CN219910037U CN202320978528.0U CN202320978528U CN219910037U CN 219910037 U CN219910037 U CN 219910037U CN 202320978528 U CN202320978528 U CN 202320978528U CN 219910037 U CN219910037 U CN 219910037U
Authority
CN
China
Prior art keywords
plate
fixedly installed
rod
positioning device
building panels
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202320978528.0U
Other languages
Chinese (zh)
Inventor
庞强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bailin Group Co ltd
Original Assignee
Bailin Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bailin Group Co ltd filed Critical Bailin Group Co ltd
Priority to CN202320978528.0U priority Critical patent/CN219910037U/en
Application granted granted Critical
Publication of CN219910037U publication Critical patent/CN219910037U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a positioning device for installing a building precast slab, which relates to the technical field of building precast slabs and comprises a supporting plate, wherein one end, close to the right side, of the top of the supporting plate is fixedly provided with a supporting column, the left side of the supporting column is provided with a positioning mechanism, the bottom of the supporting plate is fixedly provided with a plurality of installing brackets, the bottom of each installing bracket is rotationally connected with a wheel, the bottom of the supporting plate is provided with a plurality of brake assemblies, the positioning mechanism is arranged to enable the building precast slab to be fixed through a mechanical structure when being clamped, the plate is prevented from being influenced in the installation process due to shaking, the rigid collision can be prevented through a simple buffer structure, so that the damage of components is caused, the service life of the device is prolonged, the brake assemblies are arranged to enable the building precast slab to be rapidly stopped when being transported to a designated position, the wheels are prevented from rotating, the influence is also caused in the installation process, and the working efficiency is increased.

Description

一种建筑预制板安装用定位装置A positioning device for installing prefabricated building panels

技术领域Technical field

本实用新型涉及建筑预制板技术领域,具体为一种建筑预制板安装用定位装置。The utility model relates to the technical field of building prefabricated panels, specifically a positioning device for installing prefabricated building panels.

背景技术Background technique

建筑预制板大多数为水泥预制板,是一种硅酸盐水泥与钢筋龙骨预制而成的墙体,一般由模板预制为板状,因而得名建筑预制板,多用于砖混结构的建筑,早期因其先行预制并直接使用于建筑施工中,节约建筑红砖的砌筑时间被广为使用,建筑预制板大多数用吊车进行安装,在建筑工地上十分常见。Most of the prefabricated building panels are cement prefabricated panels, which are walls prefabricated with Portland cement and steel keels. They are usually prefabricated into plate shapes by formwork, hence the name prefabricated building panels. They are mostly used in buildings with brick-concrete structures. In the early days, it was prefabricated and used directly in building construction. It was widely used to save the time of building red bricks. Most of the prefabricated building panels were installed by cranes, which is very common on construction sites.

公开号为CN207296441U的专利文件公开了一种用于安装预制板的定位装置,用于将预制板横向安装于相对设置的第一墙体和第二墙体上,定位装置包括,可拆卸地固定于第一墙体顶面的第一定位结构,通过第一定位结构于第一墙体的顶面上留设形成供预制板放置的第一承托面;以及可拆卸地固定于第二墙体顶面的第二定位结构,通过第二定位结构于第二墙体的顶面上留设形成供预制板放置的第二承托面。建筑预制板在安装时通常由吊车来进行安装作业,在部分路面复杂的区域吊车可能不方便进入施工区域,而且在安装建筑预制板时板材难免会产生晃动,从而无法及时的将建筑预制板安装在需要的地方,而且部分建筑预制板重量过大时会导致夹持的机械臂迅速掉落下来使得装置损坏,在运送建筑预制板的过程中,滑轮的持续移动也会导致建筑预制板难以第一时间到达指定位置且会影响安装过程,因此需要在到达指定位置时及时停住整个装置。The patent document with the publication number CN207296441U discloses a positioning device for installing prefabricated panels, which is used to install the prefabricated panels laterally on the first wall and the second wall that are arranged oppositely. The positioning device includes: detachably fixed A first positioning structure on the top surface of the first wall is left on the top surface of the first wall to form a first supporting surface for placing the prefabricated panels; and is detachably fixed to the second wall The second positioning structure on the top surface of the body is left on the top surface of the second wall through the second positioning structure to form a second supporting surface for placing the prefabricated panels. Precast building panels are usually installed by a crane. In some areas with complex roads, it may be inconvenient for a crane to enter the construction area. Moreover, the panels will inevitably shake when installing precast building panels, making it impossible to install the precast building panels in a timely manner. Where needed, and the excessive weight of some prefabricated building panels will cause the clamping robotic arm to fall rapidly and damage the device. During the process of transporting the prefabricated building panels, the continuous movement of the pulleys will also cause the prefabricated building panels to be difficult to place. Reaching the designated location in a short time will affect the installation process, so the entire device needs to be stopped in time when it reaches the designated location.

实用新型内容Utility model content

针对现有技术的不足,本实用新型提供了一种建筑预制板安装用定位装置,解决了上述背景技术中提出的问题。为实现以上目的,本实用新型通过以下技术方案予以实现:一种建筑预制板安装用定位装置,包括支撑板,所述支撑板的顶部靠近右侧的一端固定安装有支撑柱,所述支撑柱的左侧设有定位机构,所述支撑板的底部固定安装有多个安装支架,每个所述安装支架的底部转动连接有轮子,所述支撑板的底部设有多个刹车组件,所述定位机构包括安装板、第一电动伸缩杆,所述安装板的底部靠近左侧的一端滑动连接有多个滑杆,两个所述滑杆之间靠近顶部的一端固定安装有第一弹簧,所述滑杆的表面贯穿且滑动连接有限位盒,所述限位盒的内部铰接有第二电动伸缩杆,所述滑杆的底部靠近第一弹簧的一侧固定安装有挤压板,所述支撑板的顶部靠近左侧的一端固定安装有套筒,所述套筒的顶部贯穿且滑动连接有限位杆,所述套筒的顶部固定安装有第二弹簧。In view of the shortcomings of the existing technology, the present utility model provides a positioning device for installing prefabricated building panels, which solves the problems raised in the above background technology. In order to achieve the above objectives, the present utility model is realized through the following technical solutions: a positioning device for installing prefabricated building panels, including a support plate, a support column is fixedly installed on the top of the support plate near one end on the right side, and the support column A positioning mechanism is provided on the left side of the support plate. A plurality of mounting brackets are fixedly installed at the bottom of the support plate. The bottom of each mounting bracket is rotatably connected to a wheel. The bottom of the support plate is provided with multiple brake assemblies. The positioning mechanism includes a mounting plate and a first electric telescopic rod. A plurality of sliding rods are slidably connected to one end of the bottom of the mounting plate near the left side, and a first spring is fixedly installed at one end of the two sliding rods near the top. The surface of the sliding rod penetrates and is slidingly connected to the limit box. A second electric telescopic rod is hinged inside the limit box. An extrusion plate is fixedly installed on one side of the bottom of the slide rod close to the first spring. A sleeve is fixedly installed at one end of the top of the support plate near the left side, the top of the sleeve penetrates and is slidingly connected to the limiting rod, and a second spring is fixedly installed at the top of the sleeve.

优选的,所述第一电动伸缩杆铰接于支撑柱的内壁的顶部,所述第一电动伸缩杆的底部与安装板的顶部固定连接,所述安装板滑动连接于支撑柱的左侧,启动电动伸缩杆将安装板向下推动,使得安装板能逐渐向建筑预制板靠近,其底部的滑杆也会向下移动,并带动挤压板向下移动,再启动第二电动伸缩杆使得两个滑杆相背移动,当空隙足够大时可以使得建筑预制板可以放置在挤压板之间,缩短第二电动伸缩杆,两个所述滑杆在第一弹簧的弹性作用下被拉动从而相向移动,使得挤压板将建筑预制板固定住。Preferably, the first electric telescopic rod is hinged to the top of the inner wall of the support column, the bottom of the first electric telescopic rod is fixedly connected to the top of the installation plate, and the installation plate is slidingly connected to the left side of the support column. The electric telescopic rod pushes the installation plate downward so that the installation plate can gradually approach the building prefabricated panel. The sliding rod at the bottom will also move downward and drive the extrusion plate to move downward. Then the second electric telescopic rod is started to make the two The two sliding rods move away from each other. When the gap is large enough, the prefabricated building panels can be placed between the extruded panels. The second electric telescopic rod is shortened, and the two sliding rods are pulled under the elastic action of the first spring. Move toward each other so that the extruded panels hold the prefabricated building panels in place.

优选的,两个所述挤压板接触但无连接关系,所述限位杆顶部的板面部分与第二弹簧的顶部挤压连接,所述安装板的底部会接触到限位杆的顶部,使得限位杆向下移动,并在第二弹簧的作用下缓慢下降,防止下降过快,起到缓冲的作用。Preferably, the two extrusion plates are in contact but not connected, the plate surface part of the top of the limiting rod is extrusion-connected with the top of the second spring, and the bottom of the mounting plate will contact the top of the limiting rod. , causing the limit rod to move downward and slowly descend under the action of the second spring to prevent it from descending too fast and play a buffering role.

优选的,所述刹车组件包括外壳,所述外壳的内部固定安装有多个液压舱,每个所述液压舱的顶部贯穿且滑动连接有第一活塞杆,每个所述液压舱的底部靠近轮子的一侧贯穿且滑动连接有第二活塞杆,所述第一活塞杆的顶部固定安装有触压板,每个所述第二活塞杆靠近轮子的一端固定安装有弧形板。Preferably, the brake assembly includes a housing, a plurality of hydraulic chambers are fixedly installed inside the housing, the top of each hydraulic chamber is penetrated and slidably connected with a first piston rod, and the bottom of each hydraulic chamber is close to A second piston rod penetrates and is slidably connected to one side of the wheel, a contact plate is fixedly installed on the top of the first piston rod, and an arc plate is fixedly installed at one end of each second piston rod close to the wheel.

优选的,所述第一活塞杆贯穿且滑动连接于支撑板的内部,所述触压板位于支撑板的顶部,按压触压板使得第一活塞杆被挤压向下移动,并挤压液压舱内部的油液将受到的里通过油液传递给液压舱另一端的第二活塞杆。Preferably, the first piston rod penetrates and is slidably connected to the inside of the support plate, and the contact pressure plate is located on the top of the support plate. Pressing the contact plate causes the first piston rod to be squeezed to move downward and squeeze the inside of the hydraulic chamber. The oil will be passed through the oil to the second piston rod at the other end of the hydraulic chamber.

优选的,所述弧形板与轮子接触,所述弧形板的材质为无石棉摩擦材质,所述第二活塞杆移动时会带动弧形板移动,并与轮子紧密接触,由于弧形板的无石棉摩擦材质,可以使得轮子在弧形板的作用下快速停下并固定住。Preferably, the arc-shaped plate is in contact with the wheel, and the material of the arc-shaped plate is an asbestos-free friction material. When the second piston rod moves, it will drive the arc-shaped plate to move and be in close contact with the wheel. Since the arc-shaped plate The asbestos-free friction material allows the wheels to quickly stop and be fixed under the action of the curved plates.

本实用新型提供了一种建筑预制板安装用定位装置。具备以下有益效果:The utility model provides a positioning device for installing prefabricated building panels. It has the following beneficial effects:

(1)定位机构的设置使得建筑预制板在被夹持时可以通过机械结构将板材固定住,防止产生晃动而导致在安装过程中收到影响,通过一种简单的缓冲结构可以防止支撑结构下落过快而与其他部件发生刚性碰撞,从而导致部件损坏,增加了装置的使用寿命。(1) The setting of the positioning mechanism allows the prefabricated building panels to be fixed through the mechanical structure when being clamped to prevent shaking and impact during the installation process. A simple buffer structure can prevent the support structure from falling. Too fast and rigid collision with other components, resulting in component damage and increasing the service life of the device.

(2)刹车组件的设置使得建筑预制板在运送到指定位置时可以快速的停住,为施工作业带来方便,也可以防止轮子转动而导致安装过程中收到影响,增加了工作效率。(2) The setting of the brake assembly allows the prefabricated building panels to be quickly stopped when transported to the designated location, which brings convenience to construction operations. It can also prevent the wheel rotation from affecting the installation process and increase work efficiency.

附图说明Description of the drawings

图1为本实用新型结构立体图的示意图;Figure 1 is a schematic diagram of a structural perspective view of the utility model;

图2为本实用新型结构剖视图的示意图;Figure 2 is a schematic diagram of a cross-sectional view of the structure of the utility model;

图3为本实用新型结构定位机构的立体示意图;Figure 3 is a three-dimensional schematic diagram of the structural positioning mechanism of the present utility model;

图4为本实用新型结构刹车组件的示意图。Figure 4 is a schematic diagram of the structural brake assembly of the present utility model.

图中:1、支撑板;2、支撑柱;3、定位机构;31、安装板;32、第一电动伸缩杆;33、滑杆;34、第一弹簧;35、挤压板;36、第二电动伸缩杆;37、套筒;38、限位杆;39、第二弹簧;310、限位盒;4、轮子;5、刹车组件;51、外壳;52、液压舱;53、第一活塞杆;54、第二活塞杆;55、触压板;56、弧形板;6、安装支架。In the picture: 1. Support plate; 2. Support column; 3. Positioning mechanism; 31. Installation plate; 32. First electric telescopic rod; 33. Slide rod; 34. First spring; 35. Extrusion plate; 36. Second electric telescopic rod; 37, sleeve; 38, limit rod; 39, second spring; 310, limit box; 4, wheel; 5, brake assembly; 51, shell; 52, hydraulic cabin; 53, No. One piston rod; 54, the second piston rod; 55, contact pressure plate; 56, arc plate; 6, installation bracket.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example.

实施例一Embodiment 1

请参阅图1-4,本实用新型提供一种技术方案:一种建筑预制板安装用定位装置,包括支撑板1,支撑板1的顶部靠近右侧的一端固定安装有支撑柱2,支撑柱2的左侧设有定位机构3,支撑板1的底部固定安装有多个安装支架6,每个安装支架6的底部转动连接有轮子4,支撑板1的底部设有多个刹车组件5,定位机构3包括安装板31、第一电动伸缩杆32,安装板31的底部靠近左侧的一端滑动连接有多个滑杆33,两个滑杆33之间靠近顶部的一端固定安装有第一弹簧34,滑杆33的表面贯穿且滑动连接有限位盒310,限位盒310的内部铰接有第二电动伸缩杆36,滑杆33的底部靠近第一弹簧34的一侧固定安装有挤压板35,第一电动伸缩杆32铰接于支撑柱2的内壁的顶部,第一电动伸缩杆32的底部与安装板31的顶部固定连接,安装板31滑动连接于支撑柱2的左侧,启动电动伸缩杆32将安装板31向下推动,使得安装板31能逐渐向建筑预制板靠近,其底部的滑杆33也会向下移动,并带动挤压板35向下移动,再启动第二电动伸缩杆36使得两个滑杆33相背移动,当空隙足够大时可以使得建筑预制板可以放置在挤压板35之间,缩短第二电动伸缩杆36,两个滑杆33在第一弹簧34的弹性作用下被拉动从而相向移动,使得挤压板35将建筑预制板固定住,支撑板1的顶部靠近左侧的一端固定安装有套筒37,套筒37的顶部贯穿且滑动连接有限位杆38,套筒37的顶部固定安装有第二弹簧39,两个挤压板35接触但无连接关系,限位杆38顶部的板面部分与第二弹簧39的顶部挤压连接,在安装板31下降时,安装板31的底部会接触到限位杆38的顶部,使得限位杆38向下移动,并在第二弹簧39的作用下缓慢下降,防止下降过快,起到缓冲的作用,定位机构3的设置使得建筑预制板在被夹持时可以通过机械结构将板材固定住,防止产生晃动而导致在安装过程中收到影响,通过一种简单的缓冲结构可以防止支撑结构下落过快而与其他部件发生刚性碰撞,从而导致部件损坏,增加了装置的使用寿命。Please refer to Figures 1-4. The present utility model provides a technical solution: a positioning device for installing prefabricated building panels, including a support plate 1. A support column 2 is fixedly installed on the top of the support plate 1 near one end on the right side. The support column There is a positioning mechanism 3 on the left side of 2. A plurality of mounting brackets 6 are fixedly installed on the bottom of the support plate 1. The bottom of each mounting bracket 6 is rotatably connected to a wheel 4. The bottom of the support plate 1 is provided with multiple brake assemblies 5. The positioning mechanism 3 includes a mounting plate 31 and a first electric telescopic rod 32. A plurality of sliding rods 33 are slidably connected to the bottom of the mounting plate 31 near the left end, and the first end near the top is fixedly installed between the two sliding rods 33. The surface of the spring 34 and the sliding rod 33 penetrate and are slidingly connected to the limit box 310. A second electric telescopic rod 36 is hinged inside the limit box 310. The bottom of the sliding rod 33 is fixedly installed on one side close to the first spring 34. plate 35, the first electric telescopic rod 32 is hinged to the top of the inner wall of the support column 2, the bottom of the first electric telescopic rod 32 is fixedly connected to the top of the installation plate 31, and the installation plate 31 is slidingly connected to the left side of the support column 2, start The electric telescopic rod 32 pushes the installation plate 31 downward, so that the installation plate 31 can gradually approach the building prefabricated panel. The sliding rod 33 at the bottom will also move downward, and drive the extrusion plate 35 to move downward, and then start the second The electric telescopic rod 36 moves the two sliding rods 33 away from each other. When the gap is large enough, the prefabricated building panels can be placed between the extruded plates 35. The second electric telescopic rod 36 is shortened, and the two sliding rods 33 are moved in the first position. The spring 34 is pulled and moved toward each other under the elastic action of the spring 34, so that the extrusion plate 35 fixes the prefabricated building panel. The top of the support plate 1 near the left end is fixedly installed with a sleeve 37, and the top of the sleeve 37 penetrates and is slidably connected. The limit rod 38 has a second spring 39 fixedly installed on the top of the sleeve 37. The two extrusion plates 35 are in contact but have no connection relationship. The plate surface part at the top of the limit rod 38 is extruded and connected to the top of the second spring 39. When the mounting plate 31 is lowered, the bottom of the mounting plate 31 will contact the top of the limiting rod 38, causing the limiting rod 38 to move downward and slowly descend under the action of the second spring 39 to prevent it from descending too fast. The function of buffering and the setting of the positioning mechanism 3 allow the prefabricated building panels to be fixed through the mechanical structure when being clamped to prevent shaking and impact during the installation process. A simple buffer structure can prevent support The structure falls too fast and rigidly collides with other components, causing component damage and increasing the service life of the device.

使用时,启动电动伸缩杆32将安装板31向下推动,使得安装板31能逐渐向建筑预制板靠近,其底部的滑杆33也会向下移动,并带动挤压板35向下移动,再启动第二电动伸缩杆36使得两个滑杆33相背移动,当空隙足够大时可以使得建筑预制板可以放置在挤压板35之间,缩短第二电动伸缩杆36,两个滑杆33在第一弹簧34的弹性作用下被拉动从而相向移动,使得挤压板35将建筑预制板固定住,安装板31的底部会接触到限位杆38的顶部,使得限位杆38向下移动,并在第二弹簧39的作用下缓慢下降,防止下降过快,起到缓冲的作用。When in use, the electric telescopic rod 32 is started to push the installation plate 31 downward, so that the installation plate 31 can gradually approach the building prefabricated panel, and the sliding rod 33 at the bottom will also move downward, driving the extrusion plate 35 to move downward. Restart the second electric telescopic rod 36 to move the two sliding rods 33 away from each other. When the gap is large enough, the prefabricated building panels can be placed between the extruded plates 35. Shorten the second electric telescopic rod 36, and the two sliding rods 33 is pulled and moved toward each other under the elastic action of the first spring 34, so that the extrusion plate 35 fixes the prefabricated building panel, and the bottom of the installation plate 31 will contact the top of the limiting rod 38, causing the limiting rod 38 to move downward. moves and slowly descends under the action of the second spring 39 to prevent it from descending too fast and play a buffering role.

实施例二Embodiment 2

请参阅图1-4,基于实施例一的基础,刹车组件5包括外壳51,外壳51的内部固定安装有多个液压舱52,每个液压舱52的顶部贯穿且滑动连接有第一活塞杆53,每个液压舱52的底部靠近轮子4的一侧贯穿且滑动连接有第二活塞杆54,第一活塞杆53的顶部固定安装有触压板55,第一活塞杆53贯穿且滑动连接于支撑板1的内部,触压板55位于支撑板1的顶部,按压触压板55使得第一活塞杆53被挤压向下移动,并挤压液压舱52内部的油液将受到的里通过油液传递给液压舱52另一端的第二活塞杆54,每个第二活塞杆54靠近轮子4的一端固定安装有弧形板56,弧形板56与轮子4接触,弧形板56的材质为无石棉摩擦材质,第二活塞杆54移动时会带动弧形板56移动,并与轮子4紧密接触,由于弧形板56的无石棉摩擦材质,可以使得轮子4在弧形板56的作用下快速停下并固定住,刹车组件5的设置使得建筑预制板在运送到指定位置时可以快速的停住,为施工作业带来方便,也可以防止轮子4转动而导致安装过程中收到影响,增加了工作效率。Please refer to Figures 1-4. Based on the first embodiment, the brake assembly 5 includes a housing 51. A plurality of hydraulic chambers 52 are fixedly installed inside the housing 51. The top of each hydraulic chamber 52 penetrates and is slidably connected with a first piston rod. 53. The side of the bottom of each hydraulic chamber 52 close to the wheel 4 is penetrated and slidably connected with a second piston rod 54. A touch plate 55 is fixedly installed on the top of the first piston rod 53. The first piston rod 53 is penetrated and slidably connected to the Inside the support plate 1, the contact pressure plate 55 is located at the top of the support plate 1. Pressing the contact pressure plate 55 causes the first piston rod 53 to be squeezed to move downward, and the oil inside the hydraulic chamber 52 will be squeezed by the oil passing through it. Passed to the second piston rod 54 at the other end of the hydraulic chamber 52, an arc plate 56 is fixedly installed on one end of each second piston rod 54 close to the wheel 4. The arc plate 56 is in contact with the wheel 4. The material of the arc plate 56 is Asbestos-free friction material, when the second piston rod 54 moves, it will drive the arc plate 56 to move and be in close contact with the wheel 4. Due to the asbestos-free friction material of the arc plate 56, the wheel 4 can be moved under the action of the arc plate 56 Quickly stop and fix, the setting of the brake assembly 5 allows the building prefabricated panels to be quickly stopped when transported to the designated location, which brings convenience to the construction operation and can also prevent the wheels 4 from rotating and causing impact during the installation process. Increased work efficiency.

使用时,按压触压板55使得第一活塞杆53被挤压向下移动,并挤压液压舱52内部的油液将受到的里通过油液传递给液压舱52另一端的第二活塞杆54,第二活塞杆54移动时会带动弧形板56移动,并与轮子4紧密接触,由于弧形板56的无石棉摩擦材质,可以使得轮子4在弧形板56的作用下快速停下并固定住。During use, pressing the touch plate 55 causes the first piston rod 53 to be squeezed and moved downward, and the oil inside the hydraulic chamber 52 will be squeezed and transferred to the second piston rod 54 at the other end of the hydraulic chamber 52 through the oil. , when the second piston rod 54 moves, it will drive the arc plate 56 to move and be in close contact with the wheel 4. Due to the asbestos-free friction material of the arc plate 56, the wheel 4 can quickly stop and stop under the action of the arc plate 56. fix.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above are only preferred specific embodiments of the present utility model, but the protection scope of the present utility model is not limited thereto. Any person familiar with the technical field can, within the technical scope disclosed by the present utility model, implement the present utility model according to the present utility model. Novel technical solutions and utility model concepts, including equivalent substitutions or changes, shall be covered by the protection scope of the present utility model.

Claims (6)

1.一种建筑预制板安装用定位装置,包括支撑板(1),其特征在于:所述支撑板(1)的顶部靠近右侧的一端固定安装有支撑柱(2),所述支撑柱(2)的左侧设有定位机构(3),所述支撑板(1)的底部固定安装有多个安装支架(6),每个所述安装支架(6)的底部转动连接有轮子(4),所述支撑板(1)的底部设有多个刹车组件(5);1. A positioning device for installing prefabricated building panels, including a support plate (1), characterized in that: a support column (2) is fixedly installed on the top of the support plate (1) near one end on the right side, and the support column A positioning mechanism (3) is provided on the left side of (2). A plurality of mounting brackets (6) are fixedly installed on the bottom of the support plate (1). The bottom of each mounting bracket (6) is rotatably connected to a wheel ( 4), the bottom of the support plate (1) is provided with multiple brake assemblies (5); 所述定位机构(3)包括安装板(31)、第一电动伸缩杆(32),所述安装板(31)的底部靠近左侧的一端滑动连接有多个滑杆(33),两个所述滑杆(33)之间靠近顶部的一端固定安装有第一弹簧(34),所述滑杆(33)的表面贯穿且滑动连接有限位盒(310),所述限位盒(310)的内部铰接有第二电动伸缩杆(36),所述滑杆(33)的底部靠近第一弹簧(34)的一侧固定安装有挤压板(35),所述支撑板(1)的顶部靠近左侧的一端固定安装有套筒(37),所述套筒(37)的顶部贯穿且滑动连接有限位杆(38),所述套筒(37)的顶部固定安装有第二弹簧(39)。The positioning mechanism (3) includes a mounting plate (31) and a first electric telescopic rod (32). The bottom end of the mounting plate (31) near the left end is slidably connected with a plurality of sliding rods (33), two of which are slidingly connected. A first spring (34) is fixedly installed at one end of the sliding rods (33) near the top. The surface of the sliding rod (33) penetrates and is slidingly connected to the limiting box (310). The limiting box (310) ) has a second electric telescopic rod (36) hinged inside, a squeeze plate (35) is fixedly installed on the bottom of the slide rod (33) close to the side of the first spring (34), and the support plate (1) A sleeve (37) is fixedly installed at one end of the top near the left side. The top of the sleeve (37) penetrates and is slidingly connected to the limiting rod (38). A second second end is fixedly installed at the top of the sleeve (37). Spring(39). 2.根据权利要求1所述的一种建筑预制板安装用定位装置,其特征在于:所述第一电动伸缩杆(32)铰接于支撑柱(2)的内壁的顶部,所述第一电动伸缩杆(32)的底部与安装板(31)的顶部固定连接,所述安装板(31)滑动连接于支撑柱(2)的左侧。2. A positioning device for installing precast building panels according to claim 1, characterized in that: the first electric telescopic rod (32) is hinged to the top of the inner wall of the support column (2), and the first electric telescopic rod (32) is hinged to the top of the inner wall of the support column (2). The bottom of the telescopic rod (32) is fixedly connected to the top of the mounting plate (31), and the mounting plate (31) is slidingly connected to the left side of the support column (2). 3.根据权利要求1所述的一种建筑预制板安装用定位装置,其特征在于:两个所述挤压板(35)接触但无连接关系,所述限位杆(38)顶部的板面部分与第二弹簧(39)的顶部挤压连接。3. A positioning device for installing prefabricated building panels according to claim 1, characterized in that: the two extruded plates (35) are in contact but have no connection relationship, and the plate at the top of the limiting rod (38) The surface part is extrudedly connected to the top of the second spring (39). 4.根据权利要求1所述的一种建筑预制板安装用定位装置,其特征在于:所述刹车组件(5)包括外壳(51),所述外壳(51)的内部固定安装有多个液压舱(52),每个所述液压舱(52)的顶部贯穿且滑动连接有第一活塞杆(53),每个所述液压舱(52)的底部靠近轮子(4)的一侧贯穿且滑动连接有第二活塞杆(54),所述第一活塞杆(53)的顶部固定安装有触压板(55),每个所述第二活塞杆(54)靠近轮子(4)的一端固定安装有弧形板(56)。4. A positioning device for installing prefabricated building panels according to claim 1, characterized in that: the brake assembly (5) includes a shell (51), and a plurality of hydraulic pressures are fixedly installed inside the shell (51). cabin (52), the top of each hydraulic cabin (52) passes through and is slidably connected with a first piston rod (53), and the bottom of each hydraulic cabin (52) passes through on one side close to the wheel (4). A second piston rod (54) is slidably connected, a contact plate (55) is fixedly installed on the top of the first piston rod (53), and one end of each second piston rod (54) is fixed close to the wheel (4) A curved plate (56) is installed. 5.根据权利要求4所述的一种建筑预制板安装用定位装置,其特征在于:所述第一活塞杆(53)贯穿且滑动连接于支撑板(1)的内部,所述触压板(55)位于支撑板(1)的顶部。5. A positioning device for installing prefabricated building panels according to claim 4, characterized in that: the first piston rod (53) penetrates and is slidingly connected to the inside of the support plate (1), and the contact pressure plate (1) 55) is located on top of the support plate (1). 6.根据权利要求4所述的一种建筑预制板安装用定位装置,其特征在于:所述弧形板(56)与轮子(4)接触,所述弧形板(56)的材质为无石棉摩擦材质。6. A positioning device for installing prefabricated building panels according to claim 4, characterized in that: the arc-shaped plate (56) is in contact with the wheel (4), and the material of the arc-shaped plate (56) is stainless steel. Asbestos friction material.
CN202320978528.0U 2023-04-26 2023-04-26 Positioning device for installation of building precast slabs Expired - Fee Related CN219910037U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320978528.0U CN219910037U (en) 2023-04-26 2023-04-26 Positioning device for installation of building precast slabs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320978528.0U CN219910037U (en) 2023-04-26 2023-04-26 Positioning device for installation of building precast slabs

Publications (1)

Publication Number Publication Date
CN219910037U true CN219910037U (en) 2023-10-27

Family

ID=88468358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320978528.0U Expired - Fee Related CN219910037U (en) 2023-04-26 2023-04-26 Positioning device for installation of building precast slabs

Country Status (1)

Country Link
CN (1) CN219910037U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117703076A (en) * 2023-11-06 2024-03-15 中国建筑第八工程局有限公司 Easily-detached aluminum die device and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117703076A (en) * 2023-11-06 2024-03-15 中国建筑第八工程局有限公司 Easily-detached aluminum die device and construction method thereof

Similar Documents

Publication Publication Date Title
CN113848126B (en) Building concrete strength detection device and method
CN219910037U (en) Positioning device for installation of building precast slabs
CN219526151U (en) Lifting device for autoclaved aerated concrete plate production
CN222333297U (en) A mounting bracket for autoclaved aerated concrete wall panels
CN110409773A (en) A multi-point troweling device for civil engineering
CN211263019U (en) Foam light soil compressive strength detection device
CN211085929U (en) Prefabricated assembled recycled concrete lightweight inner partition board strength testing device
CN209922752U (en) Special lifting support for electromechanical installation
CN217840936U (en) Mounting and supporting device for assembled building laminated slab
CN217536683U (en) A kind of support equipment for bridge construction in bridge engineering
CN107999670B (en) Small-sized steel bar cutting machine
CN217819650U (en) Engineering construction supervises and uses concrete detection equipment
CN214003179U (en) Automatic lifting machine of central chain for cement
CN217535159U (en) Steel bar hoisting and clamping equipment for building construction
CN214302909U (en) A support body platform structure for floor pouring construction for housing construction
CN212044023U (en) Aerated concrete block brick fluting device
CN217105998U (en) An automatic plastering machine
CN113653299B (en) Installation equipment and installation method of externally-hung wallboard
CN217759981U (en) Quick formwork construction device of elevartor shaft
CN216160525U (en) Wall body detection device based on architectural design
CN218581131U (en) A masonry platform with lifting function for building construction
CN217054408U (en) ALC wall panel installation equipment
CN207700626U (en) A booster mechanism for wall plastering machine
CN223991593U (en) Wallboard mounting machine
CN221945753U (en) Concrete strength detection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20231027