CN219840078U - Construction engineering pile driving device - Google Patents

Construction engineering pile driving device Download PDF

Info

Publication number
CN219840078U
CN219840078U CN202321246869.5U CN202321246869U CN219840078U CN 219840078 U CN219840078 U CN 219840078U CN 202321246869 U CN202321246869 U CN 202321246869U CN 219840078 U CN219840078 U CN 219840078U
Authority
CN
China
Prior art keywords
base
screw rod
screw
driving device
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321246869.5U
Other languages
Chinese (zh)
Inventor
王芳
龙端
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321246869.5U priority Critical patent/CN219840078U/en
Application granted granted Critical
Publication of CN219840078U publication Critical patent/CN219840078U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a construction engineering piling device, which relates to the technical field of construction machinery and comprises a base and a mounting plate, wherein screw rods are respectively arranged at two ends of the base, a limiting block is fixedly arranged at one end of each screw rod, a first motor is fixedly arranged at one end of each limiting block, the output end of each first motor is connected with the screw rod, a transmission column is movably arranged in the base, one end, far away from the limiting block, of each screw rod is sleeved with a belt, one end, far away from each screw rod, of each belt is sleeved with a transmission column, screw sleeves are fixedly arranged at two ends of the mounting plate, each screw sleeve is sleeved with a screw rod, and the mounting plate is provided with a piling mechanism. The utility model solves the problem of movement of the piling mechanism, the first motor drives one screw rod to rotate, the belt connects the rotating screw rod, the transmission column and the other screw rod, and the two screw rods simultaneously rotate, so that the threaded sleeve is driven to displace, and the piling mechanism is driven to move.

Description

Construction engineering pile driving device
Technical Field
The utility model relates to the technical field of building machinery, in particular to a piling device for building engineering.
Background
The construction engineering is the engineering entity which performs the work and completion of various technologies such as building construction, reconstruction or extension of building construction and affiliated construction facilities, as well as the installation engineering of lines, pipelines and equipment matched with the engineering entity, also refers to the construction engineering of various houses and buildings, also called building workload, the investment amount must be the working materials, the piling is an indispensable step in the construction engineering, because the ground surface of the ground building is required to bear great pressure if the ground surface is required to bear great pressure, the ground surface must be ensured to have enough strength for resisting the pressure, the ground surface of the ground surface is required to be reinforced or improved, so that the piling is thought of on the foundation, and most of the weight of the building is transmitted to a deep position below the ground surface through piles, because the foundation of the position is much larger than the bearing capacity of the ground surface.
According to a building engineering pile driving device with the publication number of CN214738036U, the building engineering pile driving device comprises a workbench, the equal fixedly connected with stand in upper surface both sides of workstation, the last fixedly connected with diaphragm of stand, the lower surface middle part fixedly connected with motor case of diaphragm, the inside of motor case is provided with driving motor, driving motor's one end extension is provided with the output fixedly connected with axis of rotation of motor just motor, driving motor's one end fixedly connected with rotary disk is kept away from to the axis of rotation, the surface of rotary disk is provided with the connecting rod, the lateral wall fixedly connected with mount of stand, the one end fixedly connected with fixing base of stand is kept away from to the mount, first spout has been seted up to the inner wall sliding connection of fixing base, the one end and the connecting slider swing joint of rotary disk are kept away from to the connecting rod, the bottom fixedly connected with pile driving mechanism of connecting slider, pile driving mechanism's output is provided with the pile driving head.
However, after the pile body is pressed downwards after the pile is continuously driven, the pile head does not have mobility, so that the pile driving depth is limited, and the pile driving operation cannot be well completed.
Disclosure of Invention
Based on this, it is an object of the present utility model to provide a construction pile driving device, which solves the problems set forth in the background art mentioned above.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a building engineering pile driving device, includes base and mounting panel, the screw rod is installed respectively at the base both ends, two screw rod one end fixed mounting stopper, one stopper one end fixed mounting first motor, and first motor output connecting screw rod, the inside movable mounting transmission post of base, two the screw rod is kept away from stopper one pot head and is equipped with belt one end, two outside the transmission post is all overlapped to screw rod one end is kept away from to the belt, mounting panel both ends fixed mounting thread bush, and the screw rod is established to the thread bush cover, pile driving mechanism is installed to the mounting panel.
Through adopting above-mentioned technical scheme, solved the problem that pile mechanism moved, first motor drive a screw rod and rotate, and the belt is connected pivoted screw rod, drive post and another screw rod, and two screw rods rotate simultaneously to drive the thread bush and carry out the displacement, and then drive pile mechanism and remove.
The utility model is further characterized in that a fixing groove is formed in the center of the base, and the diameter of the fixing groove is slightly larger than that of the pile body.
Through adopting above-mentioned technical scheme, when piling, in order to prevent that the pile body from producing the skew, lead to the pile body to drive underground back and be the slope form, carry out spacing assistance to the pile body through the fixed slot.
The utility model is further characterized in that the four ends of the base are provided with rollers, and the rollers are provided with brake pads.
Through adopting above-mentioned technical scheme, through the setting of gyro wheel, the base of being convenient for removes to pile area, and after reaching pile area, through the cooperation adjustment base position of brake block and gyro wheel, make the fixed slot correspond the pile point directly over.
The utility model is further characterized in that the base is provided with a plurality of hydraulic rods in a rectangular array, and one end of each hydraulic rod, which is far away from the base, is fixedly provided with a supporting pad.
Through adopting above-mentioned technical scheme, after the base debugging to pile position, jack-up the base through the hydraulic stem to support through the supporting pad, prevent at pile in-process, equipment produces and rocks, influences pile effect, increase equipment stability.
The pile driving mechanism comprises a driving motor, a rotary table, a fixing frame, a sliding groove, a sliding column, a connecting rod and a pile driving head, wherein the driving motor is fixedly arranged at one end of the mounting plate, the output end of the driving motor is connected with the rotary table, one end of the rotary table is movably connected with one end of the connecting rod, the fixing frame is fixedly provided with the sliding groove, the sliding column is movably arranged in the sliding groove, one end of the sliding column is movably connected with one end of the connecting rod, and one end of the sliding column is fixedly provided with the pile driving head.
Through adopting above-mentioned technical scheme, driving motor starts, drives the carousel and rotates, and carousel is connected to connecting rod one end, and the traveller is connected to one end, consequently when the carousel rotates, drives the traveller and reciprocates in the spout to drive pile head up-and-down displacement, form pile motion.
The utility model is further characterized in that the fixing frame is of U-shaped design, and two ends of the fixing frame are fixedly arranged on the outer wall of one side of the mounting plate.
Through adopting above-mentioned technical scheme, through mount fixed mounting in mounting panel one side, when the mounting panel removes, drive the mount and reciprocate to pile driving mechanism removes along with the mounting panel.
In summary, the utility model has the following advantages:
according to the utility model, through the arrangement of the screw, the thread sleeves, the mounting plate and the fixing frame, the displacement problem of the piling mechanism is solved, the screw rotates, the thread sleeves are sleeved on the outer wall of the screw to drive the thread sleeves to displace, so that the mounting plate between the thread sleeves is driven to displace, the fixing frame is fixedly arranged on one side of the mounting plate, the fixing frame is simultaneously moved, the piling mechanism is respectively arranged on the mounting plate and the fixing frame, and the piling mechanism is driven to displace when the mounting plate and the fixing frame are moved.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of a pile driving mechanism according to the present utility model;
FIG. 3 is a schematic diagram of a drive train of the present utility model;
fig. 4 is a schematic view of a base of the present utility model.
In the figure: 1. a base; 2. a fixing groove; 3. a mounting plate; 4. a thread sleeve; 5. a driving motor; 6. a turntable; 7. a fixing frame; 8. a connecting rod; 9. a chute; 10. a spool; 11. piling heads; 12. a screw; 13. a limiting block; 14. a first motor; 15. a drive column; 16. a belt; 17. a roller; 18. a hydraulic rod; 19. and a support pad.
Detailed Description
The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. The embodiments described below by referring to the drawings are illustrative only and are not to be construed as limiting the utility model.
Hereinafter, an embodiment of the present utility model will be described in accordance with its entire structure.
1-4, including base 1 and mounting panel 3, screw rod 12 is installed respectively at base 1 both ends, two screw rod 12 one end fixed mounting stopper 13, a stopper 13 one end fixed mounting first motor 14, and first motor 14 output connecting screw rod 12, base 1 inside movable mounting drive post 15, two screw rods 12 keep away from stopper 13 one end cover and are equipped with belt 16 one end, two belt 16 keep away from screw rod 12 one end and all overlap and establish outside the drive post 15, mounting panel 3 both ends fixed mounting thread bush 4, and screw rod 12 is established to thread bush 4 cover, first motor 14 drives a screw rod 12 and rotates, belt 16 is connected screw rod 12 that rotates, drive post 15 and another screw rod 12, two screw rods 12 rotate simultaneously, thereby drive thread bush 4 and displace, drive mounting panel 3 reciprocates, mounting panel 3 installs pile mechanism, and then drive pile mechanism reciprocates.
Referring to fig. 1, a fixing groove 2 is formed in a central portion of a base 1, and the diameter of the fixing groove 2 is slightly larger than that of a pile body, so as to prevent the pile body from being deviated during pile driving, and the pile body is inclined after being driven into the ground, and is limited and assisted through the fixing groove 2.
Referring to fig. 1-4, rollers 17 are disposed at four ends of the base 1, and the rollers 17 are provided with brake pads, so that the base 1 can be conveniently moved to a piling area, and after reaching the piling area, the position of the base 1 is adjusted by matching the brake pads with the rollers 17, so that the fixing groove 2 is located right above the piling point.
Referring to fig. 4, a plurality of hydraulic rods 18 are installed on a rectangular array of a base 1, a supporting pad 19 is fixedly installed at one end of the hydraulic rods 18 away from the base 1, after the base 1 is debugged to a piling position, the base 1 is jacked up through the hydraulic rods 18 and supported through the supporting pad 19, so that equipment is prevented from shaking in the piling process, the piling effect is affected, and the equipment stability is increased.
Referring to fig. 2, the piling mechanism includes a driving motor 5, a turntable 6, a fixing frame 7, a chute 9, a sliding column 10, a connecting rod 8 and a piling head 11, wherein the driving motor 5 is fixedly installed at one end of the mounting plate 3, the output end of the driving motor 5 is connected with the turntable 6, one end of the turntable 6 is movably connected with one end of the connecting rod 8, the chute 9 is fixedly installed on the fixing frame 7, the sliding column 10 is movably installed on the chute 9, one end of the sliding column 10 is movably connected with one end of the connecting rod 8, one end of the sliding column 10 is fixedly installed with the piling head 11, the driving motor 5 is started to drive the turntable 6 to rotate, one end of the connecting rod 8 is connected with the turntable 6, and one end of the connecting rod is connected with the sliding column 10, so that when the turntable 6 rotates, the sliding column 10 is driven to move up and down in the chute 9, thereby driving the piling head 11 to move up and down to form piling motion.
Referring to fig. 2, the fixing frame 7 is designed as a "U", and two ends of the fixing frame 7 are fixedly mounted on one side outer wall of the mounting plate 3, and are fixedly mounted on one side of the mounting plate 3 through the fixing frame 7, when the mounting plate 3 moves, the fixing frame 7 is driven to move up and down, so that the piling mechanism moves along with the mounting plate 3.
The working principle of the utility model is as follows: when the device is used, the base 1 is moved to a piling area, after the piling area is reached, the position of the base 1 is adjusted through the cooperation of the brake block and the roller 17, the fixing groove 2 is enabled to be right above a piling point, the base 1 is jacked up by the hydraulic rod 18, the supporting pad 19 is supported, the pile body is placed in the fixing groove 2 by the crane, the driving motor 5 is started, the turntable 6 is driven to rotate, one end of the connecting rod 8 is connected with the turntable 6, one end of the connecting rod is connected with the sliding column 10, therefore, when the turntable 6 rotates, the sliding column 10 is driven to move up and down in the sliding groove 9, the pile driving head 11 is driven to move up and down, the pile driving head 11 drives the pile body to pile, the pile body is pressed to move down, the first motor 14 is started, the first motor 14 drives one screw rod 12 to rotate, the belt 16 drives the rotating screw rod 12, the driving column 15 and the other screw rod 12 to rotate, and therefore the two screw rods 12 rotate simultaneously, the thread bush 4 is driven to move the mounting plate 3 downwards, and the pile driving mechanism always drives the pile driving mechanism to move downwards.
Although embodiments of the utility model have been shown and described, the detailed description is to be construed as exemplary only and is not limiting of the utility model as the particular features, structures, materials, or characteristics may be combined in any suitable manner in any one or more embodiments or examples, and modifications, substitutions, variations, etc. may be made in the embodiments as desired by those skilled in the art without departing from the principles and spirit of the utility model, provided that such modifications are within the scope of the appended claims.

Claims (6)

1. The utility model provides a building engineering pile driving device, includes base (1) and mounting panel (3), its characterized in that: screw rods (12) are respectively installed at two ends of the base (1), two screw rods (12) are fixedly installed with limiting blocks (13), one limiting block (13) is fixedly installed with a first motor (14), the output ends of the first motor (14) are connected with the screw rods (12), driving columns (15) are movably installed inside the base (1), two screw rods (12) are far away from one end of each limiting block (13) and sleeved with one end of a belt (16), two belts (16) are far away from one end of each screw rod (12) and are sleeved with one outside of the driving columns (15), screw sleeves (4) are fixedly installed at two ends of the mounting plate (3), screw rods (12) are sleeved with the screw sleeves (4), and the mounting plate (3) is provided with a piling mechanism.
2. A construction pile driving device according to claim 1, characterised in that: a fixing groove (2) is formed in the center of the base (1), and the diameter of the fixing groove (2) is slightly larger than that of the pile body.
3. A construction pile driving device according to claim 1, characterised in that: four ends of the base (1) are provided with rollers (17), and the rollers (17) are provided with brake pads.
4. A construction pile driving device according to claim 1, characterised in that: the base (1) is provided with a plurality of hydraulic rods (18) in a rectangular array, and one end, far away from the base (1), of each hydraulic rod (18) is fixedly provided with a supporting pad (19).
5. A construction pile driving device according to claim 1, characterised in that: piling mechanism includes driving motor (5), carousel (6), mount (7), spout (9), traveller (10), connecting rod (8) and pile driver head (11), driving motor (5) fixed mounting is in mounting panel (3) one end, and carousel (6) are connected to driving motor (5) output, carousel (6) one end swing joint connecting rod (8) one end, mount (7) fixed mounting spout (9), spout (9) movable mounting traveller (10), traveller (10) one end swing joint connecting rod (8) one end, traveller (10) one end fixed mounting pile driver head (11).
6. A construction pile driving device according to claim 5, characterised in that: the fixing frame (7) is of U-shaped design, and two ends of the fixing frame (7) are fixedly arranged on the outer wall of one side of the mounting plate (3).
CN202321246869.5U 2023-05-23 2023-05-23 Construction engineering pile driving device Active CN219840078U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321246869.5U CN219840078U (en) 2023-05-23 2023-05-23 Construction engineering pile driving device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321246869.5U CN219840078U (en) 2023-05-23 2023-05-23 Construction engineering pile driving device

Publications (1)

Publication Number Publication Date
CN219840078U true CN219840078U (en) 2023-10-17

Family

ID=88300334

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321246869.5U Active CN219840078U (en) 2023-05-23 2023-05-23 Construction engineering pile driving device

Country Status (1)

Country Link
CN (1) CN219840078U (en)

Similar Documents

Publication Publication Date Title
CN108867613B (en) Ramming machine capable of controlling steering
CN108867262B (en) Ground ramming machine for road administration engineering
CN208196215U (en) A kind of handware production rapid drilling device
CN117684890B (en) Drilling machine convenient for adjusting height of drill rod for coal mining
CN219840078U (en) Construction engineering pile driving device
CN207079481U (en) A kind of bridge construction support meanss
CN111424660B (en) Foundation treatment gauze discrete pile construction pile machine for soft soil and sandy soil foundation
CN110126098B (en) Positioning and drilling equipment for civil engineering construction
CN112681434B (en) Construction machine for building foundation pit and construction method using same
CN216040965U (en) Rural highway is ditch ramming device for engineering construction
JP7466261B2 (en) Drilling Equipment
CN213269777U (en) Infrared positioning pile driver for road and bridge construction
CN110016941A (en) The reinforcement means of pile foundation
CN211115804U (en) Fixing support capable of adjusting direction of rock drill and rock drill assembly
CN110820718A (en) Vibroflotation device with guide mechanism for bridge foundation pit construction
CN112049101A (en) Geological survey sampling equipment for civil construction
CN218177148U (en) Automatic change rig to hole site structure
CN215443919U (en) Fixing device for geological drilling rig
CN221400347U (en) Construction engineering foundation pile driving device
CN213116293U (en) Portable shallow layer sample rig
CN115419100B (en) Positioning and leveling auxiliary tool for foundation bolts of line cast-in-place pile foundation
SU876822A1 (en) Walking machine for consolidating trench bottoms
CN215369680U (en) Electric auxiliary base of drilling machine
CN211872967U (en) Recyclable foundation pit supporting precast pile
CN221608941U (en) Wireless monitoring equipment for foundation engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant