CN219704957U - A flange auxiliary installation device - Google Patents

A flange auxiliary installation device Download PDF

Info

Publication number
CN219704957U
CN219704957U CN202321087767.3U CN202321087767U CN219704957U CN 219704957 U CN219704957 U CN 219704957U CN 202321087767 U CN202321087767 U CN 202321087767U CN 219704957 U CN219704957 U CN 219704957U
Authority
CN
China
Prior art keywords
clamping
rod
support frame
installation
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202321087767.3U
Other languages
Chinese (zh)
Inventor
司才强
刘志运
李文峰
赵广智
秦启彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Installation Construction Group Co ltd
Original Assignee
Gansu Installation Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Installation Construction Group Co ltd filed Critical Gansu Installation Construction Group Co ltd
Priority to CN202321087767.3U priority Critical patent/CN219704957U/en
Application granted granted Critical
Publication of CN219704957U publication Critical patent/CN219704957U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

本实用新型属于法兰安装技术领域,具体的说是一种法兰辅助安装装置,包括安装导轨,所述安装导轨内设置有滑槽,滑槽内滑动设置有安装滑块,所述安装滑块上端安装有支撑架,所述支撑架的顶端安装有夹持机构,且所述夹持机构对立且同心设置,所述夹持机构包括有夹持基座和夹持杆,每个所述夹持机构上的所述夹持杆均关于所述夹持基座的水平中性线均匀阵列设置,且所述夹持基座铰接连接在所述夹持杆的中段位置,通过夹持机构上的夹持杆沿着夹持基座的水平中心线设置,并且将夹持杆的另一端通过连接杆全都铰接在支撑架上,再利用控制杆的同步驱动,使得每个夹持机构上的夹持杆带有夹持脚可以同时向内收缩或张开,便于对管道和法兰进行夹持。

The utility model belongs to the technical field of flange installation. Specifically, it is a flange auxiliary installation device, which includes an installation guide rail. A chute is provided in the installation guide rail. An installation slider is slidably provided in the chute. The installation slider A support frame is installed at the upper end of the block, and a clamping mechanism is installed at the top of the support frame, and the clamping mechanisms are opposite and concentrically arranged. The clamping mechanism includes a clamping base and a clamping rod, each of which The clamping rods on the clamping mechanism are arranged in a uniform array with respect to the horizontal neutral line of the clamping base, and the clamping base is hingedly connected at the middle position of the clamping rod. The clamping rod is arranged along the horizontal centerline of the clamping base, and the other end of the clamping rod is hinged to the support frame through the connecting rod, and then the synchronous driving of the control rod is used to make each clamping mechanism The clamping rod has clamping feet that can be contracted or expanded inward at the same time to facilitate the clamping of pipes and flanges.

Description

一种法兰辅助安装装置A flange auxiliary installation device

技术领域Technical field

本实用新型涉及法兰安装技术领域,具体是一种法兰辅助安装装置。The utility model relates to the technical field of flange installation, specifically a flange auxiliary installation device.

背景技术Background technique

法兰,又叫法兰凸缘盘或突缘。法兰是轴与轴之间相互连接的零件,用于管端之间的连接,而在两个管道之间利用法兰进行连接时,为了确保法兰之间对接的准确性,需要确保两个法兰的同心度,从而防止对接后两个管道造成偏差。Flange, also called flange flange disk or flange. The flange is a part that connects the shafts to each other. It is used to connect the pipe ends. When using flanges to connect two pipes, in order to ensure the accuracy of the butt joint between the flanges, it is necessary to ensure that the two pipes are connected to each other. The concentricity of the two flanges can prevent deviation between the two pipes after they are connected.

现有技术公开号为CN210414302U的文献提供一种不锈钢法兰辅助安装装置,该装置包括支撑底板,支撑底板顶部的左侧固定连接有左辅助夹紧机构等等,达到对法兰对接安装的目的。The prior art publication number is CN210414302U, which provides an auxiliary installation device for stainless steel flanges. The device includes a support bottom plate. The left side of the top of the support bottom plate is fixedly connected with a left auxiliary clamping mechanism, etc., to achieve the purpose of docking the flange. .

虽然该装置有益效果较多,但依然存在下列问题:该装置在利用十字旋转杆转动带动防滑挤压内槽对管道进行夹持时,仅通过一侧的防滑挤压内槽向管道一侧移动进行夹持,容易使得两个辅助夹紧机构上所夹持的管道不在同一个中心线上,导致在拼接时容易出现对不准的情况。鉴于此,我们提出一种法兰辅助安装装置。Although this device has many beneficial effects, it still has the following problems: when the device uses the rotation of the cross rotating rod to drive the anti-skid extrusion inner groove to clamp the pipe, it only moves to one side of the pipe through the anti-slip extrusion inner groove on one side. When clamping, it is easy for the pipes clamped by the two auxiliary clamping mechanisms to be different from the same center line, resulting in misalignment during splicing. In view of this, we propose a flange auxiliary installation device.

实用新型内容Utility model content

为了弥补现有技术的不足,仅通过一侧的防滑挤压内槽向管道一侧移动进行夹持,容易使得两个辅助夹紧机构上所夹持的管道不在同一个中心线上,导致在拼接时容易出现偏差的问题,本实用新型提出一种法兰辅助安装装置。In order to make up for the shortcomings of the existing technology, only the anti-slip extrusion inner groove on one side is moved to one side of the pipe for clamping, which easily makes the pipes clamped by the two auxiliary clamping mechanisms not on the same center line, resulting in The problem of deviation easily occurs during splicing. This utility model proposes a flange auxiliary installation device.

本实用新型解决其技术问题所采用的技术方案是:本实用新型所述的一种法兰辅助安装装置,包括安装导轨,所述安装导轨内设置有滑槽,滑槽内滑动设置有安装滑块,所述安装滑块上端安装有支撑架,所述支撑架的顶端安装有夹持机构,且所述夹持机构对立且同心设置,所述夹持机构包括有夹持基座和夹持杆,每个所述夹持机构上的所述夹持杆均关于所述夹持基座的水平中性线均匀阵列设置,且所述夹持基座铰接连接在所述夹持杆的中段位置,通过夹持机构上的夹持杆沿着夹持基座的水平中心线设置,并且将夹持杆的另一端通过连接杆全都铰接在支撑架上,再利用控制杆的同步驱动,使得每个夹持机构上的夹持杆带有夹持脚可以同时向内收缩或张开,便于对管道和法兰进行夹持,并且两个夹持机构中心设置,可以确保所夹持的管道同心,方便进行拼装。The technical solution adopted by the utility model to solve the technical problem is: a flange auxiliary installation device described in the utility model includes a mounting guide rail, a chute is provided in the mounting guide rail, and a mounting slide is slidably provided in the chute. block, a support frame is installed on the upper end of the installation slide block, a clamping mechanism is installed on the top of the support frame, and the clamping mechanisms are opposite and concentrically arranged, and the clamping mechanism includes a clamping base and a clamping mechanism. rods, the clamping rods on each of the clamping mechanisms are arranged in a uniform array with respect to the horizontal neutral line of the clamping base, and the clamping base is hingedly connected to the middle section of the clamping rod position, the clamping rod on the clamping mechanism is set along the horizontal centerline of the clamping base, and the other end of the clamping rod is hinged to the support frame through the connecting rod, and then the synchronous drive of the control rod is used, so that The clamping rod on each clamping mechanism has clamping feet that can contract or expand inward at the same time to facilitate clamping of pipes and flanges, and the two clamping mechanisms are centrally located to ensure that the clamped pipes Concentric for easy assembly.

优选的,所述安装导轨内滑动设置有两组所述安装滑块,且每个所述安装滑块上均安装有支撑架,每个所述支撑架上均安装有一个夹持机构,所述安装导轨内转动设置有丝杆,且所述丝杆穿接于所述安装滑块的内侧,且所述丝杆与所述安装滑块之间为螺纹啮合连接,且两个所述安装滑块的螺纹螺旋方向相反设置,所述丝杆的一端连接有驱动电机,利用安装滑块在安装导轨上的滑动,可以使得夹持的两个管道进行对接。Preferably, two sets of installation slide blocks are provided slidingly in the installation guide rail, and a support frame is installed on each installation slide block, and a clamping mechanism is installed on each support frame, so A screw rod is rotated in the installation guide rail, and the screw rod is connected to the inside of the installation slide block, and the screw rod and the installation slide block are threadedly engaged, and the two installation The threads of the slider are arranged in opposite spiral directions. One end of the screw rod is connected to a drive motor. By sliding the installation slider on the installation guide rail, the two clamped pipes can be docked.

优选的,每个所述夹持基座的中心位置均安装有控制杆,且所述控制杆的另一端连接在所述支撑架上,并且所述控制杆的中轴线与所述夹持基座的水平中心线相重合设置,通过控制杆可以控制夹持杆的张开或闭合。Preferably, a control rod is installed at the center of each clamping base, and the other end of the control rod is connected to the support frame, and the central axis of the control rod is aligned with the clamping base. The horizontal center lines of the seats are set to coincide with each other, and the opening or closing of the clamping rod can be controlled by the control rod.

优选的,所述夹持杆的一端铰接连接有连接杆,所述连接杆的另一端铰接连接在所述支撑架上,所述夹持杆的另一端铰接连接有夹持脚,且所述夹持脚的夹持面为弧形设置,夹持脚的夹持面的弧形设置,可以更好地与管道表面相吻合。Preferably, one end of the clamping rod is hingedly connected to a connecting rod, the other end of the connecting rod is hingedly connected to the support frame, the other end of the clamping rod is hingedly connected to a clamping foot, and the The clamping surface of the clamping feet is set in an arc shape, and the arc-shaped setting of the clamping surface of the clamping legs can better match the surface of the pipe.

优选的,所述夹持脚的夹持面上贴合设置有夹持垫,利用夹持垫增加夹持的稳定性。Preferably, a clamping pad is provided on the clamping surface of the clamping foot, and the clamping pad is used to increase the stability of the clamping.

优选的,所述夹持基座的外侧上端安装有稳定杆,且所述稳定杆穿接于所述支撑架的内侧,且所述稳定杆与所述支撑架为伸缩连接。Preferably, a stabilizing bar is installed on the outer upper end of the clamping base, and the stabilizing bar is connected to the inside of the supporting frame, and the stabilizing bar and the supporting frame are telescopically connected.

本实用新型的有益之处在于:The benefits of this utility model are:

1.本实用新型通过夹持机构上的夹持杆沿着夹持基座的水平中心线设置,并且将夹持杆的另一端通过连接杆全都铰接在支撑架上,再利用控制杆的同步驱动,使得每个夹持机构上的夹持杆带有夹持脚可以同时向内收缩或张开,便于对管道和法兰进行夹持,并且两个夹持机构中心设置,可以确保所夹持的管道同心,方便进行拼装;1. In this utility model, the clamping rod on the clamping mechanism is arranged along the horizontal centerline of the clamping base, and the other end of the clamping rod is hinged to the support frame through the connecting rod, and then the synchronization of the control rod is used Driven so that the clamping rods with clamping feet on each clamping mechanism can contract or expand inward at the same time to facilitate clamping of pipes and flanges, and the two clamping mechanisms are centrally located to ensure that the clamped The pipes held are concentric for easy assembly;

2.本实用新型通过安装滑块在安装导轨实现两个夹持机构相互靠近对所夹持的管道进行拼装连接,能够确保在移动过程中,两个管道的同心度不会发生改变,确保对接的准确性。2. This utility model realizes that the two clamping mechanisms are close to each other by installing the slider on the installation guide rail to assemble and connect the clamped pipes, which can ensure that the concentricity of the two pipes will not change during the movement, ensuring docking. accuracy.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其它的附图。In order to explain the embodiments of the present invention or the technical solutions in the prior art more clearly, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings in the following description These are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without exerting any creative effort.

图1为本实用新型的整体结构示意图;Figure 1 is a schematic diagram of the overall structure of the utility model;

图2为本实用新型的一个夹持机构的放大结构示意图;Figure 2 is an enlarged structural schematic diagram of a clamping mechanism of the utility model;

图3为本实用新型的夹持脚的放大结构示意图;Figure 3 is an enlarged structural schematic diagram of the clamping foot of the present utility model;

图4为本实用新型的安装导轨与安装滑块的半剖放大结构示意图。Figure 4 is a half-section enlarged structural schematic diagram of the installation guide rail and installation slide block of the present utility model.

图中:1、安装导轨;2、安装滑块;3、支撑架;4、夹持机构;5、夹持基座;6、夹持杆;7、控制杆;8、连接杆;9、夹持脚;10、稳定杆;201、丝杆;202、驱动电机;901、夹持垫。In the picture: 1. Install the guide rail; 2. Install the slider; 3. Support frame; 4. Clamping mechanism; 5. Clamping base; 6. Clamping rod; 7. Control rod; 8. Connecting rod; 9. Clamping feet; 10. Stabilizing bar; 201. Screw; 202. Driving motor; 901. Clamping pad.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present utility model.

请参阅图1-4所示,一种法兰辅助安装装置,包括安装导轨1,安装导轨1内设置有滑槽,滑槽内滑动设置有安装滑块2,安装滑块2上端安装有支撑架3,支撑架3的顶端安装有夹持机构4,且夹持机构4对立且同心设置,夹持机构4包括有夹持基座5和夹持杆6,每个夹持机构4上的夹持杆6均关于夹持基座5的水平中性线均匀阵列设置,且夹持基座5铰接连接在夹持杆6的中段位置;Please refer to Figure 1-4. A flange auxiliary installation device includes a mounting guide rail 1. A chute is provided in the mounting guide rail 1. A mounting slide block 2 is slidably provided in the chute. A support is installed on the upper end of the mounting slide block 2. Frame 3, a clamping mechanism 4 is installed on the top of the support frame 3, and the clamping mechanisms 4 are opposite and concentrically arranged. The clamping mechanism 4 includes a clamping base 5 and a clamping rod 6. Each clamping mechanism 4 has The clamping rods 6 are all arranged in a uniform array about the horizontal neutral line of the clamping base 5, and the clamping base 5 is hingedly connected to the middle position of the clamping rod 6;

工作时,在对管道进行拼接安装时,首先将管道放置在夹持机构4的夹持杆6之间,通过操作控制杆7缩回,可以带动夹持基座5向支撑架3一侧靠近,并且通过连接杆8的连接,将连接在支撑架3一侧的夹持杆6向外顶出,然后由于夹持基座5的连接,夹持杆6带有夹持脚9的一端会向内收缩,通过夹持脚9的向内收缩对管道进行夹持,两个夹持机构4的夹持方式相同,夹持完成之后,在使得夹持机构4沿着安装导轨1相互靠近进行对接拼装。During work, when splicing and installing pipelines, first place the pipelines between the clamping rods 6 of the clamping mechanism 4, and by operating the control rod 7 to retract, the clamping base 5 can be driven closer to the support frame 3 side. , and through the connection of the connecting rod 8, the clamping rod 6 connected to the side of the support frame 3 is pushed outward, and then due to the connection of the clamping base 5, the end of the clamping rod 6 with the clamping foot 9 will Inward contraction, the pipe is clamped by the inward contraction of the clamping feet 9. The clamping methods of the two clamping mechanisms 4 are the same. After the clamping is completed, the clamping mechanisms 4 are moved closer to each other along the installation guide rail 1. Butt assembly.

安装导轨1内滑动设置有两组安装滑块2,且每个安装滑块2上均安装有支撑架3,每个支撑架3上均安装有一个夹持机构4,安装导轨1内转动设置有丝杆201,且丝杆201穿接于安装滑块2的内侧,且丝杆201与安装滑块2之间为螺纹啮合连接,且两个安装滑块2的螺纹螺旋方向相反设置,丝杆201的一端连接有驱动电机202;There are two sets of installation slide blocks 2 slidingly provided in the installation guide rail 1, and each installation slide block 2 is equipped with a support frame 3. Each support frame 3 is equipped with a clamping mechanism 4, and the installation guide rail 1 is provided with a rotation There is a screw rod 201, and the screw rod 201 is connected to the inside of the installation slide block 2, and the screw rod 201 and the installation slide block 2 are threaded and engaged, and the thread spiral directions of the two installation slide blocks 2 are set in opposite directions. One end of the rod 201 is connected with a driving motor 202;

在利用夹持机构4对两个带有法兰的管道夹持完毕之后,可以控制驱动电机202带动丝杆201进行转动,然后通过丝杆201与安装滑块2的螺纹咬合,使得两个安装滑块2相互靠近,进而带动两个夹持机构4上的管道相互靠近并且对接。After the clamping mechanism 4 is used to clamp the two pipes with flanges, the drive motor 202 can be controlled to drive the screw rod 201 to rotate, and then the screw rod 201 engages with the thread of the installation slider 2, so that the two installation The sliders 2 approach each other, thereby driving the pipes on the two clamping mechanisms 4 to approach each other and butt together.

每个夹持基座5的中心位置均安装有控制杆7,且控制杆7的另一端连接在支撑架3上,并且控制杆7的中轴线与夹持基座5的水平中心线相重合设置;A control rod 7 is installed at the center of each clamping base 5 , and the other end of the control rod 7 is connected to the support frame 3 , and the central axis of the control rod 7 coincides with the horizontal centerline of the clamping base 5 set up;

工作时,将控制杆7与夹持基座5同心设置,可以利用控制杆7同步驱动夹持基座5上的夹持杆6收缩或张开,确保夹持杆6对管道夹持的同心度。During operation, the control rod 7 and the clamping base 5 are set concentrically. The control rod 7 can be used to synchronously drive the clamping rod 6 on the clamping base 5 to shrink or expand to ensure that the clamping rod 6 clamps the pipe concentrically. Spend.

夹持杆6的一端铰接连接有连接杆8,连接杆8的另一端铰接连接在支撑架3上,夹持杆6的另一端铰接连接有夹持脚9,且夹持脚9的夹持面为弧形设置,通过连接杆8将夹持杆6交接在支撑架3上,可以便于通过控制杆7的伸缩带动夹持基座5靠近或远离支撑架3,进而使得夹持杆6张开或收缩。One end of the clamping rod 6 is hingedly connected to a connecting rod 8, the other end of the connecting rod 8 is hingedly connected to the support frame 3, the other end of the clamping rod 6 is hingedly connected to a clamping foot 9, and the clamping foot 9 is The surface is arranged in an arc shape, and the clamping rod 6 is connected to the support frame 3 through the connecting rod 8, which can facilitate the expansion and contraction of the control rod 7 to drive the clamping base 5 closer to or away from the support frame 3, thereby allowing the clamping rod 6 to open Open or shrink.

夹持脚9的夹持面上贴合设置有夹持垫901;A clamping pad 901 is provided on the clamping surface of the clamping foot 9;

在夹持过程中,夹持脚9通过夹持垫901与管道进行接触,一方面能够增加与管道的接触摩擦,另一方面能够防止对管道表面产生夹伤。During the clamping process, the clamping feet 9 come into contact with the pipe through the clamping pad 901, which on the one hand can increase the contact friction with the pipe, and on the other hand can prevent the pipe surface from being pinched.

夹持基座5的外侧上端安装有稳定杆10,且稳定杆10穿接于支撑架3的内侧,且稳定杆10与支撑架3为伸缩连接;A stabilizer bar 10 is installed on the outer upper end of the clamping base 5, and the stabilizer bar 10 is connected to the inside of the support frame 3, and the stabilizer bar 10 and the support frame 3 are telescopically connected;

在夹持基座5移动时,会带动稳定杆10在支撑架3左右的进行伸缩,并且通过稳定杆10与支撑架3之间的连接,可以增加夹持基座5移动时的稳定性。When the clamping base 5 moves, the stabilizer bar 10 will be driven to expand and contract on the left and right sides of the support frame 3, and the connection between the stabilizer bar 10 and the support frame 3 can increase the stability of the clamping base 5 when it moves.

工作原理,在对管道进行拼接安装时,首先将管道放置在夹持机构4的夹持杆6之间,通过操作控制杆7缩回,可以带动夹持基座5向支撑架3一侧靠近,并且通过连接杆8的连接,将连接在支撑架3一侧的夹持杆6向外顶出,然后由于夹持基座5的连接,夹持杆6带有夹持脚9的一端会向内收缩,通过夹持脚9的向内收缩对管道进行夹持,两个夹持机构4的夹持方式相同,夹持完成之后,在使得夹持机构4沿着安装导轨1相互靠近进行对接拼装。The working principle is that when splicing and installing pipelines, first place the pipeline between the clamping rods 6 of the clamping mechanism 4, and by operating the control rod 7 to retract, the clamping base 5 can be driven closer to the support frame 3 side. , and through the connection of the connecting rod 8, the clamping rod 6 connected to the side of the support frame 3 is pushed outward, and then due to the connection of the clamping base 5, the end of the clamping rod 6 with the clamping foot 9 will Inward contraction, the pipe is clamped by the inward contraction of the clamping feet 9. The clamping methods of the two clamping mechanisms 4 are the same. After the clamping is completed, the clamping mechanisms 4 are moved closer to each other along the installation guide rail 1. Butt assembly.

在本说明书的描述中,参考术语“一个实施例”、“示例”、“具体示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本实用新型的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任何的一个或多个实施例或示例中以合适的方式结合。In the description of this specification, reference to the terms "one embodiment," "example," "specific example," etc., means that the specific features, structures, materials or characteristics described in connection with the embodiment or example are included in the invention. In at least one embodiment or example. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.

以上显示和描述了本实用新型的基本原理、主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。The basic principles, main features and advantages of the present utility model are shown and described above. Those skilled in the industry should understand that the present utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principles of the present utility model. Without departing from the spirit and scope of the present utility model, the present utility model can be There will also be various changes and improvements in the new model, and these changes and improvements all fall within the scope of the claimed utility model.

Claims (6)

1.一种法兰辅助安装装置,其特征在于:包括安装导轨(1),所述安装导轨(1)内设置有滑槽,滑槽内滑动设置有安装滑块(2),所述安装滑块(2)上端安装有支撑架(3),所述支撑架(3)的顶端安装有夹持机构(4),且所述夹持机构(4)对立且同心设置,所述夹持机构(4)包括有夹持基座(5)和夹持杆(6),每个所述夹持机构(4)上的所述夹持杆(6)均关于所述夹持基座(5)的水平中性线均匀阵列设置,且所述夹持基座(5)铰接连接在所述夹持杆(6)的中段位置。1. A flange auxiliary installation device, characterized in that: it includes an installation guide rail (1), a chute is provided in the installation guide rail (1), and a mounting slider (2) is slidably provided in the chute. A support frame (3) is installed on the upper end of the slider (2), and a clamping mechanism (4) is installed on the top of the support frame (3). The clamping mechanism (4) is opposite and concentrically arranged. The mechanism (4) includes a clamping base (5) and a clamping rod (6). The clamping rod (6) on each clamping mechanism (4) is relative to the clamping base (6). The horizontal neutral lines of 5) are arranged in a uniform array, and the clamping base (5) is hingedly connected to the middle position of the clamping rod (6). 2.根据权利要求1所述的一种法兰辅助安装装置,其特征在于:所述安装导轨(1)内滑动设置有两组所述安装滑块(2),且每个所述安装滑块(2)上均安装有支撑架(3),每个所述支撑架(3)上均安装有一个夹持机构(4),所述安装导轨(1)内转动设置有丝杆(201),且所述丝杆(201)穿接于所述安装滑块(2)的内侧,且所述丝杆(201)与所述安装滑块(2)之间为螺纹啮合连接,且两个所述安装滑块(2)的螺纹螺旋方向相反设置,所述丝杆(201)的一端连接有驱动电机(202)。2. A flange auxiliary installation device according to claim 1, characterized in that: two sets of installation slide blocks (2) are provided slidingly in the installation guide rail (1), and each of the installation slide blocks (2) A support frame (3) is installed on each block (2). A clamping mechanism (4) is installed on each support frame (3). A screw rod (201) is rotated in the installation guide rail (1). ), and the screw rod (201) is connected to the inside of the installation slide block (2), and the screw rod (201) and the installation slide block (2) are threadedly engaged, and the two The thread spiral directions of each of the mounting slide blocks (2) are arranged in opposite directions, and a driving motor (202) is connected to one end of the screw rod (201). 3.根据权利要求2所述的一种法兰辅助安装装置,其特征在于:每个所述夹持基座(5)的中心位置均安装有控制杆(7),且所述控制杆(7)的另一端连接在所述支撑架(3)上,并且所述控制杆(7)的中轴线与所述夹持基座(5)的水平中心线相重合设置。3. A flange auxiliary installation device according to claim 2, characterized in that: a control rod (7) is installed at the center of each clamping base (5), and the control rod (7) The other end of 7) is connected to the support frame (3), and the central axis of the control rod (7) coincides with the horizontal centerline of the clamping base (5). 4.根据权利要求3所述的一种法兰辅助安装装置,其特征在于:所述夹持杆(6)的一端铰接连接有连接杆(8),所述连接杆(8)的另一端铰接连接在所述支撑架(3)上,所述夹持杆(6)的另一端铰接连接有夹持脚(9),且所述夹持脚(9)的夹持面为弧形设置。4. A flange auxiliary installation device according to claim 3, characterized in that: one end of the clamping rod (6) is hingedly connected with a connecting rod (8), and the other end of the connecting rod (8) Hingedly connected to the support frame (3), the other end of the clamping rod (6) is hingedly connected to a clamping foot (9), and the clamping surface of the clamping foot (9) is arranged in an arc shape. . 5.根据权利要求4所述的一种法兰辅助安装装置,其特征在于:所述夹持脚(9)的夹持面上贴合设置有夹持垫(901)。5. A flange auxiliary installation device according to claim 4, characterized in that: a clamping pad (901) is provided on the clamping surface of the clamping foot (9). 6.根据权利要求5所述的一种法兰辅助安装装置,其特征在于:所述夹持基座(5)的外侧上端安装有稳定杆(10),且所述稳定杆(10)穿接于所述支撑架(3)的内侧,且所述稳定杆(10)与所述支撑架(3)为伸缩连接。6. A flange auxiliary installation device according to claim 5, characterized in that: a stabilizing bar (10) is installed on the outer upper end of the clamping base (5), and the stabilizing bar (10) passes through It is connected to the inner side of the support frame (3), and the stabilizer bar (10) and the support frame (3) are telescopically connected.
CN202321087767.3U 2023-05-08 2023-05-08 A flange auxiliary installation device Expired - Fee Related CN219704957U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321087767.3U CN219704957U (en) 2023-05-08 2023-05-08 A flange auxiliary installation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321087767.3U CN219704957U (en) 2023-05-08 2023-05-08 A flange auxiliary installation device

Publications (1)

Publication Number Publication Date
CN219704957U true CN219704957U (en) 2023-09-19

Family

ID=88014684

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321087767.3U Expired - Fee Related CN219704957U (en) 2023-05-08 2023-05-08 A flange auxiliary installation device

Country Status (1)

Country Link
CN (1) CN219704957U (en)

Similar Documents

Publication Publication Date Title
WO2024021288A1 (en) Pipeline construction apparatus
CN109732512B (en) A working method of a pipe fitting end fixing mechanism
CN105817829B (en) A kind of tube-like piece is welded rapid abutting joint positioner
CN209349721U (en) A HDPE steel strip reinforced spiral corrugated pipe welding device
CN219704957U (en) A flange auxiliary installation device
CN119566563A (en) Cutting equipment for gas engineering pipeline installation
CN217667536U (en) Processing and positioning device for stainless steel pressure pipeline
CN215334857U (en) Prefabricated direct-burried high temperature steam pipe fixed bolster
CN218747786U (en) Clamping fixtures for pipe butt joints
CN220488470U (en) Butt joint device for water pipe construction
CN219465297U (en) Hydraulic engineering pipeline is auxiliary fixtures for accurate butt joint
CN218612649U (en) An auxiliary connection device for municipal water supply and drainage pipelines
CN221941607U (en) Cross joint for steel supporting structure
CN116810287A (en) Be used for prefabricated group of assembled arc pipeline to device
CN221665433U (en) A pipe fixing device for civil construction
CN219649249U (en) A clamping mechanism for pipe turning processing
CN219054159U (en) A clamping device for pipeline testing
CN221196384U (en) Pipeline fixing frame convenient to butt joint
CN221365954U (en) A purification fan circulating water pipe docking device
CN221248590U (en) A pipe splicing and butt joint structure
CN223431507U (en) A quick docking structure for construction engineering pipelines
CN218905011U (en) Auxiliary installation tool for pipeline flange
CN221647774U (en) A water conservancy pipeline support connection structure
CN222095054U (en) An automatic welding clamp device for tower crane legs
CN216430728U (en) A kind of pipeline fixing device for water conservancy project construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230919

CF01 Termination of patent right due to non-payment of annual fee