CN219732279U - Prefabricated bolted self-returning beam-column node structure - Google Patents

Prefabricated bolted self-returning beam-column node structure Download PDF

Info

Publication number
CN219732279U
CN219732279U CN202320705516.0U CN202320705516U CN219732279U CN 219732279 U CN219732279 U CN 219732279U CN 202320705516 U CN202320705516 U CN 202320705516U CN 219732279 U CN219732279 U CN 219732279U
Authority
CN
China
Prior art keywords
precast concrete
column
steel pipe
fixedly connected
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320705516.0U
Other languages
Chinese (zh)
Inventor
章锐潮
罗漪
赖勇
李星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Shenshan Investment Holding Group Co ltd
Shenzhen Shenshan Special Cooperation Zone Housing Construction And Water Affairs Bureau
Huaqiao University
Original Assignee
Guangdong Shenshan Investment Holding Group Co ltd
Shenzhen Shenshan Special Cooperation Zone Housing Construction And Water Affairs Bureau
Huaqiao University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Shenshan Investment Holding Group Co ltd, Shenzhen Shenshan Special Cooperation Zone Housing Construction And Water Affairs Bureau, Huaqiao University filed Critical Guangdong Shenshan Investment Holding Group Co ltd
Priority to CN202320705516.0U priority Critical patent/CN219732279U/en
Application granted granted Critical
Publication of CN219732279U publication Critical patent/CN219732279U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses an assembled bolt connection self-resetting beam column node structure, which relates to the technical field of building structure earthquake resistance and comprises the following components: the device comprises a precast concrete beam, a precast concrete column, a plurality of positioning bolts, a plurality of energy consumption pieces and a plurality of resetting pieces, wherein one end of each positioning bolt penetrates through the precast concrete column and can be detachably and fixedly connected with the precast concrete column, and the other end of each positioning bolt is detachably and fixedly connected with the middle part of the precast concrete beam; one end of the energy consumption piece penetrates through the precast concrete column and is detachably and fixedly connected with the precast concrete column, and the other end of the energy consumption piece is detachably and fixedly connected with the precast concrete beam; one end fixed connection that precast concrete post was kept away from to the one end of piece that resets and precast concrete post, the one side fixed connection that precast concrete post was kept away from to the other end and precast concrete post effectively strengthen the power consumption ability of node structure, reduce the damage and the destruction of structure under the seismic action, and can automatic re-setting.

Description

装配式螺栓连接自复位梁柱节点结构Prefabricated bolted self-returning beam-column node structure

技术领域Technical field

本实用新型涉及建筑结构抗震技术领域,特别是涉及一种装配式螺栓连接自复位梁柱节点结构。The utility model relates to the field of anti-seismic technology of building structures, in particular to an assembled bolt-connected self-returning beam-column node structure.

背景技术Background technique

传统装配式钢筋混凝土梁柱节点为达到结构整体“等同现浇”的目的,通常采用节点现浇或二次浇筑的做法。但这种做法需要大量的湿作业,存在现场施工较为复杂,施工质量较难控制等缺点,无法发挥出装配式的优势。近年来,以螺栓连接和焊接连接等方式为代表的干式梁柱连接技术逐渐兴起。大量试验研究结果表明,现有的此类连接方式能够保证节点连接区域的刚度和承载力,受力可靠,但耗能较差,在反复地震荷载作用下灌浆处容易发生脆性破坏;在由于地震或其他原因发生破坏后,其变形程度较大,也无法自我修复。中国专利CN108867861A公开了螺栓钢筋插销预制装配混凝土梁柱边节点,采用“干式”连接来形成预制装配混凝土框架梁柱节点,现场无湿作业,安装效率高;连接钢筋可有效传递拉、压力,形成刚性连接,保证梁柱连接节点的受力性能,同时连接钢筋在孔道内无粘结,变形能力好,具有较高的抗震耗能能力,可有效保证该连接节点在地震荷载作用下的结构性能。但是,该梁柱边节点处的连接钢筋无法进行便捷的更换,在使用一段时间后,由于其损耗,耗能能力也就会相对降低,在地震作用下结构仍然容易损伤和破坏;而且,该梁柱边节点并没有能够自我修复的相关结构。因此,亟需一种能够有效增强节点结构的耗能能力,降低结构在地震作用下的损伤和破坏,且能够自动复位的梁柱节点结构。In order to achieve the purpose of "equivalent to cast-in-place" of the entire structure, traditional prefabricated reinforced concrete beam-column joints usually adopt the method of joint cast-in-place or secondary pouring. However, this method requires a lot of wet work, has the disadvantages of more complex on-site construction, and difficult to control the construction quality, and cannot give full play to the advantages of assembly. In recent years, dry beam-column connection technology represented by bolted connections and welded connections has gradually emerged. A large number of experimental research results show that the existing connection method can ensure the stiffness and bearing capacity of the node connection area, and is reliable in bearing force, but has poor energy consumption. The grouting area is prone to brittle failure under repeated earthquake loads; After being damaged due to other reasons, it will be deformed to a large extent and unable to repair itself. Chinese patent CN108867861A discloses prefabricated assembled concrete beam-column edge nodes with bolts, steel bars and pins. It adopts "dry" connection to form prefabricated concrete frame beam-column nodes. There is no wet operation on site and the installation efficiency is high; the connecting steel bars can effectively transmit tension and pressure. It forms a rigid connection to ensure the mechanical performance of the beam-column connection node. At the same time, the connecting steel bar has no bond in the channel, has good deformation ability, and has high seismic energy dissipation capacity, which can effectively ensure the structural stability of the connection node under earthquake load. performance. However, the connecting steel bars at the edge nodes of the beams and columns cannot be easily replaced. After a period of use, due to their loss, the energy dissipation capacity will be relatively reduced, and the structure is still easily damaged and destroyed under earthquake action; moreover, the structure The beam-column edge nodes do not have related structures that can self-repair. Therefore, there is an urgent need for a beam-column joint structure that can effectively enhance the energy dissipation capacity of the joint structure, reduce the damage and destruction of the structure under earthquake action, and can automatically reset.

实用新型内容Utility model content

本实用新型的目的是提供一种装配式螺栓连接自复位梁柱节点结构,以解决上述现有技术存在的问题,有效增强节点结构的耗能能力,降低结构在地震作用下的损伤和破坏,且能够自动复位。The purpose of this utility model is to provide an assembled bolted self-returning beam-column node structure to solve the problems existing in the above-mentioned existing technologies, effectively enhance the energy dissipation capacity of the node structure, and reduce the damage and destruction of the structure under earthquake action. And can automatically reset.

为实现上述目的,本实用新型提供了如下方案:In order to achieve the above purpose, the utility model provides the following solutions:

本实用新型提供一种装配式螺栓连接自复位梁柱节点结构,包括:预制混凝土梁、预制混凝土柱、多个定位螺栓、多个耗能件和多个复位件,所述定位螺栓的一端贯穿所述预制混凝土柱并与所述预制混凝土柱能够拆卸地固定连接,另一端与所述预制混凝土梁的中部能够拆卸地固定连接;所述耗能件的一端贯穿所述预制混凝土柱并与所述预制混凝土柱能够拆卸地固定连接,另一端与所述预制混凝土梁能够拆卸地固定连接,所述预制混凝土梁的顶部和底部均布置至少一个所述耗能件;所述复位件贯穿所述预制混凝土梁与所述预制混凝土柱,且所述复位件的一端与所述预制混凝土梁远离所述预制混凝土柱的一端固定连接,另一端与所述预制混凝土柱远离所述预制混凝土梁的一侧固定连接。The utility model provides an assembled bolt-connected self-returning beam-column node structure, which includes: precast concrete beams, precast concrete columns, multiple positioning bolts, multiple energy-consuming parts and multiple reset parts. One end of the positioning bolts runs through The precast concrete column is removably and fixedly connected to the precast concrete column, and the other end is removably and fixedly connected to the middle part of the precast concrete beam; one end of the energy-consuming part penetrates the precast concrete column and is removably fixed to the precast concrete column. The precast concrete column is detachably and fixedly connected, and the other end is detachably and fixedly connected to the precast concrete beam. At least one of the energy-consuming parts is arranged on the top and bottom of the precast concrete beam; the reset part runs through the The precast concrete beam and the precast concrete column, and one end of the reset member is fixedly connected to the end of the precast concrete beam away from the precast concrete column, and the other end is connected to the end of the precast concrete column away from the precast concrete beam. Side fixed connection.

优选的,所述预制混凝土梁内设置有多个第一钢管,所述第一钢管用于替换所述预制混凝土梁内的纵向钢筋,所述预制混凝土柱预埋有多个第二钢管,所述第一钢管与所述第二钢管对应设置并连通,一个所述复位件用于穿过一个所述第一钢管和一个所述第二钢管内的孔道后两端分别与所述预制混凝土柱和所述预制混凝土梁固定连接。Preferably, a plurality of first steel pipes are provided in the precast concrete beam, and the first steel pipes are used to replace the longitudinal steel bars in the precast concrete beam, and a plurality of second steel pipes are embedded in the precast concrete column, so The first steel pipe and the second steel pipe are arranged correspondingly and communicate with each other, and a reset member is used to pass through a hole in one of the first steel pipe and one of the second steel pipe and the two ends thereof are respectively connected with the precast concrete column. fixedly connected to the precast concrete beam.

优选的,所述复位件为预应力筋和锚具,所述预应力筋穿过所述第一钢管和所述第二钢管内的孔道后的两端分别与所述预制混凝土柱和所述预制混凝土梁通过锚具固定连接,所述第一钢管内的所述预应力筋与所述第一钢管之间填充有无粘结微膨胀材料,所述第二钢管内的所述预应力筋与所述第二钢管之间填充有无粘结微膨胀材料。Preferably, the restoring components are prestressed tendons and anchors, and the two ends of the prestressed tendons after passing through the channels in the first steel pipe and the second steel pipe are respectively connected with the precast concrete column and the The precast concrete beams are fixedly connected through anchors. The prestressed tendons in the first steel pipe are filled with unbonded micro-expansion material. The prestressed tendons in the second steel pipe are The space between the second steel pipe and the second steel pipe is filled with unbonded micro-expansion material.

优选的,所述预制混凝土梁包括第一梁体和第二梁体,所述第一梁体的截面尺寸大于所述第二梁体的截面尺寸,且所述第一梁体的中心线与所述第二梁体的中心线重合,所述第一梁体上高于和低于所述第二梁体的部分为耗能件连接部,所述耗能件连接部设置有多个第三钢管,所述预制混凝土柱预埋有多个第四钢管,所述第四钢管与所述第三钢管对应设置并连通,一个所述耗能件穿过一个所述第四钢管和一个所述第三钢管后的两端分别与所述耗能件连接部和所述预制混凝土柱固定。Preferably, the precast concrete beam includes a first beam body and a second beam body, the cross-sectional size of the first beam body is larger than the cross-sectional size of the second beam body, and the center line of the first beam body is between The center lines of the second beam bodies coincide with each other, and the parts of the first beam body that are higher and lower than the second beam body are energy-consuming part connecting parts, and the energy-consuming part connecting parts are provided with a plurality of third Three steel pipes, the prefabricated concrete column is embedded with a plurality of fourth steel pipes, the fourth steel pipes are arranged correspondingly and connected with the third steel pipes, and one of the energy-consuming parts passes through one of the fourth steel pipes and one of the four steel pipes. The two rear ends of the third steel pipe are respectively fixed to the energy-consuming component connection part and the precast concrete column.

优选的,所述耗能件包括耗能螺栓和多个第一固定螺母,所述耗能螺栓穿过一个所述第四钢管和一个所述第三钢管后的两端分别与所述第一固定螺母螺纹固定连接。Preferably, the energy-consuming part includes energy-consuming bolts and a plurality of first fixing nuts, and the two ends of the energy-consuming bolts passing through one of the fourth steel pipes and one of the third steel pipes are respectively connected with the first Fixed nut threaded connection.

优选的,还包括柱预埋钢板和梁预埋钢板,所述柱预埋钢板固定设置于所述预制混凝土柱远离所述预制混凝土梁的一侧,所述梁预埋钢板固定设置于所述预制混凝土梁靠近所述预制混凝土柱的一侧,所述柱预埋钢板和所述梁预埋钢板上均设置有用于所述定位螺栓、所述耗能件和所述复位件穿过的通孔。Preferably, it also includes a column embedded steel plate and a beam embedded steel plate. The column embedded steel plate is fixedly arranged on the side of the precast concrete column away from the precast concrete beam. The beam embedded steel plate is fixedly arranged on the side of the precast concrete column. On the side of the precast concrete beam close to the precast concrete column, the column embedded steel plate and the beam embedded steel plate are both provided with passages for the positioning bolts, the energy consumption parts and the reset parts to pass through. hole.

优选的,还包括多个侧围框壳和多个第二固定螺母,各所述侧围框壳与所述梁预埋钢板远离所述预制混凝土柱一侧的中部固定连接,所述预制混凝土梁上设置有放置所述侧围框壳的凹槽,所述侧围框壳设置有操作开口,且所述定位螺栓穿过所述梁预埋钢板伸入所述侧围框壳内部后与所述第二固定螺母螺纹连接固定。Preferably, it also includes a plurality of side frame shells and a plurality of second fixing nuts. Each side frame shell is fixedly connected to the middle part of the beam embedded steel plate on the side away from the precast concrete column. The beam is provided with a groove for placing the side frame shell, the side frame shell is provided with an operating opening, and the positioning bolt passes through the beam's embedded steel plate and extends into the side frame shell with the The second fixing nut is threaded and fixed.

本实用新型相对于现有技术取得了以下技术效果:Compared with the existing technology, the utility model achieves the following technical effects:

本实用新型提供一种装配式螺栓连接自复位梁柱节点结构,通过设置耗能件使得地震作用下塑性行为集中在耗能件,并且耗能件能够拆卸更换,提高了震后修复能力,修复方便高效;通过控制损伤顺序满足多地震水准下的抗震韧性要求,另外通过设置复位件,通过设置复位件实现自动复位,减少地震下结构的残余位移,提高梁柱节点的自复位能力同时复位件相对于预制混凝土梁和柱可以产生相对滑移,具有良好的耗能能力;所有构件可以在工厂预制,在现场只需拼装和预应力张拉,减少人工成本和环境污染,符合装配式建筑绿色环保、高效节能的发展理念。The utility model provides an assembled bolt-connected self-returning beam-column node structure. By arranging energy-consuming parts, the plastic behavior under earthquake action is concentrated on the energy-consuming parts, and the energy-consuming parts can be disassembled and replaced, thereby improving the post-earthquake repair ability and repairing Convenient and efficient; it meets the seismic toughness requirements under multiple earthquake levels by controlling the damage sequence. In addition, automatic reset is achieved by setting reset parts to reduce the residual displacement of the structure under earthquakes and improve the self-reset capability of beam-column joints while simultaneously resetting the parts. Compared with prefabricated concrete beams and columns, it can produce relative slippage and has good energy consumption capacity; all components can be prefabricated in the factory, and only need to be assembled and prestressed on site, reducing labor costs and environmental pollution, and is in line with the green and environmental protection of prefabricated buildings. The development concept of high efficiency and energy saving.

附图说明Description of the drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to explain the embodiments of the present invention or the technical solutions in the prior art more clearly, the drawings required in the embodiments will be briefly introduced below. Obviously, the drawings in the following description are only for the present invention. For some embodiments, those of ordinary skill in the art can also obtain other drawings based on these drawings without exerting creative efforts.

图1为本实用新型提供的装配式螺栓连接自复位梁柱节点结构的结构示意图。Figure 1 is a schematic structural diagram of the assembled bolt-connected self-returning beam-column node structure provided by the present utility model.

图2为本实用新型提供的装配式螺栓连接自复位梁柱节点结构的正视图。Figure 2 is a front view of the assembled bolt-connected self-returning beam-column joint structure provided by the present utility model.

图3为本实用新型提供的装配式螺栓连接自复位梁柱节点结构中的预制混凝土梁的结构示意图。Figure 3 is a schematic structural diagram of a prefabricated concrete beam in a self-returning beam-column joint structure provided by an assembled bolt connection provided by the present utility model.

图4为本实用新型提供的装配式螺栓连接自复位梁柱节点结构中的预制混凝土柱的示意图。Figure 4 is a schematic diagram of a prefabricated concrete column in a self-returning beam-column node structure provided by the utility model.

图5为预制混凝土梁的梁预埋钢板和侧围框壳的结构示意图。Figure 5 is a schematic structural diagram of the beam embedded steel plate and side frame shell of the precast concrete beam.

图中:1、预制混凝土梁;2、预制混凝土柱;3、锚具;4、第二固定螺母;5、第三钢管;6、耗能螺栓;7、第一钢管;8、预应力筋;9、柱预埋钢板;10、侧围框壳;11、梁预埋钢板;12、定位螺栓;13、第二钢管;14、第四钢管;15、第一固定螺母。In the picture: 1. Precast concrete beam; 2. Precast concrete column; 3. Anchor; 4. Second fixing nut; 5. Third steel pipe; 6. Energy-consuming bolt; 7. First steel pipe; 8. Prestressed tendon ; 9. Column embedded steel plate; 10. Side frame shell; 11. Beam embedded steel plate; 12. Positioning bolt; 13. Second steel pipe; 14. Fourth steel pipe; 15. First fixing nut.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present utility model.

本实用新型的目的是提供一种装配式螺栓连接自复位梁柱节点结构,以解决上述现有技术存在的问题,有效增强节点结构的耗能能力,降低结构在地震作用下的损伤和破坏,且能够自动复位。The purpose of this utility model is to provide an assembled bolted self-returning beam-column node structure to solve the problems existing in the above-mentioned existing technologies, effectively enhance the energy dissipation capacity of the node structure, and reduce the damage and destruction of the structure under earthquake action. And can automatically reset.

为使本实用新型的上述目的、特征和优点能够更加明显易懂,下面结合附图和具体实施方式对本实用新型作进一步详细的说明。In order to make the above-mentioned purposes, features and advantages of the present utility model more obvious and easy to understand, the utility model will be further described in detail below in conjunction with the accompanying drawings and specific implementation modes.

实施例一Embodiment 1

本实施例提供一种装配式螺栓连接自复位梁柱节点结构,如图1~5所示,包括:预制混凝土梁1、预制混凝土柱2、多个定位螺栓12、多个耗能件和多个复位件,定位螺栓12的一端贯穿预制混凝土柱2并与预制混凝土柱2能够拆卸地固定连接,另一端与预制混凝土梁1的中部能够拆卸地固定连接;耗能件的一端贯穿预制混凝土柱2并与预制混凝土柱2能够拆卸地固定连接,另一端与预制混凝土梁1能够拆卸地固定连接,预制混凝土梁1的顶部和底部均布置至少一个耗能件;复位件贯穿预制混凝土梁1与预制混凝土柱2,且复位件的一端与预制混凝土梁1远离预制混凝土柱2的一端固定连接,另一端与预制混凝土柱2远离预制混凝土梁1的一侧固定连接,通过设置耗能件并且耗能件为低屈服强度的构件,能够使得在地震作用下塑性行为集中在耗能件,并且耗能件能够拆卸更换,提高了震后修复能力,修复方便高效;通过控制损伤顺序满足多地震水准下的抗震韧性要求,另外通过设置复位件,通过设置复位件实现自动复位,减少地震下结构的残余位移,提高梁柱节点的自复位能力同时复位件相对于预制混凝土梁和柱可以产生相对滑移,具有良好的耗能能力;所有构件可以在工厂预制,在现场只需拼装和预应力张拉,减少人工成本和环境污染,符合装配式建筑绿色环保、高效节能的发展理念。This embodiment provides an assembled bolt-connected self-returning beam-column node structure, as shown in Figures 1 to 5, including: a precast concrete beam 1, a precast concrete column 2, a plurality of positioning bolts 12, a plurality of energy-consuming parts and a plurality of One end of the positioning bolt 12 penetrates the precast concrete column 2 and is detachably fixedly connected to the precast concrete column 2, and the other end is detachably fixedly connected to the middle part of the precast concrete beam 1; one end of the energy-consuming part penetrates the precast concrete column 2 and is removably and fixedly connected to the precast concrete column 2, and the other end is removably and fixedly connected to the precast concrete beam 1. At least one energy-consuming component is arranged on the top and bottom of the precast concrete beam 1; the reset component penetrates the precast concrete beam 1 and Precast concrete column 2, and one end of the reset piece is fixedly connected to the end of the precast concrete beam 1 away from the precast concrete column 2, and the other end is fixedly connected to the side of the precast concrete column 2 away from the precast concrete beam 1. By setting the energy-consuming parts and consuming The energy-consuming parts are components with low yield strength, which can make the plastic behavior concentrated in the energy-consuming parts under earthquake action, and the energy-consuming parts can be disassembled and replaced, which improves the post-earthquake repair ability, making the repair convenient and efficient; it can meet multiple earthquake levels by controlling the damage sequence. Under the seismic toughness requirements, in addition, by setting the reset parts, automatic reset can be achieved by setting the reset parts, reducing the residual displacement of the structure under earthquakes, improving the self-reset ability of the beam-column joints, and at the same time, the reset parts can produce relative slip relative to the precast concrete beams and columns. It has good energy consumption capacity; all components can be prefabricated in the factory, and only need to be assembled and prestressed on site, reducing labor costs and environmental pollution, and conforming to the development concept of green, environmentally friendly, efficient and energy-saving prefabricated buildings.

在一个优选的实施例中,预制混凝土梁1内设置有多个第一钢管7,第一钢管7用于替换预制混凝土梁1内的纵向钢筋,减少了预制混凝土梁1的钢筋用量,预制混凝土柱2的与第一钢管7对应的位置设置有多个第二钢管13并与第一钢管7连通,一个复位件用于穿过一个第一钢管7和一个第二钢管13内的孔道后两端分别与预制混凝土柱2和预制混凝土梁1固定连接,节省钢筋用量的同时降低了预制混凝土梁的自重。无粘结预应力筋8承担原本受力纵筋的受力功能,薄壁钢管孔道承担原本受力纵筋的构造功能。在不降低结构原有性能的情况下为节点提供了自复位功能。In a preferred embodiment, a plurality of first steel pipes 7 are provided in the precast concrete beam 1. The first steel pipes 7 are used to replace the longitudinal steel bars in the precast concrete beam 1, thereby reducing the amount of steel bars used in the precast concrete beam 1. Precast concrete A plurality of second steel pipes 13 are provided in the position of the column 2 corresponding to the first steel pipe 7 and are connected with the first steel pipe 7. A reset member is used to pass through the last two holes in the first steel pipe 7 and the second steel pipe 13. The ends are fixedly connected to the precast concrete column 2 and the precast concrete beam 1 respectively, which saves the amount of steel bars and reduces the weight of the precast concrete beam. The unbonded prestressed bars 8 assume the stress-bearing function of the original stress-bearing longitudinal bars, and the thin-walled steel pipe channels bear the structural function of the original stress-bearing longitudinal bars. The self-resetting function is provided for the nodes without reducing the original performance of the structure.

在一个优选的实施例中,复位件为预应力筋8和锚具3,预应力筋8穿过第一钢管7和第二钢管13内的孔道后的两端分别与预制混凝土柱2和预制混凝土梁1通过锚具3固定连接,第一钢管7和第二钢管13内填充有无粘结微膨胀材料,保证预应力筋8在预留孔道内可自由滑动,预应力筋8的数量及张拉控制应力根据计算确定,应保证预应力筋8在对应设防烈度的罕遇地震下保持弹性,预应力筋8为无粘结预应力筋8,且无粘结预应力筋8为外包防腐润滑脂和聚乙烯护套的无粘结高强低松弛钢绞线。In a preferred embodiment, the restoring components are prestressed tendons 8 and anchors 3. After the prestressed tendons 8 pass through the holes in the first steel pipe 7 and the second steel pipe 13, the two ends are respectively connected with the precast concrete columns 2 and the precast concrete columns 2. The concrete beam 1 is fixedly connected through the anchor 3. The first steel pipe 7 and the second steel pipe 13 are filled with unbonded micro-expansion material to ensure that the prestressed tendons 8 can slide freely in the reserved channels. The number of the prestressed tendons 8 and The tensile control stress is determined based on calculations to ensure that the prestressed tendons 8 remain elastic under rare earthquakes with corresponding fortification intensity. The prestressed tendons 8 are unbonded prestressed tendons 8 , and the unbonded prestressed tendons 8 are wrapped for anti-corrosion. Grease and polyethylene sheathed non-bonded high strength low relaxation steel strand.

在一个优选的实施例中,预制混凝土梁1包括第一梁体和第二梁体,第一梁体的截面尺寸大于第二梁体的截面尺寸,且第一梁体的中心线与第二梁体的中心线重合,第一梁体上高于和低于第二梁体的部分为耗能件连接部,耗能件连接部配置有适当的构造钢筋,耗能件连接部设置有多个第三钢管5,预制混凝土柱2上与第三钢管5的对应位置设置有第四钢管14,且第四钢管14与第三钢管5连通,一个耗能件穿过一个第四钢管14和一个第三钢管5后的两端分别与耗能件连接部和预制混凝土柱2固定,预制混凝土梁在连接处扩大了截面,所以连接节点不会先于预制混凝土整体构件发生破坏,符合“强节点,弱构件”的理念。In a preferred embodiment, the precast concrete beam 1 includes a first beam body and a second beam body. The cross-sectional size of the first beam body is larger than the cross-sectional size of the second beam body, and the center line of the first beam body is in line with the second beam body. The center lines of the beam bodies coincide. The parts of the first beam body that are higher and lower than the second beam body are the energy-consuming part connecting parts. The energy-consuming part connecting parts are equipped with appropriate structural steel bars. The energy-consuming part connecting parts are provided with multiple A third steel pipe 5 is provided on the precast concrete column 2 at a position corresponding to the third steel pipe 5, and the fourth steel pipe 14 is connected to the third steel pipe 5. An energy dissipating component passes through a fourth steel pipe 14 and The two ends of a third steel pipe 5 are respectively fixed to the energy-consuming part connection part and the precast concrete column 2. The precast concrete beam has an enlarged cross-section at the connection, so the connection node will not be damaged before the precast concrete integral member, which is in line with the "strong" Node, weak component" concept.

在一个优选的实施例中,耗能件包括耗能螺栓6和多个第一固定螺母15,耗能螺栓6穿过一个第四钢管14和一个第三钢管5后的两端分别第一固定螺母15螺纹固定连接,耗能螺栓6为低屈服强度的材料,耗能螺栓6最先发生屈服变形消耗能量,第三钢管5和第四钢管14的内径比耗能螺栓6外径大2-3mm,并在第三钢管5和第四钢管14内填充无粘结微膨胀材料,保证钢筋在孔道内可自由滑动和较为容易地安装或拆卸。In a preferred embodiment, the energy-consuming parts include energy-consuming bolts 6 and a plurality of first fixing nuts 15. After the energy-consuming bolts 6 pass through a fourth steel pipe 14 and a third steel pipe 5, the two ends are respectively first fixed. The nut 15 is threaded for fixed connection. The energy-consuming bolt 6 is a material with low yield strength. The energy-consuming bolt 6 is the first to undergo yield deformation and consume energy. The inner diameter of the third steel pipe 5 and the fourth steel pipe 14 is larger than the outer diameter of the energy-consuming bolt 6 by 2- 3mm, and fill the third steel pipe 5 and the fourth steel pipe 14 with unbonded micro-expansion material to ensure that the steel bars can slide freely in the tunnel and be installed or disassembled relatively easily.

在一个优选的实施例中,装配式螺栓连接自复位梁柱节点结构还包括柱预埋钢板9和梁预埋钢板11,柱预埋钢板9固定设置于预制混凝土柱2远离预制混凝土梁1的一侧,梁预埋钢板11固定设置于预制混凝土梁1靠近预制混凝土柱2的一侧,柱预埋钢板9和梁预埋钢板11上均设置有用于定位螺栓12、耗能件和复位件穿过的通孔,柱预埋钢板9能够提高钢筋混凝土预制住的承载能力。In a preferred embodiment, the assembled bolt-connected self-returning beam-column joint structure also includes column embedded steel plates 9 and beam embedded steel plates 11. The column embedded steel plates 9 are fixedly disposed on the precast concrete columns 2 away from the precast concrete beams 1. On one side, the beam embedded steel plate 11 is fixedly arranged on the side of the precast concrete beam 1 close to the precast concrete column 2. The column embedded steel plate 9 and the beam embedded steel plate 11 are provided with positioning bolts 12, energy dissipating parts and reset parts. Through the through holes, the column embedded steel plate 9 can improve the load-bearing capacity of the reinforced concrete precast.

在一个优选的实施例中,装配式螺栓连接自复位梁柱节点结构还包括多个侧围框壳10和多个第二固定螺母4,各侧围框壳10与梁预埋钢板11远离预制混凝土柱2一侧的中部固定连接,且定位螺栓12穿过梁预埋钢板11伸入侧围框壳10内部后与第二固定螺母4螺纹连接固定,预制混凝土梁上设置有放置侧围框壳的凹槽,侧围框壳设置有操作开口,操作人员操作工具伸入操作开口对定位螺栓进行固定或者拆卸,侧围框壳10为定位螺栓12安装留出工作空间,定位螺栓12能够保证节点定位准确的同时提供抗剪承载力。In a preferred embodiment, the assembled bolt-connected self-returning beam-column joint structure also includes a plurality of side frame shells 10 and a plurality of second fixing nuts 4. Each side frame shell 10 and the beam embedded steel plate 11 are far away from the prefabricated steel plate 11. The middle part of one side of the concrete column 2 is fixedly connected, and the positioning bolt 12 passes through the beam's embedded steel plate 11 and extends into the side frame shell 10 and then is threaded and fixed with the second fixing nut 4. The precast concrete beam is provided with a side frame The groove of the shell, the side frame shell is provided with an operating opening, and the operator extends the operating tool into the operating opening to fix or remove the positioning bolt. The side frame shell 10 leaves a working space for the installation of the positioning bolt 12, and the positioning bolt 12 can ensure The nodes are positioned accurately while providing shear bearing capacity.

实施例二Embodiment 2

本实施例还提供一种如实施例一所述的装配式螺栓连接自复位梁柱节点结构的施工方法,包括以下步骤:This embodiment also provides a construction method for a self-returning beam-column node structure connected by prefabricated bolts as described in Embodiment 1, which includes the following steps:

加工制作预制混凝土梁1;Processing and fabrication of precast concrete beams 1;

加工制作预制混凝土柱2;Processing and fabrication of precast concrete columns 2;

安装定位螺栓12将预制混凝土梁1与预制混凝土柱2连接固定,为保证上述吊装精度和稳定性,宜采用必要的临时支撑;Install positioning bolts 12 to connect and fix the precast concrete beam 1 and the precast concrete column 2. In order to ensure the accuracy and stability of the above hoisting, necessary temporary supports should be used;

安装复位件,将复位件贯穿预制混凝土梁1与预制混凝土柱2后的两端分别与预制混凝土梁1与预制混凝土柱2固定;Install the reset piece, and fix the two ends of the reset piece through the precast concrete beam 1 and the precast concrete column 2 with the precast concrete beam 1 and the precast concrete column 2 respectively;

安装耗能件,将耗能件的一端贯穿预制混凝土柱2并与预制混凝土柱2能够拆卸地固定连接,另一端与预制混凝土梁1能够拆卸地固定连接。Install the energy-consuming part, one end of the energy-consuming part penetrates the precast concrete column 2 and is detachably fixedly connected to the precast concrete column 2, and the other end is detachably fixedly connected to the precast concrete beam 1.

发生大震后,拆卸可更换耗能螺栓6,安装新的可更换耗能螺栓6,使结构的抗震性能得到恢复。After a major earthquake occurs, the replaceable energy-consuming bolts 6 are removed and new replaceable energy-consuming bolts 6 are installed to restore the seismic performance of the structure.

本实用新型中应用了具体个例对本实用新型的原理及实施方式进行了阐述,以上实施例的说明只是用于帮助理解本实用新型的方法及其核心思想;同时,对于本领域的一般技术人员,依据本实用新型的思想,在具体实施方式及应用范围上均会有改变之处。综上所述,本说明书内容不应理解为对本实用新型的限制。Specific examples are used in the present utility model to illustrate the principles and implementation modes of the present utility model. The description of the above embodiments is only used to help understand the method and the core idea of the present utility model; at the same time, for those of ordinary skill in the art , according to the idea of the present utility model, there will be changes in the specific implementation and application scope. In summary, the contents of this specification should not be construed as limitations of the present invention.

Claims (7)

1. The utility model provides an assembled bolted connection is from beam column node structure that resets which characterized in that: comprising the following steps:
the concrete beam is prefabricated and the concrete beam is arranged in the prefabricated concrete beam,
the concrete column is prefabricated,
one end of each positioning bolt penetrates through the precast concrete column and is detachably and fixedly connected with the precast concrete column, and the other end of each positioning bolt is detachably and fixedly connected with the middle part of the precast concrete beam;
the energy dissipation components penetrate through the precast concrete columns at one end and are detachably and fixedly connected with the precast concrete columns, the precast concrete beams can be detachably and fixedly connected at the other end, and at least one energy dissipation component is arranged at the top and the bottom of each precast concrete beam; and
the restoring pieces penetrate through the precast concrete beam and the precast concrete column, one end of each restoring piece is fixedly connected with one end of the precast concrete beam, which is far away from the precast concrete column, and the other end of each restoring piece is fixedly connected with one side of the precast concrete column, which is far away from the precast concrete beam.
2. The fabricated bolted self-resetting beam-column node structure of claim 1, wherein: the precast concrete beam is pre-buried to have a plurality of first steel pipes, precast concrete post pre-buried has a plurality of second steel pipes, first steel pipe with the second steel pipe corresponds the setting and communicates, one reset piece is used for passing one behind the pore in first steel pipe and the second steel pipe both ends respectively with precast concrete post with precast concrete beam fixed connection.
3. The fabricated bolted self-resetting beam-column node structure of claim 2, wherein: the reset piece is a prestressed rib and an anchorage device, two ends of the prestressed rib after penetrating through the pore canal in the first steel pipe and the second steel pipe are respectively fixedly connected with the precast concrete column and the precast concrete beam through the anchorage device, an unbonded micro-expansion material is filled between the prestressed rib in the first steel pipe and the first steel pipe, and an unbonded micro-expansion material is filled between the prestressed rib in the second steel pipe and the second steel pipe.
4. The fabricated bolted self-resetting beam-column node structure of claim 1, wherein: the precast concrete roof beam includes first roof beam body and second roof beam body, the cross-sectional dimension of first roof beam body is greater than the cross-sectional dimension of second roof beam body, just the central line of first roof beam body with the central line coincidence of second roof beam body, be higher than on the first roof beam body with be less than the part of second roof beam body is power consumption spare connecting portion, power consumption spare connecting portion are provided with a plurality of third steel pipes, precast concrete post pre-buried has a plurality of fourth steel pipes, the fourth steel pipe with the third steel pipe corresponds the setting and communicates, one power consumption spare pass one fourth steel pipe and one both ends behind the third steel pipe respectively with power consumption spare connecting portion with precast concrete post is fixed.
5. The fabricated bolted self-righting beam column node structure of claim 4, wherein: the energy consumption piece comprises an energy consumption bolt and a plurality of first fixing nuts, and two ends of the energy consumption bolt, which penetrate through one fourth steel pipe and one third steel pipe, are respectively and fixedly connected with the first fixing nuts through threads.
6. The fabricated bolted self-resetting beam-column node structure of claim 1, wherein: still include post pre-buried steel sheet and pre-buried steel sheet of roof beam, post pre-buried steel sheet fixed set up in precast concrete column keeps away from one side of precast concrete roof beam, the pre-buried steel sheet of roof beam fixed set up in precast concrete roof beam is close to one side of precast concrete column, post pre-buried steel sheet with all be provided with on the pre-buried steel sheet of roof beam be used for positioning bolt the power consumption piece with the through-hole that the piece passed resets.
7. The fabricated bolted self-righting beam column node structure of claim 6, wherein: the side wall frame comprises a precast concrete column and is characterized by further comprising a plurality of side wall frame shells and a plurality of second fixing nuts, wherein each side wall frame shell is fixedly connected with the middle part of one side of the precast concrete column away from the beam embedded steel plate, a groove for placing the side wall frame shells is formed in the precast concrete beam, the side wall frame shells are provided with operation openings, and the positioning bolts penetrate through the beam embedded steel plate and extend into the side wall frame shells to be fixedly connected with the second fixing nuts through threads.
CN202320705516.0U 2023-04-03 2023-04-03 Prefabricated bolted self-returning beam-column node structure Active CN219732279U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320705516.0U CN219732279U (en) 2023-04-03 2023-04-03 Prefabricated bolted self-returning beam-column node structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320705516.0U CN219732279U (en) 2023-04-03 2023-04-03 Prefabricated bolted self-returning beam-column node structure

Publications (1)

Publication Number Publication Date
CN219732279U true CN219732279U (en) 2023-09-22

Family

ID=88060884

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320705516.0U Active CN219732279U (en) 2023-04-03 2023-04-03 Prefabricated bolted self-returning beam-column node structure

Country Status (1)

Country Link
CN (1) CN219732279U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116145810A (en) * 2023-04-03 2023-05-23 华侨大学 Structure and construction method of self-resetting beam-column joints connected by prefabricated bolts

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116145810A (en) * 2023-04-03 2023-05-23 华侨大学 Structure and construction method of self-resetting beam-column joints connected by prefabricated bolts
CN116145810B (en) * 2023-04-03 2025-12-23 华侨大学 Prefabricated bolted self-resetting beam-column joint structure and construction method

Similar Documents

Publication Publication Date Title
CN108755975B (en) A replaceable self-resetting assembled connection node and construction method
CN203213282U (en) Fabricated reinforced concrete frame structure system
CN206941858U (en) Band is encorbelmented the structure of attached prestressing force assembled power consumption frame strengthening outside plate framework
CN111749364B (en) A C-steel-based assembled composite wall and construction method thereof
CN108360745B (en) Assembled double-energy-consumption recoverable square concrete filled steel tube combination column and installation method thereof
CN114108808B (en) A composite structure of PVC-FRP pipe concrete column and concrete composite beam with adjustable connection nodes and its installation method
CN207003644U (en) A kind of low layer assembled beam-column node
CN110158769A (en) Full assembled is bolted Self-resetting bean column node, installation method and self-resetting method
CN112627332A (en) Dry-type connection assembly type self-resetting reinforced concrete frame structure
CN110439104A (en) Low system of multi-floor steel structure residential building and its method of construction
CN111851737A (en) Prefabricated concrete frame beam-column dry connection joint
CN108468378B (en) A kind of prefabricated prefabricated joint of concrete structure
CN210887559U (en) Low multi-storey steel structure residential system
CN116145810B (en) Prefabricated bolted self-resetting beam-column joint structure and construction method
CN106759948A (en) A kind of prestressing force assembled high performance steel concrete beam and column node and its construction method
CN112962823A (en) Double-steel-plate shear wall with replaceable inclined struts and construction method thereof
CN115419166A (en) Support-free connecting joint for prefabricated beam column of assembled concrete frame structure and construction method
CN209066596U (en) A beam-column connection node of a prefabricated frame structure
CN207919737U (en) A kind of assembled steel-Combined concrete frame structure
CN101285329A (en) Suspension Concrete Integrated Floor Structure and Its Construction Method
CN212317149U (en) Prefabricated concrete frame beam-column dry connection node
CN219732280U (en) Assembled concrete self-resetting energy-consumption column foot node structure
CN108166629A (en) A kind of detachable assembling type steel core concrete column-connected mode and its construction method
CN111424847A (en) Self-resetting connecting node of steel tube bundle combined shear wall and steel beam
CN218757991U (en) Connecting structure of precast beam and precast column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant