CN219753917U - Stable form Cheng Diaolan for building engineering construction - Google Patents
Stable form Cheng Diaolan for building engineering construction Download PDFInfo
- Publication number
- CN219753917U CN219753917U CN202321184350.9U CN202321184350U CN219753917U CN 219753917 U CN219753917 U CN 219753917U CN 202321184350 U CN202321184350 U CN 202321184350U CN 219753917 U CN219753917 U CN 219753917U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- block
- plate
- movable door
- bottom plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
Description
技术领域Technical field
本实用新型涉及工程吊篮领域,尤其涉及一种建筑工程施工用稳定型工程吊篮。The utility model relates to the field of engineering hanging baskets, and in particular to a stable engineering hanging basket for building engineering construction.
背景技术Background technique
吊篮是一种能够替代传统脚手架的新型高处作业设备,吊篮的使用已经逐渐成为一种趋势,在高层多层高建筑的外墙施工、幕墙安装、保温施工和维修清洗外墙等高空作业中得到广泛认可当遇到大风天气时,吊篮在高空会发生严重的晃动,不仅影响工作人员的正常工作,还会对建筑外墙造成损坏。The hanging basket is a new type of high-altitude working equipment that can replace traditional scaffolding. The use of hanging baskets has gradually become a trend. It is used in high-altitude exterior wall construction, curtain wall installation, insulation construction and maintenance and cleaning of exterior walls of high-rise multi-story buildings. It has been widely recognized in the operation. When encountering strong winds, the hanging basket will shake seriously at high altitude, which will not only affect the normal work of the staff, but also cause damage to the building exterior wall.
但是由于吊篮需要通过吊绳吊挂在高空作业中,因此吊篮受到风力或受其他外力条件影响时,会产生晃动而使吊篮不稳定,从而影响到操作人员的工作效率,甚至影响操作人员的自身安全,且晃动的吊篮与墙壁撞击也容易使吊篮和墙壁损坏现有技术下建筑工程吊篮是以底板作为底部支撑,其四周由护栏组成框状围护结构,人员进出吊篮需要翻越护栏,大型物料和施工工具在吊篮上拿取放置也极为费力,体积巨大的护栏的结构在运输时也会占用大量空间,提高运输成本,所以需要改进。However, since the hanging basket needs to be hung by a hanging rope during high-altitude operations, when the hanging basket is affected by wind or other external conditions, it will shake and make the hanging basket unstable, thus affecting the operator's work efficiency and even affecting the operation. The personnel's own safety, and the impact of the swinging hanging basket with the wall can easily cause damage to the hanging basket and the wall. Under the existing technology, the construction engineering hanging basket uses the bottom plate as the bottom support, and is surrounded by guardrails to form a frame-like enclosure structure. People can enter and exit the hanging basket. The basket needs to climb over the guardrail, and it is extremely laborious to pick up and place large materials and construction tools on the hanging basket. The structure of the huge guardrail will also take up a lot of space during transportation and increase transportation costs, so it needs to be improved.
实用新型内容Utility model content
本实用新型的目的是为了解决现有技术中存在的缺点,而提出的一种建筑工程施工用稳定型工程吊篮。The purpose of this utility model is to propose a stable engineering hanging basket for building engineering construction in order to solve the shortcomings existing in the existing technology.
为了实现上述目的,本实用新型采用了如下技术方案:一种建筑工程施工用稳定型工程吊篮,包括底板,所述底板的两侧均设置有T形槽,所述T形槽的内侧滑动连接有侧板,所述侧板的一侧设置有滑槽,所述滑槽的内侧滑动连接有活动门,所述底板的一侧设置有后板,所述后板的底部设置有块体,所述块体的两端均设置有圆柱,所述圆柱的外侧转动连接有旋转块,所述后板的一侧两端均转动连接有柱体,所述柱体的外侧固定连接有限位块。In order to achieve the above purpose, the present utility model adopts the following technical solution: a stable engineering hanging basket for building engineering construction, including a bottom plate. T-shaped grooves are provided on both sides of the bottom plate, and the inner side of the T-shaped groove slides A side plate is connected, and a chute is provided on one side of the side plate. A movable door is slidably connected to the inside of the chute. A back plate is provided on one side of the bottom plate, and a block is provided on the bottom of the back plate. , both ends of the block are provided with cylinders, the outside of the cylinder is rotatably connected to a rotating block, one side of the rear plate is rotatably connected to a cylinder at both ends, and the outside of the cylinder is fixedly connected with a limiter piece.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述活动门的一侧底部设置有卡块,所述活动门的右侧转动连接有卡件。A clamping block is provided at the bottom of one side of the movable door, and a clamping piece is rotatably connected to the right side of the movable door.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述旋转块固定连接在底板的一侧。The rotating block is fixedly connected to one side of the base plate.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述底板的两侧均设置有滑轮,所述滑轮的数量为多个。Pulleys are provided on both sides of the bottom plate, and the number of the pulleys is multiple.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述后板的外侧上方设置有缓冲机构,所述缓冲机构包括滑动槽,所述滑动槽的内侧设置滑动连接有滑块,所述滑块的一端设置有弹簧,所述滑块的两端均螺纹连接有螺丝,所述螺丝的外侧螺纹连接有固定块,所述固定块的底部设置有滑块。A buffering mechanism is provided on the outer side of the rear plate. The buffering mechanism includes a sliding groove. A sliding block is provided on the inner side of the sliding groove. One end of the sliding block is provided with a spring, and both ends of the sliding block are provided with a spring. Screws are threadedly connected to each other, a fixing block is threadedly connected to the outside of the screws, and a slider is provided at the bottom of the fixing block.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述弹簧的一端固定连接在后板的一侧,所述弹簧的数量为多个。One end of the spring is fixedly connected to one side of the rear plate, and there are multiple springs.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述滑动槽的一端固定连接在后板的一侧上方。One end of the sliding groove is fixedly connected to one side of the rear plate.
本实用新型具有如下有益效果:The utility model has the following beneficial effects:
1、本实用新型中,首先,安装只需要将折叠的后板通过块体在底板上转动展开,将两个侧板插入底板上的T形槽,然后通过后板下方的两个柱体转动限位块,使侧板被限位不会向外滑,然后工作人员进入吊篮的底板上,将活动门通过侧板插入滑槽,当完全到底时活动门一侧底部的卡块将活动门限位,此时拧动活动门右侧的卡件,将活动门限位,卡块和卡件使活动门不会左右滑动,当完成作业后只需要依次解除限位将卡件和后板拧回,将活动门抽出然后将两个侧板抽出,最后折叠后板即可大大减小吊篮占有体积,且拆装简单快捷,降低运输成本提高工作效率。1. In this utility model, first of all, installation only requires rotating and unfolding the folded back panel through the block on the base plate, inserting the two side panels into the T-shaped slots on the base plate, and then rotating through the two cylinders under the back panel. The limit block prevents the side panel from sliding outward. Then the staff enters the bottom of the hanging basket and inserts the movable door into the chute through the side panel. When it is completely bottomed out, the block at the bottom of one side of the movable door will move. The door is limited. At this time, twist the clamp on the right side of the movable door to limit the movable door. The clamp and the clamp prevent the movable door from sliding left and right. After completing the operation, you only need to release the limit in sequence and move the clamp and the rear Screw the panel back, pull out the movable door and then pull out the two side panels. Finally, fold the rear panel to greatly reduce the volume of the hanging basket. Disassembly and assembly are simple and fast, reducing transportation costs and improving work efficiency.
2、本实用新型中,在作业过程中,如果遇到晃动,墙壁与橡胶材质的滑块相撞,滑块带动上方固定块带动滑块在滑动槽中滑动,挤压弹簧,起到缓冲作用,减少吊篮和墙壁应撞击受到的冲击,避免吊篮和墙壁的损坏。2. In this utility model, during the operation, if there is shaking and the wall collides with the rubber slider, the slider drives the upper fixed block to drive the slider to slide in the sliding groove, squeezing the spring and playing a buffering role. , reduce the impact of the hanging basket and the wall, and avoid damage to the hanging basket and the wall.
附图说明Description of the drawings
图1为本实用新型提出的一种建筑工程施工用稳定型工程吊篮的整体示意图;Figure 1 is an overall schematic diagram of a stable engineering hanging basket for construction projects proposed by the utility model;
图2为本实用新型提出的一种建筑工程施工用稳定型工程吊篮的限位槽示意图;Figure 2 is a schematic diagram of the limit groove of a stable engineering hanging basket for construction projects proposed by the utility model;
图3为本实用新型提出的一种建筑工程施工用稳定型工程吊篮的安装滑槽结构示意图;Figure 3 is a schematic structural diagram of the installation chute of a stable engineering hanging basket for construction projects proposed by the utility model;
图4为本实用新型提出的一种建筑工程施工用稳定型工程吊篮的折叠结构示意图;Figure 4 is a schematic diagram of the folding structure of a stable engineering hanging basket for construction projects proposed by the utility model;
图5为本实用新型提出的一种建筑工程施工用稳定型工程吊篮的缓冲机构示意图;Figure 5 is a schematic diagram of the buffer mechanism of a stable engineering hanging basket for construction projects proposed by the utility model;
图6为本实用新型提出的一种建筑工程施工用稳定型工程吊篮的限位结构示意图。Figure 6 is a schematic diagram of the limiting structure of a stable engineering hanging basket for construction projects proposed by the utility model.
图例说明:illustration:
1、底板;2、T形槽;3、侧板;4、滑槽;5、活动门;6、卡块;7、卡件;8、后板;9、限位块;10、块体;11、旋转块;12、滑动槽;13、固定块;14、螺丝;15、滑块;16、弹簧;17、滑轮;18、柱体;19、圆柱。1. Bottom plate; 2. T-shaped slot; 3. Side plate; 4. Chute; 5. Movable door; 6. Clamp; 7. Clamp; 8. Back plate; 9. Limit block; 10. Block ; 11. Rotating block; 12. Sliding groove; 13. Fixed block; 14. Screw; 15. Slider; 16. Spring; 17. Pulley; 18. Cylinder; 19. Cylinder.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present utility model.
参照图1-3,本实用新型提供的一种实施例:一种建筑工程施工用稳定型工程吊篮,包括底板1,底板1的两侧均设置有T形槽2,两个侧板3可以插入底板1上的T形槽2,T形槽2的内侧滑动连接有侧板3,侧板3的一侧设置有滑槽4,滑槽4的内侧滑动连接有活动门5,底板1的一侧设置有后板8,后板8的底部设置有块体10,块体10的两端均设置有圆柱19,圆柱19的外侧转动连接有旋转块11,后板8的一侧两端均转动连接有柱体18,柱体18的外侧固定连接有限位块9通过后板8下方的两个柱体18转动限位块9,使侧板3被限位不会向外滑,然后工作人员进入吊篮的底板1上,将活动门5通过侧板3插入滑槽4,当完全到底时活动门5一侧底部的卡块6将活动门5限位,此时拧动活动门5右侧的卡件7,将活动门5限位,卡块6和卡件7使活动门5不会左右滑动。Referring to Figures 1-3, an embodiment of the present utility model is provided: a stable engineering hanging basket for construction projects, including a bottom plate 1. T-shaped slots 2 are provided on both sides of the bottom plate 1, and two side plates 3 It can be inserted into the T-shaped slot 2 on the base plate 1. The inner side of the T-shaped slot 2 is slidingly connected to the side plate 3. One side of the side plate 3 is provided with a chute 4. The inner side of the chute 4 is slidably connected to the movable door 5. The base plate 1 A back plate 8 is provided on one side of the back plate 8. A block 10 is provided at the bottom of the back plate 8. Columns 19 are provided at both ends of the block 10. A rotating block 11 is rotatably connected to the outside of the cylinder 19. Two sides of the back plate 8 have two sides. Both ends are rotatably connected with cylinders 18. The outer sides of the cylinders 18 are fixedly connected with the limiting blocks 9 and rotate through the two cylinders 18 under the rear plate 8 so that the side plates 3 are limited and will not slide outwards. Then the staff enters the bottom plate 1 of the hanging basket and inserts the movable door 5 through the side plate 3 into the chute 4. When it is completely bottomed out, the block 6 at the bottom of one side of the movable door 5 limits the movable door 5. At this time, twist the movable door 5 The clamping piece 7 on the right side of the door 5 limits the position of the movable door 5. The clamping block 6 and the clamping piece 7 prevent the movable door 5 from sliding left and right.
活动门5的一侧底部设置有卡块6,活动门5的右侧转动连接有卡件7,旋转块11固定连接在底板1的一侧,底板1的两侧均设置有滑轮17,滑轮17的数量为多个,将吊机连接底板1两侧的滑轮17,开始抬升吊篮,后板8的外侧上方设置有缓冲机构,缓冲机构包括滑动槽12,滑动槽12的内侧设置滑动连接有滑块15,在作业过程中,如果遇到晃动,墙壁与橡胶材质的滑块15相撞,滑块15带动上方固定块13带动滑块15在滑动槽12中滑动,挤压弹簧16,起到缓冲作用,减少吊篮和墙壁应撞击受到的冲击,避免吊篮和墙壁的损坏,滑块15为橡胶结构,可以有效防止墙壁应撞击损伤墙壁,也可以起到一定缓冲作用,滑块15顺着墙壁滚动使吊篮稳定上升下降,滑块15的一端设置有弹簧16,滑块15的两端均螺纹连接有螺丝14,螺丝14的外侧螺纹连接有固定块13,固定块13的底部设置有滑块15,弹簧16的一端固定连接在后板8的一侧,弹簧16的数量为多个,滑动槽12的一端固定连接在后板8的一侧上方。A clamping block 6 is provided at the bottom of one side of the movable door 5. A clamping piece 7 is rotationally connected to the right side of the movable door 5. The rotating block 11 is fixedly connected to one side of the base plate 1. Pulleys 17 are provided on both sides of the base plate 1. The number of 17 is multiple. Connect the crane to the pulleys 17 on both sides of the bottom plate 1 and start to lift the hanging basket. A buffer mechanism is provided on the outside of the rear plate 8. The buffer mechanism includes a sliding groove 12. A sliding connection is provided on the inside of the sliding groove 12. There is a slider 15. During the operation, if there is shaking, the wall collides with the rubber slider 15. The slider 15 drives the upper fixed block 13 to drive the slider 15 to slide in the sliding groove 12, squeezing the spring 16. It plays a buffering role, reducing the impact of the hanging basket and the wall, and avoiding damage to the hanging basket and the wall. The slider 15 is a rubber structure, which can effectively prevent the wall from being damaged by the impact, and can also play a certain buffering role. The slider 15 15 rolls along the wall to make the hanging basket rise and fall stably. One end of the slider 15 is provided with a spring 16. Both ends of the slider 15 are threaded with screws 14. The outside of the screws 14 is threadedly connected with a fixing block 13. The fixing block 13 A slider 15 is provided at the bottom. One end of the spring 16 is fixedly connected to one side of the back plate 8 . There are multiple springs 16 . One end of the sliding groove 12 is fixedly connected to one side of the back plate 8 .
工作原理:首先将折叠的后板8通过块体10上的圆柱19在底板1的旋转块11上转动展开,将两个侧板3插入底板1上的T形槽2,然后通过后板8下方的两个柱体18转动限位块9,使侧板3被限位不会向外滑,然后工作人员进入吊篮的底板1上,将活动门5通过侧板3插入滑槽4,当完全到底时活动门5一侧底部的卡块6将活动门5限位,此时拧动活动门5右侧的卡件7,将活动门5限位,卡块6和卡件7使活动门5不会左右滑动,此时将吊机连接底板1两侧的滑轮17,开始抬升吊篮,在作业过程中,如果遇到晃动,墙壁与橡胶材质的滑块15相撞,滑块15带动上方固定块13带动滑块15在滑动槽12中滑动,挤压弹簧16,起到缓冲作用,减少吊篮和墙壁应撞击受到的冲击,避免吊篮和墙壁的损坏,当完成作业后只需要依次解除限位将卡件7和后板8拧回,将活动门5抽出然后将两个侧板3抽出,最后折叠后板8即可大大减小吊篮占有体积,且拆装简单快捷,降低运输成本提高工作效率。Working principle: First, rotate and unfold the folded back plate 8 through the cylinder 19 on the block 10 on the rotating block 11 of the base plate 1. Insert the two side plates 3 into the T-shaped slot 2 on the base plate 1, and then pass the back plate 8 The two lower columns 18 rotate the limit blocks 9 so that the side plate 3 is limited and does not slide outward. Then the staff enters the bottom plate 1 of the hanging basket and inserts the movable door 5 into the chute 4 through the side plate 3. When it is completely bottomed out, the clamping block 6 at the bottom of one side of the movable door 5 will limit the position of the movable door 5. At this time, twist the clamping piece 7 on the right side of the movable door 5 to limit the position of the movable door 5. The clamping block 6 and the clamping piece 7 will The movable door 5 will not slide left and right. At this time, connect the crane to the pulleys 17 on both sides of the base plate 1 and start to lift the hanging basket. During the operation, if there is shaking, the wall will collide with the rubber slider 15, and the slider will 15 drives the upper fixed block 13 to drive the slider 15 to slide in the sliding groove 12, squeezing the spring 16, which plays a buffering role, reducing the impact of the hanging basket and the wall, and avoiding damage to the hanging basket and the wall. When the operation is completed It is only necessary to release the limit in sequence, screw back the clamp 7 and the back plate 8, pull out the movable door 5 and then pull out the two side plates 3, and finally fold the back plate 8 to greatly reduce the space occupied by the hanging basket, and it is easy to disassemble and assemble. Fast, reduce transportation costs and improve work efficiency.
最后应说明的是:以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Finally, it should be noted that the above are only preferred embodiments of the present invention and are not intended to limit the present utility model. Although the present utility model has been described in detail with reference to the foregoing embodiments, for those skilled in the art , it is still possible to modify the technical solutions recorded in the foregoing embodiments, or to perform equivalent substitutions on some of the technical features. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model, All should be included in the protection scope of this utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321184350.9U CN219753917U (en) | 2023-05-17 | 2023-05-17 | Stable form Cheng Diaolan for building engineering construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321184350.9U CN219753917U (en) | 2023-05-17 | 2023-05-17 | Stable form Cheng Diaolan for building engineering construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219753917U true CN219753917U (en) | 2023-09-26 |
Family
ID=88091662
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202321184350.9U Expired - Fee Related CN219753917U (en) | 2023-05-17 | 2023-05-17 | Stable form Cheng Diaolan for building engineering construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219753917U (en) |
-
2023
- 2023-05-17 CN CN202321184350.9U patent/CN219753917U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN113511583B (en) | Multifunctional high-safety assembled building lifting clamp | |
| CN211173046U (en) | Wall-attached support for attached lifting scaffold | |
| CN219753917U (en) | Stable form Cheng Diaolan for building engineering construction | |
| CN206477588U (en) | White washed wall construction operation hoistable platform | |
| CN216616780U (en) | A construction scaffolding anti-fall device | |
| CN216740613U (en) | Outer wall scaffold for green building construction | |
| CN115749242A (en) | Anti-falling structure of quick-assembly aluminum alloy scaffold | |
| CN218264859U (en) | Hanging basket structure for building exterior wall decoration | |
| CN218438177U (en) | Protective structure is used in construction of building curtain | |
| CN217498522U (en) | A safety device for tower crane anti-climbing | |
| CN209413250U (en) | A kind of telescopic foot hand cradle being applicable in narrow space operation | |
| CN221761296U (en) | A construction hanging basket protection mechanism | |
| CN219173974U (en) | Elevator pit maintenance protection device | |
| CN219773702U (en) | High-altitude falling object prevention security equipment | |
| CN219491676U (en) | A protective device for high-stable high-rise building construction | |
| CN114394541A (en) | Tower crane standard knot with double safety protection devices | |
| CN219753913U (en) | A kind of collision buffer protection mechanism for building construction | |
| CN221666751U (en) | Combined firework setting-off rack | |
| CN220351649U (en) | A fire-fighting platform that is easy to disassemble | |
| CN220353338U (en) | A kind of construction engineering climbing frame with protective function | |
| CN221646498U (en) | Safety ladder cage for construction | |
| CN219197167U (en) | A prefabricated fire window | |
| CN218623244U (en) | Integrated form adheres to lifting foot hand frame protection network connection structure | |
| CN216240270U (en) | Energy-saving aluminum alloy door and window with heat insulation teeth | |
| CN219100381U (en) | Fireproof plate fixing device for electromechanical installation of building |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230926 |