CN220035829U - Glass curtain wall mounting structure - Google Patents
Glass curtain wall mounting structure Download PDFInfo
- Publication number
- CN220035829U CN220035829U CN202321586788.XU CN202321586788U CN220035829U CN 220035829 U CN220035829 U CN 220035829U CN 202321586788 U CN202321586788 U CN 202321586788U CN 220035829 U CN220035829 U CN 220035829U
- Authority
- CN
- China
- Prior art keywords
- assembly
- glass curtain
- curtain wall
- plate
- assembly plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
- Securing Of Glass Panes Or The Like (AREA)
Abstract
Description
技术领域Technical field
本实用新型涉及玻璃幕墙技术领域,具体涉及为一种玻璃幕墙安装结构。The utility model relates to the technical field of glass curtain walls, and specifically relates to a glass curtain wall installation structure.
背景技术Background technique
玻璃幕墙是一种美观新颖的建筑外围护结构,其具有很高的装饰性,因此在城市建设领域得到了广泛的使用,是现代主义高层建筑时代的显著特征;现有的玻璃幕墙都是由若干块玻璃拼接而成;The glass curtain wall is a beautiful and novel building envelope structure. It is highly decorative, so it has been widely used in the field of urban construction. It is a prominent feature of the era of modernist high-rise buildings; existing glass curtain walls are all Made of several pieces of glass;
在中国实用新型CN212001778U中提出“一种玻璃幕墙安装结构”,该申请为了解决现有玻璃幕墙的安装效率,主要采用玻璃吸盘对玻璃幕墙后表面进行吸附固定,然后达到相应的装配效果,该装置虽然能够对玻璃幕墙进行安装,但是玻璃吸盘的使用成本相对较高,其次在玻璃幕墙后面设置三角形的卡接机构,影响了玻璃幕墙本身的一体性设计,从而影响了玻璃幕墙的使用效率;"A glass curtain wall installation structure" is proposed in Chinese utility model CN212001778U. In order to solve the installation efficiency of the existing glass curtain wall, this application mainly uses glass suction cups to adsorb and fix the rear surface of the glass curtain wall, and then achieves the corresponding assembly effect. This device Although the glass curtain wall can be installed, the cost of using the glass suction cup is relatively high. Secondly, the triangular clamping mechanism is installed behind the glass curtain wall, which affects the integrated design of the glass curtain wall itself, thereby affecting the efficiency of the glass curtain wall;
为此,我们提出一种玻璃幕墙安装结构。To this end, we propose a glass curtain wall installation structure.
实用新型内容Utility model content
本实用新型的目的在于克服上述技术不足,提供一种玻璃幕墙安装结构,解决现有技术中玻璃幕墙之间的装配过程较为繁琐,不方便工作人员对玻璃幕墙进行安装,同时无法保证装配后玻璃幕墙美观性的技术问题。The purpose of this utility model is to overcome the above technical deficiencies and provide a glass curtain wall installation structure, which solves the problem that the assembly process between glass curtain walls in the prior art is relatively cumbersome and is inconvenient for workers to install the glass curtain wall. At the same time, it is impossible to ensure that the assembled glass Technical issues of curtain wall aesthetics.
为达到上述技术目的,本实用新型采取了以下技术方案:In order to achieve the above technical objectives, the present utility model adopts the following technical solutions:
一种玻璃幕墙安装结构,包括连接机构、玻璃幕墙本体、装配机构和连接螺杆;A glass curtain wall installation structure, including a connecting mechanism, a glass curtain wall body, an assembly mechanism and a connecting screw;
所述连接机构包括第一装配板和第二装配板;所述第一装配板和所述第二装配板相对的一面均固定两个限位板,两个相邻所述限位板之间形成一用于安装所述玻璃幕墙本体的装配区域;所述第一装配板和所述第二装配板相背的一面均竖直设置有多个延伸部,所述延伸部的外周设有缓冲部;The connection mechanism includes a first assembly plate and a second assembly plate; two limiting plates are fixed on opposite sides of the first assembly plate and the second assembly plate, and between the two adjacent limiting plates An assembly area is formed for installing the glass curtain wall body; the first assembly plate and the second assembly plate are each vertically provided with a plurality of extension parts on the opposite side, and the outer periphery of the extension part is provided with a buffer department;
所述装配机构包括装配壳和隔板:所述装配壳的两侧均开设有供所述第一装配板和所述第二装配板延伸的开口,所述隔板设置于所述装配壳内,用于对所述缓冲部进行限位,并在所述装配壳内形成一安装区域;The assembly mechanism includes an assembly shell and a partition: both sides of the assembly shell are provided with openings for the first assembly plate and the second assembly plate to extend, and the partition is arranged in the assembly shell. , used to limit the buffer portion and form an installation area in the assembly shell;
所述连接螺杆竖直设置于所述装配壳内,并贯穿延伸至所述安装区域内的所述延伸部。The connecting screw is vertically disposed in the assembly shell and penetrates the extension portion extending into the installation area.
在具体一实施例中,所述第一装配板的左侧固定有两个所述延伸部,所述第二装配板的右侧固定有三个所述延伸部。In a specific embodiment, two extension parts are fixed on the left side of the first assembly plate, and three extension parts are fixed on the right side of the second assembly plate.
在具体一实施例中,任意一个所述延伸部均包括安装柱和装配杆;所述第一装配板和所述第二装配板上均固定有多个所述安装柱,任意一个安装柱上均固定有所述装配杆,所述安装柱的外周设有所述缓冲部。In a specific embodiment, any one of the extension parts includes a mounting column and an assembly rod; a plurality of the mounting columns are fixed on both the first assembly plate and the second assembly plate. The assembly rods are all fixed, and the buffer portion is provided on the outer periphery of the installation column.
在具体一实施例中,所述缓冲部包括环体和弹簧条;所述环体滑动设置于所述安装柱外周,且所述环体通过所述弹簧条连接于所述第一装配板或所述第二装配板上。In a specific embodiment, the buffer part includes a ring body and a spring bar; the ring body is slidably disposed on the outer periphery of the mounting post, and the ring body is connected to the first assembly plate or spring bar through the spring bar. on the second assembly board.
在具体一实施例中,所述装配杆上开设有供所述连接螺杆贯穿的通孔。In a specific embodiment, the assembly rod is provided with a through hole for the connecting screw rod to pass through.
在具体一实施例中,所述隔板上开设有供所述装配杆贯穿的延伸孔。In a specific embodiment, the partition plate is provided with an extension hole for the assembly rod to pass through.
在具体一实施例中,所述安装柱和所述装配杆的截面均为圆形,且所述延伸孔的截面面积大于所述安装柱的截面面积,并小于所述装配杆的截面面积。In a specific embodiment, the cross-sections of the mounting post and the assembly rod are both circular, and the cross-sectional area of the extension hole is larger than the cross-sectional area of the mounting post and smaller than the cross-sectional area of the assembly rod.
与现有技术相比,本实用新型的有益效果包括:Compared with the existing technology, the beneficial effects of this utility model include:
1、本实用新型与现有技术相比,当需要装配玻璃幕墙本体时,将相邻两个玻璃幕墙本体分别插入装配壳内,使第二装配板上的延伸部从装配壳的左侧延伸至装配壳内部的安装区域中,将第二块玻璃幕墙本体左侧的第一装配板从装配壳的右侧延伸至安装区域中,其中通过限位板能够有效对延伸部上的缓冲部进行限位,同时通过连接螺杆竖直插入装配壳,并贯穿延伸部,从而使两个玻璃幕墙本体分别装配在装配壳的两侧,且从正面和背面上均看不出安装痕迹,一体性更强,同时方便工作人员的安拆,极大地提高了玻璃幕墙本体的安拆效率。1. Compared with the existing technology, this utility model requires that when the glass curtain wall body needs to be assembled, two adjacent glass curtain wall bodies are inserted into the assembly shell respectively, so that the extension on the second assembly plate extends from the left side of the assembly shell. To the installation area inside the assembly shell, extend the first assembly plate on the left side of the second glass curtain wall body from the right side of the assembly shell to the installation area, where the buffer portion on the extension can be effectively adjusted through the limiting plate. At the same time, the assembly shell is inserted vertically through the connecting screw rod and penetrates the extension part, so that the two glass curtain wall bodies are assembled on both sides of the assembly shell respectively, and no installation traces can be seen from the front and back, and the integration is better It is strong and convenient for workers to install and dismantle, which greatly improves the installation and disassembly efficiency of the glass curtain wall body.
附图说明Description of the drawings
图1是本实用新型立体示意图;Figure 1 is a three-dimensional schematic diagram of the utility model;
图2是本实用新型背面示意图;Figure 2 is a schematic view of the back of the utility model;
图3是本实用新型正面示意图;Figure 3 is a front schematic view of the utility model;
图4是本实用新型侧面示意图。Figure 4 is a schematic side view of the utility model.
图中:1、连接机构;11、第一装配板;12、第二装配板;2、限位板;21、装配区域;3、延伸部;31、安装柱;32、装配杆;321、通孔;4、缓冲部;41、环体;42、弹簧条;5、玻璃幕墙本体;6、装配机构;61、装配壳;62、隔板;63、延伸孔;7、连接螺杆。In the figure: 1. Connection mechanism; 11. First assembly plate; 12. Second assembly plate; 2. Limiting plate; 21. Assembly area; 3. Extension; 31. Installation column; 32. Assembly rod; 321. Through hole; 4. Buffering part; 41. Ring body; 42. Spring bar; 5. Glass curtain wall body; 6. Assembly mechanism; 61. Assembly shell; 62. Partition plate; 63. Extension hole; 7. Connection screw.
具体实施方式Detailed ways
为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solutions and advantages of the present utility model more clear, the utility model will be further described in detail below with reference to the drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention and are not intended to limit the present invention.
请参阅图1,本实用新型提供的一种玻璃幕墙安装结构,包括连接机构1、玻璃幕墙本体5、装配机构6和连接螺杆7。Please refer to Figure 1. The utility model provides a glass curtain wall installation structure, which includes a connecting mechanism 1, a glass curtain wall body 5, an assembly mechanism 6 and a connecting screw 7.
连接机构1包括第一装配板11和第二装配板12;第一装配板11和第二装配板12相对的一面均固定两个限位板2,两个相邻限位板2之间形成一用于安装玻璃幕墙本体5的装配区域21;第一装配板11和第二装配板12相背的一面均竖直设置有多个延伸部3,延伸部3的外周设有缓冲部4。The connection mechanism 1 includes a first assembly plate 11 and a second assembly plate 12; two limiting plates 2 are fixed on the opposite sides of the first assembly plate 11 and the second assembly plate 12, and a gap is formed between the two adjacent limiting plates 2. An assembly area 21 for installing the glass curtain wall body 5; the first assembly plate 11 and the second assembly plate 12 are each vertically provided with a plurality of extension parts 3 on the opposite sides, and a buffer part 4 is provided on the outer periphery of the extension part 3.
装配机构6包括装配壳61和隔板62:装配壳61的两侧均开设有供第一装配板11和第二装配板12延伸的开口,隔板62设置于装配壳61内,用于对缓冲部4进行限位,并在装配壳61内形成一安装区域。The assembly mechanism 6 includes an assembly shell 61 and a partition 62: both sides of the assembly shell 61 are provided with openings for the first assembly plate 11 and the second assembly plate 12 to extend. The buffer portion 4 limits the position and forms an installation area in the assembly shell 61 .
连接螺杆7竖直设置于装配壳61内,并贯穿延伸至安装区域内的延伸部3。The connecting screw 7 is installed vertically in the assembly shell 61 and extends through the extension part 3 in the installation area.
其中一个装配壳61可以装配两个玻璃幕墙本体5,通过设置第一装配板11和第二装配板12,并在第一装配板11或第二装配板12上设置限位板2,通过限位板2形成一装配区域21,从而方便安装玻璃幕墙本体5,其中一个玻璃幕墙本体5右侧的第二装配板12通过装配壳61左侧的开口延伸至装配壳61内,另一个玻璃幕墙本体5左侧的第一装配板11通过装配壳61右侧的开口延伸至装配壳61内,并通过隔板62对延伸部3上的缓冲部4,当第一装配板11和第二装配板12上的延伸部3均延伸至安装区域后,将连接螺杆7从上至下贯穿延伸部3,并对延伸部3进行限位,使两个玻璃幕墙本体5装配在装配壳61的两侧,从而完成玻璃幕墙本体5之间的装配工作,且由于装配结构设置在装配壳61内,从外部无法明显看出,这样也不会影响多个幕墙之间的美观性。One of the assembly shells 61 can assemble two glass curtain wall bodies 5. By setting the first assembly plate 11 and the second assembly plate 12, and setting the limiting plate 2 on the first assembly plate 11 or the second assembly plate 12, the limiter can be The position plate 2 forms an assembly area 21 to facilitate the installation of the glass curtain wall body 5. The second assembly plate 12 on the right side of one glass curtain wall body 5 extends into the assembly shell 61 through the opening on the left side of the assembly shell 61, and the other glass curtain wall The first assembly plate 11 on the left side of the body 5 extends into the assembly shell 61 through the opening on the right side of the assembly shell 61, and passes through the partition 62 to the buffer portion 4 on the extension part 3. When the first assembly plate 11 and the second assembly After the extension parts 3 on the board 12 are all extended to the installation area, the connecting screws 7 are passed through the extension parts 3 from top to bottom, and the extension parts 3 are limited so that the two glass curtain wall bodies 5 are assembled on both sides of the assembly shell 61 side, thereby completing the assembly work between the glass curtain wall bodies 5, and since the assembly structure is arranged in the assembly shell 61, it cannot be clearly seen from the outside, so it will not affect the aesthetics of multiple curtain walls.
为方便第一装配板11和第二装配板12的配合,请参阅图1、图3和图4,在一优选实施例中,第一装配板11的左侧固定有两个延伸部3,第二装配板12的右侧固定有三个延伸部3。In order to facilitate the cooperation of the first assembly plate 11 and the second assembly plate 12, please refer to Figures 1, 3 and 4. In a preferred embodiment, two extension parts 3 are fixed on the left side of the first assembly plate 11. Three extension parts 3 are fixed on the right side of the second assembly plate 12 .
其中在第一装配板11的左侧设置两个延伸部3,在第二装配板12的右侧设置三个延伸部3,是为了方便当第一装配板11和第二装配板12延伸至装配壳61后,多个延伸部3之间不会发生碰撞,通过交错设置方便连接螺杆7将多个延伸部3贯穿,从而达到装配的效果。Two extension parts 3 are provided on the left side of the first assembly plate 11 , and three extension parts 3 are provided on the right side of the second assembly plate 12 . This is for convenience when the first assembly plate 11 and the second assembly plate 12 extend to After the shell 61 is assembled, there will be no collision between the multiple extension parts 3. The staggered arrangement facilitates the connecting screws 7 to penetrate the multiple extension parts 3, thereby achieving the assembly effect.
为方便玻璃幕墙本体5的拆卸效率,请参阅图1、图3和图4,在一优选实施例中,任意一个延伸部3均包括安装柱31和装配杆32;第一装配板11和第二装配板12上均固定有多个安装柱31,任意一个安装柱31上均固定有装配杆32,安装柱31的外周设有缓冲部4,缓冲部4包括环体41和弹簧条42;环体41滑动设置于安装柱31外周,且环体41通过弹簧条42连接于第一装配板11或第二装配板12上。In order to facilitate the disassembly efficiency of the glass curtain wall body 5, please refer to Figures 1, 3 and 4. In a preferred embodiment, any extension part 3 includes a mounting column 31 and an assembly rod 32; the first assembly plate 11 and the A plurality of installation columns 31 are fixed on the two assembly plates 12, and an assembly rod 32 is fixed on any one of the installation columns 31. A buffer part 4 is provided on the outer periphery of the installation column 31, and the buffer part 4 includes a ring body 41 and a spring bar 42; The ring body 41 is slidably disposed on the outer periphery of the mounting post 31 , and the ring body 41 is connected to the first assembly plate 11 or the second assembly plate 12 through a spring bar 42 .
其中通过在安装柱31的外表面通过弹簧条42连接环体41,当将装配杆32朝隔板62方向移动时,装配杆32可以贯穿隔板62,但是隔板62会对环体41进行限位,环体41挤压弹簧条42,使其退回至安装柱31的外周,当后续连接螺杆7不再对装配杆32进行限位时,通过弹簧条42和环体41,能够推动整个玻璃幕墙本体5快速远离装配壳61,这样便可以达到快速拆卸的效果。The outer surface of the mounting post 31 is connected to the ring body 41 through the spring bar 42. When the assembly rod 32 is moved toward the partition 62, the assembly rod 32 can penetrate the partition 62, but the partition 62 will cause damage to the ring body 41. limit, the ring body 41 squeezes the spring bar 42 to make it return to the outer periphery of the mounting post 31. When the subsequent connecting screw 7 no longer limits the assembly rod 32, the entire spring bar 42 and the ring body 41 can be pushed The glass curtain wall body 5 quickly moves away from the assembly shell 61, so that the effect of quick disassembly can be achieved.
为方便连接螺杆7对装配杆32进行限位,请参与图1、图3和图4,在一优选实施例中,装配杆32上开设有供连接螺杆7贯穿的通孔321,隔板62上开设有供装配杆32贯穿的延伸孔63,安装柱31和装配杆32的截面均为圆形,且延伸孔63的截面面积大于安装柱31的截面面积,并小于装配杆32的截面面积。In order to facilitate the connecting screw rod 7 to limit the position of the assembly rod 32, please refer to Figure 1, Figure 3 and Figure 4. In a preferred embodiment, the assembly rod 32 is provided with a through hole 321 for the connecting screw rod 7 to penetrate, and the partition 62 There is an extension hole 63 for the assembly rod 32 to pass through. The cross-sections of the installation post 31 and the assembly rod 32 are both circular, and the cross-sectional area of the extension hole 63 is larger than the cross-sectional area of the installation post 31 and smaller than the cross-sectional area of the assembly rod 32 .
其中通过在装配杆32上开设通孔321,方便整个连接螺杆7贯穿装配杆32,而在隔板62上开设延伸孔63,则是为了方便装配杆32延伸至安装区域内,且可以对环体41进行限位,使环体41挤压弹簧条42并移动至安装柱31的外周,同时也具备一定的减震效果。The through hole 321 is provided on the assembly rod 32 to facilitate the entire connecting screw 7 to pass through the assembly rod 32, and the extension hole 63 is provided on the partition 62 to facilitate the assembly rod 32 to extend into the installation area and enable the ring to be aligned. The body 41 is limited, so that the ring body 41 squeezes the spring bar 42 and moves to the outer periphery of the mounting column 31, and also has a certain shock absorption effect.
为了更好地理解本实用新型,以下结合图1-图4来对本实用新型一种玻璃幕墙安装结构的工作过程进行详细说明:在使用时,其中当需要对两块玻璃幕墙本体5装配时,在两个玻璃幕墙本体5的两侧分别安装第一装配板11和第二装配板12,并在第一装配板11的左侧安装两个安装柱31,任意一个安装柱31上均固定有装配杆32,并在安装柱31和装配杆32的外周设置环体41,环体41通过弹簧条42与第一装配板11外壁连接,同理在第二装配板12的右侧安装三个安装柱31,任意一个安装柱31上均固定有装配杆32,并在安装柱31和装配杆32的外周设置环体41,环体41通过弹簧条42与第二装配板12外壁连接,当玻璃幕墙本体5装配完毕后,将一个玻璃幕墙本体5右侧的第二装配板12延伸至装配壳61内,并使装配杆32贯穿隔板62,并延伸至装配壳61部的安装区域内,然后将另一个玻璃幕墙本体5左侧的第一装配板11延伸至装配壳61内,使装配杆32贯穿隔板62,并延伸至安装区域内,其中这些装配杆32交错设置于装配壳61内,并通过连接螺杆7将其紧固在装配壳61内,从而完成安装工作,其中在隔板62上开设延伸孔63,方便装配杆32延伸,同时起到了对环体41进行阻隔的效果,使环体41挤压弹簧条42,并让环体41从装配杆32的外周退至安装柱31的外周,当后续连接螺杆7从装配杆32上拆卸时,通过弹簧条42的弹力推动隔板62,能够方便工作人员快速对玻璃幕墙本体5进行拆卸。In order to better understand the present utility model, the working process of a glass curtain wall installation structure of the present utility model will be described in detail below with reference to Figures 1 to 4: During use, when two glass curtain wall bodies 5 need to be assembled, The first assembly plate 11 and the second assembly plate 12 are respectively installed on both sides of the two glass curtain wall bodies 5, and two installation columns 31 are installed on the left side of the first assembly plate 11. Each installation column 31 is fixed with Assembly rod 32, and a ring body 41 is provided on the outer periphery of the mounting column 31 and the assembly rod 32. The ring body 41 is connected to the outer wall of the first assembly plate 11 through a spring bar 42. Similarly, three installation plates are installed on the right side of the second assembly plate 12. Mounting column 31, any mounting column 31 is fixed with an assembly rod 32, and a ring body 41 is provided on the outer periphery of the mounting column 31 and the assembly rod 32. The ring body 41 is connected to the outer wall of the second assembly plate 12 through a spring bar 42. When After the glass curtain wall body 5 is assembled, extend the second assembly plate 12 on the right side of the glass curtain wall body 5 into the assembly shell 61, and make the assembly rod 32 penetrate the partition 62 and extend into the installation area of the assembly shell 61. , and then extend the first assembly plate 11 on the left side of the other glass curtain wall body 5 into the assembly shell 61, so that the assembly rods 32 penetrate the partition 62 and extend into the installation area, where these assembly rods 32 are staggered in the assembly shell. 61, and fasten it in the assembly shell 61 through the connecting screw rod 7 to complete the installation work. An extension hole 63 is opened on the partition 62 to facilitate the extension of the assembly rod 32, and at the same time it blocks the ring body 41. As a result, the ring body 41 squeezes the spring bar 42, and the ring body 41 retreats from the outer periphery of the assembly rod 32 to the outer periphery of the mounting post 31. When the subsequent connecting screw rod 7 is disassembled from the assembly rod 32, the elastic force of the spring bar 42 Pushing the partition 62 facilitates the staff to quickly disassemble the glass curtain wall body 5 .
以上所述本实用新型的具体实施方式,并不构成对本实用新型保护范围的限定。任何根据本实用新型的技术构思所作出的各种其他相应的改变与变形,均应包含在本实用新型权利要求的保护范围内。The specific embodiments of the present invention described above do not constitute a limitation on the protection scope of the present invention. Any other corresponding changes and deformations made based on the technical concept of the present utility model shall be included in the protection scope of the claims of the present utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321586788.XU CN220035829U (en) | 2023-06-20 | 2023-06-20 | Glass curtain wall mounting structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321586788.XU CN220035829U (en) | 2023-06-20 | 2023-06-20 | Glass curtain wall mounting structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN220035829U true CN220035829U (en) | 2023-11-17 |
Family
ID=88739048
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202321586788.XU Active CN220035829U (en) | 2023-06-20 | 2023-06-20 | Glass curtain wall mounting structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN220035829U (en) |
-
2023
- 2023-06-20 CN CN202321586788.XU patent/CN220035829U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN220035829U (en) | Glass curtain wall mounting structure | |
| CN209145215U (en) | A kind of earthquake-resistant energy-saving house decorating inner and external walls plate | |
| CN211622166U (en) | An easy-to-install building curtain wall | |
| CN201495926U (en) | Fixing structure of decorative strips between insulating glass | |
| CN210976411U (en) | Exterior wall cladding structure of prefabricated building | |
| CN207048146U (en) | One kind reinforces vertical and horizontal keel connecting structure | |
| CN209099571U (en) | A kind of villa exterior wall insulated structure | |
| CN209353849U (en) | Safety fence for electric engineering | |
| CN205858138U (en) | One can on full glass curtain wall hard-wired decoration shutter device | |
| CN221837803U (en) | Connecting assembly for building curtain wall engineering installation | |
| CN217379444U (en) | A curved frame type aluminum panel curtain wall installation structure | |
| CN223410081U (en) | A sound barrier sound absorbing board installation and disassembly structure | |
| CN221957021U (en) | Glass curtain wall beam upright post mounting structure | |
| CN219298627U (en) | Sunshade baffle of green building | |
| CN219386804U (en) | Aluminum alloy curtain wall beam connecting piece | |
| CN206000059U (en) | A kind of external metal assembled formula curtain wall of building | |
| CN216042032U (en) | Large plate glass fiber reinforced plastic supporting strip of unit curtain wall | |
| CN207177014U (en) | Member type curtain connects system | |
| CN223689162U (en) | Adjustable hanging structure of high-rise inclined unit curtain wall | |
| CN104314205B (en) | One is exempted to weld all steel and is cut off curtain wall | |
| CN202124976U (en) | Upright fastening cover section bar of exposed frame aluminum alloy glass curtain wall | |
| CN218714065U (en) | Anti-seismic structure of detachable composite wallboard | |
| CN222350017U (en) | Steel square pipe and steel square pipe hinged connection system for glass curtain wall | |
| CN215716457U (en) | Aluminum veneer convenient to disassemble | |
| CN220620605U (en) | Building curtain wall convenient to installation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20241231 Address after: Room 1603, Building 6, Block B3, Haichao Hui Plaza, 1677 Xingyuan Street, Tangzhi Street, Licheng District, Jinan City, Shandong Province, China 250109 Patentee after: China Construction Third Engineering Group Shandong Investment Construction Co.,Ltd. Country or region after: China Address before: No. 552 Guanshan Road, Hongshan District, Wuhan City, Hubei Province, 430070 Patentee before: CHINA CONSTRUCTION THIRD CONSTRUCTION ENGINEERING Co.,Ltd. Country or region before: China |