CN219690530U - A kind of foundation pit structure molding waterproof construction structure - Google Patents

A kind of foundation pit structure molding waterproof construction structure Download PDF

Info

Publication number
CN219690530U
CN219690530U CN202320685127.6U CN202320685127U CN219690530U CN 219690530 U CN219690530 U CN 219690530U CN 202320685127 U CN202320685127 U CN 202320685127U CN 219690530 U CN219690530 U CN 219690530U
Authority
CN
China
Prior art keywords
layer
waterproof
fine stone
stone concrete
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202320685127.6U
Other languages
Chinese (zh)
Inventor
杨静
邓文瑶
刘锐
张笑冬
丛辉
于成红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Construction and Development Co Ltd
Original Assignee
China Construction First Group Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Construction and Development Co Ltd filed Critical China Construction First Group Construction and Development Co Ltd
Priority to CN202320685127.6U priority Critical patent/CN219690530U/en
Application granted granted Critical
Publication of CN219690530U publication Critical patent/CN219690530U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

一种基坑结构模筑防水施工构造,包括结构底板和结构侧墙,结构底板浇筑于垫层上,结构侧墙外侧、垫层上自下而上顺次设有永久砖墙、细石混凝土浇筑层和单层砌砖防水保护层,永久砖墙、细石混凝土浇筑层朝向结构侧墙的内侧还设有防水涂料抹面层,垫层上设有底层自粘防水板和细石混凝土保护层,底层自粘防水板满铺于垫层上,并上沿至细石混凝土浇筑层的防水涂料抹面层上,单层砌砖防水保护层内侧铺贴有侧向自粘防水板。本申请通过细石混凝土浇筑层的密实、均匀性,施工缝缝隙的压力薄弱点、涂料防水加强层进行进一步改善,完全避免了回填时可能产生的破坏,增强了该薄弱点受到的防水能力。

A foundation pit structure molding waterproof construction structure, including a structural bottom plate and a structural side wall. The structural bottom plate is poured on the cushion layer. Permanent brick walls and fine stone concrete are arranged on the outside of the structural side wall and on the cushion layer from bottom to top. The pouring layer and single-layer brickwork waterproof protective layer. The permanent brick wall and fine stone concrete pouring layer are also provided with a waterproof coating plaster layer on the inside facing the structural side wall. The cushion layer is provided with an underlying self-adhesive waterproofing board and fine stone concrete protection. layer, the bottom layer of self-adhesive waterproof board is fully paved on the cushion layer, and the upper edge reaches the waterproof coating surface layer of the fine stone concrete pouring layer, and the lateral self-adhesive waterproof board is paved on the inside of the single-layer brick waterproof protective layer. This application further improves the density and uniformity of the fine stone concrete pouring layer, the pressure weak points of the construction joints and the waterproof reinforcement layer of the paint, completely avoiding possible damage during backfilling and enhancing the waterproofing ability of the weak points.

Description

一种基坑结构模筑防水施工构造A kind of foundation pit structure molding waterproof construction structure

技术领域Technical field

本申请涉及建筑施工领域,具体属于一种基坑结构模筑防水施工构造。This application relates to the field of construction, specifically a foundation pit structure molding waterproof construction structure.

背景技术Background technique

城市轨道交通明挖法地下段和建筑工程地下室、厂房地下水池等渗漏问题层出不穷,渗漏水问题被誉为业内第一大顽疾,而明挖车站、明挖区间中底板、仰拱或筏板与侧墙施工缝的渗漏点又尤为突出,除混凝土浇筑等工艺原因,该处由于工艺折卷保护不易引起的砸伤、刺穿、烧焦、污染等工艺缺陷,还受到日晒雨淋的老化受损,为解决上述问题,提出了一种基坑结构模筑防水施工构造。Leakage problems arise one after another in the underground sections of urban rail transit using the open-cut method, as well as in the basements of construction projects and underground pools in factory buildings. The water leakage problem is known as the number one stubborn problem in the industry. The leakage point of the construction joint between the slab and the side wall is particularly prominent. In addition to the technical reasons such as concrete pouring, the process defects such as smashing, puncture, burning, and pollution due to the folding protection of the process are not easy to cause, and it is also exposed to the sun and rain. In order to solve the above problems caused by aging and damage due to flooding, a waterproof construction structure of foundation pit structure molding was proposed.

实用新型内容Utility model content

本实用新型的目的是提供一种基坑结构模筑防水施工构造,以解决现有技术中防水板老化受损、砸伤、刺穿、烧焦、污染导致底板与侧墙施工缝间渗漏的问题。The purpose of this utility model is to provide a foundation pit structure molding waterproof construction structure to solve the problem of leakage between the construction joints of the bottom plate and the side wall caused by aging damage, smashing, puncture, scorching and pollution of the waterproof board in the existing technology. The problem.

为实现上述目的,本实用新型采用如下技术方案:In order to achieve the above purpose, the present utility model adopts the following technical solutions:

与现有技术相比本实用新型具有以下特点和有益效果:Compared with the existing technology, this utility model has the following characteristics and beneficial effects:

一种基坑结构模筑防水施工构造,包括结构底板和结构侧墙,其特征在于:结构底板浇筑于垫层上,结构侧墙外侧、垫层上自下而上顺次设有永久砖墙、细石混凝土浇筑层和单层砌砖防水保护层,所述永久砖墙、细石混凝土浇筑层朝向结构侧墙的内侧还设有防水涂料抹面层,所述垫层上设有底层自粘防水板和细石混凝土保护层,所述底层自粘防水板满铺于垫层上,并上沿至细石混凝土浇筑层的防水涂料抹面层上,所述单层砌砖防水保护层内侧铺贴有侧向自粘防水板,所述侧向自粘防水板下延伸至细石混凝土浇筑层并与底层自粘防水板互相搭接,搭接处靠近结构侧墙外侧设有涂料防水加强层。A foundation pit structure molding waterproof construction structure, including a structural bottom plate and a structural side wall, which is characterized in that: the structural bottom plate is poured on the cushion layer, and permanent brick walls are provided on the outside of the structural side wall and on the cushion layer from bottom to top. , fine stone concrete pouring layer and single-layer brickwork waterproof protective layer. The permanent brick wall and fine stone concrete pouring layer are also provided with a waterproof paint plaster layer on the inner side of the structure side wall. The cushion layer is provided with a bottom self-propelled layer. Adhesive waterproof board and fine stone concrete protective layer. The bottom self-adhesive waterproof board is fully spread on the cushion layer and extends up to the waterproof coating plaster layer of the fine stone concrete pouring layer. The single-layer brick waterproof protective layer A lateral self-adhesive waterproofing board is paved on the inside. The lateral self-adhesive waterproofing board extends downward to the fine stone concrete pouring layer and overlaps with the bottom self-adhesive waterproofing board. The overlap is provided with paint waterproofing on the outside of the side wall of the structure. Reinforcement layer.

进一步优选地,所述涂料防水加强层涂满细石混凝土保护层外侧。Further preferably, the waterproof reinforcing layer of the paint is coated on the outside of the fine stone concrete protective layer.

进一步地,所述垫层与永久砖墙连接的阴角部位设有倒角,所述倒角上、底层自粘防水板内侧铺贴有防水加强层,倒角高50mm。Furthermore, the inner corner where the cushion layer is connected to the permanent brick wall is provided with a chamfer. A waterproof reinforcement layer is laid on the chamfer and on the inside of the bottom self-adhesive waterproof board. The chamfer height is 50mm.

进一步地,所述细石混凝土保护层厚度为50mm,细石混凝土保护层高500~550mm。Further, the thickness of the fine stone concrete protective layer is 50mm, and the height of the fine stone concrete protective layer is 500~550mm.

进一步地,所述细石混凝土浇筑层的水平二等分线高于结构侧墙的纵向水平施工缝。Further, the horizontal bisector of the fine stone concrete pouring layer is higher than the longitudinal horizontal construction joint of the structural side wall.

此外,所述细石混凝土浇筑层为C15或C20细石混凝土层。In addition, the fine stone concrete pouring layer is a C15 or C20 fine stone concrete layer.

更加优选地,所述侧向自粘防水板与底层自粘防水板搭接宽度大于100mm。More preferably, the overlap width of the lateral self-adhesive waterproof board and the bottom self-adhesive waterproof board is greater than 100mm.

本申请通过细石混凝土浇筑层的密实、均匀性,施工缝缝隙的压力薄弱点、涂料防水加强层进行进一步改善,完全避免了回填时可能产生的破坏,增强了该薄弱点受到的防水能力。This application further improves the density and uniformity of the fine stone concrete pouring layer, the pressure weak points of the construction joints and the waterproof reinforcement layer of the paint, completely avoiding possible damage during backfilling and enhancing the waterproofing ability of the weak points.

附图说明Description of the drawings

图1为本申请一种基坑结构模筑防水施工构造的结构示意图。Figure 1 is a schematic structural diagram of a waterproof construction structure for foundation pit structure molding in this application.

具体实施方式Detailed ways

为使本实用新型实现的技术手段、创新特征、达成目的与功效易于明白了解,下面对本实用新型进一步说明。In order to make the technical means, innovative features, objectives and effects achieved by the present utility model easy to understand, the present utility model will be further described below.

在此记载的实施例为本实用新型的特定的具体实施方式,用于说明本实用新型的构思,均是解释性和示例性的,不应解释为对本实用新型实施方式及本实用新型范围的限制。除在此记载的实施例外,本领域技术人员还能够基于本申请权利要求书和说明书所公开的内容采用显而易见的其它技术方案,这些技术方案包括采用对在此记载的实施例的做出任何显而易见的替换和修改的技术方案。The embodiments described here are specific implementations of the present utility model. They are used to illustrate the concept of the present utility model and are illustrative and exemplary. They should not be construed as limiting the implementation of the present utility model and the scope of the present utility model. limit. In addition to the embodiments recorded here, those skilled in the art can also adopt other obvious technical solutions based on the content disclosed in the claims and the specification of this application. These technical solutions include the use of any obvious technical solutions to the embodiments recorded here. Technical solutions for replacement and modification.

一种基坑结构模筑防水施工构造,如图1所示,包括结构底板1和结构侧墙2,结构底板1浇筑于垫层14上,结构侧墙2外侧、垫层14上自下而上顺次设有永久砖墙3、细石混凝土浇筑层4和单层砌砖防水保护层5,永久砖墙3、细石混凝土浇筑层4朝向结构侧墙2的内侧还设有防水涂料抹面层6,垫层14上设有底层自粘防水板7和细石混凝土保护层8,底层自粘防水板7满铺于垫层14上,并上沿至细石混凝土浇筑层4的防水涂料抹面层6上,单层砌砖防水保护层5内侧铺贴有侧向自粘防水板9,侧向自粘防水板9向下延伸至细石混凝土浇筑层4并与底层自粘防水板7互相搭接,搭接处靠近结构侧墙2外侧设有涂料防水加强层10,涂料防水加强层10涂满细石混凝土保护层8外侧,垫层14与永久砖墙3连接的阴角部位设有倒角11,倒角11上、底层自粘防水板7内侧铺贴有防水加强层12,倒角11高50mm,细石混凝土保护层8厚度为50mm,细石混凝土保护层8高500~550mm,细石混凝土浇筑层4的水平二等分线高于结构侧墙2的纵向水平施工缝13,细石混凝土浇筑层4为C15或C20细石混凝土层,侧向自粘防水板9与底层自粘防水板7搭接宽度大于100mm。A foundation pit structure molding waterproof construction structure, as shown in Figure 1, includes a structural bottom plate 1 and a structural side wall 2. The structural bottom plate 1 is poured on the cushion layer 14. The outside of the structural side wall 2 and the cushion layer 14 are formed from bottom to top. There is a permanent brick wall 3, a fine stone concrete pouring layer 4 and a single-layer brick waterproofing protective layer 5 in sequence. The permanent brick wall 3 and the fine stone concrete pouring layer 4 are also provided with a waterproof coating plaster on the inner side of the structure side wall 2. The surface layer 6 and the cushion layer 14 are provided with a bottom self-adhesive waterproofing board 7 and a fine stone concrete protective layer 8. The bottom self-adhesive waterproof board 7 is fully spread on the cushion layer 14 and extends up to the waterproof layer of the fine stone concrete pouring layer 4. On the paint plaster layer 6, a lateral self-adhesive waterproofing board 9 is paved on the inside of the single-layer brick waterproofing protective layer 5. The lateral self-adhesive waterproofing board 9 extends downward to the fine stone concrete pouring layer 4 and is self-adhesive and waterproof with the bottom layer. The boards 7 overlap each other. The overlap is close to the outside of the structural side wall 2 and is provided with a paint waterproof reinforcement layer 10. The paint waterproof reinforcement layer 10 is coated with the outside of the fine stone concrete protective layer 8. The cushion layer 14 is connected to the inner corner of the permanent brick wall 3. The location is provided with a chamfer 11. There is a waterproof reinforcing layer 12 on the chamfer 11 and on the inside of the bottom self-adhesive waterproof board 7. The chamfer 11 is 50mm high. The thickness of the fine stone concrete protective layer 8 is 50mm. The fine stone concrete protective layer 8 is high. 500~550mm, the horizontal bisector of the fine stone concrete pouring layer 4 is higher than the longitudinal horizontal construction joint 13 of the structural side wall 2, the fine stone concrete pouring layer 4 is a C15 or C20 fine stone concrete layer, and the lateral self-adhesive waterproof board 9. The overlap width with the bottom self-adhesive waterproof board 7 is greater than 100mm.

本申请施工步骤如下:The construction steps for this application are as follows:

S1:基坑开挖至基底,对基坑排水、基底处理、地质及承载力、平面位置、尺寸、高程等检验确认,及时清底并浇筑垫层混凝土;S1: Excavate the foundation pit to the base, inspect and confirm the drainage of the foundation pit, base treatment, geology and bearing capacity, plane position, size, elevation, etc., clear the bottom in time and pour cushion concrete;

S2:分区浇筑段砖胎膜砌筑抹灰,具体步骤如下:S2: Partial pouring section brick membrane masonry and plastering, the specific steps are as follows:

S2.1:分区浇筑段砖胎膜砌筑,砖胎膜砌筑高度较底板、侧墙施工缝高程略高,砌筑厚度一般为24墙,不得采用蒸压加气块等易吸水、体积收缩大的砖砌材料:S2.1: Brick membrane masonry in the divided pouring section. The height of the brick membrane masonry is slightly higher than the elevation of the floor and side wall construction joints. The masonry thickness is generally 24 walls. Autoclaved aerated blocks, which are easy to absorb water and are not allowed to be bulky, are not allowed. Brickwork materials with large shrinkage:

S2.2:砖胎膜内膜抹面及阴阳角倒角设置,以防止砌筑砖块、灰缝的尖锐物损伤防水层,确保防水板铺设时平顺过渡;S2.2: The inner membrane of the brick membrane is plastered and the inner and outer corners are chamfered to prevent sharp objects from masonry bricks and mortar joints from damaging the waterproof layer, and to ensure a smooth transition when laying waterproof boards;

S3:防水层、细石保护层及筏板或底板浇筑,铺设时为便于防止侧壁防水层滑落、不顺直、偏移,可直接在砖胎膜顶部用锚钉固定;S3: The waterproof layer, the fine stone protective layer and the raft or bottom plate are poured. In order to prevent the side wall waterproof layer from slipping, being uneven and shifting during laying, it can be directly fixed with anchors on the top of the brick membrane;

S4:上部结构继续施工,浇筑至一定高度或浇筑完成且强度符合要求后,砖胎膜侧壁与基坑壁之间按要求分层回填;S4: The construction of the superstructure continues. After pouring to a certain height or after the pouring is completed and the strength meets the requirements, the space between the brick membrane side wall and the foundation pit wall is backfilled in layers as required;

S5:拆除砖胎膜、防水板搭焊接、区段及接缝混凝土浇筑,具体步骤如下:S5: Remove the brick membrane, weld the waterproof board, and pour concrete for sections and joints. The specific steps are as follows:

S5.1:砖胎膜顶部杂物清理,平行切除砖胎膜顶部有钉部分,人工拆除砖胎膜顶部部分砌筑,暴露新鲜、未老化防水层;S5.1: Clean the debris on the top of the brick membrane, cut off the nailed part on the top of the brick membrane in parallel, and manually remove the top part of the brick membrane to expose the fresh, unaging waterproof layer;

S5.2:揭露的未污染、未老化防水层与上层防水层按设计进行连接和加强层施工,下方防水层覆盖上部防水层并检验;S5.2: The exposed non-polluted and non-aging waterproof layer and the upper waterproof layer are connected and reinforced as designed, and the lower waterproof layer covers the upper waterproof layer and is inspected;

S5.3:防水层搭接完成后,用细石混凝土浇筑已防水加强段,振捣密实;S5.3: After the overlapping of the waterproof layer is completed, pour the waterproof reinforced section with fine stone concrete and vibrate it tightly;

S6:上部防水保护层、回填、结构等工序。S6: Upper waterproof protective layer, backfill, structure and other processes.

步骤S2.1中,具体步骤为:砖胎膜砌筑高度较底板、侧墙施工缝高程至少高1匹砖或50mm;砖胎膜砌筑高度以下6匹砖位置的灰缝厚度缩短一半,并交错布置,以利于人工拆除。In step S2.1, the specific steps are: the height of the brick membrane construction is at least 1 brick or 50mm higher than the elevation of the floor and side wall construction joints; the thickness of the mortar joints at the position of 6 bricks below the brick membrane construction height is shortened by half. And arranged in a staggered manner to facilitate manual dismantling.

步骤S2.2中,具体步骤为:在步骤S2.2中,具体步骤为:砖胎膜内壁顶部下方至少6匹砖采用土工布做隔离层和拆除缓冲保护层。In step S2.2, the specific steps are: In step S2.2, the specific steps are: use geotextile as an isolation layer for at least 6 bricks below the top of the inner wall of the brick membrane and remove the buffer protective layer.

步骤S5.1中,具体步骤为:拆除顶部砖胎膜砖砌厚度6匹即约300mm,以确保防水层搭接时≥100mm,施工缝以下加强层宽度≥500mm。In step S5.1, the specific steps are: remove the top bricks and membrane bricks to a thickness of 6 pieces, which is about 300mm, to ensure that the waterproof layer is ≥100mm when overlapped, and the width of the reinforcement layer below the construction joint is ≥500mm.

步骤S5.2中,具体步骤为:施工缝防水层及防水加强层施工完毕后,面层采用双层防渗沥青涂层或2mm厚波力尔液体橡胶喷涂材料喷涂。In step S5.2, the specific steps are: after the construction of the construction joint waterproof layer and waterproof reinforcement layer is completed, the surface layer is sprayed with a double-layer anti-seepage asphalt coating or 2mm thick Bolier liquid rubber spray material.

步骤S5.3中,具体步骤为:浇筑C15或C20细石混凝土,浇筑高度至少500mm,即施工缝以下300mm、施工缝以上250mm,浇筑厚度≥150mm,使防水加强层、防水层、喷涂层、混凝土粘结成整体。In step S5.3, the specific steps are: pour C15 or C20 fine stone concrete with a pouring height of at least 500mm, that is, 300mm below the construction joint and 250mm above the construction joint. The pouring thickness is ≥150mm, so that the waterproof reinforcement layer, waterproof layer, spray layer, Concrete is bonded into a whole.

1、砖胎膜砌筑高度较底板、侧墙施工缝高程至少高1匹砖即50mm,能够解决防水层顶部栓钉固定问题,当前国内防水板拱顶、侧墙的固定措施主要有垫圈热熔和背后棉绳固定两种基本方法,其牢固程度均有易掉落的严重缺陷,其次还衍生出一种自粘型防水板先用自粘层采用垫圈与栓钉固定后再铺设防水层,也造成严防水板浪费。通过砖胎膜顶面的栓钉固定,搭接前进行确保搭接宽度后进行切割,技术可靠,经济可行。1. The height of brick membrane masonry must be at least 1 brick or 50mm higher than the elevation of the floor and side wall construction joints, which can solve the problem of bolt fixation at the top of the waterproof layer. Currently, the main fixing measures for domestic waterproof board vaults and side walls include gasket heat. The two basic methods of fixing are the melting method and the cotton rope fixing at the back. Both of them have serious shortcomings in that they are easy to fall off. Secondly, a self-adhesive waterproof board is derived. The self-adhesive layer is first fixed with washers and studs, and then the waterproof layer is laid. , and also cause severe waste of waterproof boards. It is fixed by bolts on the top surface of the brick membrane, and is cut after ensuring the width of the overlap before overlapping. It is technically reliable and economically feasible.

2、在步骤S5.1中,通过顶部砖胎膜6匹的保护和拆除方法,能够解决风吹日晒引起的老化问题和上部结构施工时混凝土、模板、钢筋、焊接对防水板的刺穿、烧伤、烧穿等问题。2. In step S5.1, through the protection and removal of 6 pieces of brick membranes on the top, the aging problem caused by wind and sun and the puncture of the waterproof board by concrete, formwork, steel bars and welding during the construction of the superstructure can be solved , burns, burn through and other problems.

3、在步骤5.2中,防水板搭接后,通过揭开顶部砖胎膜并进行双层防渗沥青和波力尔液体橡胶的喷涂或涂刷,进一步加强施工缝关键位置的防水作用。3. In step 5.2, after the waterproof boards are overlapped, the waterproofing effect of the key locations of the construction joints is further enhanced by uncovering the top brick membrane and spraying or brushing double layers of anti-seepage asphalt and Bolier liquid rubber.

4、在步骤5.3中,通过混凝土的密实、均匀性,施工缝缝隙的压力薄弱点、防水加强层进行进一步改善,完全避免了回填时可能产生的破坏,增强了该薄弱点受到的防水能力。4. In step 5.3, through the denseness and uniformity of the concrete, the pressure weak points of the construction joints and the waterproof reinforcement layer are further improved to completely avoid possible damage during backfilling and enhance the waterproof ability of the weak points.

本实用新型未涉及部分均与现有技术相同或可采用现有技术加以实现。The parts not involved in the present utility model are the same as the existing technology or can be implemented using the existing technology.

以上显示和描述了本实用新型的基本原理和主要特征和本实用新型的优点,对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。The basic principles and main features of the present utility model and the advantages of the present utility model have been shown and described above. For those skilled in the art, it is obvious that the present utility model is not limited to the details of the above exemplary embodiments, and does not deviate from the present utility model. Without the spirit or basic characteristics of the invention, the present invention can be implemented in other specific forms. Therefore, from any point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the appended claims rather than the above description, and it is therefore intended that all claims falling within the rights All changes within the meaning and scope of the required equivalent elements are included in the present invention. Any reference signs in the claims shall not be construed as limiting the claim in question.

此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described in terms of implementations, not each implementation only contains an independent technical solution. This description of the specification is only for the sake of clarity, and those skilled in the art should take the specification as a whole. , the technical solutions in each embodiment can also be appropriately combined to form other implementations that can be understood by those skilled in the art.

Claims (7)

1.一种基坑结构模筑防水施工构造,包括结构底板(1)和结构侧墙(2),其特征在于:结构底板(1)浇筑于垫层(14)上,结构侧墙(2)外侧、垫层(14)上自下而上顺次设有永久砖墙(3)、细石混凝土浇筑层(4)和单层砌砖防水保护层(5),所述永久砖墙(3)、细石混凝土浇筑层(4)朝向结构侧墙(2)的内侧还设有防水涂料抹面层(6),所述垫层(14)上设有底层自粘防水板(7)和细石混凝土保护层(8),所述底层自粘防水板(7)满铺于垫层(14)上,并上沿至细石混凝土浇筑层(4)的防水涂料抹面层(6)上,所述单层砌砖防水保护层(5)内侧铺贴有侧向自粘防水板(9),所述侧向自粘防水板(9)向下延伸至细石混凝土浇筑层(4)并与底层自粘防水板(7)互相搭接,搭接处靠近结构侧墙(2)外侧设有涂料防水加强层(10)。1. A foundation pit structure molding waterproof construction structure, including a structural bottom plate (1) and a structural side wall (2), which is characterized in that: the structural bottom plate (1) is poured on the cushion (14), and the structural side wall (2) ), a permanent brick wall (3), a fine stone concrete pouring layer (4) and a single-layer brick waterproofing protective layer (5) are provided in sequence from bottom to top on the outside and on the cushion layer (14). The permanent brick wall (3) 3). The fine stone concrete pouring layer (4) is also provided with a waterproof paint plaster layer (6) on the inside facing the structural side wall (2), and the bottom layer of self-adhesive waterproofing board (7) is provided on the cushion layer (14). and fine stone concrete protective layer (8), the bottom self-adhesive waterproof board (7) is fully spread on the cushion layer (14), and is connected to the waterproof coating plaster layer (6) of the fine stone concrete pouring layer (4) ), a lateral self-adhesive waterproof board (9) is paved on the inside of the single-layer brick waterproof protective layer (5), and the lateral self-adhesive waterproof board (9) extends downward to the fine stone concrete pouring layer ( 4) and overlap with the bottom self-adhesive waterproof board (7), and a paint waterproof reinforcement layer (10) is provided on the outside of the overlap near the structural side wall (2). 2.如权利要求1所述的一种基坑结构模筑防水施工构造,其特征在于:所述涂料防水加强层(10)涂满细石混凝土保护层(8)外侧。2. A foundation pit structure molding waterproof construction structure according to claim 1, characterized in that: the waterproof reinforced layer of paint (10) is coated with the outside of the fine stone concrete protective layer (8). 3.如权利要求1所述的一种基坑结构模筑防水施工构造,其特征在于:所述垫层(14)与永久砖墙(3)连接的阴角部位设有倒角(11),所述倒角(11)上、底层自粘防水板(7)内侧铺贴有防水加强层(12),倒角(11)高50mm。3. A foundation pit structure molding waterproof construction structure according to claim 1, characterized in that: the inner corner where the cushion (14) is connected to the permanent brick wall (3) is provided with a chamfer (11) , a waterproof reinforcement layer (12) is paved on the inside of the chamfer (11) and the bottom self-adhesive waterproof board (7), and the chamfer (11) is 50mm high. 4.如权利要求1所述的一种基坑结构模筑防水施工构造,其特征在于:所述细石混凝土保护层(8)厚度为50mm,细石混凝土保护层(8)高500~550mm。4. A foundation pit structure molding waterproof construction structure according to claim 1, characterized in that: the thickness of the fine stone concrete protective layer (8) is 50mm, and the fine stone concrete protective layer (8) is 500~550mm high . 5.如权利要求1所述的一种基坑结构模筑防水施工构造,其特征在于:所述细石混凝土浇筑层(4)的水平二等分线高于结构侧墙(2)的纵向水平施工缝(13)。5. A foundation pit structure molding waterproof construction structure according to claim 1, characterized in that: the horizontal bisector of the fine stone concrete pouring layer (4) is higher than the longitudinal direction of the structural side wall (2). Horizontal construction joints (13). 6.如权利要求1所述的一种基坑结构模筑防水施工构造,其特征在于:所述细石混凝土浇筑层(4)为C15或C20细石混凝土层。6. A foundation pit structure molding waterproof construction structure according to claim 1, characterized in that: the fine stone concrete pouring layer (4) is a C15 or C20 fine stone concrete layer. 7.如权利要求1~6任意一项所述的一种基坑结构模筑防水施工构造,其特征在于:所述侧向自粘防水板(9)与底层自粘防水板(7)搭接宽度大于100mm。7. A foundation pit structure molding waterproof construction structure according to any one of claims 1 to 6, characterized in that: the lateral self-adhesive waterproof board (9) is overlapped with the bottom self-adhesive waterproof board (7) The connection width is greater than 100mm.
CN202320685127.6U 2023-03-31 2023-03-31 A kind of foundation pit structure molding waterproof construction structure Expired - Fee Related CN219690530U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320685127.6U CN219690530U (en) 2023-03-31 2023-03-31 A kind of foundation pit structure molding waterproof construction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320685127.6U CN219690530U (en) 2023-03-31 2023-03-31 A kind of foundation pit structure molding waterproof construction structure

Publications (1)

Publication Number Publication Date
CN219690530U true CN219690530U (en) 2023-09-15

Family

ID=87962150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320685127.6U Expired - Fee Related CN219690530U (en) 2023-03-31 2023-03-31 A kind of foundation pit structure molding waterproof construction structure

Country Status (1)

Country Link
CN (1) CN219690530U (en)

Similar Documents

Publication Publication Date Title
CN110607809B (en) Waterproof construction method for basement of building engineering
CN110747899B (en) Basement waterproof construction method
CN105862873A (en) Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit
CN106801517B (en) A kind of prefabricated porous plate brick mixed structure of school building exterior reinforcement and strengthening method
CN107190844A (en) The waterproof and water drainage system and construction method of a kind of basement bottom board and exterior wall
CN112112295A (en) Reinforcing construction method for post-cast strip of post-sealed outer wall
CN114482135A (en) Advanced water stop structure of basement exterior wall post-cast strip and construction method
CN206599798U (en) Advanced water-stop post-pouring belt of foundation slab structure
CN110453884A (en) Fully floating vibration-damping and sound-insulating floor and its construction method
CN102839691A (en) Quick sealing method and device for sandless cement pipe deep well dewatering wellhead
CN104594388B (en) A kind of advanced sealing pouring after settlement of sole plate
CN115387393A (en) Quick construction method of post-pouring belt pre-sealing
CN110541431A (en) waterproof structure of pipe gallery and construction method thereof
CN110644538A (en) Basement side wall extra front and back pouring belt periphery protection structure
CN102425228A (en) Multifunctional environment-friendly movable water tank
CN205804419U (en) The tenon formula joint waterproofing structure of concrete waist rail embedded structure side wall
CN202401561U (en) Multifunctional environment-friendly movable water channel
CN108589793A (en) A kind of poured band of outer wall of basement postposition assembled advance water stop construction method
CN219690530U (en) A kind of foundation pit structure molding waterproof construction structure
CN218148527U (en) Subside post-cast strip structure sealed in advance
CN210117738U (en) An underground waterproof structure
CN217352628U (en) Basement waterproof structure
CN205839811U (en) A kind of post-cast strip exterior wall advanced water-stopping processes structure
CN115961647A (en) Advance closed structure, construction structure and construction method of post-pouring belt on basement roof
CN115897662A (en) A buffer structure for connecting old and new basements and its construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230915

CF01 Termination of patent right due to non-payment of annual fee