CN219957701U - Junction box - Google Patents

Junction box Download PDF

Info

Publication number
CN219957701U
CN219957701U CN202320836010.3U CN202320836010U CN219957701U CN 219957701 U CN219957701 U CN 219957701U CN 202320836010 U CN202320836010 U CN 202320836010U CN 219957701 U CN219957701 U CN 219957701U
Authority
CN
China
Prior art keywords
junction box
clamping
positioning
mounting base
junction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202320836010.3U
Other languages
Chinese (zh)
Inventor
代植成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202320836010.3U priority Critical patent/CN219957701U/en
Application granted granted Critical
Publication of CN219957701U publication Critical patent/CN219957701U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Connection Or Junction Boxes (AREA)

Abstract

本实用新型公开了一种接线盒,涉及电能计量接线盒技术领域,包括多个接线盒单体、一个安装座B和一个安装座A,所述接线盒单体的左侧面开设有两个卡孔一,所述接线盒单体的右侧面设置有两个与卡孔一相适配的卡柱一。本实用新型通过接线盒单体两侧设置的卡孔一和卡柱一,便于多个接线盒单体进行组合拼装固定,另外通过接线盒单体两侧设置的定位槽一和定位柱一,当多个接线盒单体进行组合拼装时,首先把定位柱一的底端嵌入定位槽一内,然后使两个卡柱一分别插入两个卡孔一内,即可快速实现两个接线盒单体之间的固定装配工作,只需要一个模具生产的接线盒单体,就能拼装出多种规格的接线盒,能够减少开发模具的成本,提高生产机动性。

The utility model discloses a junction box, which relates to the technical field of electric energy metering junction boxes. It includes a plurality of junction box units, one mounting base B and one mounting base A. The left side of the junction box unit is provided with two Clamping hole 1, the right side of the junction box unit is provided with two clamping posts 1 that are adapted to the clamping hole 1. The utility model facilitates the assembly, assembly and fixation of multiple junction box units through the first clamping hole and the first clamping column provided on both sides of the junction box unit. In addition, through the positioning slot one and the positioning post one provided on both sides of the junction box unit, When multiple junction boxes are combined and assembled, first insert the bottom end of the positioning post one into the positioning groove one, and then insert the two clamping posts one into the two clamping holes one respectively, so that two junction boxes can be quickly realized For the fixed assembly work between the units, only one junction box unit produced by the mold can be assembled to assemble junction boxes of various specifications, which can reduce the cost of developing molds and improve production mobility.

Description

一种接线盒a junction box

技术领域Technical field

本实用新型涉及电能计量接线盒技术领域,具体是一种接线盒。The utility model relates to the technical field of electric energy metering junction boxes, specifically a junction box.

背景技术Background technique

电能计量接线盒安装于经电流互感器接线的电流计量回路中,是将互感器引出的二次线圈经过电能计量接线盒的接线端的端子串联或并联后再接到电能表的接线端子,其适用于单相照明和各种电压等级的三相有功、无功电能计量的联合接线。The electric energy measurement junction box is installed in the current measurement circuit connected by the current transformer. The secondary coil drawn from the transformer is connected in series or parallel through the terminals of the electric energy measurement junction box and then connected to the terminals of the electric energy meter. It is suitable for It is suitable for joint wiring of single-phase lighting and three-phase active and reactive energy measurement of various voltage levels.

电能计量接线盒在电力系统中应用广泛,为了适应各种的应用场景,其规格型号非常繁杂,分为单路接线盒、三路接线盒和多路接线盒。常规接线盒的盒体均为整体式结构,为了生产不同规格的电能计量接线盒,就需要生产不同盒体,由于盒体多为塑料或电木等绝缘材料,其生产也主要依靠模具成型,规格不同的接线盒,就需要制备多种规格的模具,以满足不同的客户对于电能计量接线盒的定制要求,这样一来,就加大了开发模具的成本,导致接线盒的生产成本高和生产机动性差的问题。所以,在此提出一种接线盒,其为分体式电能计量接线盒,能够自由组装成不同的规格,便于组装生产。Electric energy metering junction boxes are widely used in power systems. In order to adapt to various application scenarios, their specifications and models are very complicated, and they are divided into single-channel junction boxes, three-channel junction boxes and multi-channel junction boxes. The boxes of conventional junction boxes are all of an integral structure. In order to produce electric energy metering junction boxes of different specifications, different boxes need to be produced. Since the boxes are mostly made of insulating materials such as plastic or bakelite, their production mainly relies on mold forming. For junction boxes with different specifications, molds of various specifications need to be prepared to meet different customers' customized requirements for electric energy metering junction boxes. This increases the cost of developing molds, resulting in high production costs and The problem of poor production mobility. Therefore, a junction box is proposed here, which is a split-type electric energy measurement junction box that can be freely assembled into different specifications to facilitate assembly and production.

实用新型内容Utility model content

解决的技术问题technical issues solved

本实用新型的目的就是为了弥补现有技术的不足,提供了一种接线盒。The purpose of this utility model is to provide a junction box to make up for the shortcomings of the existing technology.

技术方案Technical solutions

为实现上述目的,本实用新型提供如下技术方案:一种接线盒,包括多个接线盒单体、一个安装座B和一个安装座A,所述接线盒单体的左侧面开设有两个卡孔一,所述接线盒单体的右侧面设置有两个与卡孔一相适配的卡柱一,且两个卡柱一的位置与两个卡孔一的位置相对应。当多个接线盒单体进行组合拼装时,通过卡孔一和卡柱一的配合设置,便于多个接线盒单体进行组合拼装固定。In order to achieve the above purpose, the present utility model provides the following technical solution: a junction box, including a plurality of junction box units, a mounting base B and a mounting base A. The left side of the junction box unit is provided with two One clamping hole, the right side of the junction box unit is provided with two clamping pillars one that are adapted to the clamping hole one, and the positions of the two clamping pillars one correspond to the positions of the two clamping holes one. When multiple junction box units are combined and assembled, the combination of the clamping hole one and the clamping column one facilitates the assembly, assembly and fixation of the multiple junction box units.

所述接线盒单体的左侧面的中部开设有一个定位槽一,所述接线盒单体右侧面的中部开设有和定位槽一位置相对应的定位柱一。当多个接线盒单体进行组合拼装时,首先把定位柱一的底端嵌入定位槽一内,然后使两个卡柱一分别插入两个卡孔一内,即可快速实现两个接线盒单体之间的固定装配工作。A positioning slot I is provided in the middle of the left side of the junction box unit, and a positioning post I corresponding to the position of the positioning slot I is provided in the middle of the right side of the junction box unit. When multiple junction boxes are combined and assembled, first insert the bottom end of the positioning post one into the positioning groove one, and then insert the two clamping posts one into the two clamping holes one respectively, so that two junction boxes can be quickly realized Fixed assembly work between units.

所述安装座A靠近接线盒单体的一侧面设置有两个卡柱二,且两个卡柱二与两个卡孔一的位置相对应,所述安装座A靠近接线盒单体一侧面的中部设置有与定位槽一相适配的定位柱二。在安装座A和接线盒单体进行组合拼装的过程中,首先把定位柱二的底端嵌入定位槽一内,然后使两个卡柱二分别插入两个卡孔一内,即可把安装座A快速装配在接线盒单体的一侧。Two clamping posts 2 are provided on one side of the mounting base A close to the junction box unit, and the two clamping posts 2 correspond to the positions of the two clamping holes 1. The mounting base A is close to one side of the junction box unit. There is a positioning post two that matches the positioning slot one in the middle. In the process of assembling the mounting base A and the junction box alone, first insert the bottom end of the positioning post 2 into the positioning groove 1, and then insert the two clamping posts 2 into the two clamping holes 1 respectively, and the installation can be completed. Base A is quickly assembled on one side of the junction box.

所述安装座B靠近接线盒单体的一侧面开设有两个卡孔二,且两个卡孔二与两个卡柱一的位置相对应,所述安装座B靠近接线盒单体一侧面的中部开设有与定位柱一相适配的定位槽二。在安装座B与接线盒单体进行组合拼装的过程中,使定位柱一的底端嵌入定位槽二的内部,然后使两个卡柱一分别插入两个卡孔二的内部,即可把安装座B快速装配在接线盒单体的另一侧。There are two clamping holes 2 on one side of the mounting base B close to the junction box unit, and the two clamping holes 2 correspond to the positions of the two clamping posts 1. The mounting base B is close to one side of the junction box unit. There is a positioning groove two that matches the positioning column one in the middle. During the assembly process of the mounting base B and the junction box alone, insert the bottom end of the positioning column one into the interior of the positioning groove two, and then insert the two clamping columns one into the two clamping holes two respectively, and then the Mounting base B is quickly assembled on the other side of the junction box unit.

在接线盒单体中,每个所述卡柱一的底部均设置有锥台体一,有利于使卡柱一快速插入卡孔二的内部,所述定位柱一的底部设置有锥台体二,有利于使定位柱一快速嵌入定位槽二的内部,所述卡柱一、定位柱一、锥台体一、锥台体二和接线盒单体为一体成型。In the junction box unit, a frustum body is provided at the bottom of each clamping post one, which facilitates the quick insertion of the clamping post one into the inside of the clamping hole two. A frustum body is provided at the bottom of the positioning post one. Second, it is conducive to quickly insert the positioning column 1 into the interior of the positioning groove 2. The clamping column 1, the positioning column 1, the frustum body 1, the frustum body 2 and the junction box are formed in one piece.

在安装座A中,每个所述卡柱二的底部均设置有锥台体三,有利于使卡柱二快速插入卡孔二的内部,所述定位柱二的底部设置有锥台体四,有利于使定位柱二快速嵌入定位槽一的内部,所述卡柱二、定位柱二、锥台体四、锥台体三和安装座A为一体成型。In the mounting base A, a frustum body 3 is provided at the bottom of each clamping column 2, which is beneficial to quickly inserting the clamping column 2 into the interior of the clamping hole 2. A truncated cone body 4 is provided at the bottom of the positioning column 2. , which is conducive to quickly inserting the positioning column 2 into the interior of the positioning groove 1. The clamping column 2, the positioning column 2, the frustum body 4, the truncated cone body 3 and the mounting seat A are integrally formed.

在安装座A中,所述安装座A的上表面开设有凹槽一,所述凹槽一的内部开设有一组安装孔一,且安装孔一贯穿至安装座A的底面,通过设置的安装孔一,能够快速把安装座A以及该接线盒安装到墙体上。In the mounting base A, a groove 1 is provided on the upper surface of the mounting base A. A set of mounting holes 1 is formed inside the groove 1, and the mounting holes 1 penetrate to the bottom surface of the mounting base A. Through the installation Hole 1 can quickly install the mounting base A and the junction box to the wall.

在安装座B中,所述安装座B的上表面开设有凹槽二,所述凹槽二的内部开设有一组安装孔二,且安装孔二贯穿至安装座B的底面,能够快速把安装座B以及该接线盒安装到墙体上。In the mounting base B, a groove 2 is provided on the upper surface of the mounting base B. A set of mounting holes 2 is formed inside the groove 2, and the mounting holes 2 penetrate to the bottom surface of the mounting base B, which can quickly install the mounting base B. Mount B and the junction box to the wall.

进一步的,所述接线盒单体的底面设置有一组橡胶条,用于提高该接线盒在使用时的防滑效果。Furthermore, a set of rubber strips is provided on the bottom surface of the junction box unit to improve the anti-slip effect of the junction box when in use.

有益效果:Beneficial effects:

与现有技术相比,该接线盒具备如下有益效果:Compared with the existing technology, this junction box has the following beneficial effects:

一、本实用新型通过接线盒单体两侧设置的卡孔一和卡柱一,便于多个接线盒单体进行组合拼装固定,另外通过接线盒单体两侧设置的定位槽一和定位柱一,当多个接线盒单体进行组合拼装时,首先把定位柱一的底端嵌入定位槽一内,然后使两个卡柱一分别插入两个卡孔一内,即可快速实现两个接线盒单体之间的固定装配工作,只需要一个模具生产的接线盒单体,就能拼装出多种规格的接线盒,能够减少开发模具的成本,提高生产机动性。1. This utility model facilitates the assembly, assembly and fixation of multiple junction box units through the clamping holes 1 and the clamping posts 1 provided on both sides of the junction box unit. In addition, the positioning slot 1 and the positioning post 1 are provided on both sides of the junction box unit. 1. When multiple junction boxes are combined and assembled, first embed the bottom end of the positioning column 1 into the positioning slot 1, and then insert the two clamping columns 1 into the two clamping holes 1 respectively, so that the two clamping holes can be quickly realized. For the fixed assembly work between the junction box units, only one junction box unit produced by the mold can be assembled to assemble junction boxes of various specifications, which can reduce the cost of developing molds and improve production mobility.

二、该接线盒通过分体式的装配结构设计,能够使多个接线盒单体进行快速组装固定装配,并能够使安装座B和安装座A快速固定装配在接线盒单体的两侧,在进行生产的过程中,能够灵活实现多种规格接线盒的拼装,无需制备多种规格的模具,从而能够提高生产机动性,减少生产成本。2. Through the split assembly structure design, the junction box can quickly assemble and fix multiple junction box units, and the mounting base B and mounting base A can be quickly fixed and assembled on both sides of the junction box unit. During the production process, junction boxes of various specifications can be assembled flexibly without the need to prepare molds of various specifications, thereby improving production flexibility and reducing production costs.

本实用新型的其他优点、目标和特征在某种程度上将在随后的说明书中进行阐述,并且在某种程度上,基于对下文的考察研究对本领域技术人员而言将是显而易见的,或者可以从本实用新型的实践中得到教导。Other advantages, objects, and features of the present invention will be set forth in the description that follows, and to the extent that they will be apparent to those skilled in the art based on an examination of the following, or can be Learn from the practice of this utility model.

附图说明Description of the drawings

图1为该接线盒单体装配的第一视角立体结构示意图;Figure 1 is a first perspective three-dimensional structural schematic diagram of the single assembly of the junction box;

图2为该接线盒单体装配的第二视角立体结构示意图;Figure 2 is a schematic three-dimensional structural diagram of the single assembly of the junction box from a second perspective;

图3为该接线盒组合装配的第一视角立体结构示意图;Figure 3 is a schematic three-dimensional structural diagram of the junction box assembly from a first perspective;

图4为该接线盒组合装配的第二视角立体结构示意图;Figure 4 is a schematic three-dimensional structural diagram of the junction box assembly from a second perspective;

图5为该接线盒组合装配的后视视角立体结构示意图。Figure 5 is a schematic diagram of the rear perspective three-dimensional structure of the junction box assembly.

图中:In the picture:

1、接线盒单体;101、卡孔一;102、卡柱一;103、定位槽一;104、定位柱一;105、锥台体二;106、锥台体二;107、橡胶条;1. Junction box single body; 101. One clamping hole; 102. One clamping column; 103. One positioning slot; 104. One positioning column; 105. Two frustum bodies; 106. Two frustum bodies; 107. Rubber strips;

2、安装座B;201、卡孔二;202、定位槽二;203、凹槽二;204、安装孔二;2. Mounting base B; 201. Two mounting holes; 202. Two positioning slots; 203. Two grooves; 204. Two mounting holes;

3、安装座A;301、卡柱二;302、定位柱二;303、凹槽一;304、安装孔一;305、锥台体四;306、锥台体三。3. Mounting seat A; 301. Two clamping posts; 302. Two positioning posts; 303. One groove; 304. One mounting hole; 305. Four frustum bodies; 306. Three frustum bodies.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present utility model.

如图1-5所示,本实用新型提供一种技术方案:一种接线盒,包括多个接线盒单体1、一个安装座B2和一个安装座A3,接线盒单体1的左侧面开设有两个卡孔一101,接线盒单体1的右侧面设置有两个与卡孔一101相适配的卡柱一102,且两个卡柱一102的位置与两个卡孔一101的位置相对应。当多个接线盒单体1进行组合拼装时,通过卡孔一101和卡柱一102的配合设置,便于多个接线盒单体1进行组合拼装固定,只需要一个模具生产的接线盒单体1,就能拼装出多种规格的接线盒,能够减少开发模具的成本,提高生产机动性。As shown in Figures 1-5, the present utility model provides a technical solution: a junction box, including a plurality of junction box units 1, a mounting base B2 and a mounting base A3. The left side of the junction box unit 1 There are two clamping holes 101. The right side of the junction box unit 1 is provided with two clamping posts 102 that are adapted to the clamping holes 101. The positions of the two clamping posts 102 are in line with the two clamping holes. Corresponds to the position of 101. When multiple junction box units 1 are combined and assembled, the combination of the clamping hole 101 and the clamping post 102 facilitates the assembly, assembly and fixation of the multiple junction box units 1, and only one junction box unit produced by a mold is required. 1. Junction boxes of various specifications can be assembled, which can reduce the cost of developing molds and improve production flexibility.

接线盒单体1的左侧面的中部开设有一个定位槽一103,接线盒单体1右侧面的中部开设有和定位槽一103位置相对应的定位柱一104。当多个接线盒单体1进行组合拼装时,首先把定位柱一104的底端嵌入定位槽一103内,然后使两个卡柱一102分别插入两个卡孔一101内,即可快速实现两个接线盒单体1之间的固定装配工作。A positioning slot 103 is provided in the middle of the left side of the junction box unit 1, and a positioning post 104 corresponding to the position of the positioning slot 103 is provided in the middle of the right side of the junction box unit 1. When multiple junction box units 1 are combined and assembled, first insert the bottom end of the positioning post 104 into the positioning groove 103, and then insert the two clamping posts 102 into the two clamping holes 101 respectively, and then quickly Realize the fixed assembly work between the two junction box units 1.

安装座A3靠近接线盒单体1的一侧面设置有两个卡柱二301,且两个卡柱二301与两个卡孔一101的位置相对应,安装座A3靠近接线盒单体1一侧面的中部设置有与定位槽一103相适配的定位柱二302。在安装座A3和接线盒单体1进行组合拼装的过程中,首先把定位柱二302的底端嵌入定位槽一103内,然后使两个卡柱二301分别插入两个卡孔一101内,即可把安装座A3快速装配在接线盒单体1的一侧。Two clamping posts 301 are provided on one side of the mounting base A3 close to the junction box unit 1, and the two clamping posts 301 correspond to the positions of the two clamping holes 101. The mounting base A3 is close to the junction box unit 1. The middle part of the side is provided with a positioning post 2 302 that matches the positioning groove 103 . During the assembly process of the mounting base A3 and the junction box unit 1, first insert the bottom end of the positioning post 2 302 into the positioning groove 103, and then insert the two clamping posts 301 into the two clamping holes 101 respectively. , the mounting base A3 can be quickly assembled on one side of the junction box unit 1.

安装座B2靠近接线盒单体1的一侧面开设有两个卡孔二201,且两个卡孔二201与两个卡柱一102的位置相对应,安装座B2靠近接线盒单体1一侧面的中部开设有与定位柱一104相适配的定位槽二202。在安装座B2与接线盒单体1进行组合拼装的过程中,使定位柱一104的底端嵌入定位槽二202的内部,然后使两个卡柱一102分别插入两个卡孔二201的内部,即可把安装座B2快速装配在接线盒单体1的另一侧。There are two clamping holes 201 on one side of the mounting base B2 close to the junction box unit 1, and the two clamping holes 201 correspond to the positions of the two clamping posts 102. The mounting base B2 is close to the junction box unit 1. The middle part of the side is provided with a positioning groove two 202 that matches the positioning post one 104. During the assembly process of the mounting base B2 and the junction box unit 1, the bottom end of the positioning post 104 is inserted into the interior of the positioning groove 202, and then the two clamping posts 102 are inserted into the two clamping holes 201 respectively. Inside, the mounting base B2 can be quickly assembled on the other side of the junction box unit 1.

请着重参照图2,在接线盒单体1中,每个卡柱一102的底部均设置有锥台体一105,有利于使卡柱一102快速插入卡孔二201的内部,定位柱一104的底部设置有锥台体二106,有利于使定位柱一104快速嵌入定位槽二202的内部,卡柱一102、定位柱一104、锥台体一105、锥台体二106和接线盒单体1为一体成型。Please focus on Figure 2. In the junction box unit 1, a frustum body 105 is provided at the bottom of each clamping post 102, which is helpful for the clamping post 102 to be quickly inserted into the inside of the clamping hole 201. The positioning post 1 The bottom of 104 is provided with a truncated cone body 106, which facilitates the positioning column 104 to quickly embed into the interior of the positioning groove 202. The clamping column 102, positioning column 104, truncated cone body 105, truncated cone body 2 106 and wiring The box unit 1 is formed in one piece.

请再次着重参照图2,在安装座A3中,每个卡柱二301的底部均设置有锥台体三306,有利于使卡柱二301快速插入卡孔二201的内部,定位柱二302的底部设置有锥台体四305,有利于使定位柱二302快速嵌入定位槽一103的内部,卡柱二301、定位柱二302、锥台体四305、锥台体三306和安装座A3为一体成型。Please refer to Figure 2 again. In the mounting base A3, a frustum body three 306 is provided at the bottom of each clamping column 301, which is helpful for the clamping column 301 to be quickly inserted into the interior of the clamping hole 201. The positioning column 302 There is a frustum body four 305 at the bottom, which is helpful for the positioning column two 302 to quickly embed into the interior of the positioning groove one 103. The two clamping columns 301, the positioning column two 302, the frustum body four 305, the frustum body three 306 and the mounting seat A3 is formed in one piece.

请着重参照图3,在安装座A3中,安装座A3的上表面开设有凹槽一303,凹槽一303的内部开设有一组安装孔一304,且安装孔一304贯穿至安装座A3的底面,通过设置的安装孔一304,能够快速把安装座A3以及该接线盒安装到墙体上。Please focus on Figure 3. In the mounting base A3, a groove 303 is provided on the upper surface of the mounting base A3. A set of mounting holes 304 is formed inside the groove 303, and the mounting hole 304 penetrates to the top of the mounting base A3. On the bottom, through the mounting hole 304, the mounting base A3 and the junction box can be quickly installed on the wall.

请再次着重参照图3,在安装座B2中,安装座B2的上表面开设有凹槽二203,凹槽二203的内部开设有一组安装孔二204,且安装孔二204贯穿至安装座B2的底面,能够快速把安装座B2以及该接线盒安装到墙体上。Please refer to Figure 3 again. In the mounting base B2, a groove 203 is formed on the upper surface of the mounting base B2. A set of mounting holes 204 is formed inside the groove 203, and the mounting holes 204 pass through to the mounting base B2. The bottom surface of the installation base B2 and the junction box can be quickly installed on the wall.

工作原理:在该接线盒的装配过程中,当对多个接线盒单体1进行组装时,首先把定位柱一104的底端嵌入定位槽一103内,然后使两个卡柱一102分别插入两个卡孔一101内,即可快速实现两个接线盒单体1之间的固定装配工作。对多个接线盒单体1进行组装固定后,再分别把安装座B2和安装座A3安装在接线盒单体1的两侧,其过程中,首先把定位柱二302的底端嵌入定位槽一103内,然后使两个卡柱二301分别插入两个卡孔一101内,即可把安装座A3固定装配在接线盒单体1的一侧;然后使定位柱一104的底端嵌入定位槽二202的内部,再使两个卡柱一102分别插入两个卡孔二201的内部,即可把安装座B2固定装配在接线盒单体1的另一侧。综合上述原理可知,该接线盒通过分体式的装配结构,能够使多个接线盒单体1进行快速组装固定装配,并能够使安装座B2和安装座A3快速固定装配在接线盒单体1的两侧,在进行生产的过程中,能够灵活实现多种规格接线盒的拼装,无需制备多种规格的模具,从而能够提高生产机动性,减少生产成本。Working principle: During the assembly process of the junction box, when assembling multiple junction box units 1, first insert the bottom end of the positioning post 104 into the positioning groove 103, and then make the two clamping posts 102 respectively By inserting into the two card holes 101, the fixed assembly work between the two junction box units 1 can be quickly realized. After assembling and fixing multiple junction box units 1, install the mounting bases B2 and A3 on both sides of the junction box unit 1 respectively. During the process, first insert the bottom end of the positioning post 2 302 into the positioning groove. 103, and then insert the two clamping posts 301 into the two clamping holes 101 respectively, so that the mounting base A3 can be fixedly assembled on one side of the junction box unit 1; then insert the bottom end of the positioning post 104 Position the inside of the second slot 202, and then insert the two clamping posts 102 into the two clamping holes 201 respectively, so that the mounting base B2 can be fixedly assembled on the other side of the junction box unit 1. Based on the above principles, it can be seen that through the split assembly structure of the junction box, multiple junction box units 1 can be quickly assembled and fixed, and the mounting base B2 and the mounting base A3 can be quickly fixed and assembled on the junction box unit 1. On both sides, during the production process, junction boxes of various specifications can be assembled flexibly without the need to prepare molds of various specifications, thereby improving production flexibility and reducing production costs.

请着重参照图5,进一步的,接线盒单体1的底面设置有一组橡胶条107,用于提高该接线盒在使用时的防滑效果。Please refer to Figure 5 . Furthermore, a set of rubber strips 107 is provided on the bottom surface of the junction box unit 1 to improve the anti-slip effect of the junction box when in use.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those of ordinary skill in the art will understand that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention. , substitutions and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (6)

1. The utility model provides a terminal box, includes a plurality of terminal box monomers (1), a mount pad B (2) and a mount pad A (3), its characterized in that: two clamping holes I (101) are formed in the left side face of the junction box monomer (1), two clamping columns I (102) matched with the clamping holes I (101) are arranged on the right side face of the junction box monomer (1), the positions of the two clamping columns I (102) correspond to the positions of the two clamping holes I (101), a positioning groove I (103) is formed in the middle of the left side face of the junction box monomer (1), and a positioning column I (104) corresponding to the positioning groove I (103) is formed in the middle of the right side face of the junction box monomer (1);
two clamping columns II (301) are arranged on one side surface, close to the junction box monomer (1), of the mounting seat A (3), the positions of the two clamping columns II (301) and the two clamping holes I (101) correspond, and a positioning column II (302) matched with the positioning groove I (103) is arranged in the middle of one side surface, close to the junction box monomer (1), of the mounting seat A (3);
two clamping holes II (201) are formed in the middle of the side face, close to the junction box monomer (1), of the mounting seat B (2), two clamping holes II (201) correspond to the positions of two clamping columns I (102), and a positioning groove II (202) matched with the positioning column I (104) is formed in the middle of the side face, close to the junction box monomer (1), of the mounting seat B (2).
2. A junction box according to claim 1, characterized in that: the bottom of each clamping column I (102) is provided with a frustum body I (105), the bottom of each positioning column I (104) is provided with a frustum body II (106), and the clamping column I (102), the positioning column I (104), the frustum body I (105), the frustum body II (106) and the junction box monomer (1) are integrally formed.
3. A junction box according to claim 1, characterized in that: the bottom of every card post two (301) all is provided with frustum body three (306), the bottom of reference column two (302) is provided with frustum body four (305), card post two (301), reference column two (302), frustum body four (305), frustum body three (306) and mount pad A (3) are integrated into one piece.
4. A junction box according to claim 1, characterized in that: the upper surface of the mounting seat A (3) is provided with a first groove (303), a group of first mounting holes (304) are formed in the first groove (303), and the first mounting holes (304) penetrate through the bottom surface of the mounting seat A (3).
5. A junction box according to claim 1, characterized in that: the upper surface of mount pad B (2) has seted up recess two (203), a set of mounting hole two (204) have been seted up to the inside of recess two (203), and mounting hole two (204) run through to the bottom surface of mount pad B (2).
6. A junction box according to claim 1, characterized in that: a group of rubber strips (107) are arranged on the bottom surface of the junction box monomer (1).
CN202320836010.3U 2023-04-15 2023-04-15 Junction box Expired - Fee Related CN219957701U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320836010.3U CN219957701U (en) 2023-04-15 2023-04-15 Junction box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320836010.3U CN219957701U (en) 2023-04-15 2023-04-15 Junction box

Publications (1)

Publication Number Publication Date
CN219957701U true CN219957701U (en) 2023-11-03

Family

ID=88538569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320836010.3U Expired - Fee Related CN219957701U (en) 2023-04-15 2023-04-15 Junction box

Country Status (1)

Country Link
CN (1) CN219957701U (en)

Similar Documents

Publication Publication Date Title
CN219957701U (en) Junction box
CN205248341U (en) Electric automobile's battery module
CN109001506B (en) Electric energy metering joint junction box
CN103558575B (en) A kind of compatible three-phase electric energy meter and electric information acquisition terminal automatic calibration method
CN203672912U (en) Lithium battery clamp
CN212230783U (en) An electric meter box extension bracket
CN205228336U (en) Soft involution core of lithium ion battery inspection tool
CN206640182U (en) A kind of Utilities Electric Co. is used for the fixture for changing ammeter
CN102377090B (en) A kind of interconnecting module
CN209266620U (en) Battery connector base
CN216288038U (en) Switch terminal convenient to equipment
CN207587455U (en) A kind of high voltage suspended insulator high-precision umbrella shape module
CN201262882Y (en) Special bobbin winder bracket of transformer
CN203055648U (en) Current mutual inductor used for high-pressure soft boot of light rail
CN200986564Y (en) Electric energy metering junction box
CN202003923U (en) Electric-connection wire holder structure
CN211743612U (en) Wall Mounted Air Conditioner Cable Set
CN204348841U (en) The lithium ion batteries for automobiles that a kind of full screw connects
CN201819920U (en) Composite plug-in board for fully automatic variable ratio bridge
CN204361561U (en) 1/4 unit drawer circuit separated time switching device in a kind of power distribution cabinet
CN202258728U (en) Wire racks with high voltage components
CN204882647U (en) Tail wiring reason line ware is showed to electric energy
CN221651296U (en) An integrated current transformer
CN216980807U (en) High-precision power module parallel sheet of new energy battery
CN221747628U (en) Double-jack bottom cover for battery

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20231103