CN220100592U - A small construction hanging basket on the roof - Google Patents
A small construction hanging basket on the roof Download PDFInfo
- Publication number
- CN220100592U CN220100592U CN202321449351.1U CN202321449351U CN220100592U CN 220100592 U CN220100592 U CN 220100592U CN 202321449351 U CN202321449351 U CN 202321449351U CN 220100592 U CN220100592 U CN 220100592U
- Authority
- CN
- China
- Prior art keywords
- connecting arm
- hanging basket
- frame
- upper frame
- directional
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Jib Cranes (AREA)
Abstract
Description
技术领域Technical field
本实用新型涉及屋顶施工设备技术领域,具体为一种屋顶小型施工挂篮。The utility model relates to the technical field of roof construction equipment, specifically a small roof construction hanging basket.
背景技术Background technique
现代建筑中,在建筑完成后,出于美观及维护工作的需要,比如需要进行屋顶泛光安装、线路铺设、女儿墙外墙施工和修补等,需要施工人员对屋顶外立面进行施工,因为建筑脚手架已拆除,因此需要采用一些安全措施和设备方便施工人员进行施工,并且要求保证安全。In modern buildings, after the building is completed, due to the needs of aesthetics and maintenance work, such as roof floodlight installation, wiring laying, parapet exterior wall construction and repair, etc., construction workers are required to perform construction on the roof facade, because The construction scaffolding has been removed, so some safety measures and equipment need to be adopted to facilitate construction workers and ensure safety.
实用新型内容Utility model content
本实用新型的目的在于提供一种占地面积小不影响屋顶施工,移动方便,组装验收简单的屋顶小型施工挂篮。The purpose of this utility model is to provide a small roof construction hanging basket that occupies a small area, does not affect roof construction, is easy to move, and is simple to assemble and accept.
为实现上述目的,本实用新型提供如下技术方案:In order to achieve the above purpose, the present utility model provides the following technical solutions:
一种屋顶小型施工挂篮,包括上框架、下框架、吊篮;所述的上框架中部下方设有定向脚轮,所述的上框架两侧分别设有向下延伸的第一连接臂、第二连接臂;所述的下框架底部设有定向脚轮,所述的下框架一侧设有与第一连接臂配合连接的下连接臂、另一侧设有配重,所述的下连接臂或第一连接臂上设有定向脚轮,所述的下连接臂与下框架之间设有斜向加强杆;所述的吊篮包括吊篮框架,所述的吊篮框架一侧设有与第二连接臂配合连接的吊篮连接臂,所述的吊篮连接臂或第二连接臂上设有定向脚轮。A small construction hanging basket for a roof, including an upper frame, a lower frame, and a hanging basket; directional casters are provided below the middle part of the upper frame, and first and third connecting arms extending downward are respectively provided on both sides of the upper frame. Two connecting arms; the bottom of the lower frame is provided with directional casters, one side of the lower frame is provided with a lower connecting arm that is connected to the first connecting arm, and the other side is provided with a counterweight, and the lower connecting arm Or the first connecting arm is provided with directional casters, and an oblique reinforcing rod is provided between the lower connecting arm and the lower frame; the hanging basket includes a hanging basket frame, and one side of the hanging basket frame is provided with a The second connecting arm is matched with the hanging basket connecting arm, and the hanging basket connecting arm or the second connecting arm is provided with directional casters.
本方案主要用于高空平台临边作业,挂篮需要铺设于平整的女儿墙顶或者人工铺设的钢轨道上,使用高度不超过100m;本方案产品使用时,上框架、下框架、吊篮相互连接,其中,上框架置于女儿墙顶部,下框架和吊篮分别置于女儿墙两侧,上框架底部的定向脚轮在女儿墙顶部移动,下连接臂或第一连接臂上的定向脚轮贴紧女儿墙内侧移动,第二连接臂或吊篮连接臂上的定向脚轮贴紧女儿墙外侧移动,另外,下框架底部的定向脚轮方便下框架在屋顶移动;施工人员施工时处于女儿墙外侧吊篮内,相对应的,在女儿墙内侧的下框架上设置了配重,使得上框架两侧达到受力平衡;定向脚轮是指脚轮移动时轨迹是直线型的,不能随意改变移动方向,区别于万向脚轮。This solution is mainly used for edge operations on high-altitude platforms. The hanging basket needs to be laid on the top of a flat parapet or on an artificially laid steel track. The use height does not exceed 100m. When the product of this solution is used, the upper frame, lower frame and hanging basket are mutually exclusive. Connection, in which the upper frame is placed on the top of the parapet, the lower frame and the hanging basket are placed on both sides of the parapet respectively, the directional casters at the bottom of the upper frame move on the top of the parapet, and the directional casters on the lower connecting arm or the first connecting arm are attached When the inner side of the parapet is moved tightly, the directional casters on the second connecting arm or the hanging basket connecting arm move close to the outer side of the parapet. In addition, the directional casters at the bottom of the lower frame facilitate the movement of the lower frame on the roof; the construction personnel are hanging outside the parapet during construction. In the basket, correspondingly, a counterweight is set on the lower frame on the inside of the parapet, so that the forces on both sides of the upper frame are balanced; directional casters mean that the trajectory of the casters is linear when moving, and the direction of movement cannot be changed at will. The difference On swivel casters.
作为本实用新型优选的方案,所述的下连接臂或第一连接臂上设置的定向脚轮设有可调节螺栓组,所述的定向脚轮与下连接臂或第一连接臂的间距可调整。本方案中,由于不同女儿墙的厚度会有差别,因此把下连接臂或第一连接臂上设置的定向脚轮设置成可调节间距的,使得女儿墙内外侧的定向脚轮都可以贴紧女儿墙侧面。As a preferred solution of the present invention, the directional caster provided on the lower connecting arm or the first connecting arm is provided with an adjustable bolt group, and the distance between the directional caster and the lower connecting arm or the first connecting arm is adjustable. In this plan, since the thickness of different parapets will be different, the directional casters on the lower connecting arm or the first connecting arm are set to have adjustable spacing, so that the directional casters on the inside and outside of the parapet can be close to the parapet. side.
作为本实用新型优选的方案,所述的下框架底部设有两列定向脚轮,其中,一列定向脚轮设于下连接臂一侧下方,另一列定向脚轮设于远离下连接臂一侧下方,所述远离下连接臂的定向脚轮上方设有承重梁、配重套杆,所述的配重为圆环形,所述的配重设有多个并分别套接在配重套杆上。本方案的配重可以由多个带中心孔的圆盘状(圆环形)或其它形状重物组成,优点是可以通过调整数量来增加或减少配重,方便使用。As a preferred solution of the present invention, the bottom of the lower frame is provided with two rows of directional casters, wherein one row of directional casters is provided below the side of the lower connecting arm, and the other row of directional casters is provided below the side away from the lower connecting arm, so A load-bearing beam and a counterweight sleeve rod are provided above the directional caster away from the lower connecting arm. The counterweight is annular. There are multiple counterweights and they are respectively sleeved on the counterweight sleeve rod. The counterweight of this solution can be composed of multiple disc-shaped (annular) or other shaped weights with central holes. The advantage is that the counterweight can be increased or decreased by adjusting the number, which is convenient for use.
作为本实用新型优选的方案,所述的上框架与第一连接臂、第二连接臂之间设有加强筋,所述的上框架外侧设有封头板,所述的上框架下方设有排成一列的三组定向脚轮。本方案封头板用于遮蔽及保护上框架,加强筋可提高上框架的整体强度。As a preferred solution of the present invention, reinforcing ribs are provided between the upper frame and the first connecting arm and the second connecting arm, a head plate is provided on the outside of the upper frame, and a head plate is provided below the upper frame. Three sets of directional casters in a row. The head plate of this solution is used to shield and protect the upper frame, and the reinforcing ribs can improve the overall strength of the upper frame.
作为本实用新型优选的方案,所述的吊篮框架底部及侧面分别设有保护板,所述的吊篮框架中部设有横向加强筋。本方案的保护板主要对在吊篮内施工的工作人员提供防护,同时也可防止施工物品从吊篮内意外坠落。As a preferred solution of the present invention, the bottom and sides of the hanging basket frame are respectively provided with protective plates, and the middle part of the hanging basket frame is provided with transverse reinforcing ribs. The protective board of this solution mainly provides protection for workers working in the hanging basket, and can also prevent construction items from accidentally falling from the hanging basket.
作为本实用新型优选的方案,所述的第一连接臂与下连接臂、第二连接臂与吊篮连接臂均为方管,所述的第一连接臂与下连接臂、第二连接臂与吊篮连接臂套接且设有相互配合的多个固定孔、固定螺栓组。本方案的第一连接臂与下连接臂、第二连接臂与吊篮连接臂均为方管,并且为一大一小,小方管可插入大方管内,二者采用螺栓组连接固定,多个固定孔还可以提供部分伸缩余地,可有限上框架与下框架和吊篮的相对高度。As a preferred solution of the present invention, the first connecting arm, the lower connecting arm, and the second connecting arm and the hanging basket connecting arm are all square tubes. It is socketed with the hanging basket connecting arm and provided with multiple fixing holes and fixing bolt groups that match each other. The first connecting arm and the lower connecting arm, the second connecting arm and the hanging basket connecting arm of this solution are all square tubes, one large and one small. The small square tube can be inserted into the large square tube. The two are connected and fixed by a set of bolts. Each fixing hole can also provide some room for expansion and contraction, which can limit the relative height of the upper frame, lower frame and hanging basket.
本方案安装和拆卸作业应设置警戒区,专人负责统一指挥和监督,禁止无关人员进入,仔细检查所有待装结构件有无明显弯曲、扭曲或局部变形;检查焊缝有无裂纹、裂缝;检查受力构件表面锈蚀情况,其锈蚀深度不得大于原厚度10%;凡有缺陷的构件坚决更换或修复后再用,挂篮分为三个部分,挂篮部分、上框架部分、下框架部分,首先应在屋顶平台将各部件放置好。将挂篮和上框架部分先进行组装,挂篮插入上框架部分然后用3个M16高强螺栓连接牢固;连接完成后用绳子拴住上框架部分防止安装时意外滑脱,同时两个人将挂篮和上框架部分安放于女儿墙顶上,挂篮在室外侧;然后将下框架部分(配重系统)调整插入上框架部分,用3个M16螺栓连接牢固,最后将配重块安放好;安装时应由两人同时进行操作,有专人统一协调,挂篮未完全组装完成时,拴在上框架部分上的绳子不应解除;挂篮拆除程序为:人员和材料撤出挂篮至屋面平台-----拆卸配重块----松开上框架部分与下框架部分的连接螺栓-----抽出下框架部分-----将上框架部分连接挂篮整体搬运至屋面平台-----松掉加强绳------上框架部分和挂篮解体。A warning area should be set up for the installation and disassembly operations of this plan. A dedicated person should be responsible for unified command and supervision. Unrelated personnel are prohibited from entering. All structural parts to be installed should be carefully checked for obvious bending, distortion or local deformation; the welds should be checked for cracks and fissures; For surface corrosion of stress-bearing components, the corrosion depth shall not be greater than 10% of the original thickness; any defective components must be replaced or repaired before use. The hanging basket is divided into three parts, the hanging basket part, the upper frame part, and the lower frame part. First, the components should be placed on the roof deck. Assemble the hanging basket and the upper frame part first. Insert the hanging basket into the upper frame part and connect it firmly with three M16 high-strength bolts. After the connection is completed, tie the upper frame part with a rope to prevent accidental slippage during installation. At the same time, two people will connect the hanging basket and the upper frame part. The upper frame part is placed on the top of the parapet wall, and the hanging basket is on the outdoor side; then adjust the lower frame part (counterweight system) and insert it into the upper frame part, connect it firmly with 3 M16 bolts, and finally place the counterweight block; during installation It should be operated by two people at the same time, with a dedicated person for unified coordination. When the hanging basket is not fully assembled, the rope tied to the upper frame part should not be removed; the hanging basket disassembly procedure is: personnel and materials are evacuated from the hanging basket to the roof platform - ----Remove the counterweight block----Loosen the connecting bolts between the upper frame part and the lower frame part-----Pull out the lower frame part-----Connect the upper frame part to the hanging basket and transport it to the roof platform as a whole -----Loosen the reinforcing rope------The upper frame part and hanging basket are disassembled.
与现有技术相比,本实用新型的有益效果是:占地面积小不影响屋顶施工,移动方便,组装验收简单。Compared with the existing technology, the utility model has the following beneficial effects: it occupies a small area without affecting roof construction, is easy to move, and is simple to assemble and accept.
附图说明Description of the drawings
图1为本实用新型的一种外形结构示意图。Figure 1 is a schematic diagram of the appearance structure of the utility model.
图2为本实用新型的一种框架结构示意图。Figure 2 is a schematic diagram of a frame structure of the present utility model.
图3为本实用新型在使用时的一种截面结构示意图。Figure 3 is a schematic cross-sectional structural diagram of the utility model in use.
图4为本实用新型上框架的一种结构示意图。Figure 4 is a structural schematic diagram of the upper frame of the utility model.
图5为本实用新型下框架的一种结构示意图。Figure 5 is a structural schematic diagram of the lower frame of the utility model.
图6为本实用新型吊篮的一种结构示意图。Figure 6 is a structural schematic diagram of the hanging basket of the present utility model.
图中:1、上框架 2、下框架 3、吊篮 4、第一连接臂In the picture: 1. Upper frame 2. Lower frame 3. Hanging basket 4. First connecting arm
5、第二连接臂 6、下连接臂 7、配重 8、斜向加强杆5. Second connecting arm 6. Lower connecting arm 7. Counterweight 8. Oblique reinforcing rod
9、吊篮框架 10、吊篮连接臂 11、可调节螺栓组9. Gondola frame 10. Gondola connecting arm 11. Adjustable bolt group
12、承重梁 13、配重套杆 14、加强筋12. Load-bearing beam 13. Counterweight sleeve rod 14. Reinforcing ribs
15、封头板 16、保护板 17、横向加强筋。15. Head plate 16. Protection plate 17. Transverse reinforcement.
具体实施方式Detailed ways
下面将结合本实用新型实施例,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例,基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, rather than all the embodiments. Based on this The embodiments in the utility model and all other embodiments obtained by those of ordinary skill in the art without creative efforts belong to the scope of protection of the utility model.
为了便于理解本实用新型,下面将参照相关附图对本实用新型进行更全面的描述。给出了本实用新型的若干实施例。但是,本实用新型可以以许多不同的形式来实现,并不限于本文所描述的实施例。相反地,提供这些实施例的目的是使对本实用新型的公开内容更加透彻全面。In order to facilitate understanding of the present utility model, the present utility model will be described more comprehensively below with reference to the relevant drawings. Several embodiments of the present invention are given. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
需要说明的是,当元件被称为“固设于”另一个元件,它可以直接在另一个元件上或者也可以存在居中的元件。当一个元件被认为是“连接”另一个元件,它可以是直接连接到另一个元件或者可能同时存在居中元件。本文所使用的术语“垂直的”、“水平的”、“左”、“右”以及类似的表述只是为了说明的目的。It should be noted that when an element is referred to as being "mounted" on another element, it can be directly on the other element or intervening elements may also be present. When an element is said to be "connected" to another element, it can be directly connected to the other element or there may also be intervening elements present. The terms "vertical," "horizontal," "left," "right" and similar expressions are used herein for illustrative purposes only.
除非另有定义,本文所使用的所有的技术和科学术语与属于本实用新型的技术领域的技术人员通常理解的含义相同。本文中在本实用新型的说明书中所使用的术语只是为了描述具体的实施例的目的,不是旨在于限制本实用新型。本文所使用的术语“及/或”包括一个或多个相关的所列项目的任意的和所有的组合。Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the technical field to which the invention belongs. The terms used in the description of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
请参阅图1-图6,本实用新型提供一种技术方案:Please refer to Figures 1-6. The present utility model provides a technical solution:
一种屋顶小型施工挂篮,包括上框架1、下框架2、吊篮3;上框架1中部下方设有定向脚轮,上框架1两侧分别设有向下延伸的第一连接臂4、第二连接臂5;下框架2底部设有定向脚轮,下框架2一侧设有与第一连接臂4配合连接的下连接臂6、另一侧设有配重7,第一连接臂4上设有定向脚轮,下连接臂6与下框架2之间设有斜向加强杆8;吊篮3包括吊篮框架9,吊篮框架9一侧设有与第二连接臂5配合连接的吊篮连接臂10,吊篮连接臂10上设有定向脚轮。A small construction hanging basket on the roof, including an upper frame 1, a lower frame 2, and a hanging basket 3; a directional caster is provided at the bottom of the middle of the upper frame 1, and a first connecting arm 4 and a second connecting arm extending downward are respectively provided on both sides of the upper frame 1. Two connecting arms 5; the bottom of the lower frame 2 is provided with directional casters, one side of the lower frame 2 is provided with a lower connecting arm 6 that is connected to the first connecting arm 4, and the other side is provided with a counterweight 7. It is provided with directional casters, and an oblique reinforcing rod 8 is provided between the lower connecting arm 6 and the lower frame 2; the hanging basket 3 includes a hanging basket frame 9, and a hanging basket connected to the second connecting arm 5 is provided on one side of the hanging basket frame 9. The basket connecting arm 10 is provided with directional casters.
第一连接臂4上设置的定向脚轮设有可调节螺栓组11,定向脚轮与第一连接臂4的间距可调整。The directional caster provided on the first connecting arm 4 is provided with an adjustable bolt group 11, and the distance between the directional caster and the first connecting arm 4 is adjustable.
下框架2底部设有两列定向脚轮,其中,一列定向脚轮设于下连接臂6一侧下方,另一列定向脚轮设于远离下连接臂6一侧下方,远离下连接臂6的定向脚轮上方设有承重梁12、配重套杆13,配重7为圆环形,配重7设有多个并分别套接在配重套杆13上。There are two rows of directional casters at the bottom of the lower frame 2. One row of directional casters is located below the side of the lower connecting arm 6, and the other row of directional casters is located below the side away from the lower connecting arm 6 and above the directional casters away from the lower connecting arm 6. There is a load-bearing beam 12 and a counterweight sleeve rod 13. The counterweight 7 is annular in shape. There are multiple counterweights 7 and they are respectively sleeved on the counterweight sleeve rod 13.
上框架1与第一连接臂4、第二连接臂5之间设有加强筋14,上框架1外侧设有封头板15,上框架1下方设有排成一列的三组定向脚轮。Reinforcing ribs 14 are provided between the upper frame 1 and the first connecting arm 4 and the second connecting arm 5. A head plate 15 is provided on the outside of the upper frame 1. There are three sets of directional casters arranged in a row below the upper frame 1.
吊篮框架9底部及侧面分别设有保护板16,吊篮框架9中部设有横向加强筋17。The bottom and sides of the hanging basket frame 9 are respectively provided with protective plates 16, and the middle part of the hanging basket frame 9 is provided with transverse reinforcing ribs 17.
第一连接臂4与下连接臂6、第二连接臂5与吊篮连接臂10均为方管,第一连接臂4与下连接臂6、第二连接臂5与吊篮连接臂10套接且设有相互配合的多个固定孔、固定螺栓组。The first connecting arm 4 and the lower connecting arm 6, the second connecting arm 5 and the hanging basket connecting arm 10 are all square tubes, and the first connecting arm 4 and the lower connecting arm 6, the second connecting arm 5 and the hanging basket connecting arm 10 are set It is connected and provided with multiple fixing holes and fixing bolt groups that cooperate with each other.
本实用新型具体使用过程:首先应在屋顶平台将各部件放置好,将吊篮3和上框架1部分先进行组装,吊篮3吊篮连接臂10插入上框架1第二连接臂5然后用M16高强螺栓连接牢固;连接完成后用绳子拴住上框架1防止安装时意外滑脱,同时两个人将吊篮3和上框架1安放于女儿墙顶上,吊篮3在室外侧;然后将下框架2下连接臂6调整插入上框架1第一连接臂4,用M16螺栓连接牢固,最后将配重7安放好;The specific usage process of this utility model: First, place all components on the roof platform, assemble the hanging basket 3 and the upper frame 1 part first, insert the hanging basket connecting arm 10 of the hanging basket 3 into the second connecting arm 5 of the upper frame 1 and then use M16 high-strength bolts are connected firmly; after the connection is completed, tie the upper frame 1 with a rope to prevent accidental slippage during installation. At the same time, two people place the hanging basket 3 and the upper frame 1 on the top of the parapet wall, with the hanging basket 3 on the outside; then put the lower Adjust the lower connecting arm 6 of the frame 2 and insert it into the first connecting arm 4 of the upper frame 1, connect it firmly with M16 bolts, and finally place the counterweight 7;
施工完成后,挂篮拆除程序为:人员和材料撤出吊篮3至屋面平台-----拆卸配重7----松开上框架1与下框架2的连接螺栓-----抽出下框架2-----将上框架1连接吊篮3整体搬运至屋面平台-----松掉加强绳------上框架1和吊篮3解体。After the construction is completed, the procedure for dismantling the hanging basket is as follows: remove personnel and materials from the hanging basket 3 to the roof platform - remove the counterweight 7 - loosen the connecting bolts between the upper frame 1 and the lower frame 2 - -Pull out the lower frame 2-----Transport the upper frame 1 and the hanging basket 3 to the roof platform as a whole-----Loosen the reinforcing rope------Disassemble the upper frame 1 and the hanging basket 3.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those of ordinary skill in the art will understand that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention. , substitutions and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321449351.1U CN220100592U (en) | 2023-06-07 | 2023-06-07 | A small construction hanging basket on the roof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321449351.1U CN220100592U (en) | 2023-06-07 | 2023-06-07 | A small construction hanging basket on the roof |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN220100592U true CN220100592U (en) | 2023-11-28 |
Family
ID=88846580
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202321449351.1U Expired - Fee Related CN220100592U (en) | 2023-06-07 | 2023-06-07 | A small construction hanging basket on the roof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN220100592U (en) |
-
2023
- 2023-06-07 CN CN202321449351.1U patent/CN220100592U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103669832B (en) | A kind of standard type Bailey bracket assembled jacking formwork system | |
| CN102864936B (en) | Combination lifting construction method for large-scale high hollow building roof of steel structure | |
| CN107902545B (en) | Horse way air pipe hoisting construction device and construction method | |
| CN112663927A (en) | Steel structure dome aerial work stepped operation platform and construction method thereof | |
| CN109184061A (en) | It cornices outside space structure ceiling system structure and construction method | |
| CN105178584A (en) | Assembled house out-hung scaffold system and construction method | |
| CN218912194U (en) | Portable safe operation platform for elevator shaft of high-rise building | |
| CN220100592U (en) | A small construction hanging basket on the roof | |
| CN102817464B (en) | Construction device for painting anti-corrosion and fireproof paint of building | |
| CN204778237U (en) | Can have enough to meet need construction elevator layer door connects material platform | |
| CN206753087U (en) | A kind of lighting roof operating platform structure | |
| CN211949737U (en) | A liftable construction platform for external reinforcement of circular silos | |
| CN205369872U (en) | Large -scale air cooling tower X pillar crowd structure scaffold | |
| CN221422602U (en) | A platform for DOME steel structure construction | |
| CN220723383U (en) | Adjusting mechanism for tower crane wall-attached supporting platform | |
| CN220599110U (en) | Movable bridge type operation platform | |
| CN117027352A (en) | Large-span high altitude vestibule curtain wall construction operation platform | |
| CN212535265U (en) | Microwave tower with regular triangle structure | |
| CN205369948U (en) | Lifting device for daylighting top is used for installing | |
| CN220451395U (en) | Structural climbing frame attaching supporting device | |
| CN223675788U (en) | Suspended type easy-to-detach aerial work platform applicable to tree-shaped special-shaped building structure | |
| CN204754150U (en) | Disc type node scaffolding | |
| CN223228872U (en) | Auxiliary tool for overhauling and cleaning cooling triangular tube bundle of indirect cooling tower | |
| CN221053135U (en) | A cantilevered operating platform for exterior wall decoration construction | |
| CN219219401U (en) | Temporary protection device for deformation joint in staggered floor construction of tower |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20231128 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |