CN220058804U - Pouring frame fixing structure - Google Patents

Pouring frame fixing structure Download PDF

Info

Publication number
CN220058804U
CN220058804U CN202321378077.3U CN202321378077U CN220058804U CN 220058804 U CN220058804 U CN 220058804U CN 202321378077 U CN202321378077 U CN 202321378077U CN 220058804 U CN220058804 U CN 220058804U
Authority
CN
China
Prior art keywords
clamping
fixing
threaded shaft
baffle
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202321378077.3U
Other languages
Chinese (zh)
Inventor
李俊鹏
贺浩克
耿诗雅
高靖凯
陈瑞怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN202321378077.3U priority Critical patent/CN220058804U/en
Application granted granted Critical
Publication of CN220058804U publication Critical patent/CN220058804U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model belongs to the field of frame fixing structures, in particular to a pouring frame fixing structure, which comprises a concrete pouring frame, a frame fixing mechanism and a steel bar clamping assembly; the frame fixing mechanism includes: the device comprises a first handle, a first threaded shaft, a threaded groove, a clamping plate, a clamping groove, a clamping block, a movable rod, a first fixed block, a second fixed block and a fixed rod; one side of the first handle is fixedly connected with a first threaded shaft, a threaded groove is movably sleeved in the middle of the first threaded shaft, clamping plates are fixedly connected to two sides of the threaded groove, and clamping grooves with the number of four are formed in one side of each clamping plate; the first handle is rocked to complete the whole front-back movement of the first threaded shaft, interaction force is generated under the mutual cooperation of the first threaded shaft and the fixing rod, the interaction force of the first fixing block and the second fixing block is guided, the whole body reaches the fixing effect, the problem that people move inconveniently when fixing work due to the overweight whole body is solved, and the efficiency of reinforcing operation is improved.

Description

一种浇筑框架固定结构A pouring frame fixed structure

技术领域Technical field

本实用新型涉及框架固定结构领域,具体是一种浇筑框架固定结构。The utility model relates to the field of frame fixed structures, specifically a pouring frame fixed structure.

背景技术Background technique

现浇混凝土结构工程施工用的浇筑框架结构,主要由面板,支撑结构和连接件三部分组成,在土木建筑工程施工过程中,需要使用框架固定模板结构规范浇筑范围,对横梁、地基等主要位置进行浇筑工作,浇筑模板是一种临时性支护结构,按设计要求制作,使混凝土结构、勾践按规定的位置、几何尺寸成形,保持正确位置,并承受浇筑模板自重及作用在其上的外部载荷。The pouring frame structure used in the construction of cast-in-place concrete structure projects is mainly composed of three parts: panels, support structures and connectors. During the construction process of civil construction projects, it is necessary to use frame-fixed formwork structures to standardize the pouring range, and to control main locations such as beams and foundations. Carry out pouring work. The pouring formwork is a temporary supporting structure, which is made according to the design requirements. It allows the concrete structure and structure to be formed according to the specified position and geometric size, maintain the correct position, and bear the weight of the pouring formwork and the external forces acting on it. load.

中国专利号为CN202222993159.0公开了浇筑框架固定模板结构,包括框架模板,所述框架模板的外表面通过螺栓连接有紧固板,所述紧固板的外表面设有紧固孔,所述紧固板的外表面设有伸缩杆一,所述伸缩杆一的下方通过抽插连接有伸缩杆二,所述伸缩杆二下方设有固定凹形槽,所述固定凹形槽的下方通过焊接连接有翻转板,所述翻转板的表面设有螺栓帽,所述螺栓帽的下方通过螺纹连接有定位螺栓。Chinese patent number CN202222993159.0 discloses a pouring frame fixed formwork structure, which includes a frame formwork. The outer surface of the frame formwork is connected with a fastening plate through bolts, and the outer surface of the fastening plate is provided with fastening holes. The outer surface of the fastening plate is provided with a telescopic rod 1. The telescopic rod 1 is connected to the telescopic rod 2 by pulling in and out. A fixed concave groove is provided below the telescopic rod 2. The fixed concave groove is passed through the lower part. A flip plate is welded and connected, a bolt cap is provided on the surface of the flip plate, and a positioning bolt is threadedly connected below the bolt cap.

从上述可知,通过框架模板的外表面通过螺栓连接有紧固板,紧固板的外表面设有紧固孔,紧固板的外表面设有伸缩杆一,伸缩杆一的下方通过抽插连接有伸缩杆二,伸缩杆二下方设有固定凹形槽,固定凹形槽的下方通过焊接连接有翻转板,进而在安装时可减小一半的工程量,同时便于安装,安装过程省时省力,提高装置实用性和工作效率,但是该案还有以下不足之处:其一,在需要对浇筑框架进行固定时,通常要移动整体,因整体重量过重,会导致人们在进行固定工作时行动不便,增加劳动负担,使加固作业的效率降低;其二,在固定浇筑框架时,内部需要固定钢筋,以增加混凝土的承重强度,在钢筋顶部没有合适的固定时,容易影响后续操作导致精度偏差。As can be seen from the above, the outer surface of the frame formwork is connected with a fastening plate through bolts. The outer surface of the fastening plate is provided with fastening holes. The outer surface of the fastening plate is provided with a telescopic rod. The lower part of the telescopic rod is inserted into the There is a telescopic rod two connected. There is a fixed concave groove below the telescopic rod two. The flip plate is connected by welding below the fixed concave groove, which can reduce the amount of work during installation by half. It is also easy to install and saves time in the installation process. It saves effort and improves the practicability and work efficiency of the device. However, this case still has the following shortcomings: First, when the pouring frame needs to be fixed, the whole body usually needs to be moved. Because the overall weight is too heavy, people will have to fix the frame during the fixing work. Movement is inconvenient, which increases labor burden and reduces the efficiency of reinforcement operations; secondly, when fixing the pouring frame, the steel bars need to be fixed internally to increase the load-bearing strength of the concrete. When the top of the steel bars is not properly fixed, it is easy to affect subsequent operations, resulting in Accuracy deviation.

因此,针对上述问题提出一种浇筑框架固定结构。Therefore, a pouring frame fixed structure is proposed to solve the above problems.

实用新型内容Utility model content

为了弥补现有技术的不足,因整体重量过重导致人们在进行固定工作时行动不便和在钢筋顶部没有合适的固定时容易影响后续操作导致精度偏差的问题,本实用新型提出一种浇筑框架固定结构。In order to make up for the shortcomings of the existing technology, the overweight of the overall weight causes inconvenience for people to move when performing fixing work, and the problem that subsequent operations are easily affected when there is no suitable fixing on the top of the steel bars, resulting in accuracy deviations, this utility model proposes a pouring frame fixing method. structure.

本实用新型解决其技术问题所采用的技术方案是:本实用新型所述的一种浇筑框架固定结构,包括混凝土浇筑框架、框架固定机构、钢筋夹持组件;所述框架固定机构包括:第一把手、第一螺纹轴、螺纹槽、卡板、卡槽、卡块、活动杆、第一固定块、第二固定块、固定杆;所述第一把手的一侧固定连接有第一螺纹轴,所述第一螺纹轴的中间活动套接有螺纹槽,所述螺纹槽的两侧固定连接有卡板,所述卡板的一侧开设有数量为四的卡槽,所述卡板的内壁活动连接有数量为二的活动杆。The technical solution adopted by the utility model to solve the technical problem is: a pouring frame fixing structure described in the utility model includes a concrete pouring frame, a frame fixing mechanism, and a steel bar clamping assembly; the frame fixing mechanism includes: a first handle , first threaded shaft, threaded groove, clamping plate, clamping groove, clamping block, movable rod, first fixed block, second fixed block, fixed rod; one side of the first handle is fixedly connected with the first threaded shaft, so There is a threaded groove in the middle of the first threaded shaft, and clamping plates are fixedly connected to both sides of the threaded groove. There are four clamping slots on one side of the clamping plate, and the inner wall of the clamping plate is movable. There are two movable rods connected.

优选的,所述钢筋夹持组件包括:第二把手、第二螺纹轴、夹持条、连接杆、第三固定块;所述第二把手的一侧分别固定连接有第二螺纹轴,所述第二螺纹轴分别活动套接有数量为四的夹持条。Preferably, the steel bar clamping assembly includes: a second handle, a second threaded shaft, a clamping bar, a connecting rod, and a third fixed block; one side of the second handle is fixedly connected to a second threaded shaft, so The second threaded shafts are respectively movably connected with four clamping bars.

优选的,所述混凝土浇筑框架设置有第一挡板,所述第一挡板开设有数量为二的活动槽,所述第一挡板开设有数量为的孔洞,在其孔洞内活动连接有数量为四的加固杆。Preferably, the concrete pouring frame is provided with a first baffle, the first baffle is provided with a number of movable grooves, the first baffle is provided with a number of holes, and there are movable grooves in the holes. Reinforcement rods in quantity four.

优选的,所述活动杆的一侧分别固定连接有卡块,所述活动杆的另一侧分别固定有第一固定块,所述第一固定块的一侧分别卡接有第二固定块,所述第二固定块的一侧固定连接有固定杆。Preferably, one side of the movable rod is fixedly connected with a clamping block, the other side of the movable rod is fixed with a first fixed block, and one side of the first fixed block is respectively clamped with a second fixed block. , a fixing rod is fixedly connected to one side of the second fixing block.

优选的,所述夹持条的一侧活动连接有数量为二的连接杆,所述连接杆两端分别固定连接有第三固定块。Preferably, two connecting rods are movably connected to one side of the clamping bar, and third fixing blocks are fixedly connected to both ends of the connecting rod.

优选的,所述第一挡板的一侧活动连接有数量为二的第三挡板,所述第三挡板的另一侧活动连接有第二挡板。Preferably, two third baffles are movably connected to one side of the first baffle, and a second baffle is movably connected to the other side of the third baffle.

优选的,所述第二挡板开设有数量为四的孔洞,在其孔洞内活动连接有数量为四的加固杆,所述第二挡板的一侧固定连接有数量为二的固定杆。Preferably, the second baffle is provided with four holes, four reinforcing rods are movably connected in the holes, and two fixed rods are fixedly connected to one side of the second baffle.

本实用新型的有益之处在于:The benefits of this utility model are:

1.本实用新型通过框架固定机构的结构设计,实现了框架固定组装的功能,通过摇动第一把手可以完成第一螺纹轴整体的前后移动,在第一螺纹轴和固定杆的相互配合下产生相互作用力,引导第一固定块和第二固定块的相互作用力,使整体到达固定的效果,解决了因整体重量过重导致人们在进行固定工作时行动不便的问题,提高了加固作业的效率;1. Through the structural design of the frame fixing mechanism, the utility model realizes the function of fixing and assembling the frame. By shaking the first handle, the entire first threaded shaft can move forward and backward, and the first threaded shaft and the fixed rod cooperate with each other to produce mutual movement. The action force guides the interaction force between the first fixed block and the second fixed block to achieve a fixed effect as a whole, solving the problem of people's inconvenience in movement during fixing work due to the excessive overall weight, and improving the efficiency of reinforcement operations. ;

2.本实用新型通过钢筋夹持组件的结构设计,实现了对钢筋排列固定的功能,通过旋转第二把手,有利于在夹持条和第二螺纹轴的螺纹配合下,夹持条相互收缩,对需要夹持的钢筋进行固定,解决了在钢筋顶部没有合适的固定时容易影响后续操作导致精度偏差的问题,提高了后续操作的适应性。2. This utility model realizes the function of arranging and fixing the steel bars through the structural design of the steel bar clamping assembly. By rotating the second handle, it is conducive to the mutual contraction of the clamping bars and the second threaded shaft under the thread cooperation. , fixing the steel bars that need to be clamped, solving the problem that it is easy to affect subsequent operations and causing accuracy deviations when the top of the steel bars is not properly fixed, and improves the adaptability of subsequent operations.

附图说明Description of the drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其它的附图。In order to explain the embodiments of the present invention or the technical solutions in the prior art more clearly, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings in the following description These are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without exerting creative efforts.

图1为本实用新型的整体结构示意图;Figure 1 is a schematic diagram of the overall structure of the utility model;

图2为本实用新型的整体结构爆炸示意图;Figure 2 is an exploded schematic diagram of the overall structure of the utility model;

图3为本实用新型的框架固定机构结构示意图;Figure 3 is a schematic structural diagram of the frame fixing mechanism of the present utility model;

图4为本实用新型的钢筋夹持组件结构示意图;Figure 4 is a schematic structural diagram of the steel bar clamping assembly of the present utility model;

图5为本实用新型混凝土浇筑框架的结构爆炸示意图。Figure 5 is an exploded schematic diagram of the structure of the concrete pouring frame of the present utility model.

图中:1、混凝土浇筑框架;2、框架固定机构;3、钢筋夹持组件;11、加固杆;12、第一挡板;13、第二挡板;14、第三挡板;15、活动槽;21、第一把手;22、第一螺纹轴;23、螺纹槽;24、卡板;25、卡槽;26、卡块;27、活动杆;28、第一固定块;29、第二固定块;30、固定杆;31、第二把手;32、第二螺纹轴;33、夹持条;34、连接杆;35、第三固定块。In the picture: 1. Concrete pouring frame; 2. Frame fixing mechanism; 3. Steel bar clamping assembly; 11. Reinforcement rod; 12. First baffle; 13. Second baffle; 14. Third baffle; 15. Movable groove; 21. First handle; 22. First threaded shaft; 23. Threaded groove; 24. Clamping plate; 25. Clamping slot; 26. Clamping block; 27. Movable rod; 28. First fixed block; 29. No. Two fixed blocks; 30, fixed rod; 31, second handle; 32, second threaded shaft; 33, clamping bar; 34, connecting rod; 35, third fixed block.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present utility model.

请参阅图1-图5所示,一种浇筑框架固定结构,包括混凝土浇筑框架1、框架固定机构2、钢筋夹持组件3;框架固定机构2包括:第一把手21、第一螺纹轴22、螺纹槽23、卡板24、卡槽25、卡块26、活动杆27、第一固定块28、第二固定块29、固定杆30;第一把手21的一侧固定连接有第一螺纹轴22,第一螺纹轴22的中间活动套接有螺纹槽23,螺纹槽23的两侧固定连接有卡板24,卡板24的一侧开设有数量为四的卡槽25,卡板24的内壁活动连接有数量为二的活动杆27;Referring to Figures 1 to 5, a pouring frame fixing structure includes a concrete pouring frame 1, a frame fixing mechanism 2, and a steel bar clamping assembly 3; the frame fixing mechanism 2 includes: a first handle 21, a first threaded shaft 22, Threaded groove 23, clamping plate 24, clamping groove 25, clamping block 26, movable rod 27, first fixed block 28, second fixed block 29, fixed rod 30; one side of the first handle 21 is fixedly connected with a first threaded shaft 22 , the middle of the first threaded shaft 22 is movable with a threaded groove 23, and both sides of the threaded groove 23 are fixedly connected with clamping plates 24. One side of the clamping plate 24 is provided with four clamping slots 25, and the inner wall of the clamping plate 24 The movable connection has two movable rods 27;

工作时,通过摇动第一把手21可以完成第一螺纹轴22整体的前后移动,在第一螺纹轴22和固定杆30的相互配合下产生相互作用力,使整体到达固定的效果。During operation, by shaking the first handle 21, the entire first threaded shaft 22 can move forward and backward, and the mutual cooperation between the first threaded shaft 22 and the fixed rod 30 generates an interaction force, so that the entirety can achieve a fixed effect.

进一步的,钢筋夹持组件3包括:第二把手31、第二螺纹轴32、夹持条33、连接杆34、第三固定块35;第二把手31的一侧分别固定连接有第二螺纹轴32,第二螺纹轴32分别活动套接有数量为四的夹持条33;Further, the steel bar clamping assembly 3 includes: a second handle 31, a second threaded shaft 32, a clamping bar 33, a connecting rod 34, and a third fixed block 35; one side of the second handle 31 is fixedly connected with a second thread. The shaft 32 and the second threaded shaft 32 are respectively movably connected with four clamping bars 33;

工作时,通过旋转第二把手31,有利于在夹持条33和第二螺纹轴32的螺纹配合下,夹持条33相互收缩,对需要夹持的钢筋进行固定。During operation, by rotating the second handle 31, the clamping bars 33 contract with each other under the thread cooperation of the clamping bar 33 and the second threaded shaft 32, thereby fixing the steel bar to be clamped.

进一步的,混凝土浇筑框架1设置有第一挡板12,第一挡板12开设有数量为二的活动槽15,第一挡板12开设有数量为的孔洞,在其孔洞内活动连接有数量为四的加固杆11;Further, the concrete pouring frame 1 is provided with a first baffle 12. The first baffle 12 is provided with a number of two movable grooves 15. The first baffle 12 is provided with a number of holes, and a number of movable grooves are movablely connected in the holes. Four reinforcement rods 11;

工作时,通过加固杆11有利于对第三挡板14进行加固,防止在混凝土在化合作用下膨胀时将第三挡板14顶开。During operation, the reinforcing rod 11 is used to reinforce the third baffle 14 to prevent the third baffle 14 from being pushed open when the concrete expands under chemical reaction.

进一步的,活动杆27的一侧分别固定连接有卡块26,活动杆27的另一侧分别固定有第一固定块28,第一固定块28的一侧分别卡接有第二固定块29,第二固定块29的一侧固定连接有固定杆30;Further, one side of the movable rod 27 is fixedly connected with a clamping block 26, and the other side of the movable rod 27 is fixed with a first fixed block 28. One side of the first fixed block 28 is respectively clamped with a second fixed block 29. , a fixed rod 30 is fixedly connected to one side of the second fixed block 29;

工作时,通过第一固定块28和第二固定块29产生的相互作用力使第一挡板12和第二挡板13相互收紧,达到对混凝土浇筑框架1整体的固定效果。During operation, the first baffle 12 and the second baffle 13 tighten each other through the interaction force generated by the first fixing block 28 and the second fixing block 29, thereby achieving a fixing effect on the entire concrete pouring frame 1.

进一步的,夹持条33的一侧活动连接有数量为二的连接杆34,连接杆34两端分别固定连接有第三固定块35;Further, two connecting rods 34 are movably connected to one side of the clamping bar 33, and third fixing blocks 35 are fixedly connected to both ends of the connecting rod 34;

工作时,通过连接杆34,有利于在夹持条33活动时,夹持条33为同一水平运动,第三固定块35对移动的夹持条33进行阻挡防止掉落。During operation, the connecting rod 34 facilitates the movement of the clamping bar 33 in the same horizontal direction when the clamping bar 33 moves, and the third fixed block 35 blocks the moving clamping bar 33 to prevent it from falling.

进一步的,第一挡板12的一侧活动连接有数量为二的第三挡板14,第三挡板14的另一侧活动连接有第二挡板13;Further, a number of two third baffles 14 are movably connected to one side of the first baffle 12, and a second baffle 13 is movably connected to the other side of the third baffle 14;

工作时,通过第二挡板13、第三挡板14和活动槽15组成框架,有利于对内部需浇筑的混凝土进行定型固定。During operation, the second baffle 13, the third baffle 14 and the movable groove 15 form a frame, which is beneficial to shaping and fixing the concrete to be poured inside.

工作时,第二挡板13开设有数量为四的孔洞,在其孔洞内活动连接有数量为四的加固杆11,第二挡板13的一侧固定连接有数量为二的固定杆30;During operation, the second baffle 13 is provided with four holes, four reinforcing rods 11 are movably connected in the holes, and two fixed rods 30 are fixedly connected to one side of the second baffle 13;

进一步的,通过固定杆30实现对第一螺纹轴22的相互作用力,使整体固定方式相互配合,配合下第一挡板12和第二挡板13相互夹紧。Furthermore, the interaction force on the first threaded shaft 22 is achieved through the fixing rod 30, so that the overall fixing methods cooperate with each other, and the first baffle 12 and the second baffle 13 are clamped to each other with the cooperation.

工作原理:实施例一,通过框架固定机构2,当需要固定混凝土浇筑框架1时,将框架固定机构2组装至混凝土浇筑框架1的活动槽15内,卡板24上设置有数量为四的卡槽25,卡槽25与卡块26相互卡接,通过移动上下的活动杆27使第一固定块28与第二固定块29的一侧相互卡接,此时的卡块26将跟随活动杆27一同移动,摇动第一把手21,通过摇动第一把手21带动第一螺纹轴22进行顺时针旋转,在第一螺纹轴22和螺纹槽23的相互配合下第一螺纹轴22将向前移动,第一螺纹轴22的顶部会与固定杆30的一侧相接触,当移动到一定位置时,卡块26将与卡板24开设的卡槽25进行卡接固定,继续旋转第一把手21使第一螺纹轴22和固定杆30之间产生相互作用力,使与螺纹槽23固定的卡板24向后移动,移动至一定位置时,通过第一固定块28和第二固定块29的作用力下,框架固定机构2的整体为夹紧状态,通过相互作用力使第一挡板12和第二挡板13实现固定,固定的同时方便组装拆卸,拆卸时将第一把手21逆时针旋转使作用力取消,在将相互卡接的关系分离即可完成拆卸。Working principle: Embodiment 1, through the frame fixing mechanism 2, when the concrete pouring frame 1 needs to be fixed, the frame fixing mechanism 2 is assembled into the movable groove 15 of the concrete pouring frame 1, and a number of four clamps are provided on the clamping plate 24. The slot 25 and the clamping block 26 are engaged with each other. By moving the up and down movable rod 27, one side of the first fixed block 28 and the second fixed block 29 are engaged with each other. At this time, the clamping block 26 will follow the movable rod. 27 move together, shake the first handle 21, and the first threaded shaft 22 is driven to rotate clockwise by shaking the first handle 21. With the mutual cooperation of the first threaded shaft 22 and the threaded groove 23, the first threaded shaft 22 will move forward, and the first threaded shaft 22 will move forward. The top of a threaded shaft 22 will be in contact with one side of the fixed rod 30. When moved to a certain position, the clamping block 26 will be clamped and fixed with the slot 25 opened by the clamping plate 24. Continue to rotate the first handle 21 to make the first The interaction force is generated between the threaded shaft 22 and the fixed rod 30, causing the clamping plate 24 fixed with the threaded groove 23 to move backward. When it moves to a certain position, it is lowered by the force of the first fixed block 28 and the second fixed block 29. , the whole frame fixing mechanism 2 is in a clamped state, and the first baffle 12 and the second baffle 13 are fixed through the interaction force, which facilitates assembly and disassembly while being fixed. When disassembling, rotate the first handle 21 counterclockwise to make the force Cancel, and the disassembly can be completed by separating the mutual latching relationship.

实施例二,通过设有夹持条33,当混凝土浇筑框架1进行固定完成后,需要对内部的钢筋进行固定,如不固定,很容易影响建筑精度及后续工作,将钢筋夹持组件3放置于混凝土浇筑框架1上,通过夹持条33之间的间隙将钢筋一一排列,在排列完成后,通过顺时针旋转一侧的第二把手31,另一侧的第二把手31逆时针旋转,夹持条33在螺纹和第二螺纹轴32的配合下,将对排列好的钢筋进行夹持,在夹持条33上设置的连接杆34可以保证夹持条33在移动的同时,使两侧的夹持条33为同一水平,第三固定块35进行阻挡,保证在活动的同时夹持条33的一侧不会掉落,当夹持的力度到一定程度时,完成对钢筋的固定,拆卸时将第二把手31为反方向旋转,使夹持的力度变小,在将钢筋夹持组件3从混凝土浇筑框架1上取下进行拆卸框架固定机构2的后续工作。Embodiment 2, by providing the clamping strip 33, after the concrete pouring frame 1 is fixed, the internal steel bars need to be fixed. If not fixed, it will easily affect the construction accuracy and subsequent work. Place the steel bar clamping assembly 3 On the concrete pouring frame 1, arrange the steel bars one by one through the gaps between the clamping bars 33. After the arrangement is completed, rotate the second handle 31 on one side clockwise and the second handle 31 on the other side counterclockwise. , the clamping bar 33 will clamp the arranged steel bars with the cooperation of the thread and the second threaded shaft 32. The connecting rod 34 provided on the clamping bar 33 can ensure that the clamping bar 33 moves while The clamping bars 33 on both sides are at the same level, and the third fixed block 35 blocks it to ensure that one side of the clamping bar 33 will not fall while moving. When the clamping strength reaches a certain level, the steel bar is completed. Fixed, when disassembling, rotate the second handle 31 in the opposite direction to reduce the clamping force. After removing the steel bar clamping assembly 3 from the concrete pouring frame 1, proceed with the subsequent work of disassembling the frame fixing mechanism 2.

以上显示和描述了本实用新型的基本原理、主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。The basic principles, main features and advantages of the present utility model are shown and described above. Those skilled in the industry should understand that the present utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principles of the present utility model. Without departing from the spirit and scope of the present utility model, the present utility model can be There will also be various changes and improvements in the new model, and these changes and improvements all fall within the scope of the claimed utility model.

Claims (7)

1.一种浇筑框架固定结构,其特征在于:包括混凝土浇筑框架(1)、框架固定机构(2)、钢筋夹持组件(3);所述框架固定机构(2)包括:第一把手(21)、第一螺纹轴(22)、螺纹槽(23)、卡板(24)、卡槽(25)、卡块(26)、活动杆(27)、第一固定块(28)、第二固定块(29)、固定杆(30);所述第一把手(21)的一侧固定连接有第一螺纹轴(22),所述第一螺纹轴(22)的中间活动套接有螺纹槽(23),所述螺纹槽(23)的两侧固定连接有卡板(24),所述卡板(24)的一侧开设有数量为四的卡槽(25),所述卡板(24)的内壁活动连接有数量为二的活动杆(27)。1. A pouring frame fixing structure, characterized by: including a concrete pouring frame (1), a frame fixing mechanism (2), and a steel bar clamping assembly (3); the frame fixing mechanism (2) includes: a first handle (21 ), first threaded shaft (22), threaded groove (23), clamping plate (24), clamping groove (25), clamping block (26), movable rod (27), first fixed block (28), second Fixed block (29) and fixed rod (30); a first threaded shaft (22) is fixedly connected to one side of the first handle (21), and a threaded groove is movable in the middle of the first threaded shaft (22) (23), both sides of the threaded groove (23) are fixedly connected with clamping plates (24), and one side of the clamping plate (24) is provided with four clamping slots (25). The clamping plate (24) The inner wall of 24) is movable connected with two movable rods (27). 2.根据权利要求1所述的一种浇筑框架固定结构,其特征在于:所述钢筋夹持组件(3)包括:第二把手(31)、第二螺纹轴(32)、夹持条(33)、连接杆(34)、第三固定块(35);所述第二把手(31)的一侧分别固定连接有第二螺纹轴(32),所述第二螺纹轴(32)分别活动套接有数量为四的夹持条(33)。2. A pouring frame fixed structure according to claim 1, characterized in that: the steel bar clamping assembly (3) includes: a second handle (31), a second threaded shaft (32), a clamping bar ( 33), connecting rod (34), and third fixed block (35); one side of the second handle (31) is fixedly connected with a second threaded shaft (32), and the second threaded shaft (32) is respectively The movable socket has a number of four clamping bars (33). 3.根据权利要求2所述的一种浇筑框架固定结构,其特征在于:所述混凝土浇筑框架(1)设置有第一挡板(12),所述第一挡板(12)开设有数量为二的活动槽(15),所述第一挡板(12)开设有数量为的孔洞,在其孔洞内活动连接有数量为四的加固杆(11)。3. A pouring frame fixed structure according to claim 2, characterized in that: the concrete pouring frame (1) is provided with a first baffle (12), and the first baffle (12) is provided with a number of There are two movable slots (15), the first baffle (12) is provided with a number of holes, and a number of four reinforcing rods (11) are movably connected in the holes. 4.根据权利要求1所述的一种浇筑框架固定结构,其特征在于:所述活动杆(27)的一侧分别固定连接有卡块(26),所述活动杆(27)的另一侧分别固定有第一固定块(28),所述第一固定块(28)的一侧分别卡接有第二固定块(29),所述第二固定块(29)的一侧固定连接有固定杆(30)。4. A pouring frame fixed structure according to claim 1, characterized in that: one side of the movable rod (27) is fixedly connected with a clamping block (26), and the other side of the movable rod (27) First fixing blocks (28) are respectively fixed on one side of the first fixing block (28), and second fixing blocks (29) are clamped on one side of the first fixing block (28). One side of the second fixing block (29) is fixedly connected. There is a fixed rod (30). 5.根据权利要求2所述的一种浇筑框架固定结构,其特征在于:所述夹持条(33)的一侧活动连接有数量为二的连接杆(34),所述连接杆(34)两端分别固定连接有第三固定块(35)。5. A pouring frame fixed structure according to claim 2, characterized in that: one side of the clamping bar (33) is movably connected with two connecting rods (34), and the connecting rod (34) ) are respectively fixedly connected with third fixing blocks (35) at both ends. 6.根据权利要求3所述的一种浇筑框架固定结构,其特征在于:所述第一挡板(12)的一侧活动连接有数量为二的第三挡板(14),所述第三挡板(14)的另一侧活动连接有第二挡板(13)。6. A pouring frame fixed structure according to claim 3, characterized in that: two third baffles (14) are movably connected to one side of the first baffle (12), and the third baffle (14) is movably connected to one side of the first baffle (12). A second baffle (13) is movably connected to the other side of the three baffles (14). 7.根据权利要求6所述的一种浇筑框架固定结构,其特征在于:所述第二挡板(13)开设有数量为四的孔洞,在其孔洞内活动连接有数量为四的加固杆(11),所述第二挡板(13)的一侧固定连接有数量为二的固定杆(30)。7. A pouring frame fixed structure according to claim 6, characterized in that: the second baffle (13) is provided with four holes, and four reinforcing rods are movably connected in the holes. (11). Two fixing rods (30) are fixedly connected to one side of the second baffle (13).
CN202321378077.3U 2023-06-01 2023-06-01 Pouring frame fixing structure Expired - Fee Related CN220058804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321378077.3U CN220058804U (en) 2023-06-01 2023-06-01 Pouring frame fixing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321378077.3U CN220058804U (en) 2023-06-01 2023-06-01 Pouring frame fixing structure

Publications (1)

Publication Number Publication Date
CN220058804U true CN220058804U (en) 2023-11-21

Family

ID=88765915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321378077.3U Expired - Fee Related CN220058804U (en) 2023-06-01 2023-06-01 Pouring frame fixing structure

Country Status (1)

Country Link
CN (1) CN220058804U (en)

Similar Documents

Publication Publication Date Title
CN208966012U (en) Suitable for the building template quickly assembled
CN115233819B (en) Assembled lacing wire steel pipe concrete connection structure
CN104131700B (en) A kind of door and window Cast-in-situ Beam casting method and mould
CN220058804U (en) Pouring frame fixing structure
CN210947702U (en) Aluminum formwork device for building
CN216765936U (en) Cast-in-place concrete frame beam regularization template structure
CN202644781U (en) Compound cross-section combination shear wall
CN206512744U (en) Gallery formwork-support device in a kind of concrete dam body
CN216475804U (en) A steel truss floor deck
CN110359580A (en) Prefabricated assembled composite steel concrete column component node connection structure and method for protecting support
CN211947965U (en) Cast-in-situ continuous box girder internal mold
CN220953506U (en) A new type of connection structure of prefabricated slab
CN211006352U (en) Pier stud template reinforced structure
CN218090550U (en) Bridge Deck Construction Formwork Structure
CN223202562U (en) An assembled composite panel with a detachable aluminum formwork structure
CN221095826U (en) Mounting structure of shaping post-pouring belt mould hanging tool
CN221837989U (en) Reinforcing steel bar positioning structure
CN222333259U (en) Welding-spot-free steel bar truss floor support plate
CN222500760U (en) Install quick precast concrete component
CN217500526U (en) Wood-concrete frame structure fabricated building
CN223119516U (en) A wall column formwork verticality control and plate thickness control device
CN222390981U (en) Building engineering construction pouring template
CN221032647U (en) A hydraulic tunnel inverted arch trestle type mobile formwork
CN218264935U (en) Reinforced structure of shear force wall concrete floor template
CN221345655U (en) Precast pile and foundation connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20231121

CF01 Termination of patent right due to non-payment of annual fee