CN220082721U - Engineering surveying instrument strutting arrangement - Google Patents

Engineering surveying instrument strutting arrangement Download PDF

Info

Publication number
CN220082721U
CN220082721U CN202321398486.XU CN202321398486U CN220082721U CN 220082721 U CN220082721 U CN 220082721U CN 202321398486 U CN202321398486 U CN 202321398486U CN 220082721 U CN220082721 U CN 220082721U
Authority
CN
China
Prior art keywords
mounting
surveying instrument
lifting
protective box
sets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321398486.XU
Other languages
Chinese (zh)
Inventor
欧美极
周江刚
仲霞莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Gongda Vocational And Technical College
Original Assignee
Hefei Gongda Vocational And Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Gongda Vocational And Technical College filed Critical Hefei Gongda Vocational And Technical College
Priority to CN202321398486.XU priority Critical patent/CN220082721U/en
Application granted granted Critical
Publication of CN220082721U publication Critical patent/CN220082721U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A90/00Technologies having an indirect contribution to adaptation to climate change
    • Y02A90/30Assessment of water resources

Landscapes

  • Details Of Measuring And Other Instruments (AREA)

Abstract

The utility model relates to the technical field of building engineering surveying and mapping, in particular to an engineering surveying and mapping instrument supporting device, which comprises a supporting sleeve, wherein three groups of supporting frames are arranged on the outer side of the supporting sleeve, a connecting column is connected to the inner thread of the supporting sleeve, a mounting column is fixedly connected to the top of the connecting column, a mounting seat is sleeved on the outer side of the mounting column, a protective box is fixedly connected to the top of the mounting seat, a box cover is arranged on the top of the protective box, and a lifting mechanism is arranged in the protective box; the inside of mount pad has been seted up the joint groove, the mount pad is connected with the erection column through the installed part, the inside of mount pad just is located the corresponding position department of installed part and has seted up the mounting groove. The lifting mechanism comprises a lifting plate which is slidably connected in the protective box, and two groups of lifting frames are arranged at the bottom of the lifting plate.

Description

Engineering surveying instrument strutting arrangement
Technical Field
The utility model relates to the technical field of building engineering surveying and mapping, in particular to an engineering surveying and mapping instrument supporting device.
Background
The surveying engineering is to measure various information of space and earth and draw various topographic maps, the object to be surveyed is very extensive, mainly include various ground objects, landforms and structures of underground geology of the earth's surface, etc., need use specialized surveying instrument to survey while surveying, the surveying instrument is instrument and apparatus such as data acquisition, processing, output, etc. designed and manufactured for surveying operation, mainly divide into theodolite, level gauge and total station, etc., the surveying instrument needs to cooperate with specialized strutting arrangement of the surveying instrument to use while using, fix the surveying instrument on strutting arrangement in order to survey the place to be surveyed;
through retrieval, bulletin number: CN218153319U discloses an engineering surveying instrument supporting device, which comprises a mounting plate, the top fixed mounting of mounting panel has the supporting seat, the top fixed mounting of supporting seat has the backup pad, the bottom of mounting panel is connected with three supporting leg through the pivot rotation, the bottom fixed mounting of mounting panel has the leading truck, the inside top side of leading truck is connected with the external screw thread sleeve through the bearing frame rotation, the outside fixed mounting of bottom of external screw thread sleeve has the turning handle, the outside of external screw thread sleeve just is located the inside threaded connection of leading truck has the connecting plate, connecting plate and leading truck sliding connection; according to the utility model, through the mutual matching among the rotating handle, the external thread sleeve, the connecting plate, the guide frame and other components, the lifting of the connecting plate is controlled by rotating the rotating handle, and then the limiting and fixing effects on the position of the support leg after being folded are realized;
with respect to the related art described above, the following drawbacks still exist during use: when the surveying instrument is used, the surveying instrument is required to be moved to another place when the surveying instrument is needed to be surveyed, the three supporting legs can be stored, but the supporting legs cannot be limited, a user is required to hold the surveying instrument when the surveying instrument is carried, meanwhile, the head of the supporting device is required to be arranged due to the fact that the surveying instrument is arranged on the head of the supporting device, the supporting device can be inclined, the user is required to hold the gravity center of the supporting device when the surveying instrument is carried, the carrying is inconvenient, and the surface is dirty and the clothes of the user are easy to dirty because the surveying instrument works outside for a long time, so that the novel supporting device is designed for improving the existing supporting device to change the technical defects, and the practicability of the whole supporting device is particularly important.
Disclosure of Invention
The present utility model is directed to an engineering surveying instrument supporting device, which solves the problems set forth in the background art.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the utility model provides an engineering surveying instrument strutting arrangement, includes support sleeve, support sleeve's outside is equipped with three support frames, support sleeve's inside threaded connection has the spliced pole, the top fixedly connected with erection column of spliced pole, the outside cover of erection column is equipped with the mount pad, the top fixedly connected with protective housing of mount pad, the top of protective housing is equipped with the case lid, the inside of protective housing is equipped with elevating system;
the inside of mount pad has been seted up the joint groove, the mount pad is connected with the erection column through the installed part, the inside of mount pad just is located the corresponding position department of installed part and has seted up the mounting groove.
The lifting mechanism comprises lifting plates, the lifting plates are slidably connected to the inside of the protective box, two groups of lifting frames are arranged at the bottom of the lifting plates, rotating shafts are arranged between the lifting frames and at the center of the two groups of lifting frames, and sliding shafts are arranged at the corners between the lifting frames and between the two groups of lifting frames.
As a preferable scheme of the utility model, a plurality of sliding shafts are connected with the protective box through connecting shafts, the right side of the protective box is rotatably connected with a knob at a position corresponding to the connecting shafts, and the knob penetrates through the protective box and is connected with the connecting shafts.
As a preferable scheme of the utility model, the box cover is connected with the protective box through two sets of hinges, the top of the box cover is provided with a handle, and the front surface of the box cover is provided with two sets of buckles.
As the preferable scheme of the utility model, the two groups of lifting frames are in an X-shaped structural design, the two groups of lifting frames are connected with the protective box and the lifting plate in a sliding manner, the connecting shafts are connected with the sliding shafts in a threaded manner, and the two groups of lifting frames are connected with the rotating shaft in a rotating manner.
As a preferable scheme of the utility model, the inner structure size of the clamping groove is correspondingly arranged with the outer structure size of the mounting column and the outer structure sizes of the three groups of supporting frames.
As a preferable scheme of the utility model, a positioning groove is formed in the mounting column and at a position corresponding to the mounting piece, and a fixing groove is formed in the support sleeve, the support frame and the connecting column.
Compared with the prior art, the utility model has the beneficial effects that:
according to the utility model, through the design of the support sleeve, the support frame, the connecting column, the mounting seat, the protective box and the lifting mechanism, when in use, the three groups of support frames and the ground form a triangle, so that the support effect on the surveying instrument is realized, the stability of the support device is improved, meanwhile, the height of the surveying instrument can be adjusted through the support sleeve, the use effect of the surveying instrument is improved, the mounting seat is taken down from the mounting column when in carrying, the three groups of support frames are retracted, the mounting seat is sleeved on the outer sides of the three groups of support frames and is positioned at the gravity center of the support device, the three groups of support frames are limited through the mounting seat, the support frames are prevented from falling off when in carrying, the support device can be easily carried by holding a handle on the protective box, and meanwhile, the mounting seat is sleeved on the gravity center of the support device can not incline when in carrying.
Drawings
FIG. 1 is a schematic view of the overall three-dimensional structure of the present utility model in a first state;
FIG. 2 is a schematic view of the overall three-dimensional structure of the present utility model in a second state;
FIG. 3 is a schematic perspective view of a support sleeve according to the present utility model;
FIG. 4 is a schematic view of the inside of the three-dimensional structure of the protection box of the present utility model.
In the figure: 1. a support sleeve; 101. a fixing groove; 2. a support frame; 3. a connecting column; 4. a mounting column; 401. a positioning groove; 5. a mounting base; 501. a clamping groove; 502. a mounting member; 503. a mounting groove; 6. a protective box; 7. a case cover; 701. a handle; 702. a buckle; 8. a lifting mechanism; 801. a lifting plate; 802. a lifting frame; 803. a rotating shaft; 804. a sliding shaft; 805. a connecting shaft; 806. and (5) a knob.
Detailed Description
The technical solutions of the embodiments of the present utility model will be clearly and completely described below in conjunction with the embodiments of the present utility model, and it is apparent that the described embodiments are only some embodiments of the present utility model, but not all embodiments, and all other embodiments obtained by those skilled in the art without making any inventive effort based on the embodiments of the present utility model are within the scope of protection of the present utility model.
Examples:
aiming at the defects of the prior art, the utility model aims to provide an engineering surveying instrument supporting device which aims to solve the technical problems that a user is required to hold a surveying instrument when carrying the supporting device in the prior art, meanwhile, the surveying instrument is arranged at the head of the supporting device, so that the supporting device is heavy and light in weight, the supporting device can incline, the carrying of the user is not facilitated, and the surveying instrument works outside for a long time, the surface is dirty and the clothes of the user are easy to dirty.
Referring to fig. 1-4, the present utility model provides a technical solution:
the utility model provides an engineering surveying instrument strutting arrangement, includes support sleeve 1, and support sleeve 1's outside is equipped with three support frames 2, and support sleeve 1's inside threaded connection has spliced pole 3, and spliced pole 3's top fixedly connected with erection column 4, erection column 4's outside cover is equipped with mount pad 5, and the top fixedly connected with protective housing 6 of mount pad 5, and the top of protective housing 6 is equipped with case lid 7, and the inside of protective housing 6 is equipped with elevating system 8;
further, the case cover 7 is connected with the protective case 6 through two sets of hinges, the top of the case cover 7 is provided with a handle 701, the front of the case cover 7 is provided with two sets of buckles 702, the buckles 702 are opened firstly, the case cover 7 is opened through the handle 701, after a surveying instrument is placed in the protective case 6, the case cover 7 is covered on the protective case 6 through the buckles 702 after the surveying instrument is placed, the case cover 7 carries the supporting device to a designated position, the inner side of the mounting seat 5 is provided with a clamping groove 501, the inner structure size of the clamping groove 501 is corresponding to the outer structure size of the mounting column 4 and the outer structure size of the three sets of supporting frames 2, the mounting seat 5 is taken off from the outer side of the supporting frames 2 through the mounting groove 503 and the fixing groove 101, the mounting seat 5 is mounted on the mounting column 4, the mounting seat 5 is connected with the mounting column 4 through the mounting piece 502, a positioning groove 401 is formed in the mounting column 4 and is positioned at a position corresponding to the mounting piece 502, a mounting groove 503 is formed in the mounting seat 5 and is positioned at a position corresponding to the mounting piece 502, a fixing groove 101 is formed in the supporting sleeve 1, the supporting frame 2 and the connecting column 3, the mounting column 4 and the clamping groove 501 are mutually clamped, the positioning groove 401 on the mounting column 4 and the mounting groove 503 in the mounting seat 5 are mutually clamped, the mounting piece 502 is screwed into the positioning groove 401 and the mounting groove 503, the mounting seat 5 and the mounting column 4 are fixed through the mounting piece 502, the case cover 7 is opened, the surveying instrument is driven to rise through the lifting mechanism 8, after the surveying instrument is exposed, the site is measured through the surveying instrument, the connecting column 3 can be lifted up and down in the supporting sleeve 1 through rotating the connecting column 3 through threads and the supporting sleeve 1 during the measuring, the height of the surveying instrument can be changed.
Referring to fig. 4, the specific structure of the lifting mechanism 8 is as follows:
elevating system 8 includes lifter plate 801, lifter plate 801 sliding connection is in the inside of protective housing 6, and the bottom of lifter plate 801 is equipped with two sets of lifting frame 802, and the center department that just is located two sets of lifting frame 802 between two sets of lifting frame 802 is equipped with axis of rotation 803, and the corner that just is located two sets of lifting frame 802 between two sets of lifting frame 802 all is equipped with sliding shaft 804, and a plurality of sliding shaft 804 all is connected with protective housing 6 through connecting axle 805, and the right side of protective housing 6 just is located the corresponding position department rotation of connecting axle 805 and is connected with knob 806.
Furthermore, the lifting mechanism 8 is used to drive the surveying instrument to lift, the knob 806 penetrates through the protective box 6 and is connected with the connecting shaft 805, the knob 806 is rotated to drive the connecting shaft 805 to rotate, the connecting shaft 805 is formed by splicing two groups of threaded columns with opposite directions, the connecting shaft 805 drives two groups of sliding shafts 804 to move in the protective box 6 during rotation, the two groups of sliding shafts 804 are close to each other, the sliding shafts 804 drive the bottoms of the lifting frames 802 to be close to each other during movement, the two groups of lifting frames 802 are in an X-shaped structural design, the two groups of lifting frames 802 are connected with the protective box 6 and the lifting plates 801 in a sliding manner, the connecting shaft 805 is in threaded connection with the sliding shafts 804, the two sets of lifting frames 802 are in rotary connection with the rotary shaft 803, the two sets of lifting frames 802 rotate through the rotary shaft 803, the width of the two sets of lifting frames 802 is reduced, the length of the lifting frames rises, the lifting frames 802 drive the lifting plates 801 to rise, the lifting plates 801 drive the surveying instrument to rise when rising, the surveying instrument slides out of the interior of the protective box 6, the site can be measured through the surveying instrument, after surveying, the surveying instrument is retracted into the protective box 6 by rotating the knob 806 in the reverse direction, the box cover 7 is covered, and the protective box 6 and the box cover 7 play a protective role on the surveying instrument.
The working flow of the utility model is as follows: when using strutting arrangement, at first open buckle 702, open case lid 7 through handle 701, place the surveying instrument in protective housing 6, cover case lid 7 after placing, cover case lid 7 on protective housing 6 through buckle 702, carry strutting arrangement to appointed position department, in unscrew mounting 502 from mounting groove 503 and fixed slot 101, take off mount pad 5 from the outside of support frame 2, install mount pad 5 on erection column 4, make erection column 4 and joint groove 501 block each other, make the constant head tank 401 on the erection column 4 and the mounting groove 503 block each other in the erection column 5, fix erection column 5 and erection column 4 through mounting 502 in the constant head tank 401, open case lid 7, after making surveying instrument expose, measure the place through surveying instrument, in measuring, still can also rotate through rotatory spliced pole 3 with support sleeve 1 through the screw thread, make spliced pole 3 carry out the mutual block in support sleeve 1's inside at the support sleeve 1, the utility model, the high practicality of the utility model is improved, the utility model is realized by the whole and the instrument is fixed, the utility model is characterized by the improvement of the whole design.
The foregoing embodiments are preferred embodiments of the present utility model, and in addition, the present utility model may be implemented in other ways, and any obvious substitution is within the scope of the present utility model without departing from the concept of the present utility model.

Claims (6)

1. Engineering surveying instrument strutting arrangement, including supporting sleeve (1), its characterized in that: the three groups of supporting frames (2) are arranged on the outer side of the supporting sleeve (1), the connecting columns (3) are connected with the inner threads of the supporting sleeve (1), the top of each connecting column (3) is fixedly connected with the corresponding mounting column (4), the outer side of each mounting column (4) is sleeved with a mounting seat (5), the top of each mounting seat (5) is fixedly connected with a protective box (6), the top of each protective box (6) is provided with a box cover (7), and the inside of each protective box (6) is provided with a lifting mechanism (8);
a clamping groove (501) is formed in the inner side of the mounting seat (5), the mounting seat (5) is connected with the mounting column (4) through a mounting piece (502), and a mounting groove (503) is formed in the mounting seat (5) and located at a position corresponding to the mounting piece (502);
elevating system (8) are including lifter plate (801), lifter plate (801) sliding connection is in the inside of protective housing (6), the bottom of lifter plate (801) is equipped with two sets of lifting frame (802), two sets of between lifting frame (802) and be located the center department of two sets of lifting frame (802) and be equipped with axis of rotation (803), two sets of between lifting frame (802) and be located the corner of two sets of lifting frame (802) all be equipped with sliding shaft (804).
2. An engineering surveying instrument support device according to claim 1, wherein: the sliding shafts (804) are connected with the protective box (6) through the connecting shafts (805), knobs (806) are rotatably connected to the right side of the protective box (6) and located at positions corresponding to the connecting shafts (805), and the knobs (806) penetrate through the protective box (6) and are connected with the connecting shafts (805).
3. An engineering surveying instrument support device according to claim 1, wherein: the box cover (7) is connected with the protection box (6) through two sets of hinges, a handle (701) is arranged at the top of the box cover (7), and two sets of buckles (702) are arranged on the front face of the box cover (7).
4. An engineering surveying instrument support device according to claim 2, wherein: the two groups of lifting frames (802) are of an X-shaped structural design, the two groups of lifting frames (802) are connected with the protective box (6) and the lifting plate (801) in a sliding mode, the connecting shafts (805) are connected with the sliding shafts (804) in a threaded mode, and the two groups of lifting frames (802) are connected with the rotating shaft (803) in a rotating mode.
5. An engineering surveying instrument support device according to claim 1, wherein: the inner structure of the clamping groove (501) is correspondingly arranged with the outer structure of the mounting column (4) and the outer structures of the three groups of supporting frames (2).
6. An engineering surveying instrument support according to claim 5, wherein: positioning grooves (401) are formed in the mounting columns (4) and located at positions corresponding to the mounting pieces (502), and fixing grooves (101) are formed in the supporting sleeve (1), the supporting frame (2) and the connecting columns (3).
CN202321398486.XU 2023-06-01 2023-06-01 Engineering surveying instrument strutting arrangement Active CN220082721U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321398486.XU CN220082721U (en) 2023-06-01 2023-06-01 Engineering surveying instrument strutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321398486.XU CN220082721U (en) 2023-06-01 2023-06-01 Engineering surveying instrument strutting arrangement

Publications (1)

Publication Number Publication Date
CN220082721U true CN220082721U (en) 2023-11-24

Family

ID=88816085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321398486.XU Active CN220082721U (en) 2023-06-01 2023-06-01 Engineering surveying instrument strutting arrangement

Country Status (1)

Country Link
CN (1) CN220082721U (en)

Similar Documents

Publication Publication Date Title
CN212510321U (en) Positioning balance acquisition device for geographic mapping
CN209069283U (en) A kind of engineering Multifunctional mapping instrument
CN217930301U (en) Accurate mapping device for engineering survey
CN214580185U (en) Topographic surveying and mapping device with installation height adjusting function
CN220082721U (en) Engineering surveying instrument strutting arrangement
CN220817132U (en) Triangular support device for measurement
CN219841967U (en) Conveniently stored surveying and mapping device
CN113374997A (en) Measuring equipment ultrafast flattening fixing device for survey and drawing
CN219954722U (en) A real estate map drawing device for real estate surveying and mapping
CN216869530U (en) House settlement detection device
CN212604198U (en) Supplementary mapping device of mapping engineering
CN216520729U (en) Mapping and drawing equipment for space planning and design
CN215639440U (en) Positioning and marking device for geological mapping
CN208736414U (en) Surveying instrument is used in a kind of construction of Geological Engineering
CN211875580U (en) Real estate surveying and mapping measuring instrument support
CN221743746U (en) A BIM building surveying and mapping device
CN211291541U (en) Multifunctional integrated constructional engineering quality detector
CN219867236U (en) Portable survey instrument
CN222209603U (en) Auxiliary mapping device for mapping engineering
CN213481345U (en) On-spot mapping device of building engineering cost
CN220061172U (en) A portable survey, design and measurement equipment
CN220551729U (en) Construction engineering is with multi-functional measuring equipment
CN222651000U (en) Surveying instrument adjusting device for engineering
CN218720410U (en) Foldable total powerstation support frame
CN218712806U (en) Static sounding instrument

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant