CN219672115U - Tool type suspension steel template system - Google Patents

Tool type suspension steel template system Download PDF

Info

Publication number
CN219672115U
CN219672115U CN202321318935.5U CN202321318935U CN219672115U CN 219672115 U CN219672115 U CN 219672115U CN 202321318935 U CN202321318935 U CN 202321318935U CN 219672115 U CN219672115 U CN 219672115U
Authority
CN
China
Prior art keywords
wire rope
bottom plate
steel wire
sleeve
stress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321318935.5U
Other languages
Chinese (zh)
Inventor
胡建康
李俊
余小东
陈江
马俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN202321318935.5U priority Critical patent/CN219672115U/en
Application granted granted Critical
Publication of CN219672115U publication Critical patent/CN219672115U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a tool type suspension steel template system, which relates to the technical field of building construction and comprises a bottom plate arranged at the bottom of a hole and stress frames arranged at the two sides of the hole, wherein a steel wire rope is arranged on the bottom plate, the top end of the steel wire rope is fixed at the top of the stress frame and used for suspending the bottom plate, a sleeve is arranged on the bottom plate along the vertical direction, the steel wire rope penetrates through the sleeve and is connected with the bottom plate, the stress frames comprise support frames arranged at the two sides of the hole and stress rods transversely arranged at the tops of the two support frames, and the top ends of the steel wire rope are fixed on the stress rods; the steel template is customized to replace the traditional wood template, the special tool type stress frame is matched, the steel template and the stress frame are connected by utilizing the characteristics of high flexibility and high strength of the steel wire rope, a set of tool type template and a supporting system are integrally formed, the uniformity is high, the safety is high, and the construction is simple and convenient.

Description

Tool type suspension steel template system
Technical Field
The utility model relates to the technical field of building construction, in particular to a tool type suspension steel template system.
Background
The steel template is used for concrete pouring molding, except steel templates, wood templates, plywood templates and the like, the steel template is widely applied to constructional engineering by the characteristics of repeated use, attractive concrete pouring molding and the like, particularly in the floor construction process, holes are reserved often because of construction requirements, in the existing construction technology, when the reserved holes are plugged, the steel template is generally constructed by adopting a disposable wood template matched with a steel pipe scaffold support system, the wood template is used for plugging the bottoms of the holes, then a scaffold is erected at the bottom to support the wood templates, and the construction mode is large in mounting and dismounting difficulty and poor in adjustability, and influences the construction of the next floor and indoor construction and decoration engineering which are synchronously carried out, more importantly, the construction mode cannot embody the advantages of assembly type construction.
Disclosure of Invention
In view of the above, the utility model provides a tool type suspension steel template system, which can improve the speed and efficiency of the concrete pouring of the reserved hole, ensure the safety and stability in the pouring process and realize the tooling of the reserved hole concrete pouring template and a supporting system.
The tool type suspension steel template system provided by the utility model adopts the following technical scheme:
the utility model provides a steel form system is hung to instrument formula, includes the bottom plate that sets up in the entrance to a cave bottom and sets up in the atress frame at entrance to a cave both sides, be equipped with wire rope on the bottom plate, wire rope's top is fixed at the atress frame top and is used for hanging the bottom plate, be equipped with the sleeve pipe along vertical direction on the bottom plate, wire rope passes the sleeve pipe and is connected with the bottom plate, the atress frame is including setting up in the support frame at entrance to a cave both sides and the atress pole at two support frame tops of transverse arrangement, wire rope's top is fixed on the atress pole.
Further, a clamping piece for fixing the steel wire rope is arranged at the bottom of the bottom plate, and the steel wire rope penetrates through the bottom plate and is fixedly connected with the clamping piece.
Further, the clamping piece comprises a stud penetrating through the bottom plate and being inserted into the sleeve through threads and a fixing plate used for fixing the steel wire rope, the steel wire rope penetrates through the stud and the fixing plate and is fixed on the fixing plate, and the fixing plate is abutted to the bottom of the bottom plate.
Further, the two stress rods are symmetrically arranged on the support frame, and the steel wire rope penetrates through the two stress rods and is fixed on the stress rods.
Further, a clamping block used for being clamped on the two stress rods is arranged at a position, close to the top end, on the steel wire rope.
Further, two the last spacing groove that is used for preventing fixture block gliding that all is equipped with of atress pole, the fixture block is contradicted in the spacing inslot.
Further, the top of two support frames is equipped with the sleeve along the horizontal direction, the sleeve that the both ends slip of atress pole passed on two support frames is used for adjusting the distance between two support frames, be equipped with the fastening bolt that is used for fixing the atress pole on the sleeve.
In summary, the present utility model comprises at least one of the following beneficial effects: the utility model adopts the custom steel template to replace the traditional wood template and is matched with the special tool type stress frame, and the steel template and the stress frame are connected by utilizing the characteristics of high flexibility and high strength of the steel wire rope, so that a set of tool type template and supporting system is integrally formed, the uniformity is high, the safety is high, and the construction is simple and convenient.
Drawings
FIG. 1 is a schematic diagram of an embodiment of the present utility model;
FIG. 2 is a schematic view of the structure in which the sleeve is mounted on the base plate;
fig. 3 is a schematic side view of a force-bearing frame.
Reference numerals illustrate:
1. a bottom plate; 11. a wire rope; 12. a sleeve; 13. a clamping piece; 131. a screw; 132. a fixing plate; 14. a clamping block; 2. a stress frame; 21. a support frame; 211. a sleeve; 212. a fastening bolt; 22. a force-bearing rod; 221. and a limit groove.
Detailed Description
Other advantages and effects of the present utility model will become apparent to those skilled in the art from the following disclosure, which describes the embodiments of the present utility model with reference to specific examples. The utility model may be practiced or carried out in other embodiments that depart from the specific details, and the details of the present description may be modified or varied from the spirit and scope of the present utility model.
The utility model is described in further detail below with reference to fig. 1-3.
The embodiment of the utility model discloses a tool type suspension steel template system. Referring to fig. 1-3, the tool type suspension steel template system comprises a bottom plate 1 arranged at the bottom of a hole and stress frames 2 arranged at two sides of the hole, wherein a steel wire rope 11 is arranged on the bottom plate 1, the top end of the steel wire rope 11 is fixed at the top of the stress frame 2 and used for suspending the bottom plate 1, the bottom plate 1 is transported to the bottom of the hole when in use, the stress frame 2 is placed on the hole, the bottom plate 1 is suspended on the stress frame 2 by using the steel wire rope 11, concrete is poured on the bottom plate 1, the bottom plate 1 is removed after the concrete is solidified, and the bottom plate 1 and the stress frame 2 are transported to a next place to be poured for repeated use.
In order to avoid the situation that the steel wire rope 11 cannot be taken out when being buried in concrete in a pouring process, the bottom plate 1 is provided with the sleeve 12 in the vertical direction, the steel wire rope 11 penetrates through the sleeve 12 to be connected with the bottom plate 1, the bottom of the bottom plate 1 is provided with the clamping piece 13 used for fixing the steel wire rope 11, the steel wire rope 11 penetrates through the bottom plate 1 to be fixedly connected with the clamping piece 13, the clamping piece 13 comprises a stud 131 penetrating through the bottom plate 1 to be inserted into the sleeve 12 and a fixing plate 132 used for fixing the steel wire rope 11, the steel wire rope 11 penetrates through the stud 131 and the fixing plate 132 and is fixed on the fixing plate 132, the fixing plate 132 is pulled out from the upper side of the sleeve 12, the steel wire rope 11 penetrates through the sleeve 12 and the clamping piece 13 during use, the sleeve 12 is aligned to an installation position, the stud 131 of the clamping piece 13 penetrates through the bottom plate 1 and is inserted into the bottom of the sleeve 12 in a threaded mode, the fixing plate 132 is abutted to the bottom of the bottom plate 1, the steel wire rope 11 is fixed on the fixing plate 132, after concrete is poured, the steel wire rope 11 is loosened from the fixing plate 132, the steel wire rope 11 is pulled out from the fixing plate 132, the stud 11 is pulled out from the upper side of the fixing plate 12, the sleeve 11 is rotated, the sleeve is removed from the bottom plate 12, the sleeve is removed from the bottom plate is rotated, and the sleeve is removed from the bottom plate 12, the sleeve is removed from the bottom by the sleeve is more conveniently, and the bottom is removed from the bottom plate by the mould, and the bottom is more convenient.
In this embodiment, the stress frame 2 includes a support frame 21 disposed at two sides of the hole and a stress rod 22 transversely disposed at the top of the two support frames 21, the support frame 21 is made of a plurality of steel welded into a tripod, the top end of the steel wire rope 11 is fixed on the stress rod 22, in order to make the stress rod 22 bear greater gravity, the stress rods 22 are disposed two and symmetrically disposed on the support frame 21, and the steel wire rope 11 passes through the two stress rods 22 and is fixed on the stress rod 22.
Meanwhile, in order to fix the steel wire rope 11 on the stress rods 22 more conveniently, clamping blocks 14 used for being clamped on the two stress rods 22 are arranged at positions, close to the top ends, of the steel wire rope 11, when the steel wire rope 11 is fixed, the bottom ends of the steel wire rope 11 penetrate through the two stress rods 22, so that the clamping blocks 14 are clamped on the two stress rods 22, the steel wire rope 11 can be fixed on the stress rods 22, and a suspension state is formed for the bottom plate 1.
Because the fixture block 14 can receive great power when pouring concrete, in order to avoid the fixture block 14 to remove on atress pole 22 when pouring concrete, lead to the uneven condition of bottom plate 1 atress to appear, all be equipped with on two atress poles 22 and be used for preventing the gliding spacing groove 221 of fixture block 14, fixture block 14 is contradicted in spacing groove 221, and spacing groove 221 can play spacing effect to fixture block 14, avoids the condition that fixture block 14 removed on atress pole 22 when pouring concrete to appear.
When constructing in different positions, the hole of reserving can have the condition of size difference, and the top of two support frames 21 all is equipped with sleeve 211 along the horizontal direction, and the sleeve 211 that the both ends of atress pole 22 were slided and are passed on two support frames 21 is used for adjusting the distance between two support frames 21, is equipped with the fastening bolt 212 that is used for fixing atress pole 22 on the sleeve 211, and when the width of hole was great, the fastening bolt 212 on the sleeve 221 was loosened, moves support frame 21 to both sides, makes atress pole 22 in sleeve 211 internal sliding, can adjust the distance between two support frames 21 for the device can adapt to the hole of equidimension.
Finally, it is noted that the above embodiments are only for illustrating the technical solution of the present utility model and not for limiting the same, and although the present utility model has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that modifications and equivalents may be made thereto without departing from the spirit and scope of the technical solution of the present utility model, which is intended to be covered by the scope of the claims of the present utility model.

Claims (7)

1. A tool-type suspended steel form system, characterized in that: including setting up in bottom plate (1) of entrance to a cave bottom and setting up in atress frame (2) of entrance to a cave both sides, be equipped with wire rope (11) on bottom plate (1), the top of wire rope (11) is fixed at atress frame (2) top and is used for hanging bottom plate (1), be equipped with sleeve pipe (12) along vertical direction on bottom plate (1), wire rope (11) pass sleeve pipe (12) and are connected with bottom plate (1), atress frame (2) are including setting up in support frame (21) of entrance to a cave both sides and transversely being placed in atress pole (22) at two support frames (21) tops, the top of wire rope (11) is fixed on atress pole (22).
2. The tool-suspended steel template system of claim 1, wherein: the bottom of the bottom plate (1) is provided with a clamping piece (13) for fixing the steel wire rope (11), and the steel wire rope (11) penetrates through the bottom plate (1) to be fixedly connected with the clamping piece (13).
3. The tool-suspended steel template system of claim 2, wherein: the clamping piece (13) comprises a stud (131) which penetrates through the bottom plate (1) to be inserted into the sleeve (12) in a threaded mode and a fixing plate (132) used for fixing the steel wire rope (11), the steel wire rope (11) penetrates through the stud (131) and the fixing plate (132) and is fixed on the fixing plate (132), and the fixing plate (132) is abutted to the bottom of the bottom plate (1).
4. The tool-suspended steel template system of claim 1, wherein: the two stress rods (22) are symmetrically arranged on the supporting frame (21), and the steel wire rope (11) penetrates through the two stress rods (22) and is fixed on the stress rods (22).
5. The tool-suspended steel template system of claim 4, wherein: the position of the steel wire rope (11) close to the top end is provided with a clamping block (14) which is used for being clamped on the two stress rods (22).
6. The tool-suspended steel template system of claim 5, wherein: limiting grooves (221) for preventing the clamping blocks (14) from sliding are formed in the two stress rods (22), and the clamping blocks (14) are abutted in the limiting grooves (221).
7. The tool-suspended steel template system of claim 6, wherein: the top of two support frames (21) is equipped with sleeve (211) along the horizontal direction, sleeve (211) on two support frames (21) are passed in the both ends slip of atress pole (22) are used for adjusting the distance between two support frames (21), be equipped with on sleeve (211) and be used for fixing atress pole (22) fastening bolt (212).
CN202321318935.5U 2023-05-26 2023-05-26 Tool type suspension steel template system Active CN219672115U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321318935.5U CN219672115U (en) 2023-05-26 2023-05-26 Tool type suspension steel template system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321318935.5U CN219672115U (en) 2023-05-26 2023-05-26 Tool type suspension steel template system

Publications (1)

Publication Number Publication Date
CN219672115U true CN219672115U (en) 2023-09-12

Family

ID=87920375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321318935.5U Active CN219672115U (en) 2023-05-26 2023-05-26 Tool type suspension steel template system

Country Status (1)

Country Link
CN (1) CN219672115U (en)

Similar Documents

Publication Publication Date Title
CN219672115U (en) Tool type suspension steel template system
CN116623939A (en) Tool type suspension steel template construction method
CN211313306U (en) Movable scaffold for constructional engineering
CN210598068U (en) Novel scaffold convenient to install and detach
CN217581295U (en) But reuse's assembled post positioner
CN209507411U (en) A kind of lifting balance car
CN206591845U (en) Suitable for the safety belt suspension device of scaffold
CN215631613U (en) Post-cast strip bottom mold supporting system
CN211645985U (en) Outer hanging steel formwork for viaduct anti-collision guardrail
CN110409820B (en) Formwork supporting device for construction of cantilever structure and construction method thereof
CN217461456U (en) Mould hoisting device for building
CN214144711U (en) Be provided with mould reinforcing apparatus's for building aluminum mould board
CN218815224U (en) Hang mould support node
CN222314552U (en) Vertical rod supporting connector structure
CN2236000Y (en) Bench mould support
CN220889348U (en) Looseness-preventing scaffold for building engineering
CN219864068U (en) Detachable civil air defense door frame supporting device
CN221046977U (en) Deformed steel bar flatness adjusting device
CN214696800U (en) Attachment device for climbing formwork and wall
CN216787830U (en) Sliding stair support template installation component
CN215562761U (en) Tool for fixing basic stand column of railway bridge contact net
CN215717186U (en) Building engineering construction is with hanging mould device
CN218492298U (en) Hanging basket with adjustable supporting legs for bridge construction
CN220348226U (en) Adjustable door and window processing support
CN214364797U (en) Scaffold for external construction of tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant