CN219956836U - Boiler pressure vessel inspection detection device - Google Patents

Boiler pressure vessel inspection detection device Download PDF

Info

Publication number
CN219956836U
CN219956836U CN202321161281.XU CN202321161281U CN219956836U CN 219956836 U CN219956836 U CN 219956836U CN 202321161281 U CN202321161281 U CN 202321161281U CN 219956836 U CN219956836 U CN 219956836U
Authority
CN
China
Prior art keywords
boiler
mounting bracket
pressure vessel
detection device
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202321161281.XU
Other languages
Chinese (zh)
Inventor
车帅
姜茗月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321161281.XU priority Critical patent/CN219956836U/en
Application granted granted Critical
Publication of CN219956836U publication Critical patent/CN219956836U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measuring Fluid Pressure (AREA)

Abstract

The utility model discloses a boiler pressure vessel inspection and detection device which comprises a base, wherein a rotary disk is rotatably arranged on the upper surface of the base, a motor is fixedly arranged at the lower end of the base, a first mounting frame and a second mounting frame are respectively and fixedly arranged at the upper end of the rotary disk, limit components capable of fixing a boiler are arranged on the inner walls of the first mounting frame and the second mounting frame, a third mounting frame is fixedly arranged on the upper surface of the base, and a pressure detection component is arranged on the inner wall of the third mounting frame. Compared with the existing detection mode, the device can be used for detecting one boiler and simultaneously installing the other boiler, when the boiler right below the pressure detection component is detected, the rotating disc can be rotated 180 degrees to enable the installed boiler to be rotated to the position right below the pressure detection component for detection, and meanwhile the detected boiler can be disassembled, so that the detection efficiency can be improved.

Description

一种锅炉压力容器检验检测装置A boiler pressure vessel inspection and detection device

技术领域Technical field

本实用新型涉及检测设备技术领域,尤其涉及一种锅炉压力容器检验检测装置。The utility model relates to the technical field of detection equipment, in particular to a boiler and pressure vessel inspection and detection device.

背景技术Background technique

中国专利公告号CN216747564U公开了一种锅炉压力容器检验检测装置,包括底座,所述底座的内腔设置有驱动机构,所述驱动机构上连接有滑动板,所述滑动板的顶部安装有第一液压缸,所述第一液压缸的顶部固定连接有支撑托架,所述底座的顶部固定连接有防护板,所述防护板的的一端固定连接有支撑板,所述支撑板上安装有第二液压缸,本实用新型通过设有驱动机构和第一液压缸,在对锅炉压力容器进行检测时,能够对锅炉压力容器的位置进行调节,以便于检测机构伸入锅炉压力容器内,满足各种锅炉压力容器的检测需求,方便使用,通过设有检测机构,能够对检测仪本体的位置和角度进行调节,实现锅炉压力容器内壁的全方位检测。Chinese Patent Announcement No. CN216747564U discloses a boiler pressure vessel inspection and detection device, which includes a base. The inner cavity of the base is provided with a driving mechanism. The driving mechanism is connected with a sliding plate. The top of the sliding plate is equipped with a first Hydraulic cylinder, the top of the first hydraulic cylinder is fixedly connected with a support bracket, the top of the base is fixedly connected with a protective plate, one end of the protective plate is fixedly connected with a support plate, and a third support plate is installed on the support plate. With two hydraulic cylinders, the utility model is provided with a driving mechanism and a first hydraulic cylinder. When detecting the boiler pressure vessel, the position of the boiler pressure vessel can be adjusted so that the detection mechanism can extend into the boiler pressure vessel to meet various requirements. It meets the testing needs of boiler pressure vessels and is easy to use. With a testing mechanism, the position and angle of the detector body can be adjusted to achieve all-round testing of the inner wall of the boiler pressure vessel.

但该装置在使用时存在以下缺陷:该装置在对锅炉进行压力检测时,首先需要将锅炉放置在支撑托架上,检测完毕后需要将锅炉从支撑托架上取出,且检测时需要较长的等待时间,因此会导致该装置在对锅炉进行检验时过于耗时。为此,我们提出一种锅炉锅炉压力容器检验检测装置。However, this device has the following defects when used: when the device performs pressure testing on the boiler, the boiler first needs to be placed on the support bracket. After the test is completed, the boiler needs to be taken out from the support bracket, and the test takes a long time. waiting time, thus making the unit too time consuming to inspect the boiler. To this end, we propose a boiler and pressure vessel inspection and detection device.

实用新型内容Utility model content

本实用新型的目的在于提供一种锅炉压力容器检验检测装置,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide a boiler pressure vessel inspection and detection device to solve the problems raised in the above background technology.

为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above purpose, the present utility model adopts the following technical solutions:

一种锅炉压力容器检验检测装置,包括底座,所述底座的上表面转动安装有旋转盘,底座的下端固定安装有电机,电机的输出端与旋转盘的下端固定连接,旋转盘的上端分别固定安装有第一安装架和第二安装架,第一安装架和第二安装架的内壁均设置有可对锅炉进行固定的限位组件,限位组件由第一固定环、第二固定环、限位螺栓和定位盘构成,第一固定环、第二固定环和定位盘的数量均为两个,底座的上表面固定安装有第三安装架,第三安装架的内壁设置有压力检测组件,压力检测组件由气动伸缩杆、气泵、进气管、排气管、密封盘、气压表和电磁阀构成。A boiler pressure vessel inspection and detection device, including a base, a rotating disk is installed on the upper surface of the base, a motor is fixedly installed on the lower end of the base, the output end of the motor is fixedly connected to the lower end of the rotating disk, and the upper ends of the rotating disk are respectively fixed. A first mounting bracket and a second mounting bracket are installed. The inner walls of the first mounting bracket and the second mounting bracket are provided with a limiting component that can fix the boiler. The limiting component is composed of a first fixing ring, a second fixing ring, The limit bolts and positioning plates are composed of two first fixed rings, two second fixing rings and two positioning plates. A third mounting bracket is fixedly installed on the upper surface of the base, and a pressure detection component is provided on the inner wall of the third mounting bracket. , the pressure detection component consists of a pneumatic telescopic rod, air pump, air intake pipe, exhaust pipe, sealing plate, air pressure gauge and solenoid valve.

优选地,所述两个第一固定环的外环面分别与第一安装架和第二安装架的内壁固定连接,第一固定环的表面和第二固定环的表面通过合页转动连接,限位螺栓螺纹连接在第二固定环的表面,第一固定环的表面开设有与限位螺栓相适配的螺纹孔。Preferably, the outer annular surfaces of the two first fixing rings are fixedly connected to the inner walls of the first mounting bracket and the second mounting bracket respectively, and the surfaces of the first fixing ring and the second fixing ring are rotationally connected through hinges, The limiting bolt is threadedly connected to the surface of the second fixed ring, and the surface of the first fixed ring is provided with threaded holes that match the limiting bolt.

优选地,所述两个定位盘的下端均与旋转盘的上端固定连接,且两个定位盘分别与两个第一固定环同心。Preferably, the lower ends of the two positioning disks are fixedly connected to the upper ends of the rotating disk, and the two positioning disks are concentric with the two first fixed rings respectively.

优选地,所述气动伸缩杆的安装端与第三安装架的内顶壁固定连接,气动伸缩杆的伸缩端与密封盘的上端固定连接。Preferably, the installation end of the pneumatic telescopic rod is fixedly connected to the inner top wall of the third mounting frame, and the telescopic end of the pneumatic telescopic rod is fixedly connected to the upper end of the sealing disk.

优选地,所述进气管和排气管均固定安装在密封盘的下端,气泵固定安装在第三安装架的上表面,进气管的另一端延伸至密封盘的外部,并与气泵相连接。Preferably, the air inlet pipe and the exhaust pipe are both fixedly installed on the lower end of the sealing plate, the air pump is fixedly installed on the upper surface of the third mounting bracket, and the other end of the air inlet pipe extends to the outside of the sealing plate and is connected to the air pump.

优选地,所述排气管的另一端延伸至密封盘的外部,且气压表设置在排气管的表面,电磁阀的数量为两个,两个电磁阀分别设置在排气管和进气管的表面。Preferably, the other end of the exhaust pipe extends to the outside of the sealing plate, and the air pressure gauge is set on the surface of the exhaust pipe. The number of solenoid valves is two, and the two solenoid valves are respectively set on the exhaust pipe and the intake pipe. s surface.

本实用新型与现有技术相比具有以下优点:Compared with the existing technology, this utility model has the following advantages:

1、本实用新型通过设置旋转盘和限位组件,将一个锅炉放置在处于第一安装架内的限位组件内,接着驱使旋转盘转动,从而可将第一安装架旋转至压力检测组件的正下方,接着利用压力检测组件对第一安装架内的锅炉进行压力检测,且,在对锅炉进行压力检测的同时,操作人员可将第二个锅炉放置在第二安装架内的限位组件内,对比现有的检测方式,该装置在对一个锅炉检测的同时可对另一个锅炉进行安装,当处于压力检测组件正下方的锅炉检测完毕后,转动旋转盘180度可将安装完成的锅炉转动至压力检测组件正下方进行检测,同时可对检测完毕的锅炉进行拆卸,从而可提高检测的效率。1. This utility model sets a rotating disk and a limiting component, places a boiler in the limiting component in the first mounting bracket, and then drives the rotating disk to rotate, so that the first mounting bracket can be rotated to the pressure detection component. Directly below, the pressure detection component is then used to detect the pressure of the boiler in the first mounting bracket. While performing the pressure detection on the boiler, the operator can place the second boiler on the limit component in the second mounting bracket. Compared with the existing detection methods, this device can detect one boiler while installing another boiler. When the boiler directly below the pressure detection component is tested, the installed boiler can be installed by rotating the rotating plate 180 degrees. Rotate to the bottom of the pressure detection component for detection, and the boiler that has been tested can be disassembled at the same time, thereby improving the efficiency of detection.

2、本实用新型通过设置压力检测组件和定位盘,利用定位盘可对锅炉的位置进行定位,当锅炉转动至密封盘正下方后,驱动气动伸缩杆下降可驱使密封盘将锅炉的开口处封堵进行检测,避免了锅炉位置偏移造成密封盘撞击锅炉表面导致损坏的问题。2. This utility model is equipped with a pressure detection component and a positioning plate, and the positioning plate can be used to locate the position of the boiler. When the boiler rotates to directly below the sealing plate, the pneumatic telescopic rod is driven downward to drive the sealing plate to seal the opening of the boiler. Blockage detection is carried out to avoid the problem of damage caused by the deflection of the boiler position causing the sealing disk to hit the boiler surface.

附图说明Description of the drawings

图1为实用新型提出的立体结构示意图;Figure 1 is a schematic diagram of the three-dimensional structure proposed by the utility model;

图2为实用新型提出的正剖结构示意图;Figure 2 is a schematic diagram of the front section structure proposed by the utility model;

图3为实用新型提出的第一固定环俯剖结构示意图;Figure 3 is a schematic cross-sectional view of the first fixed ring proposed by the utility model;

图4为实用新型提出的密封盘正剖结构示意图。Figure 4 is a schematic cross-sectional view of the sealing disk proposed by the utility model.

图中:1底座、2旋转盘、3电机、4第一安装架、5第二安装架、6第一固定环、7第二固定环、8限位螺栓、9定位盘、10第三安装架、11气动伸缩杆、12气泵、13进气管、14排气管、15密封盘、16气压表、17电磁阀、18锅炉。In the picture: 1 base, 2 rotating plate, 3 motor, 4 first mounting bracket, 5 second mounting bracket, 6 first fixed ring, 7 second fixed ring, 8 limit bolt, 9 positioning plate, 10 third installation Frame, 11 pneumatic telescopic rod, 12 air pump, 13 air inlet pipe, 14 exhaust pipe, 15 sealing plate, 16 air pressure gauge, 17 solenoid valve, 18 boiler.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example.

在本实用新型的描述中,需要理解的是,术语“上”、“下”、“前”、“后”、“左”、“右”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present utility model, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inner", The orientation or positional relationship indicated by "outside" is based on the orientation or positional relationship shown in the drawings. It is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or component referred to must have a specific orientation. , is constructed and operated in a specific orientation, and therefore cannot be construed as a limitation of the present invention.

参照图1-4,一种锅炉压力容器检验检测装置,包括底座1,底座1的上表面转动安装有旋转盘2,底座1的下端固定安装有电机3,电机3的输出端与旋转盘2的下端固定连接,旋转盘2的上端分别固定安装有第一安装架4和第二安装架5,驱动电机3可带动旋转盘2转动,从而可驱使第一安装架4和第二安装架5同步转动。Referring to Figures 1-4, a boiler pressure vessel inspection and testing device includes a base 1. A rotating disk 2 is mounted on the upper surface of the base 1 for rotation. A motor 3 is fixedly installed on the lower end of the base 1. The output end of the motor 3 is connected to the rotating disk 2. The lower end of the rotary plate 2 is fixedly connected, and the first mounting bracket 4 and the second mounting bracket 5 are respectively fixedly installed on the upper end of the rotating plate 2. The driving motor 3 can drive the rotating plate 2 to rotate, thereby driving the first mounting bracket 4 and the second mounting bracket 5. Rotate synchronously.

第一安装架4和第二安装架5的内壁均设置有可对锅炉进行固定的限位组件,限位组件由第一固定环6、第二固定环7、限位螺栓8和定位盘9构成,第一固定环6、第二固定环7和定位盘9的数量均为两个,两个第一固定环6的外环面分别与第一安装架4和第二安装架5的内壁固定连接,第一固定环6的表面和第二固定环7的表面通过合页转动连接,限位螺栓8螺纹连接在第二固定环7的表面,第一固定环6的表面开设有与限位螺栓8相适配的螺纹孔。The inner walls of the first mounting bracket 4 and the second mounting bracket 5 are both provided with limiting components that can fix the boiler. The limiting components consist of a first fixing ring 6, a second fixing ring 7, a limiting bolt 8 and a positioning plate 9 The number of the first fixing ring 6, the second fixing ring 7 and the positioning plate 9 is two, and the outer ring surfaces of the two first fixing rings 6 are respectively connected with the inner walls of the first mounting bracket 4 and the second mounting bracket 5. Fixed connection, the surface of the first fixed ring 6 and the surface of the second fixed ring 7 are rotationally connected through a hinge, the limit bolt 8 is threadedly connected to the surface of the second fixed ring 7, the surface of the first fixed ring 6 is provided with a limit 8 matching threaded holes for the bolts.

两个定位盘9的下端均与旋转盘2的上端固定连接,且两个定位盘9分别与两个第一固定环6同心,定位盘9的内径与锅炉18的外径相适配,打开第二固定环7,接着将锅炉18放置在定位盘9内,此时锅炉18的表面会处于第一固定环6内,接着转动第二固定环7可驱使第一固定环6和第二固定环7合并,之后将限位螺栓8拧入第一固定环6表面的螺纹孔内,从而可利用第一固定环6和第二固定环7合并将锅炉18进行夹持。The lower ends of the two positioning disks 9 are fixedly connected to the upper end of the rotating disk 2, and the two positioning disks 9 are concentric with the two first fixed rings 6 respectively. The inner diameter of the positioning disk 9 matches the outer diameter of the boiler 18, and the opening Second fixing ring 7, then place the boiler 18 in the positioning plate 9. At this time, the surface of the boiler 18 will be in the first fixing ring 6, and then rotate the second fixing ring 7 to drive the first fixing ring 6 and the second fixing ring 7. The rings 7 are merged, and then the limiting bolts 8 are screwed into the threaded holes on the surface of the first fixing ring 6, so that the first fixing ring 6 and the second fixing ring 7 can be combined to clamp the boiler 18.

底座1的上表面固定安装有第三安装架10,第三安装架10的内壁设置有压力检测组件,压力检测组件由气动伸缩杆11、气泵12、进气管13、排气管14、密封盘15、气压表16和电磁阀17构成。A third mounting bracket 10 is fixedly installed on the upper surface of the base 1. The inner wall of the third mounting bracket 10 is provided with a pressure detection component. The pressure detection component consists of a pneumatic telescopic rod 11, an air pump 12, an air inlet pipe 13, an exhaust pipe 14, and a sealing disk. 15. Composed of air pressure gauge 16 and solenoid valve 17.

气动伸缩杆11的安装端与第三安装架10的内顶壁固定连接,气动伸缩杆11的伸缩端与密封盘15的上端固定连接,进气管13和排气管14均固定安装在密封盘15的下端,气泵12固定安装在第三安装架10的上表面,进气管13的另一端延伸至密封盘15的外部,并与气泵12相连接,排气管14的另一端延伸至密封盘15的外部,且气压表16设置在排气管14的表面,电磁阀17的数量为两个,两个电磁阀17分别设置在排气管14和进气管13的表面。The installation end of the pneumatic telescopic rod 11 is fixedly connected to the inner top wall of the third mounting bracket 10. The telescopic end of the pneumatic telescopic rod 11 is fixedly connected to the upper end of the sealing plate 15. The air inlet pipe 13 and the exhaust pipe 14 are both fixedly installed on the sealing plate. 15, the air pump 12 is fixedly installed on the upper surface of the third mounting bracket 10. The other end of the air inlet pipe 13 extends to the outside of the sealing plate 15 and is connected to the air pump 12. The other end of the exhaust pipe 14 extends to the sealing plate. 15, and the air pressure gauge 16 is provided on the surface of the exhaust pipe 14, and the number of the solenoid valves 17 is two. The two solenoid valves 17 are respectively provided on the surfaces of the exhaust pipe 14 and the intake pipe 13.

当锅炉18利用限位组件固定后,接着驱动气动伸缩杆11可驱使密封盘15将锅炉18的开口封堵,利用定位盘9对锅炉18的位置进行定位后,避免了锅炉18安装后位置偏移,当锅炉18转动至密封盘15正下方时,避免了密封盘15在下降时锅炉18位置偏移密封盘15撞击锅炉18表面导致损坏的问题。After the boiler 18 is fixed using the limiting component, the pneumatic telescopic rod 11 is then driven to drive the sealing disk 15 to seal the opening of the boiler 18. After the positioning disk 9 is used to position the position of the boiler 18, the position deviation of the boiler 18 after installation is avoided. When the boiler 18 rotates to be directly below the sealing disk 15, the problem that the position of the boiler 18 shifts when the sealing disk 15 is lowered and the sealing disk 15 hits the surface of the boiler 18 and causes damage is avoided.

当密封盘15将锅炉18开口处封堵后,驱动气泵12使外界气体沿着进气管13进入锅炉18内,从而可驱使锅炉18内的气压增大至设定值,之后关闭进气管13表面的电磁阀17并观察气压表16,若气压表16数值无变动则说明压力检验合格,若气压表16压力数值变小则说明锅炉18渗漏检测不合格。After the sealing disk 15 blocks the opening of the boiler 18, the air pump 12 is driven to allow the outside air to enter the boiler 18 along the air inlet pipe 13, thereby driving the air pressure in the boiler 18 to increase to the set value, and then closing the surface of the air inlet pipe 13. Open the solenoid valve 17 and observe the barometer 16. If the value of the barometer 16 does not change, it means that the pressure test has passed. If the pressure value of the barometer 16 becomes smaller, it means that the leakage test of the boiler 18 has failed.

将一个锅炉18放置在处于第一安装架4内的限位组件内,接着驱使旋转盘2转动,从而可将第一安装架4旋转至压力检测组件的正下方,接着利用压力检测组件对第一安装架4内的锅炉18进行压力检测,且,在对锅炉18进行压力检测的同时,操作人员可将第二个锅炉18放置在第二安装架5内的限位组件内,对比现有的检测方式,该装置在对一个锅炉18检测的同时可对另一个锅炉18进行安装固定,当处于压力检测组件正下方的锅炉18检测完毕后,转动旋转盘2一百八十度可将安装固定完成的锅炉18转动至压力检测组件正下方进行检测,同时可对检测完毕的锅炉18进行拆卸,从而可提高检测的效率。A boiler 18 is placed in the limiting component in the first mounting bracket 4, and then the rotating disk 2 is driven to rotate, so that the first mounting bracket 4 can be rotated to directly below the pressure detection component, and then the pressure detection component is used to measure the third The pressure of the boiler 18 in the first mounting frame 4 is tested, and while the pressure of the boiler 18 is being tested, the operator can place the second boiler 18 in the limiting component of the second mounting frame 5. Compared with the existing The detection method allows the device to detect one boiler 18 while installing and fixing another boiler 18. After the detection of the boiler 18 directly below the pressure detection component is completed, the rotating disk 2 can be rotated one hundred and eighty degrees to install and fix the boiler 18. The fixed boiler 18 is rotated to just below the pressure detection component for testing, and the tested boiler 18 can be disassembled at the same time, thereby improving the detection efficiency.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其发明构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above are only preferred specific embodiments of the present utility model, but the protection scope of the present utility model is not limited thereto. Any person familiar with the technical field can, within the technical scope disclosed by the present utility model, implement the present utility model according to the present utility model. Novel technical solutions and their inventive concepts should be included in the protection scope of the present utility model if they are equivalently replaced or changed.

Claims (6)

1.一种锅炉压力容器检验检测装置,包括底座(1),其特征在于:所述底座(1)的上表面转动安装有旋转盘(2),底座(1)的下端固定安装有电机(3),电机(3)的输出端与旋转盘(2)的下端固定连接,旋转盘(2)的上端分别固定安装有第一安装架(4)和第二安装架(5),第一安装架(4)和第二安装架(5)的内壁均设置有可对锅炉进行固定的限位组件,限位组件由第一固定环(6)、第二固定环(7)、限位螺栓(8)和定位盘(9)构成,第一固定环(6)、第二固定环(7)和定位盘(9)的数量均为两个,底座(1)的上表面固定安装有第三安装架(10),第三安装架(10)的内壁设置有压力检测组件,压力检测组件由气动伸缩杆(11)、气泵(12)、进气管(13)、排气管(14)、密封盘(15)、气压表(16)和电磁阀(17)构成。1. A boiler pressure vessel inspection and detection device, including a base (1), characterized in that: a rotating disk (2) is rotatably installed on the upper surface of the base (1), and a motor (2) is fixedly installed on the lower end of the base (1). 3), the output end of the motor (3) is fixedly connected to the lower end of the rotating disk (2), and the first mounting bracket (4) and the second mounting bracket (5) are respectively fixedly installed on the upper end of the rotating disk (2). The inner walls of the mounting bracket (4) and the second mounting bracket (5) are both provided with limiting components that can fix the boiler. The limiting components are composed of a first fixed ring (6), a second fixed ring (7), and a limiting component. It consists of bolts (8) and positioning plates (9). The number of the first fixing ring (6), the second fixing ring (7) and the positioning plates (9) is two. The upper surface of the base (1) is fixedly installed with The third mounting frame (10) is provided with a pressure detection component on the inner wall of the third mounting frame (10). The pressure detection component consists of a pneumatic telescopic rod (11), an air pump (12), an air inlet pipe (13), and an exhaust pipe (14). ), sealing plate (15), air pressure gauge (16) and solenoid valve (17). 2.根据权利要求1所述的一种锅炉压力容器检验检测装置,其特征在于:所述两个第一固定环(6)的外环面分别与第一安装架(4)和第二安装架(5)的内壁固定连接,第一固定环(6)的表面和第二固定环(7)的表面通过合页转动连接,限位螺栓(8)螺纹连接在第二固定环(7)的表面,第一固定环(6)的表面开设有与限位螺栓(8)相适配的螺纹孔。2. A boiler pressure vessel inspection and detection device according to claim 1, characterized in that: the outer ring surfaces of the two first fixed rings (6) are respectively connected with the first mounting bracket (4) and the second mounting bracket. The inner wall of the frame (5) is fixedly connected, the surface of the first fixed ring (6) and the surface of the second fixed ring (7) are rotationally connected through a hinge, and the limit bolt (8) is threadedly connected to the second fixed ring (7) The surface of the first fixing ring (6) is provided with threaded holes that match the limiting bolts (8). 3.根据权利要求1所述的一种锅炉压力容器检验检测装置,其特征在于:所述两个定位盘(9)的下端均与旋转盘(2)的上端固定连接,且两个定位盘(9)分别与两个第一固定环(6)同心。3. A boiler pressure vessel inspection and detection device according to claim 1, characterized in that: the lower ends of the two positioning disks (9) are fixedly connected to the upper ends of the rotating disk (2), and the two positioning disks (9) are fixedly connected to the upper ends of the rotating disk (2). (9) are concentric with the two first fixed rings (6) respectively. 4.根据权利要求1所述的一种锅炉压力容器检验检测装置,其特征在于:所述气动伸缩杆(11)的安装端与第三安装架(10)的内顶壁固定连接,气动伸缩杆(11)的伸缩端与密封盘(15)的上端固定连接。4. A boiler pressure vessel inspection and detection device according to claim 1, characterized in that: the installation end of the pneumatic telescopic rod (11) is fixedly connected to the inner top wall of the third mounting frame (10), and the pneumatic telescopic rod (11) is fixedly connected to the inner top wall of the third mounting bracket (10). The telescopic end of the rod (11) is fixedly connected to the upper end of the sealing disk (15). 5.根据权利要求1所述的一种锅炉压力容器检验检测装置,其特征在于:所述进气管(13)和排气管(14)均固定安装在密封盘(15)的下端,气泵(12)固定安装在第三安装架(10)的上表面,进气管(13)的另一端延伸至密封盘(15)的外部,并与气泵(12)相连接。5. A boiler pressure vessel inspection and detection device according to claim 1, characterized in that: the air inlet pipe (13) and the exhaust pipe (14) are both fixedly installed at the lower end of the sealing plate (15), and the air pump ( 12) Fixedly installed on the upper surface of the third mounting bracket (10), the other end of the air inlet pipe (13) extends to the outside of the sealing plate (15) and is connected to the air pump (12). 6.根据权利要求1所述的一种锅炉压力容器检验检测装置,其特征在于:所述排气管(14)的另一端延伸至密封盘(15)的外部,且气压表(16)设置在排气管(14)的表面,电磁阀(17)的数量为两个,两个电磁阀(17)分别设置在排气管(14)和进气管(13)的表面。6. A boiler pressure vessel inspection and detection device according to claim 1, characterized in that: the other end of the exhaust pipe (14) extends to the outside of the sealing plate (15), and a pressure gauge (16) is provided On the surface of the exhaust pipe (14), there are two solenoid valves (17), and the two solenoid valves (17) are respectively provided on the surfaces of the exhaust pipe (14) and the intake pipe (13).
CN202321161281.XU 2023-05-15 2023-05-15 Boiler pressure vessel inspection detection device Expired - Fee Related CN219956836U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321161281.XU CN219956836U (en) 2023-05-15 2023-05-15 Boiler pressure vessel inspection detection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321161281.XU CN219956836U (en) 2023-05-15 2023-05-15 Boiler pressure vessel inspection detection device

Publications (1)

Publication Number Publication Date
CN219956836U true CN219956836U (en) 2023-11-03

Family

ID=88544784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321161281.XU Expired - Fee Related CN219956836U (en) 2023-05-15 2023-05-15 Boiler pressure vessel inspection detection device

Country Status (1)

Country Link
CN (1) CN219956836U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117589872A (en) * 2023-12-04 2024-02-23 南京海益环保工程有限公司 New material boiler pressure vessel inspection device with adjustable detection angle and inspection method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117589872A (en) * 2023-12-04 2024-02-23 南京海益环保工程有限公司 New material boiler pressure vessel inspection device with adjustable detection angle and inspection method

Similar Documents

Publication Publication Date Title
CN219956836U (en) Boiler pressure vessel inspection detection device
CN215811451U (en) Testing device of stop valve
CN110907102B (en) A valve testing device
CN117804691A (en) A pump body air tightness detection device
CN222166966U (en) Extractive gas detection device
CN210513580U (en) Automatic leak detection device for heat exchanger
CN218411543U (en) Manometer detects uses location assembly structure with regulatory function
CN221630943U (en) Air tightness test device
CN212030837U (en) Jar body device that leaks hunting
CN114414384B (en) An explosion-proof membrane testing device
CN109612654A (en) A kind of engine leak detector and its application method
CN113309121B (en) Construction process of floating-state high-double-wall steel box cofferdam for large-volume foundation in deep water
CN115306917A (en) Breather valve structure capable of being adjusted and calibrated on site
CN116625598A (en) Sealing leakage detection equipment for machine pump
CN212007682U (en) Leakage detection device for automobile exhaust switching pipe
CN114791343A (en) Automatic change gas governing valve gas tightness check out test set
CN223512877U (en) High-precision airtight detection device for automobile parts
CN222913037U (en) A high pressure resistant valve core testing device
CN223650105U (en) A testing device for gate valve production
CN221923136U (en) Internal leakage detection device for natural gas pipeline valve
CN218330479U (en) Air valve connector air tightness detection device
CN218823171U (en) High-precision detection device for valve production
CN222070025U (en) Detection device for pipeline leakage
CN110056782A (en) The experimental provision that wave influences underwater gas oil pipe leakage consequence is made in a kind of rolling
CN114878097B (en) Performance testing device for cryopump

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20231103

CF01 Termination of patent right due to non-payment of annual fee