CN219712553U - Multi-pipeline combined hanging bracket in double-T-plate factory building - Google Patents

Multi-pipeline combined hanging bracket in double-T-plate factory building Download PDF

Info

Publication number
CN219712553U
CN219712553U CN202321114580.8U CN202321114580U CN219712553U CN 219712553 U CN219712553 U CN 219712553U CN 202321114580 U CN202321114580 U CN 202321114580U CN 219712553 U CN219712553 U CN 219712553U
Authority
CN
China
Prior art keywords
hanging
plate
fixed
tube bundle
hanging shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321114580.8U
Other languages
Chinese (zh)
Inventor
崔素珍
张艳侠
江晓丹
刘铁艳
张琦
李俊祥
徐晓婷
周志华
黄开军
王振环
苏志强
薛汝霞
苏勇征
陈冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Guocai Engineering Co ltd
Original Assignee
Shandong Guocai Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Guocai Engineering Co ltd filed Critical Shandong Guocai Engineering Co ltd
Priority to CN202321114580.8U priority Critical patent/CN219712553U/en
Application granted granted Critical
Publication of CN219712553U publication Critical patent/CN219712553U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a multi-pipeline combined hanging bracket in a double-T-plate factory building, which comprises a fixed plate fixed on a factory building roof, wherein the fixed plate is provided with a plurality of hanging brackets along the left-right direction, each hanging bracket comprises a hanging shaft fixed at the bottom of the fixed plate, the hanging plate is rotatably arranged below the hanging shaft, a U-shaped bracket is fixed at the bottom of the hanging plate, a tube bundle is fixed in the middle of the bracket, mounting holes are formed in the hanging plates at two sides of the hanging shaft, a supporting plate fixed with the hanging shaft is arranged above the hanging plate, adjusting circular arc holes coaxial with the hanging shaft are formed in the supporting plates at two sides of the hanging plate, locking bolts are arranged in the adjusting circular arc holes, and the lower ends of the locking bolts penetrate through the mounting holes and are connected with locking nuts. According to the utility model, multiple pipelines can be hoisted, and the direction of each pipe bundle can be finely adjusted by adjusting the position of the locking bolt in the adjusting arc, so that the pipe bundles are more attached to the pipelines, the supporting effect is better, the pipe bundles are not easy to clamp, and the installation is convenient.

Description

Multi-pipeline combined hanging bracket in double-T-plate factory building
Technical Field
The utility model relates to a multi-pipeline combined hanging bracket in a double-T-plate factory building, and belongs to the technical field of pipeline hanging brackets.
Background
The double T-plate factory building is the factory building structure commonly used at present, and a plurality of pipelines are often needed to hoist at the top inboard of double T-plate factory building, realize through the gallows at present, and current gallows is fixed with the parallel tube bank of a plurality of axes on the hanger plate, can realize multitube line hoist and mount like this, but when the pipeline installation, hardly guarantees that a plurality of pipelines are all parallel completely, just so causes tube bank part and pipeline to laminate completely, and the supporting effect is not good, or blocks when installing, causes the installation unsmoothly.
Disclosure of Invention
The utility model provides a multi-pipeline combined hanging bracket in a double-T-plate factory building, which solves the problems that the prior device easily causes that a tube bundle part and a pipeline cannot be completely attached, the supporting effect is poor, or the installation is not smooth due to clamping during installation.
The utility model relates to a multi-pipeline combined hanging bracket in a double-T-plate factory building, which comprises a fixed plate fixed on a factory building roof, wherein the fixed plate is provided with a plurality of hanging brackets along the left-right direction, each hanging bracket comprises a hanging shaft fixed at the bottom of the fixed plate, the hanging plate is rotatably arranged below the hanging shaft, a U-shaped bracket is fixed at the bottom of the hanging plate, a tube bundle is fixed in the middle of the bracket, mounting holes are formed in the hanging plates at two sides of the hanging shaft, a supporting plate fixed with the hanging shaft is arranged above the hanging plate, adjusting circular arc holes coaxial with the hanging shaft are formed in the supporting plates at two sides of the hanging plate, locking bolts are arranged in the adjusting circular arc holes, and the lower ends of the locking bolts penetrate through the mounting holes and are connected with locking nuts.
Preferably, a semicircular mounting groove matched with the outer wall of the hanging shaft is formed in the middle of the inner side of the supporting plate, and the supporting plate is welded on the hanging shaft. The welding is firmer.
As one preferable mode, the tube bundle comprises an upper tube bundle and a lower tube bundle which are in a semicircular sleeve shape, connecting flanges are fixed on two sides of the upper tube bundle and two sides of the lower tube bundle, a through hole is formed in each connecting flange, a screw rod is arranged in each through hole, the lower end of each screw rod is fixed with the bracket, and locking nuts are arranged on the screw rods above and below the connecting flanges. The position can be conveniently adjusted, the height of the pipeline is adapted, and the tube bundle can be well compressed.
Preferably, a through hole for the hanging shaft to pass through is arranged in the middle of the hanging plate, a locking nut is arranged on the hanging shaft below the hanging plate, and a limiting ring is fixed on the hanging shaft above the hanging plate. The locking nut can be conveniently loosened, and the hanging plate can be conveniently adjusted to rotate.
Preferably, the inner holes of the upper tube bundle and the lower tube bundle are fixedly provided with anti-skid rubber layers. Better anti-skid property.
The utility model has the following beneficial effects:
can hoist and mount the multitube line to through adjusting the position of lock bolt in adjusting the circular arc, can finely tune the direction of every tube bank, make the tube bank laminate the pipeline more, the supporting effect is better, and difficult card is dead, easy to assemble.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
fig. 2 is a schematic structural view of a support plate;
in the figure: 1. factory building roof, 2, fixed plate, 3, backup pad, 4, lock bolt, 5, bracket, 6, hanging axle, 7, lead screw, 8, lower tube bank, 9, lock nut, 10, upper tube bank, 11, lock nut, 12, hanging plate, 13, lock nut, 14, spacing ring, 15, mounting groove, 16, regulation circular arc hole.
Detailed Description
The utility model is further illustrated below with reference to examples.
In the embodiment 1, as shown in fig. 1 and 2, the utility model is a multi-pipeline combined hanger in a double-T-plate factory building, which comprises a fixed plate 2 fixed on a factory building roof 1, wherein the fixed plate 2 is fixed on the factory building roof 2 through bolts, a plurality of hanging racks are arranged on the fixed plate 2 along the left-right direction, each hanging rack comprises a hanging shaft 6 fixed at the bottom of the fixed plate 2, a hanging plate 12 is rotatably arranged below the hanging shaft 6, a U-shaped bracket 5 is fixed at the bottom of the hanging plate 12, a tube bundle is fixed in the middle of the bracket 5, mounting holes are arranged on the hanging plates 12 at two sides of the hanging shaft 6, supporting plates 3 fixed with the hanging shaft 6 are arranged above the hanging plates 12, adjusting arc holes 16 coaxial with the hanging shaft 6 are arranged on the supporting plates 3 at two sides, locking bolts 4 are arranged in the adjusting arc holes 16, and locking nuts 11 are connected at the lower ends of the locking bolts 4 through the mounting holes.
A semicircular mounting groove 15 matched with the outer wall of the hanging shaft 6 is formed in the middle of the inner side of the supporting plate 3, and the supporting plate 3 is welded on the hanging shaft 6.
The tube bank includes semicircle sleeve-shaped's last tube bank 10 and lower tube bank 8, and the both sides of going up tube bank 10 and lower tube bank 8 all are fixed with the connection turn-ups, are equipped with the perforation on the connection turn-ups, are equipped with lead screw 7 in the perforation, and the lower extreme and the bracket 5 of lead screw 7 are fixed, all are equipped with lock nut 9 on the lead screw 7 of connection turn-ups.
When in operation, the device comprises: the upper and lower locking nuts 9 are respectively screwed up and down, the upper tube bundle 10 and the lower tube bundle 8 are released, the locking nuts 9 are loosened, then the tube bundles are sleeved on the pipeline, the fixing plate 2 is fixed on the factory building roof 1 through bolts, the positions of the upper and lower locking nuts 9 are adjusted, the hanging plate 12 is rotated, the upper tube bundle 10 and the lower tube bundle 8 are better attached to the top and the bottom of the pipeline, and then the locking nuts 11 and the locking nuts 9 are screwed, so that locking and fixing are completed.
In embodiment 2, on the basis of embodiment 1, a through hole for the hanging shaft 6 to pass through is provided in the middle of the hanging plate 12, a locking nut 13 is provided on the hanging shaft 6 below the hanging plate 12, and a limiting ring 14 is fixed on the hanging shaft 6 above the hanging plate 12.
When the hanger plate 12 is adjusted to rotate, the locking nut 13 is firstly loosened, then the hanger plate 12 is rotated around the hanger shaft 6, and the locking nut 13 is screwed down to fix after the adjustment.
And anti-slip rubber layers are fixed in the inner holes of the upper tube bundle 10 and the lower tube bundle 8.
In summary, the multi-pipeline lifting device can lift multiple pipelines, and the direction of each pipe bundle can be finely adjusted by adjusting the position of the locking bolt in the adjusting circular arc, so that the pipe bundles are more attached to the pipelines, the supporting effect is better, the locking is difficult, and the installation is convenient.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.
In the description of the present utility model, the terms "inner", "outer", "longitudinal", "transverse", "upper", "lower", "top", "bottom", etc. refer to the orientation or positional relationship based on that shown in the drawings, only for convenience in describing the present utility model, and do not require that the present utility model must be constructed and operated in a specific orientation, and thus should not be construed as limiting the present utility model.

Claims (5)

1. The utility model provides a multitube line combination gallows in two T board factory building, includes fixed plate (2) of fixing on factory building roof (1), and fixed plate (2) are equipped with a plurality of tubing hanger, its characterized in that along controlling the direction: each tubing hanger comprises a hanging shaft (6) fixed at the bottom of a fixed plate (2), a hanging plate (12) is rotatably installed below the hanging shaft (6), a U-shaped bracket (5) is fixed at the bottom of the hanging plate (12), a tube bundle is fixed in the middle of the bracket (5), mounting holes are formed in the hanging plates (12) on two sides of the hanging shaft (6), supporting plates (3) fixed with the hanging shaft (6) are arranged above the hanging plates (12), adjusting arc holes (16) coaxial with the hanging shaft (6) are formed in the supporting plates (3) on two sides, locking bolts (4) are arranged in the adjusting arc holes (16), and locking nuts (11) are connected at the lower ends of the locking bolts (4) through the mounting holes.
2. The multi-pipeline composite hanger in a double-T-plate building of claim 1, wherein: a semicircular mounting groove (15) matched with the outer wall of the hanging shaft (6) is arranged in the middle of the inner side of the supporting plate (3), and the supporting plate (3) is welded on the hanging shaft (6).
3. A multi-pipeline composite hanger in a double-T-plate building according to claim 1 or 2, wherein: the tube bundle comprises an upper tube bundle (10) and a lower tube bundle (8) which are in a semicircular sleeve shape, connecting flanges are respectively fixed on two sides of the upper tube bundle (10) and the lower tube bundle (8), a through hole is formed in each connecting flange, a screw rod (7) is arranged in each through hole, the lower end of each screw rod (7) is fixed with a bracket (5), and locking nuts (9) are respectively arranged on the screw rods (7) on the upper side and the lower side of the connecting flange.
4. A multi-pipeline composite hanger in a double-T-plate building as claimed in claim 3, wherein: the middle of the hanging plate (12) is provided with a through hole for the hanging shaft (6) to pass through, the hanging shaft (6) below the hanging plate (12) is provided with a locking nut (13), and the hanging shaft (6) above the hanging plate (12) is fixed with a limiting ring (14).
5. A multi-pipeline composite hanger in a double-T-plate building as claimed in claim 3, wherein: and anti-skid rubber layers are fixed in the inner holes of the upper tube bundle (10) and the lower tube bundle (8).
CN202321114580.8U 2023-05-10 2023-05-10 Multi-pipeline combined hanging bracket in double-T-plate factory building Active CN219712553U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321114580.8U CN219712553U (en) 2023-05-10 2023-05-10 Multi-pipeline combined hanging bracket in double-T-plate factory building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321114580.8U CN219712553U (en) 2023-05-10 2023-05-10 Multi-pipeline combined hanging bracket in double-T-plate factory building

Publications (1)

Publication Number Publication Date
CN219712553U true CN219712553U (en) 2023-09-19

Family

ID=87998663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321114580.8U Active CN219712553U (en) 2023-05-10 2023-05-10 Multi-pipeline combined hanging bracket in double-T-plate factory building

Country Status (1)

Country Link
CN (1) CN219712553U (en)

Similar Documents

Publication Publication Date Title
CN104271489B (en) clamp and trolley system
CN105398990B (en) Electric power angle steel tower auxiliary lifting apparatus
CN219712553U (en) Multi-pipeline combined hanging bracket in double-T-plate factory building
CN110492384A (en) A kind of disengaging extra-high voltage strain rod tower insulator chain supplementary insulation bar
CN206155822U (en) Frame supports large capacity helium gas bottle support of formula
CN214756153U (en) A photovoltaic bracket that is easy to fold and assemble
CN212078774U (en) load bearing tripod
CN216235671U (en) A safety rail clamp for gantry crane
CN214364428U (en) Improved generation steel construction cable tube combination post for construction
CN217166229U (en) Steel construction multi-angle equipment of bending
CN215168203U (en) Temporary reinforcing device for hoisting steel truss
CN214081146U (en) Fastening device of high-altitude nut
CN211088474U (en) Mounting bracket for antenna
CN222275913U (en) A screw hanger connecting square steel member
CN214031363U (en) High-rise building engineering tube well riser hoist device
CN212398589U (en) Chain type self-locking device
CN211850737U (en) Scaffold suitable for multilayer assembled shear force wall
CN107700824A (en) Bar type wall-attached frame
CN214456540U (en) Station valve overhauls and uses car
CN201661848U (en) Adjustable fixed hinge
CN220816805U (en) Fire control pipeline fixed bolster with adjustable
CN218510413U (en) A tuber pipe side direction antidetonation gallows
CN221219609U (en) Hanging basket heightening bracket for high-altitude operation
CN217201619U (en) Transfer device for pressure vessel flange machining
CN222667127U (en) Combined steel pipe concrete column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant