CN219710352U - High side slope supporting construction - Google Patents

High side slope supporting construction Download PDF

Info

Publication number
CN219710352U
CN219710352U CN202321132610.8U CN202321132610U CN219710352U CN 219710352 U CN219710352 U CN 219710352U CN 202321132610 U CN202321132610 U CN 202321132610U CN 219710352 U CN219710352 U CN 219710352U
Authority
CN
China
Prior art keywords
plate
support plate
guide
adjusting screw
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202321132610.8U
Other languages
Chinese (zh)
Inventor
孙永宏
孙伟学
宋沛伦
吕朝龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Construction Investment Civil Engineering Construction Group Co ltd
Original Assignee
Gansu Construction Investment Civil Engineering Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Construction Investment Civil Engineering Construction Group Co ltd filed Critical Gansu Construction Investment Civil Engineering Construction Group Co ltd
Priority to CN202321132610.8U priority Critical patent/CN219710352U/en
Application granted granted Critical
Publication of CN219710352U publication Critical patent/CN219710352U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model discloses a high side slope supporting structure which comprises a mounting plate, a first supporting plate and a second supporting plate, wherein one end of the first supporting plate is fixedly provided with a rotating shaft, the rotating shaft is connected and mounted at one end of the mounting plate, first fixing plates are symmetrically welded on the top surface of the mounting plate, first adjusting screws are mounted between the first fixing plates, a first guide sliding groove is formed in the center of the top surface of the mounting plate, a first guide sliding block is mounted in the first guide sliding groove in an embedded mode, the top end of the first guide sliding block is fixedly connected with a moving plate, a first nut is fixedly mounted on the moving plate, the first adjusting screws are sleeved in the first nut in a threaded mode, and a plurality of first connecting seats are uniformly welded on the side wall of one side of the moving plate. The first adjusting screw and the second adjusting screw are arranged in the high-slope support structure, so that the actual installation operation is simpler, the use flexibility is high, the installation is more time-saving and labor-saving, and the installation efficiency of the high-slope support structure is effectively improved.

Description

一种高边坡支护结构A high slope support structure

技术领域Technical field

本实用新型涉及高边坡支护技术领域,尤其涉及一种高边坡支护结构。The utility model relates to the technical field of high slope support, in particular to a high slope support structure.

背景技术Background technique

高边坡指土质边坡高度大于二十米、小于一百米或者岩质边坡高度大于三十米、小于一百米的边坡结构,边坡的常见病害类型有:风化剥落、流石流泥、掉块落石、崩塌、倾倒、坍塌、溃屈、溜坍、坍滑、滑坡、错落等类型,为了提高高边坡的安全性,常在高边坡上加装支护结构。High slope refers to a slope structure with a soil slope height greater than 20 meters and less than 100 meters or a rock slope height greater than 30 meters but less than 100 meters. Common types of slope diseases include: weathering and peeling, flowstone flow In order to improve the safety of high slopes, supporting structures are often installed on high slopes such as mud, falling rocks, collapse, toppling, collapse, buckling, slipping, slumping, landslides, staggering, etc.

现有的技术公开了公开号为:CN217758868U一种绿色环保型高边坡支护结构,属于边坡支护领域,其技术方案要点,包括:两转动连接的挡板以及连接于两挡板之间的具有支撑功能的伸缩杆,所述挡板通过锚杆固定于边坡上,所述挡板包括第一支板以及滑动连接于第一支板上的第二支板,所述第一支板上设有用于固定第二支板的固定组件,该申请在使用时,根据断层的角度,调节两挡板之间的角度,根据断层的长度,调节第一支板与第二支板之间的位置,从而使挡板与边坡贴合的更加紧密,支护效果更好。The existing technical disclosure number is: CN217758868U, a green and environmentally friendly high slope support structure, which belongs to the field of slope support. The key points of its technical solution include: two rotatably connected baffles and a connection between the two baffles. There is a telescopic rod with a support function between them, and the baffle is fixed on the slope through an anchor rod. The baffle includes a first support plate and a second support plate slidingly connected to the first support plate. The first support plate The support plate is provided with a fixing component for fixing the second support plate. When the application is used, the angle between the two baffles is adjusted according to the angle of the fault, and the first support plate and the second support plate are adjusted according to the length of the fault. position between them, so that the baffle and the slope fit more closely, and the support effect is better.

上述实用新型通过多个插杆和插孔的插接限位结构来调节第一支板和第二支板所形成的遮挡长度,并通过设置的伸缩杆配合相应的固定件调节挡板的角度,该种调节方式较为繁琐,使用灵活度一般,使得安装工人进行安装操作较为复杂困难,费时费力,从而降低了一种高边坡支护结构的安装效率。The above-mentioned utility model adjusts the shielding length formed by the first support plate and the second support plate through the insertion limit structure of multiple insertion rods and jack holes, and adjusts the angle of the baffle through the provided telescopic rod and the corresponding fixing piece. , this adjustment method is relatively cumbersome, and the flexibility of use is average, making the installation operation more complicated and difficult for the installation workers, time-consuming and labor-intensive, thereby reducing the installation efficiency of a high slope support structure.

我们为此,提出了一种高边坡支护结构解决上述弊端。For this reason, we proposed a high slope support structure to solve the above disadvantages.

实用新型内容Utility model content

本实用新型的目的是为了解决现有技术中存在的缺点,而提出的一种高边坡支护结构。The purpose of this utility model is to propose a high slope support structure in order to solve the shortcomings existing in the prior art.

为了实现上述目的,本实用新型采用了如下技术方案:一种高边坡支护结构,包括安装板、第一支板和第二支板,所述第一支板一端固定安装有转轴,且转轴连接安装在安装板一端,所述安装板顶面对称焊接有第一固定板,且第一固定板之间安装有第一调节螺杆,所述安装板顶面中央开设有第一导向滑槽,且第一导向滑槽内卡嵌安装有第一导向滑块,并且第一导向滑块顶端固定连接有移动板,所述移动板上固定安装有第一螺母,且第一螺母内螺纹套接有第一调节螺杆,所述移动板一侧侧壁均匀焊接有若干个第一连接座,所述第一支板一侧侧壁均匀焊接有若干个第二连接座,所述第一连接座和第二连接座之间连接安装有连杆,所述第一支板一侧侧壁对称焊接有第二固定板,且第二固定板之间安装有第二调节螺杆,所述第一支板上开设有第二导向滑槽,所述第二支板一侧侧壁焊接有第二导向滑块,且第二导向滑块卡嵌在第二导向滑槽内,所述第二导向滑块内固定安装有第二螺母,且第二螺母内螺纹套接有第二调节螺杆。In order to achieve the above purpose, the present utility model adopts the following technical solution: a high slope support structure, including a mounting plate, a first support plate and a second support plate. One end of the first support plate is fixedly installed with a rotating shaft, and The rotating shaft is connected and installed at one end of the installation plate. A first fixed plate is symmetrically welded to the top surface of the installation plate, and a first adjusting screw is installed between the first fixed plates. A first guide slide is provided in the center of the top surface of the installation plate. groove, and the first guide slide block is installed in the first guide chute, and the top of the first guide slide block is fixedly connected with a moving plate. The first nut is fixedly installed on the moving plate, and the first nut has an internal thread. A first adjusting screw is connected to the sleeve, a number of first connection seats are evenly welded on one side wall of the moving plate, a number of second connection seats are evenly welded on one side wall of the first support plate, and the first A connecting rod is installed between the connecting seat and the second connecting seat, a second fixing plate is symmetrically welded to one side wall of the first support plate, and a second adjusting screw is installed between the second fixing plates. A second guide chute is provided on one plate. A second guide slider is welded to one side wall of the second support plate, and the second guide slider is embedded in the second guide chute. The second guide chute is A second nut is fixedly installed in the guide slide block, and a second adjusting screw is threaded in the second nut.

优选的,所述第二支板一端固定焊接有连接板,所述连接板与安装板上对应开设有固定螺孔,且固定螺纹内螺纹套接有固定螺杆。Preferably, a connecting plate is fixedly welded to one end of the second support plate, a fixing screw hole is provided correspondingly between the connecting plate and the mounting plate, and a fixing screw is inserted into the inner thread of the fixing thread.

优选的,所述第一调节螺杆一端固定连接有第一手摇轮,所述第二调节螺杆一端固定连接有第二手摇轮。Preferably, a first hand wheel is fixedly connected to one end of the first adjustment screw, and a second hand wheel is fixedly connected to one end of the second adjustment screw.

优选的,所述连接板与第二支板相互垂直。Preferably, the connecting plate and the second support plate are perpendicular to each other.

优选的,所述第一导向滑块与第一导向滑槽横截面形状为T型。Preferably, the cross-sectional shape of the first guide slider and the first guide chute is T-shaped.

与现有技术相比,本实用新型的有益效果是;Compared with the existing technology, the beneficial effects of this utility model are:

(1)、本实用新型采用了第一调节螺杆和第二调节螺杆,安装时,工人可将安装板通过固定螺杆固定安装在高边坡底端一侧,然后工人可通过第一手摇轮带动安装在第一固定板之间的第一调节螺杆转动,因为设置的移动板上固定安装的第一螺母内螺纹套接有第一调节螺杆,且移动板底端固定安装的第一导向滑块卡嵌在第一导向滑槽内,所以随着第一调节螺杆的转动可带动移动板沿第一导向滑槽方向一定,另一方面,移动板一侧固定安装的若干个第一连接座与第一支板侧壁固定安装的若干个第二连接座之间连接安装有连杆,且第一支板一端通过转轴安装在安装板一端,所以当移动板移动时可通过连杆推动第一支板绕转轴转动,直至第一支板另一侧面与高边坡表面抵接抵紧,多个连杆与第一支板和安装板形成的三角结构可有效提高支护效果,然后工人可通过第二手摇轮带动安装在两个第二固定板之间的第二调节螺杆转动,因为设置的第二支板一侧固定安装的第二导向滑块卡嵌在第一支板上开设的第一导向滑槽内,且第二导向滑块内固定安装的第二螺母与第二调节螺杆相互啮合,所以随着第二调节螺杆的转动可带动第二支板沿第二导向滑槽方向向外延伸,即可实现对第一支板和第二支板所形成的遮挡长度的调节,使之更符合高边坡的断层使用,上述安装操作更加简单,使用灵活度高,安装起来更加省时省力,有效提高了一种高边坡支护结构的安装效率。(1) This utility model adopts a first adjusting screw and a second adjusting screw. During installation, workers can fix the installation plate on the bottom side of the high slope through the fixing screw, and then the worker can use the first hand wheel to fix the installation plate on the bottom side of the high slope. The first adjusting screw installed between the first fixed plates is driven to rotate, because the internal thread of the first nut fixedly installed on the moving plate is sleeved with the first adjusting screw, and the first guide slide fixedly installed at the bottom of the moving plate The block is embedded in the first guide chute, so the rotation of the first adjusting screw can drive the moving plate in a certain direction along the first guide chute. On the other hand, several first connection seats are fixedly installed on one side of the moving plate. Connecting rods are installed between several second connecting seats fixedly installed on the side walls of the first supporting plate, and one end of the first supporting plate is installed on one end of the mounting plate through a rotating shaft, so when the moving plate moves, the connecting rod can push the second connecting seat. One plate rotates around the rotating axis until the other side of the first support plate is in tight contact with the surface of the high slope. The triangular structure formed by multiple connecting rods, the first support plate and the mounting plate can effectively improve the support effect, and then the workers The second adjustment screw installed between the two second fixed plates can be driven to rotate by the second hand wheel, because the second guide slider fixedly installed on one side of the second support plate is embedded in the first support plate. The first guide chute is opened, and the second nut fixedly installed in the second guide slide block meshes with the second adjustment screw, so the rotation of the second adjustment screw can drive the second support plate along the second guide slide. By extending the groove direction outward, the shielding length formed by the first support plate and the second support plate can be adjusted to make it more suitable for use on faults with high slopes. The above installation operation is simpler, the use flexibility is high, and the installation It saves time and effort, and effectively improves the installation efficiency of a high slope support structure.

(2)、本实用新型采用了连接板,当高边坡高度较高,第二支板延伸至最远处仍不足够时,安装工人可领取一个一种高边坡支护结构,将其安装板放置连接板上,并使安装板与连接板上对应开设的固定螺孔对齐,最后再使用固定螺杆进行连接固定,然后再按照上述步骤重复操作,通过将多个一种高边坡支护结构进行连接使用,即可满足不同高度的高边坡的支护使用,使其适用范围更高,实用性更强。(2) This utility model adopts a connecting plate. When the height of the high slope is high and the extension of the second support plate to the farthest point is not enough, the installation worker can obtain a high slope supporting structure and install it. Place the mounting plate on the connecting plate and align the mounting plate with the corresponding fixing screw holes on the connecting plate. Finally, use fixing screws to connect and fix. Then repeat the above steps to support multiple high slope supports. The protective structure can be connected and used to meet the support requirements of high slopes of different heights, making it more applicable and more practical.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍。In order to explain the embodiments of the present invention or the technical solutions in the prior art more clearly, the drawings required to be used in the embodiments will be briefly introduced below.

图1为本实用新型提出的一种高边坡支护结构的结构示意图;Figure 1 is a schematic structural diagram of a high slope support structure proposed by the utility model;

图2为本实用新型提出的一种高边坡支护结构的第一支板和第二支板主视图;Figure 2 is a front view of the first support plate and the second support plate of a high slope support structure proposed by the utility model;

图3为本实用新型提出的图1的A处放大图;Figure 3 is an enlarged view of A in Figure 1 proposed by the present utility model;

图4为本实用新型提出的一种高边坡支护结构的第二支板立体图。Figure 4 is a perspective view of the second support plate of a high slope support structure proposed by the present utility model.

图例说明:illustration:

1、安装板;2、第一连接座;3、第一调节螺杆;4、第二连接座;5、第二调节螺杆;6、第一支板;7、第二支板;8、连接板;9、连杆;10、转轴;11、第二手摇轮;12、第二导向滑槽;13、第二导向滑块;14、第二螺母;15、第二固定板;16、第一固定板;17、移动板;18、第一螺母;19、第一手摇轮;20、第一导向滑块;21、第一导向滑槽;22、固定螺杆;23、固定螺孔。1. Mounting plate; 2. First connecting seat; 3. First adjusting screw; 4. Second connecting seat; 5. Second adjusting screw; 6. First support plate; 7. Second support plate; 8. Connection Plate; 9. Connecting rod; 10. Rotating shaft; 11. Second hand wheel; 12. Second guide chute; 13. Second guide slide block; 14. Second nut; 15. Second fixed plate; 16. The first fixed plate; 17. Moving plate; 18. The first nut; 19. The first hand wheel; 20. The first guide slider; 21. The first guide chute; 22. Fixing screw; 23. Fixing screw hole .

具体实施方式Detailed ways

为使本实用新型的目的、技术方案和优点更加清楚明了,下面结合具体实施方式并参照附图,对本实用新型进一步详细说明。应该理解,这些描述只是示例性的,而并非要限制本实用新型的范围。此外,在以下说明中,省略了对公知结构和技术的描述,以避免不必要地混淆本实用新型的概念。In order to make the purpose, technical solutions and advantages of the present utility model clearer, the utility model will be further described in detail below with reference to the specific embodiments and the accompanying drawings. It should be understood that these descriptions are exemplary only and are not intended to limit the scope of the invention. Furthermore, in the following description, descriptions of well-known structures and techniques are omitted to avoid unnecessarily confusing the concepts of the present invention.

请参照图1-4,一种高边坡支护结构,包括安装板1、第一支板6和第二支板7,第一支板6一端固定安装有转轴10,且转轴10连接安装在安装板1一端,安装板1顶面对称焊接有第一固定板16,且第一固定板16之间安装有第一调节螺杆3,安装板1顶面中央开设有第一导向滑槽21,且第一导向滑槽21内卡嵌安装有第一导向滑块20,并且第一导向滑块20顶端固定连接有移动板17,移动板17上固定安装有第一螺母18,且第一螺母18内螺纹套接有第一调节螺杆3,移动板17一侧侧壁均匀焊接有若干个第一连接座2,第一支板6一侧侧壁均匀焊接有若干个第二连接座4,第一连接座2和第二连接座4之间连接安装有连杆9,第一支板6一侧侧壁对称焊接有第二固定板15,且第二固定板15之间安装有第二调节螺杆5,第一支板6上开设有第二导向滑槽12,第二支板7一侧侧壁焊接有第二导向滑块13,且第二导向滑块13卡嵌在第二导向滑槽12内,第二导向滑块13内固定安装有第二螺母14,且第二螺母14内螺纹套接有第二调节螺杆5。Please refer to Figure 1-4. A high slope support structure includes a mounting plate 1, a first support plate 6 and a second support plate 7. The first support plate 6 has a rotating shaft 10 fixedly installed at one end, and the rotating shaft 10 is connected and installed. At one end of the mounting plate 1, a first fixing plate 16 is symmetrically welded to the top surface of the mounting plate 1, and a first adjusting screw 3 is installed between the first fixing plates 16. A first guide chute is provided in the center of the top surface of the mounting plate 1. 21, and the first guide slider 20 is installed in the first guide chute 21, and the top of the first guide slider 20 is fixedly connected with the moving plate 17, the first nut 18 is fixedly installed on the moving plate 17, and the first nut 18 is fixedly installed on the first guide slider 21. A nut 18 is internally threaded and sleeved with a first adjusting screw 3. A number of first connection seats 2 are evenly welded to one side wall of the moving plate 17. A number of second connection seats 2 are evenly welded to a side wall of the first support plate 6. 4. A connecting rod 9 is installed between the first connecting seat 2 and the second connecting seat 4. A second fixing plate 15 is symmetrically welded to the side wall of the first support plate 6, and a connecting rod 9 is installed between the second fixing plates 15. The second adjusting screw 5 and the first support plate 6 are provided with a second guide chute 12. A second guide slider 13 is welded to one side wall of the second support plate 7, and the second guide slider 13 is embedded in the second adjustment screw 5. In the second guide chute 12, a second nut 14 is fixedly installed in the second guide slide block 13, and the second adjusting screw 5 is threaded in the second nut 14.

本实施方案中:起到了安装操作更加简单,使用灵活度高,安装起来更加省时省力,有效提高了一种高边坡支护结构的安装效率。In this implementation plan: the installation operation is simpler, the use flexibility is high, the installation is more time-saving and labor-saving, and the installation efficiency of a high slope support structure is effectively improved.

具体的,第二支板7一端固定焊接有连接板8,连接板8与安装板1上对应开设有固定螺孔23,且固定螺纹内螺纹套接有固定螺杆22。Specifically, a connecting plate 8 is fixedly welded to one end of the second support plate 7 . The connecting plate 8 and the mounting plate 1 are provided with fixing screw holes 23 correspondingly, and a fixing screw 22 is inserted into the inner thread of the fixing thread.

本实施方案中:起到了通过将多个一种高边坡支护结构进行连接使用,即可满足不同高度的高边坡的支护使用,使其适用范围更高,实用性更强。In this embodiment, by connecting multiple high slope supporting structures of one kind, the supporting structure of high slopes of different heights can be satisfied, making the structure have a higher scope of application and stronger practicability.

具体的,第一调节螺杆3一端固定连接有第一手摇轮19,第二调节螺杆5一端固定连接有第二手摇轮11。Specifically, a first hand wheel 19 is fixedly connected to one end of the first adjusting screw 3 , and a second hand wheel 11 is fixedly connected to one end of the second adjusting screw 5 .

本实施方案中:,起到了便于工人转动调节第一调节螺杆3和第二调节螺杆5的作用。In this embodiment: it facilitates workers to rotate and adjust the first adjusting screw 3 and the second adjusting screw 5 .

具体的,连接板8与第二支板7相互垂直。Specifically, the connecting plate 8 and the second support plate 7 are perpendicular to each other.

具体的,第一导向滑块20与第一导向滑槽21横截面形状为T型。Specifically, the cross-sectional shape of the first guide slider 20 and the first guide slide groove 21 is T-shaped.

工作原理:本实用新型采用了第一调节螺杆3和第二调节螺杆5,安装时,工人可将安装板1通过固定螺杆22固定安装在高边坡底端一侧,然后工人可通过第一手摇轮19带动安装在第一固定板16之间的第一调节螺杆3转动,因为设置的移动板17上固定安装的第一螺母18内螺纹套接有第一调节螺杆3,且移动板17底端固定安装的第一导向滑块20卡嵌在第一导向滑槽21内,所以随着第一调节螺杆3的转动可带动移动板17沿第一导向滑槽21方向一定,另一方面,移动板17一侧固定安装的若干个第一连接座2与第一支板6侧壁固定安装的若干个第二连接座4之间连接安装有连杆9,且第一支板6一端通过转轴10安装在安装板1一端,所以当移动板17移动时可通过连杆9推动第一支板6绕转轴10转动,直至第一支板6另一侧面与高边坡表面抵接抵紧,多个连杆9与第一支板6和安装板1形成的三角结构可有效提高支护效果,然后工人可通过第二手摇轮11带动安装在两个第二固定板15之间的第二调节螺杆5转动,因为设置的第二支板7一侧固定安装的第二导向滑块13卡嵌在第一支板6上开设的第一导向滑槽21内,且第二导向滑块13内固定安装的第二螺母14与第二调节螺杆5相互啮合,所以随着第二调节螺杆5的转动可带动第二支板7沿第二导向滑槽12方向向外延伸,即可实现对第一支板6和第二支板7所形成的遮挡长度的调节,使之更符合高边坡的断层使用,上述安装操作更加简单,使用灵活度高,安装起来更加省时省力,有效提高了一种高边坡支护结构的安装效率,另外本实用新型采用了连接板8,当高边坡高度较高,第二支板7延伸至最远处仍不足够时,安装工人可领取一个一种高边坡支护结构,将其安装板1放置连接板8上,并使安装板1与连接板8上对应开设的固定螺孔23对齐,最后再使用固定螺杆22进行连接固定,然后再按照上述步骤重复操作,通过将多个一种高边坡支护结构进行连接使用,即可满足不同高度的高边坡的支护使用,使其适用范围更高,实用性更强。Working principle: This utility model adopts the first adjusting screw 3 and the second adjusting screw 5. During installation, the worker can fix the installation plate 1 on the bottom side of the high slope through the fixing screw 22, and then the worker can use the first adjusting screw 22 to fix the installation plate 1 on the bottom side of the high slope. The hand wheel 19 drives the first adjusting screw 3 installed between the first fixed plates 16 to rotate, because the first nut 18 fixedly installed on the moving plate 17 is threaded with the first adjusting screw 3, and the moving plate The first guide slide block 20 fixedly installed at the bottom of 17 is embedded in the first guide chute 21, so the rotation of the first adjusting screw 3 can drive the movable plate 17 in a certain direction along the first guide chute 21, and the other On the other hand, connecting rods 9 are installed between several first connection seats 2 fixedly installed on one side of the moving plate 17 and several second connection seats 4 fixedly installed on the side wall of the first support plate 6, and the first support plate 6 One end is installed on one end of the mounting plate 1 through the rotating shaft 10, so when the moving plate 17 moves, the first supporting plate 6 can be pushed to rotate around the rotating axis 10 through the connecting rod 9 until the other side of the first supporting plate 6 contacts the high slope surface. The triangular structure formed by the multiple connecting rods 9, the first support plate 6 and the mounting plate 1 can effectively improve the support effect. Then the worker can install it between the two second fixed plates 15 through the second hand wheel 11. The second adjusting screw 5 rotates because the second guide slider 13 fixedly installed on one side of the second support plate 7 is embedded in the first guide chute 21 opened on the first support plate 6, and the second The second nut 14 fixedly installed in the guide slider 13 meshes with the second adjustment screw 5, so the rotation of the second adjustment screw 5 can drive the second support plate 7 to extend outward along the direction of the second guide chute 12. The adjustment of the shielding length formed by the first support plate 6 and the second support plate 7 can be realized to make it more suitable for the use of faults with high slopes. The above installation operation is simpler, the use flexibility is high, and the installation is more time-saving. It is labor-saving and effectively improves the installation efficiency of a high slope support structure. In addition, the utility model adopts the connecting plate 8. When the height of the high slope is high and the extension of the second support plate 7 to the farthest point is not enough, The installation worker can receive a high slope support structure, place its mounting plate 1 on the connecting plate 8, align the mounting plate 1 with the corresponding fixing screw holes 23 on the connecting plate 8, and finally use the fixing screws 22 Connect and fix, and then repeat the above steps. By connecting multiple high slope support structures of one kind, you can meet the support use of high slopes of different heights, making it more applicable and practical. Stronger sex.

应当理解的是,本实用新型的上述具体实施方式仅仅用于示例性说明或解释本实用新型的原理,而不构成对本实用新型的限制。因此,在不偏离本实用新型的精神和范围的情况下所做的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。此外,本实用新型所附权利要求旨在涵盖落入所附权利要求范围和边界、或者这种范围和边界的等同形式内的全部变化和修改例。It should be understood that the above-mentioned specific embodiments of the present invention are only used to illustrate or explain the principles of the present invention, and do not constitute a limitation of the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present utility model shall be included in the protection scope of the present utility model. Furthermore, the appended claims of the present invention are intended to cover all changes and modifications that fall within the scope and boundaries of the appended claims, or equivalents of such scope and boundaries.

Claims (5)

1.一种高边坡支护结构,包括安装板(1)、第一支板(6)和第二支板(7),其特征在于,所述第一支板(6)一端固定安装有转轴(10),且转轴(10)连接安装在安装板(1)一端,所述安装板(1)顶面对称焊接有第一固定板(16),且第一固定板(16)之间安装有第一调节螺杆(3),所述安装板(1)顶面中央开设有第一导向滑槽(21),且第一导向滑槽(21)内卡嵌安装有第一导向滑块(20),并且第一导向滑块(20)顶端固定连接有移动板(17),所述移动板(17)上固定安装有第一螺母(18),且第一螺母(18)内螺纹套接有第一调节螺杆(3),所述移动板(17)一侧侧壁均匀焊接有若干个第一连接座(2),所述第一支板(6)一侧侧壁均匀焊接有若干个第二连接座(4),所述第一连接座(2)和第二连接座(4)之间连接安装有连杆(9),所述第一支板(6)一侧侧壁对称焊接有第二固定板(15),且第二固定板(15)之间安装有第二调节螺杆(5),所述第一支板(6)上开设有第二导向滑槽(12),所述第二支板(7)一侧侧壁焊接有第二导向滑块(13),且第二导向滑块(13)卡嵌在第二导向滑槽(12)内,所述第二导向滑块(13)内固定安装有第二螺母(14),且第二螺母(14)内螺纹套接有第二调节螺杆(5)。1. A high slope support structure, including a mounting plate (1), a first support plate (6) and a second support plate (7), characterized in that one end of the first support plate (6) is fixedly installed There is a rotating shaft (10), and the rotating shaft (10) is connected and installed at one end of the mounting plate (1). A first fixing plate (16) is symmetrically welded to the top surface of the mounting plate (1), and the first fixing plate (16) A first adjusting screw (3) is installed between them. A first guide chute (21) is provided in the center of the top surface of the mounting plate (1), and a first guide chute (21) is installed in the first guide chute (21). The slider (20), and the top of the first guide slider (20) is fixedly connected with a moving plate (17). The first nut (18) is fixedly installed on the moving plate (17), and the first nut (18) The first adjusting screw (3) is connected to the internal thread. Several first connection seats (2) are evenly welded to the side wall of the moving plate (17). The side wall of the first support plate (6) is evenly welded. Several second connection seats (4) are evenly welded, and a connecting rod (9) is installed between the first connection seat (2) and the second connection seat (4). The first support plate (6) A second fixing plate (15) is symmetrically welded to one side wall, and a second adjusting screw (5) is installed between the second fixing plates (15). A second guide is provided on the first support plate (6). chute (12), a second guide slider (13) is welded to one side wall of the second support plate (7), and the second guide slider (13) is embedded in the second guide chute (12) Inside, a second nut (14) is fixedly installed in the second guide slider (13), and a second adjusting screw (5) is threaded in the second nut (14). 2.根据权利要求1所述的一种高边坡支护结构,其特征在于,所述第二支板(7)一端固定焊接有连接板(8),所述连接板(8)与安装板(1)上对应开设有固定螺孔(23),且固定螺纹内螺纹套接有固定螺杆(22)。2. A high slope support structure according to claim 1, characterized in that a connecting plate (8) is fixedly welded to one end of the second support plate (7), and the connecting plate (8) is connected to the installation The plate (1) is provided with a corresponding fixing screw hole (23), and the internal thread of the fixing thread is sleeved with a fixing screw (22). 3.根据权利要求1所述的一种高边坡支护结构,其特征在于,所述第一调节螺杆(3)一端固定连接有第一手摇轮(19),所述第二调节螺杆(5)一端固定连接有第二手摇轮(11)。3. A high slope support structure according to claim 1, characterized in that a first hand wheel (19) is fixedly connected to one end of the first adjustment screw (3), and the second adjustment screw (3) is fixedly connected to a first hand wheel (19). (5) One end is fixedly connected with a second hand wheel (11). 4.根据权利要求2所述的一种高边坡支护结构,其特征在于,所述连接板(8)与第二支板(7)相互垂直。4. A high slope support structure according to claim 2, characterized in that the connecting plate (8) and the second support plate (7) are perpendicular to each other. 5.根据权利要求1所述的一种高边坡支护结构,其特征在于,所述第一导向滑块(20)与第一导向滑槽(21)横截面形状为T型。5. A high slope support structure according to claim 1, characterized in that the cross-sectional shape of the first guide slider (20) and the first guide chute (21) is T-shaped.
CN202321132610.8U 2023-05-11 2023-05-11 High side slope supporting construction Expired - Fee Related CN219710352U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321132610.8U CN219710352U (en) 2023-05-11 2023-05-11 High side slope supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321132610.8U CN219710352U (en) 2023-05-11 2023-05-11 High side slope supporting construction

Publications (1)

Publication Number Publication Date
CN219710352U true CN219710352U (en) 2023-09-19

Family

ID=88003903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321132610.8U Expired - Fee Related CN219710352U (en) 2023-05-11 2023-05-11 High side slope supporting construction

Country Status (1)

Country Link
CN (1) CN219710352U (en)

Similar Documents

Publication Publication Date Title
CN219710352U (en) High side slope supporting construction
CN219470695U (en) A pier body top mold support device
CN211018109U (en) A communication engineering cable erection device
CN208184278U (en) A kind of novel building template support
CN220704543U (en) Foundation pit supporting structure beneficial to drainage
CN221034316U (en) Building engineering pipe strutting arrangement
CN216275724U (en) Adjustable rectangle supporting device of geotechnical engineering
CN218327322U (en) Measuring instrument for tunnel construction
CN202627492U (en) Single-surface side wall slide mold
CN206477574U (en) A kind of concrete blinding adjustable supports system
CN214251063U (en) A green building environment detection device
CN210975828U (en) Safety protection device for deep foundation pit in construction
CN212047382U (en) A railway vehicle detection device with direction adjustment function
CN211366867U (en) A rotating and lifting type air conditioner external unit installation equipment
CN210858037U (en) Special chute for pouring constructional column concrete
CN217651809U (en) Deep foundation pit supporting beam frame structure for geotechnical engineering
CN219176031U (en) Fixing device of civil engineering fence for civil engineering
CN223280489U (en) Tool type hanging bracket for assisting installation of photovoltaic panel
CN221920985U (en) A tire frame used for secondary lining construction at the junction of the main tunnel and the manhole
CN220080024U (en) A kind of foundation pit construction supporting structure
CN210457335U (en) Lifting tool for installing door leaf
CN216243340U (en) Measuring device for building construction management
CN222207259U (en) Template support frame that house construction used
CN221828498U (en) Adjustable cable reel erection device
CN221811615U (en) A groundwater level monitoring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230919

CF01 Termination of patent right due to non-payment of annual fee