CN220129100U - Preparation facilities that light partition wall panel pipeline is pre-buried - Google Patents

Preparation facilities that light partition wall panel pipeline is pre-buried Download PDF

Info

Publication number
CN220129100U
CN220129100U CN202320651797.6U CN202320651797U CN220129100U CN 220129100 U CN220129100 U CN 220129100U CN 202320651797 U CN202320651797 U CN 202320651797U CN 220129100 U CN220129100 U CN 220129100U
Authority
CN
China
Prior art keywords
threading pipe
plate
pouring cavity
light partition
positioning base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320651797.6U
Other languages
Chinese (zh)
Inventor
杨虎
马保国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Chenchuang Runke Materials Co ltd
Original Assignee
Wuhan Chenchuang Runke Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Chenchuang Runke Materials Co ltd filed Critical Wuhan Chenchuang Runke Materials Co ltd
Priority to CN202320651797.6U priority Critical patent/CN220129100U/en
Application granted granted Critical
Publication of CN220129100U publication Critical patent/CN220129100U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a preparation device for pre-burying a light partition board pipeline, which comprises a board pouring cavity, a threading pipe, a line box, a rubber sealing ring, a positioning base and a U-shaped clamp, wherein the pipeline is embedded in the board pouring cavity; the threading pipe and the wire box are connected and fixed on the positioning base, the joint is sealed by a rubber sealing ring, then the threading pipe, the wire box and the positioning base are put into the plate pouring cavity together, finally slurry is poured into the plate pouring cavity, after natural curing is carried out for a certain time, the threading pipe which is arranged at the top of the plate pouring cavity is cut off, and finally the formed plate is disassembled for subsequent curing. The pipelines are pre-buried in the preparation process of the light partition board, after the board is installed, workers only need to connect the pipelines according to the pre-buried pipelines, so that the working efficiency of the decorating workers is improved, and dust and noise pollution generated in the grooving process are reduced.

Description

Preparation facilities that light partition wall panel pipeline is pre-buried
Technical Field
The utility model belongs to the technical field of light partition wall boards for building walls, and particularly relates to a preparation device for pre-burying pipelines of a light partition wall board.
Background
At present, the light partition board is applied to building partition walls, and especially the application of public buildings to the light partition board is continuously popularized. The use of the light partition wall board greatly improves the construction efficiency and the application effect of the building partition wall board. However, after the construction of the light partition wall board is finished at present, the burying of pipelines arranged on the light partition wall board requires the secondary construction and grooving installation of workers, so that the engineering progress is prolonged, the secondary construction cost is also caused, meanwhile, the accuracy of grooving position is not well controlled, dust and noise pollution can be generated in the installation process, and the problem of the modern building construction is avoided to the greatest extent.
Disclosure of Invention
In order to solve the problems of dust and noise pollution in the process of installing pipelines after the construction of the existing light partition wall board, the utility model provides the preparation device for the pipeline pre-embedding of the light partition wall board, which completes the construction step of the pipeline pre-embedding before the casting of the light partition wall board, saves the construction time of engineering and avoids large dust and noise in a construction site.
The technical scheme for solving the technical problems is as follows:
a preparation facilities of light partition wall panel pipeline pre-buried includes: including panel pouring chamber (1), threading pipe (2), line box (3), rubber seal (4), location base (5), U type card (6), threading pipe (2) with line box (3) are connected and are fixed on location base (5), the interface department is with rubber seal (4) seal, then will threading pipe (2) line box (3) with location base (5) are put into together panel pouring chamber (1), pour the slurry into at last panel pouring chamber (1), after the certain time of natural curing, will panel pouring chamber (1) top is many threading pipe (2) are truncated, and the panel that the shaping is good is dismantled at last carries out follow-up maintenance.
The plate pouring cavity (1) is a light wallboard pouring die, and the upper end of the plate pouring cavity is provided with a sealing cover plate.
The part of the upper end of the threading pipe (2) which exceeds the plate pouring cavity (1) is blocked by sponge, and after the threading pipe is formed, the part of the upper end of the threading pipe (2) which exceeds the plate pouring cavity (1) is cut off.
The U-shaped card (6) is arranged on the back of the wire box (3), and a sponge is plugged in the inner cavity of the front.
The number, the size and the shape of the threading pipes (2) and the thread boxes (3) can be adjusted according to actual requirements.
The threading pipe (2) and the wire box (3) are placed in the plate pouring cavity (1) before the plate is formed.
The rubber sealing ring (4) is sleeved at the joint of the threading pipe (2), the wire box (3) and the positioning base (5).
The positioning base (5) is of a metal quadrangular frustum structure, the width of the lower bottom of the quadrangular frustum is consistent with the thickness of the inner cavity of the pouring cavity (1), a certain strength is achieved after the plate is formed, and the positioning base (5) is detached.
The positioning base (5) can be adjusted in the horizontal direction to determine the positions of the threading pipe (2) and the wire box (3) in the plate pouring cavity (1).
The preparation device for the embedded light partition board pipeline has the beneficial effects that the pipeline can be embedded in the preparation process according to the design scheme, after the board is installed, workers only need to connect the pipeline according to the embedded pipeline, the working efficiency of the decorators is improved, dust and noise pollution generated in the grooving process is reduced, and the preparation device accords with the concept of green construction.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings that are needed in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present utility model, and other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of the structure of the present utility model.
Fig. 2 is a schematic view of a positioning base.
Fig. 3 is a schematic illustration of an example sheet material.
Fig. 4 is a schematic illustration of an example sheet material.
The identification in fig. 1 is as follows: 1. pouring a plate into the cavity; 2. threading pipe, 3, line box, 4, rubber seal, 5, location base, 6, U type card.
Detailed Description
The technical solutions of the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model, and it is apparent that the described embodiments are only some embodiments of the present utility model, but not all embodiments, and all other embodiments obtained by those skilled in the art without making any inventive effort based on the embodiments of the present utility model are within the scope of protection of the present utility model.
As shown in the figure, the preparation device for the pre-buried pipeline of the light partition board comprises a board pouring cavity (1), a threading pipe (2), a wire box (3), a rubber sealing ring (4), a positioning base (5) and a U-shaped clamp (6).
The plate pouring cavity (1) is a light wallboard pouring die, and the upper end of the plate pouring cavity is provided with a sealing cover plate.
The part of the upper end of the threading pipe (2) which exceeds the plate pouring cavity (1) is blocked by sponge, and after the threading pipe is formed, the part of the upper end of the threading pipe (2) which exceeds the plate pouring cavity (1) is cut off.
The U-shaped card (6) is arranged on the back of the wire box (3), and a sponge is plugged in the inner cavity of the front.
The number, the size and the shape of the threading pipes (2) and the thread boxes (3) can be adjusted according to actual requirements.
The threading pipe (2) and the wire box (3) are placed in the plate pouring cavity (1) before the plate is formed.
The rubber sealing ring (4) is sleeved at the joint of the threading pipe (2), the wire box (3) and the positioning base (5).
The positioning base (5) is of a metal quadrangular frustum structure, the width of the lower bottom of the quadrangular frustum is consistent with the thickness of the inner cavity of the pouring cavity (1), a certain strength is achieved after the plate is formed, and the positioning base (5) is detached.
The positioning base (5) can be adjusted in the horizontal direction to determine the positions of the threading pipe (2) and the wire box (3) in the plate pouring cavity (1).
The utility model is implemented in particular: connecting and fixing the threading pipe (2) and the wire box (3) on the positioning base (5), sealing the joint by using the rubber sealing ring (4), putting the threading pipe (2), the wire box (3) and the positioning base (5) into the plate pouring cavity (1) together, finally injecting slurry into the plate pouring cavity (1), naturally curing for a certain time, cutting off the threading pipe (2) which is arranged at the top of the plate pouring cavity (1), and finally removing the formed plate for subsequent curing.
The foregoing description is only a preferred embodiment of the present utility model, and the present utility model is not limited to the above-described embodiment, but may be modified or substituted for some of the technical features described in the above-described embodiments by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (9)

1. The utility model provides a pre-buried preparation facilities of light partition wall panel pipeline which characterized in that includes: the device comprises a plate pouring cavity (1), a threading pipe (2), a wire box (3), a rubber sealing ring (4), a positioning base (5) and a U-shaped clamp (6);
the threading pipe (2) and the wire box (3) are connected and fixed on the positioning base (5), the joint is sealed by the rubber sealing ring (4), then the threading pipe (2), the wire box (3) and the positioning base (5) are put into the plate pouring cavity (1) together, finally slurry is injected into the plate pouring cavity (1), after natural curing is carried out for a certain time, the threading pipe (2) which is arranged at the top of the plate pouring cavity (1) and is excessive is cut off, and finally the formed plate is detached for subsequent curing.
2. The device for preparing the light partition board pipeline pre-buried according to claim 1, wherein: the plate pouring cavity (1) is a light wallboard pouring die, and the upper end of the plate pouring cavity is provided with a sealing cover plate.
3. The device for preparing the light partition board pipeline pre-buried according to claim 1, wherein: the part of the upper end of the threading pipe (2) which exceeds the plate pouring cavity (1) is blocked by sponge, and after the threading pipe is formed, the part of the upper end of the threading pipe (2) which exceeds the plate pouring cavity (1) is cut off.
4. The device for preparing the light partition board pipeline pre-buried according to claim 1, wherein: the U-shaped card (6) is arranged on the back of the wire box (3), and a sponge is plugged in the inner cavity of the front.
5. The device for preparing the light partition board pipeline pre-buried according to claim 1, wherein: the number, the size and the shape of the threading pipes (2) and the thread boxes (3) can be adjusted according to actual requirements.
6. The device for preparing the light partition board pipeline pre-buried according to claim 1, wherein: the threading pipe (2) and the wire box (3) are placed in the plate pouring cavity (1) before the plate is formed.
7. The device for preparing the light partition board pipeline pre-buried according to claim 1, wherein: the rubber sealing ring (4) is sleeved at the joint of the threading pipe (2), the wire box (3) and the positioning base (5).
8. The device for preparing the light partition board pipeline pre-buried according to claim 1, wherein: the positioning base (5) is of a metal quadrangular frustum structure, the width of the lower bottom of the quadrangular frustum is consistent with the thickness of the inner cavity of the pouring cavity (1), a certain strength is achieved after the plate is formed, and the positioning base (5) is detached.
9. The device for preparing the light partition board pipeline pre-buried according to claim 1, wherein: the positioning base (5) can be adjusted in the horizontal direction to determine the positions of the threading pipe (2) and the wire box (3) in the plate pouring cavity (1).
CN202320651797.6U 2023-03-29 2023-03-29 Preparation facilities that light partition wall panel pipeline is pre-buried Active CN220129100U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320651797.6U CN220129100U (en) 2023-03-29 2023-03-29 Preparation facilities that light partition wall panel pipeline is pre-buried

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320651797.6U CN220129100U (en) 2023-03-29 2023-03-29 Preparation facilities that light partition wall panel pipeline is pre-buried

Publications (1)

Publication Number Publication Date
CN220129100U true CN220129100U (en) 2023-12-05

Family

ID=88964474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320651797.6U Active CN220129100U (en) 2023-03-29 2023-03-29 Preparation facilities that light partition wall panel pipeline is pre-buried

Country Status (1)

Country Link
CN (1) CN220129100U (en)

Similar Documents

Publication Publication Date Title
CN103061515B (en) Concrete hollow block infilled wall pre-buried PVC conduit poling mounting method
CN103061504A (en) Concrete board pipeline installation reserved hole construction mould and construction method
CN109676748B (en) Manufacturing method of concrete prefabricated frame of distribution box
CN103061267A (en) Construction method of combined prefabricated bridge anti-collision wall
CN204126213U (en) The direct-burried construction system of distributing box in the in-situ concrete wall having decorative layer
CN203839870U (en) Wall-mounted concealed distribution box
CN220129100U (en) Preparation facilities that light partition wall panel pipeline is pre-buried
CN106381999A (en) Fair-faced concrete wall intaglio character die plate construction method
CN202969967U (en) Temporary protecting device for once formed floor reserved hole
CN209977558U (en) Pipe cover
CN209408833U (en) The structure of transvers plate of multiple building wire box precast concrete blocks can be made simultaneously
CN111535482A (en) Aluminum mould construction concrete structure and tool and electromechanical reservation pre-embedding construction method
CN208857972U (en) Built-in fitting
CN211572085U (en) A wallboard connection major structure for assembly type structure
CN208309615U (en) A kind of hole top row ditch of foundation pit
CN210732757U (en) Interior gliding style high leakproofness prefabricated staircase mould
CN216516895U (en) One-time pre-buried forming device of block terminal in aluminum mould board
CN216865563U (en) Penetration type invisible bridge structure
CN214658750U (en) Tongue-and-groove design mould is striden to height
CN204435867U (en) Air-conditioning duct preformed hole exempts from form removal tool
CN110593560A (en) Concrete wall column inner wire box installation method
CN205863837U (en) A kind of dark wire terminal box
CN209924447U (en) Connecting structure between concrete pouring formworks of building
CN214941361U (en) Light wallboard pipeline pre-embedding device
CN215168004U (en) Wall form for housing construction engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant