第一螺钉(141)和用于方便所述第一螺钉(141)安装的第一螺钉孔(142)。4. An assembled integrated bathroom wall panel structure according to claim 2, characterized in that: the first inserting column (11) is provided with a structure for blocking the first flat wall panel (71) and the third The barrier plate (13) of the two flat wall panels (72), the end of the barrier plate (13) away from the decorative panel (77) is provided with a limiter parallel to the first flat wall panel (71) Board (14), the limiting plate (14) is provided with first screws (141) for connecting with the first flat wall panel (71) and for facilitating the installation of the first screws (141) of the first screw hole (142). 5.根据权利要求1所述的一种装配式整体卫浴墙板结构,其特征在于:所述第四凹槽(731)远离所述第二阴角墙板(74)的一侧设置有第六凹槽(732),所述第一伸出柱(211)远离所述第一板(21)的一端设置有用于插入至所述第六凹槽(732)内的第三伸出柱(213);所述第七凹槽(751)远离所述第二阳角墙板(76)的一侧设置有第九凹槽(752),所述第一柱(311)远离所述第一接板(31)的一端设置有用于插入至所述第九凹槽(752)内的第三柱(313)。5. An assembled integrated bathroom wall panel structure according to claim 1, characterized in that: a side of the fourth groove (731) away from the second female corner wall panel (74) is provided with a third Six grooves (732). One end of the first extending post (211) away from the first plate (21) is provided with a third extending post (732) for inserting into the sixth groove (732). 213); a ninth groove (752) is provided on the side of the seventh groove (751) away from the second corner wall panel (76), and the first column (311) is away from the first One end of the connecting plate (31) is provided with a third post (313) for inserting into the ninth groove (752). 6.根据权利要求5所述的一种装配式整体卫浴墙板结构,其特征在于:所述第一凹槽(711)和第三凹槽(721)均等于所述第一插柱(11)的宽度,所述第一插柱(11)的长度大于所述第一凹槽(711)的深度,所述第二插柱(12)的宽度大于所述第一插柱(11)的宽度,所述第二插柱(12)的宽度等于所述第二凹槽(712)的宽度;所述第六凹槽(732)的宽度大于所述第四凹槽(731)的宽度,所述第三伸出柱(213)的宽度等于所述第六凹槽(732)的宽度;所述第九凹槽(752)的宽度大于所述第七凹槽(751)的宽度,所述第三柱(313)的宽度等于所述第九凹槽(752)的宽度。6. An assembled integrated bathroom wall panel structure according to claim 5, characterized in that: the first groove (711) and the third groove (721) are both equal to the first insertion post (11). ), the length of the first inserting post (11) is greater than the depth of the first groove (711), the width of the second inserting post (12) is greater than the width of the first inserting post (11) Width, the width of the second plug (12) is equal to the width of the second groove (712); the width of the sixth groove (732) is greater than the width of the fourth groove (731), The width of the third protruding column (213) is equal to the width of the sixth groove (732); the width of the ninth groove (752) is greater than the width of the seventh groove (751), so The width of the third column (313) is equal to the width of the ninth groove (752). 7.根据权利要求5所述的一种装配式整体卫浴墙板结构,其特征在于:所述第三伸出柱(213)内设置有第三中空腔,所述第一伸出柱(211)内设置有第一中空腔,所述第二伸出柱(221)内设置有第二中空腔,所述第三柱(313)内设置有第三内腔,所述第一柱(311)内设置有第一内腔,所述第二柱(321)内设置有第二内腔,所述第一插柱(11)内设置有第一空腔(111),所述第二插柱(12)内设置有第二空腔(121)。7. An assembled integrated bathroom wall panel structure according to claim 5, characterized in that: a third hollow cavity is provided in the third extending column (213), and the first extending column (211 ) is provided with a first hollow cavity, the second extending column (221) is provided with a second hollow cavity, the third column (313) is provided with a third inner cavity, the first column (311 ) is provided with a first inner cavity, the second column (321) is provided with a second inner cavity, the first insertion column (11) is provided with a first cavity (111), and the second insertion column (11) is provided with a first cavity (111). A second cavity (121) is provided in the column (12). 8.根据权利要求1所述的一种装配式整体卫浴墙板结构,其特征在于:所述第一板(21)远离所述第二板(22)的一端设置有与所述第二板(22)平行的第一限位板(212),所述第二板(22)远离所述第一板(21)的一端设置有与所述第一板(21)平行的第二限位板(222),所述第一柱(311)和第二柱(321)垂直设置,所述第一接板(31)靠近所述第二接板(32)的一端设置有与所述第二接板(32)平行的第一引导板(312),所述第二接板(32)靠近所述第一接板(31)的一端设置有与所述第一接板(31)平行的第二引导板(322)。8. An assembled integrated bathroom wall panel structure according to claim 1, characterized in that: one end of the first panel (21) away from the second panel (22) is provided with a connection with the second panel. (22) A parallel first limiting plate (212), and an end of the second plate (22) away from the first plate (21) is provided with a second limiting plate parallel to the first plate (21) plate (222), the first column (311) and the second column (321) are arranged vertically, and one end of the first connecting plate (31) close to the second connecting plate (32) is provided with the first connecting plate (31) and the second connecting plate (32). The two connecting plates (32) are parallel to the first guide plate (312). One end of the second connecting plate (32) close to the first connecting plate (31) is provided with a guide plate (312) parallel to the first connecting plate (31). the second guide plate (322). 9.根据权利要求8所述的一种装配式整体卫浴墙板结构,其特征在于:所述第一限位板(212)上设置有用于与所述第一阴角墙板(73)连接的第二螺钉(214)和用于方便所述第二螺钉(214)安装的第二螺钉孔(215),所述第一引导板(312)上设置有用于与所述第一阳角墙板(75)连接的第三螺钉(314)和用于方便所述第三螺钉(314)安装的第三螺钉孔(315)。9. An assembled integrated bathroom wall panel structure according to claim 8, characterized in that: the first limiting plate (212) is provided with a hole for connecting with the first female corner wall panel (73). The second screw (214) and the second screw hole (215) used to facilitate the installation of the second screw (214), the first guide plate (312) is provided with a hole for connecting with the first external corner wall The third screw (314) is connected to the plate (75) and the third screw hole (315) is used to facilitate the installation of the third screw (314). 10.根据权利要求1所述的一种装配式整体卫浴墙板结构,其特征在于:所述平接件(1)、阴角连接件(2)以及阳角连接件(3)均为一体成型件。10. An assembled integrated bathroom wall panel structure according to claim 1, characterized in that: the flat joint (1), the female corner connector (2) and the male corner connector (3) are all integrated Molded parts.
CN202321681837.8U 2023-06-29 2023-06-29 A prefabricated integrated bathroom wall panel structure Withdrawn - After Issue CN220133334U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321681837.8U CN220133334U (en) 2023-06-29 2023-06-29 A prefabricated integrated bathroom wall panel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321681837.8U CN220133334U (en) 2023-06-29 2023-06-29 A prefabricated integrated bathroom wall panel structure

Publications (1)

Publication Number Publication Date
CN220133334U true CN220133334U (en) 2023-12-05

Family

ID=88948516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321681837.8U Withdrawn - After Issue CN220133334U (en) 2023-06-29 2023-06-29 A prefabricated integrated bathroom wall panel structure

Country Status (1)

Country Link
CN (1) CN220133334U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116677153A (en) * 2023-06-29 2023-09-01 浙江亚厦装饰股份有限公司 Assembled integral bathroom wallboard structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116677153A (en) * 2023-06-29 2023-09-01 浙江亚厦装饰股份有限公司 Assembled integral bathroom wallboard structure
CN116677153B (en) * 2023-06-29 2025-07-11 浙江亚厦装饰股份有限公司 Assembled integral bathroom wallboard structure

Similar Documents

Publication Publication Date Title
CN105464251A (en) Pre-fabricated building removable partition, wall splicing structure, and construction method
CN220133334U (en) A prefabricated integrated bathroom wall panel structure
CN205382598U (en) Portable partition wall of assembly type structure and wall body mosaic structure
CN220133332U (en) A kind of external angle splicing structure for integral bathroom wall panels
CN108222554B (en) Toilet frame and toilet frame assembly method
CN220133354U (en) Wallboard butt joint structure used between integral bathroom wallboards
CN220133333U (en) Internal corner splicing structure for integral bathroom wallboard
CN114351963A (en) A prefabricated quick-installed wall assembly and its installation method
CN219825927U (en) Connecting piece for male and female corners of assembled wall
CN217461033U (en) Composite wall panel mounting structure for modular substation
CN116677153B (en) Assembled integral bathroom wallboard structure
CN116771055A (en) Wallboard butt joint structure used between integral bathroom wallboards
CN214941733U (en) Parapet energy-saving component based on assembly type building
CN207538223U (en) A kind of rotatable pre-buried external member and prefabricated assembled wall structure
CN216587441U (en) Decorative panel external corner line closing strip
CN116695976B (en) External corner splicing structure for integral bathroom wallboard
CN213477379U (en) Heat-insulating prefabricated slab
CN116677152B (en) Internal corner splicing structure for integral bathroom wallboard
CN222044782U (en) A combined adjustable wall panel yin and yang angle design structure
CN210562806U (en) Building module splicing wall
CN209556531U (en) A kind of plug-in Assembled enclosing wall of positive pin type arc bayonet connection
KR20060030184A (en) Wall finishing panels for buildings with panel fastenings on the outside
CN209556532U (en) A kind of plug-in Assembled enclosing wall of the self-locking connection of positive pin type wedge shape
CN218091441U (en) Wallboard mounting structure and assembled wall
CN207597655U (en) A kind of stone curtain wall panel inner corner trim hidden telescopic stitches attachment device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20231205

Effective date of abandoning: 20250711

AV01 Patent right actively abandoned

Granted publication date: 20231205

Effective date of abandoning: 20250711