- connecting frame
- baffle
- notch
- base
- safety fence
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009435 building construction Methods 0.000 title abstract description 6
- 238000010276 construction Methods 0.000 claims abstract description 17
- 238000004873 anchoring Methods 0.000 claims description 2
- 230000000149 penetrating effect Effects 0.000 claims 2
- 238000005034 decoration Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 230000004888 barrier function Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
本实用新型公开了一种工民建筑施工用安全围挡装置,涉及建筑施工技术领域;而本实用新型包括挡板,挡板的一侧设置有第一连接架,挡板的另一侧设置有第二连接架,第一连接架背向挡板的一面设置有阶梯槽,第二连接架背向挡板的一面固定连接有卡板,卡板呈阶梯状,卡板与阶梯槽相配合,第一连接架和第二连接架的底面均可拆卸设置有底座,底座的顶面贯穿设置有锚固杆;本实用新型,便于对围挡进行拆装,且单个挡板尺寸不大,利于进行搬运,可以根据需求对多个本装置进行配合组装,通过卡板与阶梯槽的相互配合,从而即可完成多个本装置的配合组装。
The utility model discloses a safety enclosure device for industrial and civil construction, and relates to the technical field of building construction; and the utility model includes a baffle, a first connecting frame is provided on one side of the baffle, and a first connecting frame is provided on the other side of the baffle. There is a second connecting frame. The side of the first connecting frame facing away from the baffle is provided with a ladder groove. The side of the second connecting frame facing away from the baffle is fixedly connected with a clamping plate. The clamping plate is in the shape of a ladder, and the clamping plate matches the ladder groove. , the bottom surfaces of the first connecting frame and the second connecting frame are detachably provided with a base, and the top surface of the base is provided with an anchor rod; the utility model facilitates the disassembly and assembly of the enclosure, and the size of a single baffle is small, which is conducive to During transportation, multiple devices can be assembled together as required. Through the cooperation between the pallet and the step groove, the assembly of multiple devices can be completed.
Description
技术领域Technical field
本实用新型涉及建筑施工技术领域,具体为一种工民建筑施工用安全围挡装置。The utility model relates to the technical field of building construction, specifically a safety enclosure device for industrial and civil building construction.
背景技术Background technique
工民建指工业与民用建筑,在进行施工的过程当中,容易发生钢筋零件掉落的情况,因此出入施工地的工作人员均需要佩戴专业的安全帽,对于非工作人员没有许可是不允许进入施工地点的,为了隔开工地与外界的联系,需要搭建一些安全围挡,以此来阻挡外界行人及车辆进入施工地发生事故,避免造成不必要的麻烦及事故。Industrial and civil construction refers to industrial and civil buildings. During the construction process, steel parts are prone to fall. Therefore, workers entering and exiting the construction site need to wear professional safety helmets. Non-staff members are not allowed to enter without permission. At the construction site, in order to separate the construction site from the outside world, it is necessary to build some safety fences to prevent outside pedestrians and vehicles from entering the construction site and avoid unnecessary trouble and accidents.
现有的安全围挡体积较大,重量较重,需要大量时间装卸和搬运,不方便工作人员操作使用,针对上述问题,发明人提出一种工民建筑施工用安全围挡装置用于解决上述问题。The existing safety enclosure is large in size and heavy in weight, requires a lot of time to load, unload, and carry, and is inconvenient for workers to operate. In view of the above problems, the inventor proposes a safety enclosure device for industrial and civil construction to solve the above problem. question.
实用新型内容Utility model content
为了解决现有的安全围挡体积较大,重量较重,需要大量时间装卸和搬运,不方便工作人员操作使用的问题;本实用新型的目的在于提供一种工民建筑施工用安全围挡装置。In order to solve the problems that the existing safety enclosure is large in size, heavy in weight, requires a lot of time to load, unload and carry, and is inconvenient for workers to operate and use; the purpose of this utility model is to provide a safety enclosure device for industrial and civilian construction .
为解决上述技术问题,本实用新型采用如下技术方案:一种工民建筑施工用安全围挡装置,包括挡板,所述挡板的一侧设置有第一连接架,所述挡板的另一侧设置有第二连接架,所述第一连接架和第二连接架朝向挡板的一面均设置有凹口,所述凹口与挡板相配合,第一连接架和第二连接架用于对挡板进行限位固定,在对挡板进行安装时,需使得挡板的两端均位于凹口内,所述第一连接架背向挡板的一面设置有阶梯槽,所述第二连接架背向挡板的一面固定连接有卡板,所述卡板呈阶梯状,所述卡板与阶梯槽相配合,所述第一连接架和第二连接架的底面均可拆卸设置有底座,所述底座的顶面贯穿设置有锚固杆。In order to solve the above technical problems, the present utility model adopts the following technical solution: a safety enclosure device for industrial and civil building construction, including a baffle, a first connecting frame is provided on one side of the baffle, and a first connecting frame is provided on the other side of the baffle. A second connecting frame is provided on one side. The first connecting frame and the second connecting frame are each provided with a notch on the side facing the baffle. The notch matches the baffle. The first connecting frame and the second connecting frame It is used to limit and fix the baffle. When installing the baffle, it is necessary to make both ends of the baffle located in the notch. The side of the first connecting frame facing away from the baffle is provided with a step groove. The side of the two connecting frames facing away from the baffle is fixedly connected with a clamping plate. The clamping plates are in the shape of a ladder. The clamping plates match the ladder grooves. The bottom surfaces of the first connecting frame and the second connecting frame can be detachably arranged. There is a base, and an anchor rod is provided through the top surface of the base.
优选地,所述挡板的数量有三个,且三个所述挡板由下至上依次分布,所述挡板的侧面内嵌固定连接有磁吸板,所述磁吸板的数量有若干个且呈阵列分布,挡板用于起到安全阻挡的作用,磁吸板可用于与外接含磁性片的物体进行吸附固定,此物体可以为荧光装置,以可在夜间起到警示作用,也可为装饰物,从而增大围挡的美观性。Preferably, there are three baffles, and the three baffles are distributed in sequence from bottom to top. A magnetic suction plate is embedded and fixedly connected to the side of the baffle, and there are several magnetic suction boards. It is distributed in an array, and the baffle is used to act as a safety barrier. The magnetic suction board can be used to adsorb and fix external objects containing magnetic sheets. This object can be a fluorescent device to serve as a warning at night, or it can As decoration, thereby increasing the aesthetics of the enclosure.
优选地,所述第一连接架背向挡板的一面设置有槽口,所述槽口位于阶梯槽的下方,且所述槽口的顶端延伸至阶梯槽内,所述槽口的尺寸大于卡板的尺寸,在对多个本装置进行配合组装时,将第一连接架的槽口与卡板相对应,然后向内推动第一连接架,使得卡板与阶梯槽相对应,接着,向下移动第一连接架,使得卡板卡在阶梯槽内,从而完成多个本装置的配合组装。Preferably, a notch is provided on a side of the first connecting frame facing away from the baffle, the notch is located below the step groove, and the top end of the notch extends into the step groove, and the size of the notch is larger than For the size of the clamping plate, when assembling multiple devices, the notch of the first connecting frame should correspond to the clamping plate, and then the first connecting frame should be pushed inward so that the clamping plate corresponds to the step groove, and then, Move the first connecting frame downward so that the card plate is stuck in the step groove, thereby completing the assembly of multiple devices.
优选地,所述底座的顶面贯穿设置有通孔,所述锚固杆与通孔相配合,锚固杆用于插装进地面内,从而来对第一连接架以及第二连接架进行固定,所述底座的顶面固定连接有凸板,所述凸板的数量有两个,且两个所述凸板之间的间距与第一连接架以及第二连接架均相配合,在对底座进行安装固定后,可以将第一连接架以及第二连接架置于两个凸板之间,所述凸板的侧壁贯穿设置有通口,所述第一连接架和第二连接架的侧壁下部均设置有螺纹孔,所述螺纹孔与通口相对应,所述凸板的一侧设置有紧固螺栓,所述紧固螺栓的一端贯穿于通口与螺纹孔相配合,将紧固螺栓穿过通口与螺纹孔相配合,从而使得底座与第一连接架以及第二连接架进行连接固定。Preferably, the top surface of the base is provided with a through hole, the anchor rod matches the through hole, and the anchor rod is used to be inserted into the ground to fix the first connecting frame and the second connecting frame, The top surface of the base is fixedly connected with a convex plate. There are two convex plates, and the spacing between the two convex plates matches the first connecting frame and the second connecting frame. When facing the base After installation and fixation, the first connecting frame and the second connecting frame can be placed between the two convex plates. The side walls of the convex plates are provided with through-holes. The first connecting frame and the second connecting frame are The lower parts of the side walls are provided with threaded holes, and the threaded holes correspond to the through openings. A fastening bolt is provided on one side of the convex plate, and one end of the fastening bolts penetrates through the through openings and matches with the threaded holes. The fastening bolt passes through the through hole and matches with the threaded hole, so that the base is connected and fixed with the first connecting frame and the second connecting frame.
与现有技术相比,本实用新型的有益效果在于:Compared with the existing technology, the beneficial effects of this utility model are:
1、本实用新型,便于对围挡进行拆装,且单个挡板尺寸不大,利于进行搬运,通过多个挡板与第一连接架以及第二连接架的相互配合,从而即可完成单个围挡的组装;1. This utility model is convenient for disassembling and assembling the enclosure, and the size of a single baffle is not large, which is convenient for transportation. Through the cooperation of multiple baffles with the first connecting frame and the second connecting frame, a single baffle can be completed Assembly of enclosures;
2、本实用新型,可以根据需求对多个本装置进行配合组装,通过卡板与阶梯槽的相互配合,从而即可完成多个本装置的配合组装;2. With this utility model, multiple devices can be assembled together according to the needs. Through the cooperation of the clamping plate and the step groove, the assembly of multiple devices can be completed;
3、本实用新型,在挡板的侧面内嵌固定连接有磁吸板,磁吸板可用于与外接含磁性片的物体进行吸附固定,此物体可以为荧光装置,以可在夜间起到警示作用,也可为装饰物,从而增大围挡的美观性。3. In this utility model, a magnetic plate is embedded and fixedly connected to the side of the baffle. The magnetic plate can be used to adsorb and fix external objects containing magnetic sheets. This object can be a fluorescent device to provide a warning at night. It can also be used as a decoration to increase the aesthetics of the enclosure.
附图说明Description of the drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to explain the embodiments of the present invention or the technical solutions in the prior art more clearly, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings in the following description These are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without exerting creative efforts.
图1为本实用新型整体结构示意图。Figure 1 is a schematic diagram of the overall structure of the utility model.
图2为本实用新型挡板与第一连接架以及第二连接架配合示意图。Figure 2 is a schematic diagram of the cooperation between the baffle of the present invention and the first connecting frame and the second connecting frame.
图3为图1中的A部放大图。Figure 3 is an enlarged view of part A in Figure 1.
图4为图2中的B部放大图。Figure 4 is an enlarged view of part B in Figure 2.
图5为本实用新型底座结构示意图。Figure 5 is a schematic diagram of the base structure of the utility model.
图中:1、挡板;2、磁吸板;3、第一连接架;4、第二连接架;5、凹口;6、底座;7、通孔;8、锚固杆;9、凸板;10、通口;11、紧固螺栓;12、螺纹孔;301、槽口;302、阶梯槽;401、卡板。In the picture: 1. Baffle; 2. Magnetic plate; 3. First connecting frame; 4. Second connecting frame; 5. Notch; 6. Base; 7. Through hole; 8. Anchor rod; 9. Protrusion Plate; 10, through port; 11, fastening bolt; 12, threaded hole; 301, notch; 302, step groove; 401, clamping plate.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present utility model.
实施例:如图1-5所示,本实用新型提供了一种工民建筑施工用安全围挡装置,包括挡板1,挡板1的一侧设置有第一连接架3,挡板1的另一侧设置有第二连接架4,第一连接架3背向挡板1的一面设置有阶梯槽302,第二连接架4背向挡板1的一面固定连接有卡板401,卡板401呈阶梯状,卡板401与阶梯槽302相配合,第一连接架3和第二连接架4的底面均可拆卸设置有底座6,底座6的顶面贯穿设置有锚固杆8。Embodiment: As shown in Figures 1-5, the utility model provides a safety enclosure device for industrial and civil building construction, which includes a baffle 1. A first connecting frame 3 is provided on one side of the baffle 1. The baffle 1 The other side of the second connecting frame 4 is provided with a second connecting frame 4. The side of the first connecting frame 3 facing away from the baffle 1 is provided with a step groove 302. The side of the second connecting frame 4 facing away from the baffle 1 is fixedly connected with a clamping plate 401. The plate 401 is in a stepped shape, and the clamping plate 401 matches the stepped groove 302. The bottom surfaces of the first connecting frame 3 and the second connecting frame 4 are detachably provided with a base 6, and the top surface of the base 6 is provided with an anchoring rod 8.
第一连接架3和第二连接架4朝向挡板1的一面均设置有凹口5,凹口5与挡板1相配合。The first connecting frame 3 and the second connecting frame 4 are each provided with a notch 5 on one side facing the baffle 1, and the notch 5 matches the baffle 1.
通过采用上述技术方案,第一连接架3和第二连接架4用于对挡板1进行限位固定,在对挡板1进行安装时,需使得挡板1的两端均位于凹口5内。By adopting the above technical solution, the first connecting frame 3 and the second connecting frame 4 are used to limit and fix the baffle 1. When the baffle 1 is installed, both ends of the baffle 1 need to be located in the notch 5. Inside.
挡板1的数量有三个,且三个挡板1由下至上依次分布,挡板1的侧面内嵌固定连接有磁吸板2,磁吸板2的数量有若干个且呈阵列分布。There are three baffles 1, and the three baffles 1 are distributed in sequence from bottom to top. Magnetic suction plates 2 are embedded and fixedly connected to the side of the baffle 1. There are several magnetic suction plates 2 and they are distributed in an array.
通过采用上述技术方案,挡板1用于起到安全阻挡的作用,磁吸板2可用于与外接含磁性片的物体进行吸附固定,此物体可以为荧光装置,以可在夜间起到警示作用,也可为装饰物,从而增大围挡的美观性。By adopting the above technical solution, the baffle 1 is used to act as a safety barrier, and the magnetic plate 2 can be used to adsorb and fix an external object containing a magnetic sheet. This object can be a fluorescent device to serve as a warning at night. , can also be used as decorations to increase the aesthetics of the enclosure.
第一连接架3背向挡板1的一面设置有槽口301,槽口301位于阶梯槽302的下方,且槽口301的顶端延伸至阶梯槽302内,槽口301的尺寸大于卡板401的尺寸。A notch 301 is provided on the side of the first connecting frame 3 facing away from the baffle 1. The notch 301 is located below the step groove 302, and the top of the notch 301 extends into the step groove 302. The size of the notch 301 is larger than the clamping plate 401. size of.
通过采用上述技术方案,在对多个本装置进行配合组装时,将第一连接架3的槽口301与卡板401相对应,然后向内推动第一连接架3,使得卡板401与阶梯槽302相对应,接着,向下移动第一连接架3,使得卡板401卡在阶梯槽302内,从而完成多个本装置的配合组装。By adopting the above technical solution, when assembling multiple devices, the notch 301 of the first connecting frame 3 is corresponding to the clamping plate 401, and then the first connecting frame 3 is pushed inward, so that the clamping plate 401 is in contact with the ladder. corresponding to the groove 302, and then move the first connecting frame 3 downward so that the clamping plate 401 is stuck in the stepped groove 302, thereby completing the coordinated assembly of multiple devices.
底座6的顶面贯穿设置有通孔7,锚固杆8与通孔7相配合。The top surface of the base 6 is provided with a through hole 7, and the anchor rod 8 matches the through hole 7.
通过采用上述技术方案,锚固杆8用于插装进地面内,从而来对第一连接架3以及第二连接架4进行固定。By adopting the above technical solution, the anchor rod 8 is used to be inserted into the ground to fix the first connecting frame 3 and the second connecting frame 4 .
底座6的顶面固定连接有凸板9,凸板9的数量有两个,且两个凸板9之间的间距与第一连接架3以及第二连接架4均相配合。The top surface of the base 6 is fixedly connected with a convex plate 9 . There are two convex plates 9 , and the spacing between the two convex plates 9 matches the first connecting frame 3 and the second connecting frame 4 .
通过采用上述技术方案,在对底座6进行安装固定后,可以将第一连接架3以及第二连接架4置于两个凸板9之间。By adopting the above technical solution, after the base 6 is installed and fixed, the first connecting frame 3 and the second connecting frame 4 can be placed between the two protruding plates 9 .
凸板9的侧壁贯穿设置有通口10,第一连接架3和第二连接架4的侧壁下部均设置有螺纹孔12,螺纹孔12与通口10相对应,凸板9的一侧设置有紧固螺栓11,紧固螺栓11的一端贯穿于通口10与螺纹孔12相配合。The side wall of the raised plate 9 is provided with a through hole 10. The lower portions of the side walls of the first connecting frame 3 and the second connecting frame 4 are both provided with threaded holes 12. The threaded holes 12 correspond to the through holes 10. One side of the raised plate 9 A fastening bolt 11 is provided on the side, and one end of the fastening bolt 11 penetrates through the through hole 10 and matches with the threaded hole 12.
通过采用上述技术方案,将紧固螺栓11穿过通口10与螺纹孔12相配合,从而使得底座6与第一连接架3以及第二连接架4进行连接固定。By adopting the above technical solution, the fastening bolt 11 is passed through the through hole 10 and matched with the threaded hole 12, so that the base 6 is connected and fixed with the first connecting frame 3 and the second connecting frame 4.
工作原理:本实用新型在使用时,将底座6置于所需地面位置,通过锚固杆8来对底座6进行固定,接着,将第一连接架3和第二连接架4置于两个凸板9之间,然后,将紧固螺栓11穿过通口10与螺纹孔12相配合,从而使得底座6与第一连接架3以及第二连接架4进行连接固定,且注意,需使得第一连接架3和第二连接架4之间的间距与挡板1相配合,以使得挡板1可以卡装在第一连接架3和第二连接架4的凹口5内;Working principle: When the utility model is in use, place the base 6 at the required ground position, fix the base 6 through the anchor rod 8, and then place the first connecting frame 3 and the second connecting frame 4 on the two protrusions. between the plates 9, and then pass the fastening bolts 11 through the through holes 10 to match the threaded holes 12, so that the base 6 is connected and fixed with the first connecting frame 3 and the second connecting frame 4, and note that the second connecting frame needs to be connected and fixed. The distance between one connecting frame 3 and the second connecting frame 4 matches the baffle 1 so that the baffle 1 can be clamped in the notches 5 of the first connecting frame 3 and the second connecting frame 4;
然后,将挡板1依次卡装在第一连接架3和第二连接架4的凹口5,从而完成单个围挡的组装,在需对多个本装置进行配合组装时,将第一连接架3的槽口301与卡板401相对应,然后向内推动第一连接架3,使得卡板401与阶梯槽302相对应,接着,向下移动第一连接架3,使得卡板401卡在阶梯槽302内,从而完成多个本装置的配合组装;Then, the baffle 1 is sequentially clamped in the notches 5 of the first connecting frame 3 and the second connecting frame 4, thereby completing the assembly of a single enclosure. When multiple devices need to be assembled together, the first connecting frame is The notch 301 of the frame 3 corresponds to the clamping plate 401, and then the first connecting frame 3 is pushed inward so that the clamping plate 401 corresponds to the stepped groove 302. Then, the first connecting frame 3 is moved downward so that the clamping plate 401 is clamped. In the stepped groove 302, the coordinated assembly of multiple devices is completed;
在挡板1的侧面内嵌固定连接有磁吸板2,磁吸板2可用于与外接含磁性片的物体进行吸附固定,此物体可以为荧光装置,以可在夜间起到警示作用,也可为装饰物,从而增大围挡的美观性。A magnetic suction plate 2 is embedded and fixedly connected to the side of the baffle 1. The magnetic suction board 2 can be used to adsorb and fix an external object containing a magnetic sheet. This object can be a fluorescent device to serve as a warning at night. It can be used as a decoration to enhance the aesthetics of the enclosure.
显然,本领域的技术人员可以对本实用新型进行各种改动和变型而不脱离本实用新型的精神和范围。这样,倘若本实用新型的这些修改和变型属于本实用新型权利要求及其等同技术的范围之内,则本实用新型也意图包含这些改动和变型在内。Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. In this way, if these modifications and variations of the present utility model fall within the scope of the claims of the present utility model and equivalent technologies, the present utility model is also intended to include these modifications and variations.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320790036.9U CN219754264U (en) | 2023-04-11 | 2023-04-11 | A safety enclosure device for industrial and civil building construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320790036.9U CN219754264U (en) | 2023-04-11 | 2023-04-11 | A safety enclosure device for industrial and civil building construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219754264U true CN219754264U (en) | 2023-09-26 |
Family
ID=88088907
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320790036.9U Expired - Fee Related CN219754264U (en) | 2023-04-11 | 2023-04-11 | A safety enclosure device for industrial and civil building construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219754264U (en) |
-
2023
- 2023-04-11 CN CN202320790036.9U patent/CN219754264U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205134924U (en) | A protection network subassembly for coiling detain scaffold | |
| CN205314530U (en) | Section bar is fixed to be detained | |
| CN212897480U (en) | Steel construction vestibule bottom curtain construction platform | |
| CN215055577U (en) | Opening grating plate for protecting steel platform | |
| CN211341160U (en) | Metal plate house for building convenient to assembly | |
| JP2012007350A (en) | Unit house | |
| CN219080921U (en) | Assembled temporary support for overhauling thermal power plant | |
| CN211473484U (en) | A safety protection structure for building construction | |
| CN217461413U (en) | Protective net connecting device | |
| JP3604071B2 (en) | Hundred-footed floor beams in wooden houses | |
| CN217924759U (en) | Building structure post construction protection frame | |
| CN212743610U (en) | Warning fence for construction site of constructional engineering | |
| CN217652504U (en) | Enclose fender convenient to equipment usefulness is dismantled in municipal garden construction | |
| CN215595228U (en) | Guardrail based on construction security performance is high | |
| CN217420434U (en) | Assembled suspension platform for electric hanging basket | |
| CN222478106U (en) | Hanging basket | |
| CN220100598U (en) | Be applied to guard plate connecting piece of building engineering scaffold frame | |
| CN219808806U (en) | Fence for building engineering management | |
| CN218149107U (en) | Curtain board is with general fixed knot structure | |
| CN220247821U (en) | Construction safety protection fence | |
| CN111042558A (en) | A assembled protector for facing limit is enclosed | |
| CN112942791B (en) | Small space lifting scaffold and construction method | |
| CN218715059U (en) | Large template attached to steel frame of high-rise building machine | |
| CN220790728U (en) | Quick assembly disassembly formula camping unit and composite set thereof | |
| CN223793899U (en) | Elevation protector for steel structure building construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230926 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |