CN220100690U - Concrete pouring device - Google Patents

Concrete pouring device Download PDF

Info

Publication number
CN220100690U
CN220100690U CN202320745779.4U CN202320745779U CN220100690U CN 220100690 U CN220100690 U CN 220100690U CN 202320745779 U CN202320745779 U CN 202320745779U CN 220100690 U CN220100690 U CN 220100690U
Authority
CN
China
Prior art keywords
fixedly connected
base
concrete
support column
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202320745779.4U
Other languages
Chinese (zh)
Inventor
聂胜坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202320745779.4U priority Critical patent/CN220100690U/en
Application granted granted Critical
Publication of CN220100690U publication Critical patent/CN220100690U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本实用新型涉及浇筑装置技术领域,特别是一种混凝土浇筑装置,包括万向轮,所述万向轮的一侧固定连接有底座,所述底座的上方设置有可装配式模板,所述底座顶面固定连接有电动导轨。本实用新型的优点在于:工作人员首先推动底座使其在万向轮的作用下运动到合适的位置,随后开启液压支撑柱使其与地面接触,随后将可装配式模板在底座上拼装,并在模板内部浇筑适量的混凝土,随后通过控制器开启第一电动伸缩杆使其带动防溅板向下运动,直至滚轮运动到滑框内部后即可,最后开启收光器和电动滑轨,可以对混凝土进行收光作业,而且可以带动防溅板与收光器同步运动,可以对澎溅的混凝土进行阻挡,不会因混凝土溅出而造成资源的浪费。

The utility model relates to the technical field of pouring devices, in particular to a concrete pouring device, which includes a universal wheel. One side of the universal wheel is fixedly connected to a base. An assemblable formwork is provided above the base. The base The top surface is fixedly connected with electric guide rails. The advantage of this utility model is that the staff first push the base to move to a suitable position under the action of the universal wheel, then open the hydraulic support column to make it contact with the ground, and then assemble the assemblable formwork on the base, and Pour an appropriate amount of concrete inside the formwork, and then turn on the first electric telescopic rod through the controller to drive the splash guard to move downward until the roller moves to the inside of the slide frame. Finally, turn on the light collector and electric slide rail. It performs light collecting operations on concrete, and can drive the splash plate and light collector to move synchronously, which can block the splashing concrete and prevent the waste of resources caused by concrete splashing.

Description

一种混凝土浇筑装置A concrete pouring device

技术领域Technical field

本实用新型涉及浇筑装置技术领域,特别是一种混凝土浇筑装置。The utility model relates to the technical field of pouring devices, in particular to a concrete pouring device.

背景技术Background technique

混凝土浇筑指以水泥为主要胶凝材料,与水、砂、石子,以及必要时掺入化学外加剂和矿物掺合料按适当比例配合,经过均匀搅拌、密实成型及养护硬化而成的人造石材,由混凝土浇筑制成的预制构件广泛应用于装配式建筑,预制构件可在工地装配成建筑,尤其在地铁站的施工过程中需要用到混凝土浇筑预制构件,在预制构件的制作过程中,通常会利用到浇筑装置,以加快预制构件的成型。Concrete pouring refers to artificial stone made of cement as the main cementing material, mixed with water, sand, gravel, and if necessary, chemical admixtures and mineral admixtures in appropriate proportions, uniformly stirred, densely formed, and cured and hardened. , prefabricated components made of concrete pouring are widely used in prefabricated buildings. Prefabricated components can be assembled into buildings at the construction site. Especially in the construction process of subway stations, concrete poured prefabricated components are needed. In the production process of prefabricated components, usually Pouring equipment will be used to speed up the shaping of prefabricated elements.

如公开号为CN217434625U的一种混凝土浇筑装置,其结构包括:基座、模板组件以及收光组件,所述模板组件设于所述基座,所述收光组件设于所述基座,所述收光组件包括升降部和收光部,所述升降部用于驱动所述收光部升降,所述收光部用于对所述模板槽内的混凝土浇筑收光。For example, a concrete pouring device with publication number CN217434625U has a structure including: a base, a formwork assembly and a light-collecting assembly. The formwork assembly is located on the base, and the light-collecting assembly is located on the base. The light collecting assembly includes a lifting part and a light collecting part. The lifting part is used to drive the light collecting part to move up and down. The light collecting part is used to light collect the concrete pouring in the formwork groove.

上述混凝土浇筑装置在实际使用中还存在以下不足:上述浇筑装置为了降低施工人员的负担,在装置上增设的用于混凝土收光的构件,通过收光构件的震动对混凝土进行收光,但是震动的收光器进行收光作业时会带动混凝土产生震动,震动的混凝土容易出现澎溅,澎溅出模板的混凝土浆会造成不必要的浪费,因此需要一种混凝土浇筑装置来解决上述问题。The above-mentioned concrete pouring device still has the following shortcomings in actual use: in order to reduce the burden on construction workers, the above-mentioned pouring device adds a component for concrete light collection to the device, and the concrete is lightened by the vibration of the light collection component, but the vibration The light collector will cause the concrete to vibrate when performing the light collection operation. The vibrating concrete is prone to splashing, and the concrete slurry splashing out of the formwork will cause unnecessary waste. Therefore, a concrete pouring device is needed to solve the above problems.

实用新型内容Utility model content

本实用新型的目的旨在至少解决所述技术缺陷之一。The purpose of the present invention is to solve at least one of the technical drawbacks.

为此,本实用新型的一个目的在于提出一种混凝土浇筑装置,以解决背景技术中所提到的问题,克服现有技术中存在的不足。To this end, one purpose of the present utility model is to provide a concrete pouring device to solve the problems mentioned in the background art and overcome the deficiencies in the prior art.

为了实现上述目的,本实用新型一方面的实施例提供一种混凝土浇筑装置,包括万向轮,所述万向轮的一侧固定连接有底座,所述底座的上方设置有可装配式模板,所述底座顶面固定连接有电动导轨,所述电动导轨的一侧滑动连接有滑块,所述滑块的一侧固定连接有支撑柱,所述支撑柱的一侧设置有防溅构件,所述防溅构件包括第一电动伸缩杆,所述第一电动伸缩杆的输出端固定连接有升降柱,所述升降柱的一侧固定连接有限位柱,所述升降柱的一侧固定连接有防溅板,所述防溅板的底面转动连接有滚轮,所述防溅板的顶面固定连接有第二电动伸缩杆,所述第二电动伸缩杆的输出端固定连接有收光器。In order to achieve the above object, an embodiment of the present invention provides a concrete pouring device, which includes a universal wheel. One side of the universal wheel is fixedly connected to a base, and an assemblable formwork is provided above the base. An electric guide rail is fixedly connected to the top surface of the base, a slider is slidingly connected to one side of the electric guide rail, a support column is fixedly connected to one side of the slider, and a splash-proof member is provided on one side of the support column. The splash-proof member includes a first electric telescopic rod. The output end of the first electric telescopic rod is fixedly connected to a lifting column. One side of the lifting column is fixedly connected to a limiting column. One side of the lifting column is fixedly connected. There is a splash guard. The bottom surface of the splash guard is rotatably connected with a roller. The top surface of the splash guard is fixedly connected with a second electric telescopic rod. The output end of the second electric telescopic rod is fixedly connected with a light collector. .

由上述任一方案优选的是,所述底座的一侧固定连接有液压支撑柱,所述液压支撑柱的数量为若干个,若干个所述液压支撑柱对称分布在底座的一侧。所述万向轮的数量为若干个,若干个所述万向轮对称分布在底座的四个角上,采用上述方案可以达到的技术效果是:当需要进行混凝土浇筑作业时,首先需要推动底座使其在万向轮的作用下运动到合适的位置,随后开启液压支撑柱使其与地面接触,随后将可装配式模板在底座上拼装,并在模板内部浇筑适量的混凝土,而且通过万向轮可以使浇筑装置更便于移动。According to any of the above solutions, it is preferred that one side of the base is fixedly connected with a hydraulic support column, the number of the hydraulic support columns is several, and the several hydraulic support columns are symmetrically distributed on one side of the base. The number of the universal wheels is several, and the plurality of universal wheels are symmetrically distributed on the four corners of the base. The technical effect that can be achieved by using the above solution is: when concrete pouring operations need to be carried out, the base needs to be pushed first. Make it move to the appropriate position under the action of the universal wheel, and then open the hydraulic support column to make it contact with the ground. Then assemble the assemblable formwork on the base, pour an appropriate amount of concrete inside the formwork, and pass the universal wheel Wheels make the pouring unit easier to move.

由上述任一方案优选的是,所述第一电动伸缩杆的底座与滑块固定连接,所述支撑柱的一侧固定连接有控制器,所述控制器与第一电动伸缩杆电性连接。所述支撑柱的一侧开设有限位孔,所述限位孔的直径大小与限位柱的直径大小相等,所述升降柱与支撑柱滑动连接。所述可装配式模板包括第一模板和第二模板,所述第一模板的底面固定连接有滑框,所述滑框与滚轮相对应,采用上述方案可以达到的技术效果是:混凝土添加完成之后,随后通过控制器开启第一电动伸缩杆使其带动防溅板向下运动,直至滚轮运动到滑框内部后即可,最后开启收光器和电动滑轨,可以对混凝土进行收光作业,而且可以带动防溅板与收光器同步运动,可以对澎溅的混凝土进行阻挡,不会因混凝土溅出而造成资源的浪费。According to any of the above solutions, it is preferred that the base of the first electric telescopic rod is fixedly connected to the slider, a controller is fixedly connected to one side of the support column, and the controller is electrically connected to the first electric telescopic rod. . A limit hole is provided on one side of the support column. The diameter of the limit hole is equal to the diameter of the limit column. The lifting column is slidingly connected to the support column. The assemblable formwork includes a first formwork and a second formwork. A sliding frame is fixedly connected to the bottom surface of the first formwork. The sliding frame corresponds to the roller. The technical effect that can be achieved by using the above solution is: concrete addition is completed. After that, the first electric telescopic rod is turned on through the controller to drive the splash guard to move downward until the roller moves to the inside of the sliding frame. Finally, the light collector and electric slide rail are turned on to carry out lightening work on the concrete. , and can drive the splash guard and the light collector to move synchronously, which can block the splashing concrete, and will not cause a waste of resources due to concrete splashing.

与现有技术相比,本实用新型所具有的优点和有益效果为:Compared with the existing technology, the advantages and beneficial effects of this utility model are:

通过万向轮、底座、可装配式模板、电动导轨、滑块、支撑柱和防溅构件之间的配合设置,当需要进行混凝土浇筑作业时,首先需要推动底座使其在万向轮的作用下运动到合适的位置,随后开启液压支撑柱使其与地面接触,随后将可装配式模板在底座上拼装,并在模板内部浇筑适量的混凝土,随后通过控制器开启第一电动伸缩杆使其带动防溅板向下运动,直至滚轮运动到滑框内部后即可,最后开启收光器和电动滑轨,可以对混凝土进行收光作业,而且可以带动防溅板与收光器同步运动,可以对澎溅的混凝土进行阻挡,不会因混凝土溅出而造成资源的浪费。Through the cooperation between the universal wheel, the base, the assembled formwork, the electric guide rail, the slider, the support column and the splash-proof component, when concrete pouring operations are required, the base first needs to be pushed to make it in the role of the universal wheel. Move down to the appropriate position, then open the hydraulic support column to make it contact with the ground, then assemble the assemblable formwork on the base, and pour an appropriate amount of concrete inside the formwork, and then open the first electric telescopic rod through the controller to make it contact the ground. Drive the splash guard to move downward until the roller moves to the inside of the sliding frame. Finally, turn on the light collector and the electric slide rail, so that the concrete can be lightened, and the splash guard and the light collector can be driven to move synchronously. It can block the splashing concrete without wasting resources due to concrete splashing.

附图说明Description of the drawings

图1为本实用新型装配体的结构示意图;Figure 1 is a schematic structural diagram of the assembly of the present utility model;

图2为本实用新型浇筑组件的结构示意图;Figure 2 is a schematic structural diagram of the pouring assembly of the present utility model;

图3为本实用新型收光构件的结构示意图;Figure 3 is a schematic structural diagram of the light collecting component of the present utility model;

图4为本实用新型收光构件的剖面的结构示意图;Figure 4 is a schematic structural diagram of a cross-section of the light collecting component of the present invention;

图5为本实用新型支撑柱的结构示意图。Figure 5 is a schematic structural diagram of the support column of the present invention.

图中:1-万向轮,2-底座,3-可装配式模板,301-第一模板,302-第二模板,4-电动导轨,5-滑块,6-支撑柱,7-防溅构件,701-第一电动伸缩杆,702-升降柱,703-限位柱,704-防溅板,705-滚轮,706-第二电动伸缩杆,707-收光器,8-液压支撑柱,9-控制器,10-限位孔,11-滑框。In the picture: 1-universal wheel, 2-base, 3-assemblyable formwork, 301-first formwork, 302-second formwork, 4-electric guide rail, 5-sliding block, 6-support column, 7-anti- Splash component, 701-first electric telescopic rod, 702-lifting column, 703-limit column, 704-splash plate, 705-roller, 706-second electric telescopic rod, 707-light collector, 8-hydraulic support Column, 9-controller, 10-limiting hole, 11-sliding frame.

实施方式Implementation

下面结合附图对本实用新型做进一步的描述,但本实用新型的保护范围不局限于以下。The utility model will be further described below in conjunction with the accompanying drawings, but the protection scope of the utility model is not limited to the following.

如图1至图5所示,一种混凝土浇筑装置,它包括万向轮1,万向轮1的一侧固定连接有底座2,底座2的上方设置有可装配式模板3,底座2顶面固定连接有电动导轨4,电动导轨4的一侧滑动连接有滑块5,滑块5的一侧固定连接有支撑柱6,支撑柱6的一侧设置有防溅构件7,防溅构件7包括第一电动伸缩杆701,第一电动伸缩杆701的输出端固定连接有升降柱702,升降柱702的一侧固定连接有限位柱703,升降柱702的一侧固定连接有防溅板704,防溅板704的底面转动连接有滚轮705,防溅板704的顶面固定连接有第二电动伸缩杆705,第二电动伸缩杆705的输出端固定连接有收光器707。As shown in Figures 1 to 5, a concrete pouring device includes a universal wheel 1. One side of the universal wheel 1 is fixedly connected to a base 2. An assemblable formwork 3 is provided above the base 2. The top of the base 2 An electric guide rail 4 is fixedly connected to the surface. A slider 5 is slidingly connected to one side of the electric guide rail 4. A support column 6 is fixedly connected to one side of the slider 5. A splash-proof member 7 is provided on one side of the support column 6. The splash-proof member 7 includes a first electric telescopic rod 701. The output end of the first electric telescopic rod 701 is fixedly connected with a lifting column 702. One side of the lifting column 702 is fixedly connected with a limiting column 703. One side of the lifting column 702 is fixedly connected with a splash guard. 704, a roller 705 is rotatably connected to the bottom surface of the splash guard 704, a second electric telescopic rod 705 is fixedly connected to the top surface of the splash guard 704, and a light collector 707 is fixedly connected to the output end of the second electric telescopic rod 705.

作为本实用新型的一种可选技术方案,底座2的一侧固定连接有液压支撑柱8,液压支撑柱8的数量为若干个,若干个液压支撑柱8对称分布在底座2的一侧。万向轮1的数量为若干个,若干个万向轮对称分布在底座2的四个角上,当需要进行混凝土浇筑作业时,首先需要推动底座2使其在万向轮1的作用下运动到合适的位置,随后开启液压支撑柱8使其与地面接触,随后将可装配式模板3在底座2上拼装,并在模板内部浇筑适量的混凝土。As an optional technical solution of the present invention, one side of the base 2 is fixedly connected with a hydraulic support column 8 . There are several hydraulic support columns 8 , and several hydraulic support columns 8 are symmetrically distributed on one side of the base 2 . The number of universal wheels 1 is several, and several universal wheels are symmetrically distributed on the four corners of the base 2. When concrete pouring operation is required, the base 2 needs to be pushed first to make it move under the action of the universal wheels 1. to the appropriate position, then open the hydraulic support column 8 to make it contact the ground, then assemble the assemblable formwork 3 on the base 2, and pour an appropriate amount of concrete inside the formwork.

作为本实用新型的一种可选技术方案,第一电动伸缩杆701的底座与滑块5固定连接,支撑柱6的一侧固定连接有控制器9,控制器9与第一电动伸缩杆701电性连接。支撑柱6的一侧开设有限位孔10,限位孔10的直径大小与限位柱703的直径大小相等,升降柱702与支撑柱6滑动连接。可装配式模板3包括第一模板301和第二模板302,第一模板301的底面固定连接有滑框11,滑框11与滚轮705相对应,混凝土添加完成之后,随后通过控制器9开启第一电动伸缩杆701使其带动防溅板704向下运动,直至滚轮705运动到滑框11内部后即可,最后开启收光器707和电动滑轨4,可以对混凝土进行收光作业,而且可以带动防溅板704与收光器707同步运动,可以对澎溅的混凝土进行阻挡。As an optional technical solution of the present invention, the base of the first electric telescopic rod 701 is fixedly connected to the slider 5, and a controller 9 is fixedly connected to one side of the support column 6. The controller 9 is connected to the first electric telescopic rod 701. Electrical connection. A limit hole 10 is provided on one side of the support column 6 . The diameter of the limit hole 10 is equal to the diameter of the limit column 703 . The lifting column 702 is slidingly connected to the support column 6 . The assemblable formwork 3 includes a first formwork 301 and a second formwork 302. The bottom surface of the first formwork 301 is fixedly connected with a sliding frame 11. The sliding frame 11 corresponds to the roller 705. After the concrete addition is completed, the controller 9 is used to open the second formwork. An electric telescopic rod 701 drives the splash guard 704 to move downward until the roller 705 moves to the inside of the sliding frame 11. Finally, the light collector 707 and the electric slide rail 4 are opened, so that the concrete can be lightened, and The splash-proof plate 704 and the light collector 707 can be driven to move synchronously to block splashing concrete.

一种混凝土浇筑装置,工作原理如下:A concrete pouring device, the working principle is as follows:

1):当需要进行混凝土浇筑作业时,首先需要推动底座2使其在万向轮1的作用下运动到合适的位置,随后开启液压支撑柱8使其与地面接触,随后将可装配式模板3在底座2上拼装,并在模板内部浇筑适量的混凝土。1): When concrete pouring operation is required, first the base 2 needs to be pushed to move to a suitable position under the action of the universal wheel 1, and then the hydraulic support column 8 is opened to make it contact with the ground, and then the assembly formwork is 3. Assemble the base 2 and pour an appropriate amount of concrete inside the formwork.

2):混凝土添加完成之后,随后通过控制器9开启第一电动伸缩杆701使其带动防溅板704向下运动,直至滚轮705运动到滑框11内部后即可,最后开启收光器707和电动滑轨4,可以对混凝土进行收光作业,而且可以带动防溅板704与收光器707同步运动,可以对澎溅的混凝土进行阻挡。2): After the addition of concrete is completed, the first electric telescopic rod 701 is then turned on through the controller 9 to drive the splash guard 704 to move downward until the roller 705 moves to the inside of the sliding frame 11, and finally the light collector 707 is turned on. And the electric slide rail 4 can be used to collect light on concrete, and can drive the splash guard 704 and the light collector 707 to move synchronously to block the splashing concrete.

综上,该混凝土浇筑装置,通过万向轮1、底座2、可装配式模板3、电动导轨4、滑块5、支撑柱6和防溅构件7之间的配合设置,当需要进行混凝土浇筑作业时,首先需要推动底座2使其在万向轮1的作用下运动到合适的位置,随后开启液压支撑柱8使其与地面接触,随后将可装配式模板3在底座2上拼装,并在模板内部浇筑适量的混凝土,随后通过控制器9开启第一电动伸缩杆701使其带动防溅板704向下运动,直至滚轮705运动到滑框11内部后即可,最后开启收光器707和电动滑轨4,可以对混凝土进行收光作业,而且可以带动防溅板704与收光器707同步运动,可以对澎溅的混凝土进行阻挡,不会因混凝土溅出而造成资源的浪费。To sum up, this concrete pouring device, through the cooperation between the universal wheel 1, the base 2, the assembly formwork 3, the electric guide rail 4, the slider 5, the support column 6 and the splash-proof member 7, when concrete pouring is required During operation, you first need to push the base 2 to move to a suitable position under the action of the universal wheel 1, then open the hydraulic support column 8 to make it contact with the ground, and then assemble the assemblable formwork 3 on the base 2, and Pour an appropriate amount of concrete inside the formwork, and then use the controller 9 to open the first electric telescopic rod 701 to drive the splash guard 704 to move downward until the roller 705 moves to the inside of the sliding frame 11, and finally open the light collector 707 And the electric slide rail 4 can be used to collect light on concrete, and can drive the splash plate 704 and the light collector 707 to move synchronously, which can block the splashing concrete and prevent the waste of resources due to concrete splashing.

Claims (5)

1. The utility model provides a concrete placement device which characterized in that: including universal wheel (1), one side fixedly connected with base (2) of universal wheel (1), the top of base (2) is provided with but assembled template (3), one side fixedly connected with electric rail (4) of base (2) top surface, one side sliding connection of electric rail (4) has slider (5), one side fixedly connected with support column (6) of slider (5), one side of support column (6) is provided with splashproof component (7), splashproof component (7) include first electric telescopic handle (701), the output fixedly connected with lift post (702) of first electric telescopic handle (701), one side fixedly connected with spacing post (703) of lift post (702), one side fixedly connected with splash guard (704) of lift post (702), the bottom surface rotation of splash guard (704) is connected with gyro wheel (705), the top surface fixedly connected with second electric telescopic handle (706), the output fixedly connected with light receiver (707) of second electric telescopic handle (706), one side fixedly connected with support column (8) of base (8) is hydraulic pressure, the hydraulic support columns (8) are symmetrically distributed on one side of the base (2).
2. A concrete pouring device according to claim 1, wherein: the number of the universal wheels (1) is a plurality, and the universal wheels are symmetrically distributed on four corners of the base (2).
3. A concrete pouring device according to claim 2, wherein: the base of first electric telescopic rod (701) is fixedly connected with slider (5), one side fixedly connected with controller (9) of support column (6), controller (9) and first electric telescopic rod (701) electric connection.
4. A concrete pouring device according to claim 3, wherein: one side of the support column (6) is provided with a limiting hole (10), the diameter of the limiting hole (10) is equal to that of the limiting column (703), and the lifting column (702) is in sliding connection with the support column (6).
5. A concrete pouring device according to claim 4, wherein: the assembled template (3) comprises a first template (301) and a second template (302), wherein a sliding frame (11) is fixedly connected to the bottom surface of the first template (301), and the sliding frame (11) corresponds to the roller (705).
CN202320745779.4U 2023-04-07 2023-04-07 Concrete pouring device Expired - Fee Related CN220100690U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320745779.4U CN220100690U (en) 2023-04-07 2023-04-07 Concrete pouring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320745779.4U CN220100690U (en) 2023-04-07 2023-04-07 Concrete pouring device

Publications (1)

Publication Number Publication Date
CN220100690U true CN220100690U (en) 2023-11-28

Family

ID=88865037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320745779.4U Expired - Fee Related CN220100690U (en) 2023-04-07 2023-04-07 Concrete pouring device

Country Status (1)

Country Link
CN (1) CN220100690U (en)

Similar Documents

Publication Publication Date Title
CN208277146U (en) A kind of dedicated concrete slab of Construction of Civil Engineering pours device
CN207044416U (en) A kind of municipal construction concrete quick agitator
CN107322805A (en) A kind of municipal construction concrete quick agitator
CN118636271A (en) A kind of prefabricated concrete component production equipment for assembled buildings and intermittent casting method thereof
CN204844405U (en) Fixed mould platform is used in synchronous vibration device and production of PC component
CN220100690U (en) Concrete pouring device
CN205871254U (en) Cement bag compressor arrangement for building
CN205532629U (en) All -hydraulic central ditch die carrier
CN216587752U (en) Concrete vibrating equipment
CN202744907U (en) Concrete leveling, paste lifting and elevation control integrated device for bed plates
CN206351135U (en) Precast slab automatic mold cleaning device
CN204419203U (en) All-hydraulic gantry type ditch, cable trench mould bases chassis
CN209621337U (en) Tunnel curb gutter and cable duct integral type automatic hydraulic walking template system
CN207841756U (en) A kind of precast bridge concreting rain-proof constructing device
CN208697691U (en) A kind of prefabricated trolley of pipe gallery
CN111521463A (en) Permeable concrete laboratory forming device and method
CN205086145U (en) Cement anchor continuous automatic production device
CN208105089U (en) A kind of culvert building wall device
CN221346352U (en) Concrete leveling device
CN208288860U (en) A kind of apparatus for bending for truss bars concrete folding plate end reinforcing bar
CN211737150U (en) A tunnel cable trench and water trench construction trolley
CN222253165U (en) Concrete placement auxiliary device
CN207469685U (en) A kind of dabbing device for concrete wall surface
CN207260593U (en) Floor concrete casting operation platform is built in a kind of room
CN208168281U (en) A kind of plastering machine that can consolidate placement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20231128

CF01 Termination of patent right due to non-payment of annual fee