CN219909038U - Novel civil construction foundation pile device - Google Patents

Novel civil construction foundation pile device Download PDF

Info

Publication number
CN219909038U
CN219909038U CN202321026730.XU CN202321026730U CN219909038U CN 219909038 U CN219909038 U CN 219909038U CN 202321026730 U CN202321026730 U CN 202321026730U CN 219909038 U CN219909038 U CN 219909038U
Authority
CN
China
Prior art keywords
foundation pile
adjusting
civil construction
foundation
pile body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321026730.XU
Other languages
Chinese (zh)
Inventor
王帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321026730.XU priority Critical patent/CN219909038U/en
Application granted granted Critical
Publication of CN219909038U publication Critical patent/CN219909038U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to the technical field of wooden building foundation piles, in particular to a novel civil building foundation pile device which comprises a bearing platform and an adjusting foundation pile structure, wherein a plurality of adjusting foundation pile structures are arranged at the bottom end rectangular array of the bearing platform, each adjusting foundation pile structure comprises a foundation pile body, an adjusting stud, a reinforcing fixing seat and a fixed inserting rod, the adjusting stud is embedded and installed at the top of the foundation pile body, a connecting seat is installed at the top of each adjusting stud, a supporting wedge block is installed at the lower edge of the periphery of the foundation pile body, the reinforcing fixing seat is sleeved and installed at the upper edge of the periphery of the foundation pile body, the fixing inserting rods are installed at the top of each reinforcing fixing seat in an embedded mode, the whole device is simple in structure, and flexible adjustment and arrangement assembly are conveniently carried out according to the required installation height and bearing requirements of the foundation piles, meanwhile, the foundation pile is convenient to stably and fixedly installed, the foundation pile is flexibly installed and applied according to the use requirements of different building foundation piles, the foundation piles are high in stability and practicability, and the foundation pile has a certain popularization value.

Description

Novel civil construction foundation pile device
Technical Field
The utility model relates to the technical field of wood building foundation piles, in particular to a novel civil building foundation pile device.
Background
Wood engineering is a general term of science and technology for constructing various land engineering facilities, in building construction, foundation piles, also called pile foundations, are needed for stabilizing foundation of a building, and are deep foundations consisting of piles and pile caps connected with pile tops, and the existing civil construction foundation pile device still has the defects, specifically as follows: the inconvenient height and the equipment of arranging of carrying on flexible regulation according to required foundation pile installation need, inconvenient stable fixed mounting foundation pile use of strengthening simultaneously to the flexible installation of user demand of adaptation different civil construction foundation piles that can be fine is used.
Therefore, there is a need to design a new type of civil construction foundation pile device to solve the above-mentioned problems in the background art.
Disclosure of Invention
The utility model aims to provide a novel civil construction foundation pile device which aims to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the utility model provides a novel civil construction foundation pile device, includes the cushion cap and adjusts the foundation pile structure, the bottom rectangular array of cushion cap is provided with a plurality of foundation pile structures of adjusting, adjust the foundation pile structure and include foundation pile body, adjust the double-screw bolt, strengthen fixing base and fixed inserted link, the regulation double-screw bolt is installed in the top embedding of foundation pile body, the connecting seat is installed at the top of adjusting the double-screw bolt, support wedge is installed along the peripheral lower edge of foundation pile body, the cover is established along the cover on the periphery of foundation pile body and is installed and strengthen the fixing base, strengthen the top embedding of fixing base and install fixed inserted link.
As a preferable scheme of the utility model, the top of the foundation pile body is provided with a threaded groove, wherein the size of the threaded groove is matched with that of the installation adjusting stud.
As a preferable scheme of the utility model, the four supporting wedges are distributed in a ring shape.
As a preferable scheme of the utility model, the top of the connecting seat is fixedly connected with the bottom end of the bearing platform.
As a preferable scheme of the utility model, a plurality of threaded through holes with the sizes matched with that of the fixed inserted rod are distributed at equal intervals on the top of the reinforced fixing seat.
As a preferable scheme of the utility model, a plurality of fixed inserted bars are distributed at equal intervals in an annular mode, the fixed inserted bars are arranged in one-to-one correspondence with the threaded through holes, and the periphery of the fixed inserted bars is provided with mounting threads with the sizes matched with the threaded through holes for connection.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the adjusting foundation pile structure with the foundation pile body and the adjusting studs is arranged, so that the telescopic adjustment is conveniently carried out according to the required foundation pile mounting height requirement, the use requirement of different building foundation piles is adapted, the connecting seat of the adjusting studs is fixedly connected with the bearing platform, the top structure of the bearing platform is stably supported and used by a plurality of adjusting foundation pile structures, the foundation pile body with the supporting wedge blocks and the reinforcing fixing seats matched with the fixed inserting rods is arranged, the stable reinforcing and fixed mounting and the use of the building foundation pile in use are facilitated, the telescopic adjustment and the arrangement assembly are conveniently carried out according to the required foundation pile mounting height and bearing requirement, and meanwhile, the use of the fixed mounting foundation pile is conveniently and stably reinforced, so that the flexible mounting and application of the foundation pile of different civil constructions are adapted to the use requirement of the different building foundation piles are realized.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic diagram of a split structure of a bearing platform and an adjusting foundation pile of the utility model;
fig. 3 is a schematic diagram of a split structure of an adjusting foundation pile structure of the utility model.
In the figure: 1. bearing platform; 2. adjusting the foundation pile structure; 21. a foundation pile body; 211. a support wedge; 22. adjusting the stud; 221. a connecting seat; 23. reinforcing the fixing seat; 24. the insert rod is fixed.
Detailed Description
The technical solutions of the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model, and it is apparent that the described embodiments are only some embodiments of the present utility model, but not all embodiments, and all other embodiments obtained by those skilled in the art without making creative efforts based on the embodiments of the present utility model are included in the protection scope of the present utility model.
In order that the utility model may be readily understood, a more particular description of the utility model will be rendered by reference to specific embodiments thereof which are illustrated in the appended drawings, in which, however, the utility model may be embodied in many different forms and are not limited to the embodiments described herein, but are instead provided for the purpose of providing a more thorough and complete disclosure of the utility model.
It will be understood that when an element is referred to as being "mounted" on another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like are used herein for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this utility model belongs. The terminology used herein in the description of the utility model is for the purpose of describing particular embodiments only and is not intended to be limiting of the utility model. The term "and/or" as used herein includes any and all combinations of one or more of the associated listed items.
In an embodiment, please refer to fig. 1-3, the present utility model provides a technical solution:
the utility model provides a novel civil construction foundation pile device, including cushion cap 1 and regulation foundation pile structure 2, the bottom rectangular array of cushion cap 1 is provided with a plurality of regulation foundation pile structures 2, it includes foundation pile body 21 to adjust foundation pile structure 2, adjust double-screw bolt 22, strengthen fixing base 23 and fixed inserted link 24, the top embedding of foundation pile body 21 is installed and is adjusted double-screw bolt 22, connecting seat 221 is installed at the top of adjusting double-screw bolt 22, wherein connecting seat 221's top fixed connection is in cushion cap 1's bottom, through adjusting double-screw bolt 22's connecting seat 221 and cushion cap 1 fixed connection, thereby by a plurality of regulation foundation pile structures 2 to cushion cap 1 top stable support use, install support wedge 211 along the cover down in the periphery of foundation pile body 21, install the reinforcement fixing base 23 on the periphery of reinforcement fixing base 23, wherein support 211 annular distribution is equipped with four, and the top annular equidistant distribution of reinforcement fixing base 23 has seted up a plurality of size matching fixed inserted link 24 and installed threaded through-hole, simultaneously fixed inserted link 24 annular equidistant distribution is equipped with a plurality of, and fixed inserted link 24 and set up one-to-one with the support wedge 24 and the use of the support wedge 24 of the size matching foundation pile structure, when the installation of the support wedge 24 is used, the installation of the support wedge 24 is used for the convenience of installing the support wedge 24.
In this embodiment, referring to fig. 1, 2 and 3, a threaded groove is formed at the top of the foundation pile body 21, wherein the threaded groove is matched with the adjusting stud 22 in size, and the foundation pile structure 2 with the foundation pile body 21 and the adjusting stud 22 is provided to facilitate telescopic adjustment according to the required installation height of the foundation pile, so as to adapt to the use requirements of foundation piles of different civil constructions.
Working principle: during the use, through setting up the regulation foundation pile structure 2 that has foundation pile body 21 and adjusting stud 22, the convenience is according to the high demand of required foundation pile installation, thereby the user demand of the different civil construction foundation piles of adaptation, and through adjusting the connecting seat 221 and the cushion cap 1 fixed connection of stud 22, thereby use the stable support of cushion cap 1 top structure by a plurality of regulation foundation pile structures 2, and through setting up foundation pile body 21 that has support wedge 211 and reinforcing fixing base 23 cooperation fixed inserted bar 24, make things convenient for the stable fixed mounting use of strengthening of civil construction foundation pile when using, whole device simple structure, the convenience is according to the height of required foundation pile installation and the demand of bearing and is carried out flexible regulation and arrange the equipment, the convenient fixed mounting foundation pile of strengthening is used simultaneously, thereby the user demand flexible installation of the different civil construction foundation piles of adaptation is used, and stability and practicality are higher, have certain spreading value.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. Novel civil construction foundation pile device, including cushion cap (1) and regulation foundation pile structure (2), its characterized in that: the bottom rectangular array of cushion cap (1) is provided with a plurality of foundation pile structures (2) of adjusting, adjust foundation pile structures (2) including foundation pile body (21), adjust double-screw bolt (22), strengthen fixing base (23) and fixed inserted link (24), adjust double-screw bolt (22) are installed in the top embedding of foundation pile body (21), connecting seat (221) are installed at the top of adjusting double-screw bolt (22), support wedge (211) are installed along the periphery of foundation pile body (21) down, install along the cover on the periphery of foundation pile body (21) and strengthen fixing base (23), fixed inserted link (24) are installed in the top embedding of strengthening fixing base (23).
2. A novel civil construction foundation pile device according to claim 1, characterized in that: the top of foundation pile body (21) is equipped with the screw thread recess, and wherein screw thread recess size matches installation adjusting stud (22).
3. A novel civil construction foundation pile device according to claim 1, characterized in that: four supporting wedges (211) are annularly distributed.
4. A novel civil construction foundation pile device according to claim 1, characterized in that: the top of the connecting seat (221) is fixedly connected to the bottom end of the bearing platform (1).
5. A novel civil construction foundation pile device according to claim 1, characterized in that: a plurality of threaded through holes with sizes matched with that of the fixed inserted rods (24) are formed in the annular equidistant distribution mode at the top of the reinforcing fixed seat (23).
6. The novel civil construction foundation pile device according to claim 4, wherein: the fixed inserted bars (24) are distributed at equal intervals in an annular mode, the fixed inserted bars (24) are arranged in one-to-one correspondence with the threaded through holes, and installing threads with sizes matched with the threaded through holes are arranged on the periphery of the fixed inserted bars (24).
CN202321026730.XU 2023-05-04 2023-05-04 Novel civil construction foundation pile device Active CN219909038U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321026730.XU CN219909038U (en) 2023-05-04 2023-05-04 Novel civil construction foundation pile device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321026730.XU CN219909038U (en) 2023-05-04 2023-05-04 Novel civil construction foundation pile device

Publications (1)

Publication Number Publication Date
CN219909038U true CN219909038U (en) 2023-10-27

Family

ID=88440942

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321026730.XU Active CN219909038U (en) 2023-05-04 2023-05-04 Novel civil construction foundation pile device

Country Status (1)

Country Link
CN (1) CN219909038U (en)

Similar Documents

Publication Publication Date Title
CN112814321B (en) Wall and ground leveling frame structure and installation method thereof
CN219909038U (en) Novel civil construction foundation pile device
CN203247601U (en) Tower crane assembled base
CN214220459U (en) Assembled ground combination overhead structure
CN205348003U (en) Cast -in -place support
CN212453478U (en) Integral overhead structure of assembled ground
CN216340083U (en) Factory building steel skeleton texture that adaptability is high
CN214885438U (en) Easy dismouting of construction template is put
CN206706729U (en) It is a kind of to be easy to the fixed GSZ assembled
CN211649521U (en) Adjustable force bearing device for building construction
CN213114993U (en) Stable supporting structure for coal shed
CN215907516U (en) A assembled building supporting seat for among building engineering
CN219604762U (en) Overhead ground reinforcing structure easy to disassemble and assemble
CN111576925A (en) Quick building steel support frame and implementation method thereof
CN220492901U (en) Photovoltaic support unit and photovoltaic support system
CN211557207U (en) Solar panel support frame
CN213867901U (en) Conveniently-installed underground pile for public facilities
CN212113135U (en) Civil engineering construction safety propaganda equipment
CN216110034U (en) Support structure of outdoor tent
CN220301524U (en) Girder steel post connection structure
CN215760802U (en) Electric power iron tower with stable structure
CN212984685U (en) Building wall construction side supports steel construction
CN215291457U (en) Strutting arrangement is reserved with hole to building engineering construction
CN210800593U (en) Civil engineering measuring device
CN215343561U (en) PC base of power distribution cabinet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant