CN219863936U - Movable truss operation platform - Google Patents
Movable truss operation platform Download PDFInfo
- Publication number
- CN219863936U CN219863936U CN202320355887.0U CN202320355887U CN219863936U CN 219863936 U CN219863936 U CN 219863936U CN 202320355887 U CN202320355887 U CN 202320355887U CN 219863936 U CN219863936 U CN 219863936U
- Authority
- CN
- China
- Prior art keywords
- truss
- work platform
- movable
- platform
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
Description
技术领域Technical field
本实用新型涉及建筑工程技术领域,尤其一种可移动式桁架操作平台。The utility model relates to the technical field of construction engineering, in particular to a movable truss operating platform.
背景技术Background technique
洞口部位施工一般采用扣件式钢管脚手架搭设操作平台进行施工,对于洞口面积较大、造型较为复杂的结构,搭设常规扣件式脚手架工程量大、安全性低、施工进度慢、费用高。为此,这里提出一种可移动式桁架操作平台,避免浪费大量劳动力搭设操作架,具有很大的经济效益。The construction of openings generally uses fastener-type steel pipe scaffolding to erect operating platforms. For structures with large openings and complex shapes, erecting conventional fastener-type scaffolding requires a large amount of work, low safety, slow construction progress, and high costs. For this reason, a movable truss operating platform is proposed here to avoid wasting a lot of labor in setting up the operating frame and has great economic benefits.
因此,对于上述问题有必要提出一种可移动式桁架操作平台。Therefore, it is necessary to propose a movable truss operating platform to solve the above problems.
实用新型内容Utility model content
针对上述现有技术中存在的不足,本实用新型的目的在于提供一种可移动式桁架操作平台,以解决上述问题。In view of the above-mentioned deficiencies in the prior art, the purpose of this utility model is to provide a movable truss operating platform to solve the above-mentioned problems.
一种可移动式桁架操作平台,包括扫地杆、脚轮、企柱、桁架梁、平台板和栏杆,所述脚轮固定在扫地杆上,所述企柱固定在脚轮上,所述桁架梁安装在企柱上部,所述桁架梁的上部铺设有若干个平台板,所述栏杆安装在桁架梁的四周。A movable truss operating platform includes a sweeping pole, casters, truss columns, truss beams, platform plates and railings. The casters are fixed on the sweeping pole, the truss columns are fixed on the casters, and the truss beams are installed on Several platform boards are laid on the upper part of the pillar and the truss beam, and the railings are installed around the truss beam.
优选地,所述脚轮通过可调脚锁定与开启。Preferably, the casters are locked and unlocked by adjustable feet.
优选地,在同一侧边相邻两个所述企柱之间连接有横杆。Preferably, a cross bar is connected between two adjacent pillars on the same side.
优选地,在同一侧边相邻两个所述企柱之间还连接有斜撑。Preferably, a diagonal brace is connected between two adjacent pillars on the same side.
优选地,所述横杆、斜撑、企柱连接形成一个支撑框架。Preferably, the cross bars, diagonal braces and vertical columns are connected to form a support frame.
优选地,所述桁架梁与企柱通过螺栓连接固定。Preferably, the truss beam and the pillar are connected and fixed by bolts.
优选地,所述桁架梁在地面完成组装,然后吊装至企柱上固定。Preferably, the truss beams are assembled on the ground and then hoisted to the pillars for fixation.
优选地,若干个所述平台板呈矩阵分布。Preferably, several of the platform plates are distributed in a matrix.
优选地,所述桁架梁与企柱之间连接有加强杆。Preferably, reinforcing rods are connected between the truss beams and the pillars.
优选地,所述扫地杆上安装有辅助支撑架,所述辅助支撑架包括支架、连杆和支撑板,所述连杆贯穿于支架连接于支撑板,所述支架的侧边设置有用于调节锁紧连杆的旋钮柄,所述支撑板的底部设置有若干个防滑凸起。Preferably, an auxiliary support frame is installed on the sweeping rod. The auxiliary support frame includes a bracket, a connecting rod and a support plate. The connecting rod penetrates the bracket and is connected to the support plate. The side of the bracket is provided with a Lock the knob handle of the connecting rod, and the bottom of the support plate is provided with several anti-slip protrusions.
与现有技术相比,本实用新型有益效果:本实用新型通过结合洞口尺寸大小,调整企柱高度、桁架梁跨度,在洞口两侧搭设可移动式桁架操作平台,施工工艺简单,工程质量有保障,适用性强,保证了洞口施工的安全,相较于传统施工方法即搭设落地式钢管扣件脚手架作为操作平台而言,投入的劳动力更少、工期更短,且安全性、经济性、适用性更高。Compared with the existing technology, the utility model has beneficial effects: The utility model adjusts the height of the column and the span of the truss beam according to the size of the opening, and sets up movable truss operating platforms on both sides of the opening. The construction process is simple and the quality of the project is improved. Guaranteed, strong applicability ensures the safety of tunnel construction. Compared with the traditional construction method of erecting floor-standing steel pipe fastener scaffolding as an operating platform, less labor is invested, the construction period is shorter, and it is safe, economical, Higher applicability.
附图说明Description of the drawings
图1为本实用新型的结构俯视图;Figure 1 is a structural top view of the present utility model;
图2为本实用新型的结构正视图;Figure 2 is a structural front view of the utility model;
图3为本实用新型的结构侧视图;Figure 3 is a structural side view of the utility model;
图4为本实用新型的辅助支撑架结构图。Figure 4 is a structural diagram of the auxiliary support frame of the present utility model.
图中附图标记:1、扫地杆;2、脚轮;3、企柱;4、横杆;5、斜撑;6、桁架梁;7、平台板;8、栏杆,9、可调脚;10、支撑框架;11、加强杆;12、辅助支撑架;13、支架;14、连杆;15、支撑板;16、防滑凸起。Reference numbers in the figure: 1. Sweeping pole; 2. Casters; 3. Standing column; 4. Cross bar; 5. Diagonal brace; 6. Truss beam; 7. Platform plate; 8. Railing; 9. Adjustable feet; 10. Support frame; 11. Strengthening rod; 12. Auxiliary support frame; 13. Bracket; 14. Connecting rod; 15. Support plate; 16. Anti-slip protrusion.
具体实施方式Detailed ways
需要说明的是,在不冲突的情况下,本实用新型中的实施例及实施例中的特征可以相互组合。It should be noted that, as long as there is no conflict, the embodiments and features of the embodiments of the present invention can be combined with each other.
在本实用新型的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”等仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”等的特征可以明示或者隐含地包括一个或者更多个该特征。在本实用新型的描述中,除非另有说明,“多个”的含义是两个或两个以上。In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", The orientations or positional relationships indicated by "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention. The novel and simplified description does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be construed as a limitation of the present invention. Furthermore, the terms “first”, “second”, etc. are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the quantity of indicated technical features. Thus, features defined by "first," "second," etc. may explicitly or implicitly include one or more of such features. In the description of the present invention, unless otherwise stated, the meaning of "plurality" is two or more.
在本实用新型的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以通过具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, it should be noted that, unless otherwise clearly stated and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense. For example, it can be a fixed connection or a removable connection. Detachable connection, or integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be an internal connection between two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood through specific situations.
以下结合附图对本实用新型的实施例进行详细说明,但是本实用新型可以由权利要求限定和覆盖的多种不同方式实施。The embodiments of the present invention will be described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways as defined and covered by the claims.
如图1并结合图2至图3所示,一种可移动式桁架操作平台,包括扫地杆1、脚轮2、企柱3、桁架梁6、平台板7和栏杆8,所述脚轮2固定在扫地杆1上,所述企柱3固定在脚轮2上,所述桁架梁6安装在企柱3上部,所述桁架梁6的上部铺设有若干个平台板7,所述栏杆8安装在桁架梁6的四周。As shown in Figure 1 in combination with Figures 2 and 3, a movable truss operating platform includes a sweeping rod 1, casters 2, pillars 3, truss beams 6, platform plates 7 and railings 8. The casters 2 are fixed On the sweeping pole 1, the pillar 3 is fixed on the caster 2, the truss beam 6 is installed on the upper part of the pillar 3, a number of platform boards 7 are laid on the upper part of the truss beam 6, and the railing 8 is installed on around the truss beam 6.
进一步的,所述脚轮2通过可调脚9锁定与开启,方便可移动式桁架操作平台移动到不同施工位置。Furthermore, the casters 2 are locked and opened through adjustable feet 9 to facilitate the movable truss operating platform to move to different construction positions.
进一步的,在同一侧边相邻两个所述企柱3之间连接有横杆4。Furthermore, a cross bar 4 is connected between two adjacent pillars 3 on the same side.
进一步的,在同一侧边相邻两个所述企柱3之间还连接有斜撑5。Furthermore, diagonal braces 5 are connected between two adjacent pillars 3 on the same side.
进一步的,所述横杆4、斜撑5、企柱3连接形成一个支撑框架10,根据具体施工位置的高低长短来决定支撑框架10的高低长短。Furthermore, the cross bars 4, diagonal braces 5, and vertical columns 3 are connected to form a support frame 10, and the height and length of the support frame 10 are determined according to the height and length of the specific construction location.
进一步的,所述桁架梁6与企柱3通过螺栓连接固定。Furthermore, the truss beam 6 and the pillar 3 are connected and fixed by bolts.
进一步的,所述桁架梁6在地面完成组装,然后吊装至企柱3上固定。Further, the truss beam 6 is assembled on the ground, and then is hoisted to the pillar 3 and fixed.
进一步的,若干个所述平台板7呈矩阵分布。Furthermore, several of the platform plates 7 are distributed in a matrix.
进一步的,所述桁架梁6与企柱3之间连接有加强杆11。Furthermore, a reinforcing rod 11 is connected between the truss beam 6 and the pillar 3 .
进一步的,所述扫地杆1上安装有辅助支撑架12,所述辅助支撑架12包括支架13、连杆14和支撑板15,所述连杆14贯穿于支架13连接于支撑板15,所述支架13的侧边设置有用于调节锁紧连杆14的旋钮柄,所述支撑板15的底部设置有若干个防滑凸起16。Further, an auxiliary support frame 12 is installed on the sweeping rod 1. The auxiliary support frame 12 includes a bracket 13, a connecting rod 14 and a support plate 15. The connecting rod 14 penetrates the bracket 13 and is connected to the support plate 15, so The side of the bracket 13 is provided with a knob handle for adjusting the locking link 14 , and the bottom of the support plate 15 is provided with a number of anti-slip protrusions 16 .
与现有技术相比,本实用新型有益效果:本实用新型通过结合洞口尺寸大小,调整企柱3高度、桁架梁6跨度,在洞口两侧搭设可移动式桁架操作平台,施工工艺简单,工程质量有保障,适用性强,保证了洞口施工的安全。相较于传统施工方法即搭设落地式钢管扣件脚手架作为操作平台而言,投入的劳动力更少、工期更短,且安全性、经济性、适用性更高。Compared with the existing technology, the utility model has beneficial effects: By combining the size of the opening, the utility model adjusts the height of the three pillars and the six spans of the truss beams, and sets up movable truss operating platforms on both sides of the opening. The construction process is simple and the engineering The quality is guaranteed and the applicability is strong, ensuring the safety of tunnel construction. Compared with the traditional construction method of erecting floor-standing steel pipe fastener scaffolding as an operating platform, it requires less labor, shorter construction period, and is safer, more economical, and more practical.
工作原理:清理基层地面,确定操作平台位置后,安装可调脚9,并将脚轮2锁定,将企柱3固定在脚轮2上,用横杆4和斜撑5将企柱3连接形成支撑框架10,企柱3安装完成后,按照同一连接方式逐层向上安装,直至安装到指定高度,企柱3安装完毕后,采用提升装置将已在地面组装完成的桁架梁6吊装至企柱3上安装,并用螺栓紧固,桁架梁6安装完毕后,在桁架梁6的顶部铺设平台板7,其中需留设一块平台板7铺设开口板,其余部位铺设不开口平台板,平台板7铺设完成后,在桁架梁6的四周安装栏杆8。Working principle: After cleaning the base floor and determining the position of the operating platform, install the adjustable feet 9, lock the casters 2, fix the pillar 3 on the caster 2, and use the horizontal bar 4 and the diagonal brace 5 to connect the pillar 3 to form a support. After the installation of the frame 10 and the pillars 3 is completed, install them upward layer by layer according to the same connection method until they are installed at the specified height. After the installation of the pillars 3 is completed, use a lifting device to hoist the truss beam 6 that has been assembled on the ground to the pillars 3 Install it on the top and tighten it with bolts. After the truss beam 6 is installed, lay the platform plate 7 on the top of the truss beam 6. One of the platform plates 7 needs to be left to lay the open plate, and the rest of the parts are laid without openings. The platform plate 7 is laid After completion, railings 8 are installed around the truss beams 6.
以上所述仅为本实用新型的优选实施例,并非因此限制本实用新型的专利范围,凡是利用本实用新型说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其他相关的技术领域,均同理包括在本实用新型的专利保护范围内。The above descriptions are only preferred embodiments of the present utility model, and do not limit the patent scope of the present utility model. Any equivalent structure or equivalent process transformation made by using the description and drawings of the present utility model, or directly or indirectly used in Other related technical fields are similarly included in the scope of patent protection of the present utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320355887.0U CN219863936U (en) | 2023-02-28 | 2023-02-28 | Movable truss operation platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320355887.0U CN219863936U (en) | 2023-02-28 | 2023-02-28 | Movable truss operation platform |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219863936U true CN219863936U (en) | 2023-10-20 |
Family
ID=88324828
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320355887.0U Active CN219863936U (en) | 2023-02-28 | 2023-02-28 | Movable truss operation platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219863936U (en) |
-
2023
- 2023-02-28 CN CN202320355887.0U patent/CN219863936U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4036466A (en) | Flying deck-type concrete form installation | |
| JP3952843B2 (en) | Construction method of tower structure | |
| US7290672B2 (en) | Tower crane device | |
| CN111779248B (en) | High formwork system and construction method thereof | |
| CN205443958U (en) | Composite truss support of big cantilever bent cap | |
| JP7370626B2 (en) | Side span support structure for a continuous T-girder viaduct spanning the existing railway line | |
| CN111424948A (en) | Construction method and construction platform for cantilever structure layer of high-rise building | |
| CN114922406A (en) | A mobile support platform for scaffolding | |
| CN116411694A (en) | Adjustable modular disc buckle type supporting system and supporting method thereof | |
| CN219863936U (en) | Movable truss operation platform | |
| CN212897482U (en) | A construction platform for cantilevered structural layers of high-rise buildings | |
| CN114059658B (en) | Construction method of overweight big wood structure vertical frame in historic building reconstruction and restoration | |
| CN212925728U (en) | A steel truss arch bridge | |
| CN220377879U (en) | Construction operation platform for pipe truss high-altitude sectional assembly sliding | |
| CN220725767U (en) | Movable high and large formwork support | |
| CN116696055B (en) | Construction decoration method for cantilever structure of flat roof framework layer | |
| CN219863968U (en) | Construction platform of prestressing force structure | |
| CN217810545U (en) | Construction system for steel truss girder bridge | |
| CN106639303A (en) | Hydraulic climbing formwork frame special for lift | |
| CN217028024U (en) | High-rise embracing column wall connecting piece | |
| CN117988457A (en) | Construction method of steel structure grid roof for large-span elevated station building | |
| CN215101546U (en) | Maintenance of pavilions and roof lifting devices in ancient Chinese buildings | |
| CN115821940A (en) | Construction method of super deep foundation pit permanent combined support frame beam-ring frame slab | |
| CN213571554U (en) | A suspended anchorage gantry | |
| CN116290701A (en) | An Assembled Cantilever Scaffold Without Pre-embedding |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |