CN219622022U - Secondary structure infilled wall guide wall waterproof construction - Google Patents

Secondary structure infilled wall guide wall waterproof construction Download PDF

Info

Publication number
CN219622022U
CN219622022U CN202320994069.5U CN202320994069U CN219622022U CN 219622022 U CN219622022 U CN 219622022U CN 202320994069 U CN202320994069 U CN 202320994069U CN 219622022 U CN219622022 U CN 219622022U
Authority
CN
China
Prior art keywords
wall
guide wall
waterproof
secondary structure
overground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320994069.5U
Other languages
Chinese (zh)
Inventor
安雄宝
马泽琛
张壮壮
杨天宇
李斌
任睦坤
林宪朋
孟维哲
周海鹏
侯丽霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN202320994069.5U priority Critical patent/CN219622022U/en
Application granted granted Critical
Publication of CN219622022U publication Critical patent/CN219622022U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model relates to a waterproof structure of a secondary structure filling wall guide wall, which belongs to the technical field of filling wall guide wall waterproofing, and comprises a filling wall guide wall, wherein the filling wall guide wall is of a secondary structure, the filling wall guide wall is arranged at the top of an overground structure beam at the inner side of an outer wall, water stop sheets are welded at the tops of measure ribs at the tops of overground structure beams in the filling wall guide wall, and the upper parts of the water stop sheets extend out of a concrete pouring surface of the overground structure beam. When water permeates the outer wall of the secondary structure and the bottom of the guide wall between the water rooms, the water stop sheet can form effective protection to block water seepage or prolong a water seepage path, so that the water is prevented from further infiltrating into the indoor space, the waterproof performance of the guide wall of the filling wall is improved, and leakage between the outer wall and the guide wall between the water rooms is prevented. In addition, because the infilled wall guide wall is the secondary structure, the construction of the main body structure is not influenced, the positioning of the reserved reinforcing steel bars and the hanging die is not influenced, and holes are not required to be formed in the side faces of the columns when the horizontal reinforcing steel bars are reserved, so that the construction progress is ensured.

Description

Secondary structure infilled wall guide wall waterproof construction
Technical Field
The utility model belongs to the technical field of guide wall waterproofing of filling walls, and particularly relates to a secondary structure filling wall guide wall waterproofing structure.
Background
In recent years, the problem of leakage quality of deformation joints of building floors has been plagued, and the integrity of building products is also affected. The building quality common disease is a difficult technical problem which is difficult to solve in the building construction technology, and is a durable disease in the building quality common disease for a long time.
In order to prevent leakage between the outer wall and the guide wall of the water-bearing room, a main structure is generally provided with a waterproof ridge at one time, the waterproof ridge is provided with reinforcing bars, and when the main structure is constructed, the reserved reinforcing bars and the hanging die cannot be positioned. Especially, the reservation of horizontal muscle needs to open the hole in the post side, seriously influences the construction progress.
Disclosure of Invention
The utility model aims to provide a waterproof structure of a secondary structure filling wall guide wall, which aims to solve the problem that the positioning of reserved steel bars and hanging dies cannot be ensured when a main structure is constructed due to the fact that the main structure is provided with a waterproof bank with reinforcement bars at one time; the reserved horizontal ribs need to be provided with holes on the side surfaces of the columns, and the technical problem of construction progress is seriously affected.
The utility model provides a secondary structure filling wall guide wall waterproof structure, which comprises a filling wall guide wall, wherein the filling wall guide wall is of a secondary structure, the filling wall guide wall is arranged at the top of an overground structure beam at the inner side of an outer wall, water stopping sheets are welded at the tops of measure ribs at the tops of overground structure beams in the filling wall guide wall, and the upper parts of the water stopping sheets extend out of a concrete pouring surface of the overground structure beam.
Preferably, the measure bars are bound on the tops of the longitudinal steel bars of the overground structural beam or on the top stirrups of the overground structural beam.
Preferably, the water stop sheet is flat iron.
Preferably, the water stop sheet is in spot welding connection with the measure ribs.
Preferably, a structural floor slab is connected between the top of the overground structural beam and the guide wall of the filling wall in an anchoring manner, and waterproof mortar at the corner of the guide wall is arranged between the top of the structural floor slab and the inner side of the bottom of the guide wall of the filling wall.
Preferably, the part of the water stop sheet, which extends out of the concrete pouring surface of the overground structural beam, is at least 20mm.
Preferably, the outer wall and the filling wall guide wall sequentially comprise outer wall waterproof mortar and polyurethane waterproof coating from outside to inside.
Preferably, the waterproof mortar for the outer wall is paved on the whole outer wall.
Preferably, the top of the polyurethane waterproof coating exceeds the top of the concrete pouring surface of the overground structural beam by 100mm, and the bottom of the polyurethane waterproof coating is lower than the top of the concrete pouring surface of the overground structural beam by 100mm.
Preferably, the water stop sheet is 40mm 4mm galvanized flat iron.
Compared with the prior art, the utility model has the characteristics and beneficial effects that: according to the utility model, the water stop sheets are welded at the inner side of the outer wall and the tops of the ground structural beams and the top of the ribs, and the filling wall guide wall is poured for the second time, so that when water permeates into the outer wall with the secondary structure and the bottom of the guide wall with the water room, the water stop sheets can form effective protection, block water seepage or prolong a water seepage path, and prevent the water from further permeating into the indoor space, thereby improving the waterproof performance of the filling wall guide wall and preventing leakage between the outer wall and the guide wall with the water room. In addition, because the infilled wall guide wall is the secondary structure, the construction of the main body structure is not influenced, the positioning of the reserved reinforcing steel bars and the hanging die is not influenced, and holes are not required to be formed in the side faces of the columns when the horizontal reinforcing steel bars are reserved, so that the construction progress is ensured.
Drawings
FIG. 1 is a schematic view of a secondary structure infill wall guide wall waterproof structure;
fig. 2 is a schematic plan view of the countermeasure bar.
The drawings are marked: 1-infilled wall guide wall, 2-overground structural beam, 3-outer wall, 4-measure rib, 5-water stop sheet, 6-structural floor, 7-guide wall corner waterproof mortar, 8-outer wall waterproof mortar, 9-polyurethane waterproof coating, 10-plate upper reinforcing bar and 11-beam upper longitudinal rib.
Detailed Description
The present utility model will be further described below in order to make the technical means, innovative features, achieved objects and effects achieved by the present utility model easy to understand.
The examples described herein are specific embodiments of the present utility model, which are intended to illustrate the inventive concept, are intended to be illustrative and exemplary, and should not be construed as limiting the utility model to the embodiments and scope of the utility model. In addition to the embodiments described herein, those skilled in the art can adopt other obvious solutions based on the disclosure of the claims and specification, including those adopting any obvious substitutions and modifications to the embodiments described herein.
In the description of the present utility model, it should be noted that the directions or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific direction, be configured and operated in the specific direction, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "provided," "connected," and the like are to be construed broadly, and may be fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
As shown in fig. 1, the waterproof structure of the filling wall of the secondary structure comprises a filling wall guide wall 1, wherein the filling wall guide wall 1 is arranged at the top of an overground structural beam 2 inside an outer wall 3, a water stop sheet 5 is welded at the top of a measure rib 4 at the top of the overground structural beam 2 in the filling wall guide wall 1, and preferably, the water stop sheet 5 is in spot welding connection with the measure rib 4. The upper portion of the water stop sheet 5 protrudes from the concrete placement surface of the above-ground structural beam 2, and preferably, the portion of the water stop sheet 5 protruding from the concrete placement surface of the above-ground structural beam 2 is at least 20mm. The water stop sheet 5 is a flat iron, preferably the water stop sheet 5 is a 40mm 4mm galvanized flat iron. The infill wall guide wall 1 is of a secondary structure.
The structural floor slab 6 is connected between the top of the ground structural beam 2 and the filling wall guide wall 1 in an anchoring manner, and the waterproof mortar 7 at the corner of the guide wall is arranged between the top of the structural floor slab 6 and the inner side of the bottom of the filling wall guide wall 1, so that the waterproof performance of the secondary structural filling wall guide wall is further improved.
As shown in fig. 2, the measure tendons 4 are bound on the tops of the longitudinal rebars of the ground structural beam 2 or on the top stirrups of the ground structural beam 2. Specifically, the plate upper portion reinforcing steel bar 10 is anchored at the top of the ground structure beam 2, the measure steel bar 4 is in binding connection with the beam upper portion longitudinal steel bar 11, and the water stop sheet 5 is fixed with the measure steel bar 4 through spot welding.
The outer wall 3 and the filler guide wall 1 sequentially comprise outer wall waterproof mortar 8 and polyurethane waterproof coating 9 from outside to inside. The whole surface of the outer wall 3 is paved with the outer wall waterproof mortar 8. The top of the polyurethane waterproof coating 9 exceeds the top of the concrete casting surface of the overground structural beam 2 by 100mm, and the bottom of the polyurethane waterproof coating 9 is lower than the top of the concrete casting surface of the overground structural beam 2 by 100mm.
The construction method of the secondary structure filling wall guide wall waterproof structure comprises the following steps:
1. when binding the reinforcing steel bars of the overground structural beam 2, binding the measure bars 4 at the tops of the reinforcing steel bars of the overground structural beam 2, arranging the measure bars 4 at intervals of every 600mm, and then fixing the water stop sheets 5 to the measure bars 4 in a spot welding mode.
2. And pouring the overground structural beam 2, wherein the top of the water stop sheet 5 extends out of the concrete top surface of the overground structural beam 2. The upper concrete of the ground structural beam 2 is subjected to roughening treatment.
3. And erecting the templates by adopting templates, battens and split bolts according to the designed height, and pouring concrete after the templates are erected to form the infill wall guide wall 1.
4. And concrete light receiving is carried out on the upper part of the guide wall 1 of the filling wall.
The above examples are only illustrative of the preferred embodiments of the present utility model and are not intended to limit the scope of the present utility model, and various modifications and improvements made by those skilled in the art to the technical solution of the present utility model should fall within the scope of protection defined by the claims of the present utility model without departing from the spirit of the design of the present utility model.

Claims (10)

1. The utility model provides a secondary structure infill wall guide wall waterproof construction, includes infill wall guide wall (1), its characterized in that: the filling wall guide wall (1) is of a secondary structure, the filling wall guide wall (1) is arranged at the top of the overground structural beam (2) on the inner side of the outer wall (3), water stopping sheets (5) are welded at the tops of measure ribs (4) on the tops of the overground structural beam (2) in the filling wall guide wall (1), and the upper parts of the water stopping sheets (5) extend out of a concrete pouring surface of the overground structural beam (2).
2. The secondary structure infill wall guide wall waterproof structure according to claim 1, wherein: the measure bars (4) are bound on the tops of the longitudinal steel bars of the overground structural beam (2) or the top stirrups of the overground structural beam (2).
3. The secondary structure infill wall guide wall waterproof structure according to claim 1, wherein: the water stop sheet (5) is flat iron.
4. The secondary structure infill wall guide wall waterproof structure according to claim 1, wherein: the water stop sheet (5) is connected with the measure rib (4) through spot welding.
5. The secondary structure infill wall guide wall waterproof structure according to claim 1, wherein: the floor slab structure is characterized in that a structural floor slab (6) is connected between the top of the ground structural beam (2) and the guide wall (1) of the filling wall in an anchoring manner, and waterproof mortar (7) at the corner of the guide wall is arranged between the top of the structural floor slab (6) and the inner side of the bottom of the guide wall (1) of the filling wall.
6. The secondary structure infill wall guide wall waterproof structure according to claim 1, wherein: the part of the water stop sheet (5) extending out of the concrete pouring surface of the overground structural beam (2) is at least 20mm.
7. The secondary structure infill wall guide wall waterproof structure according to claim 1, wherein: the waterproof mortar for the outer wall (3) and the guide wall (1) of the filling wall sequentially comprise waterproof mortar (8) for the outer wall and a waterproof coating (9) for polyurethane from outside to inside.
8. The secondary structure infill wall guide wall waterproof structure of claim 7, wherein: the whole outer wall (3) is paved with the outer wall waterproof mortar (8).
9. The secondary structure infill wall guide wall waterproof structure of claim 7, wherein: the top of the polyurethane waterproof coating (9) exceeds the top of the concrete pouring surface of the overground structural beam (2) by 100mm, and the bottom of the polyurethane waterproof coating (9) is lower than the top of the concrete pouring surface of the overground structural beam (2) by 100mm.
10. The secondary structure infill wall guide wall waterproof structure according to claim 3, wherein: the water stop sheet (5) is 40mm 4mm galvanized flat iron.
CN202320994069.5U 2023-04-27 2023-04-27 Secondary structure infilled wall guide wall waterproof construction Active CN219622022U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320994069.5U CN219622022U (en) 2023-04-27 2023-04-27 Secondary structure infilled wall guide wall waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320994069.5U CN219622022U (en) 2023-04-27 2023-04-27 Secondary structure infilled wall guide wall waterproof construction

Publications (1)

Publication Number Publication Date
CN219622022U true CN219622022U (en) 2023-09-01

Family

ID=87770409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320994069.5U Active CN219622022U (en) 2023-04-27 2023-04-27 Secondary structure infilled wall guide wall waterproof construction

Country Status (1)

Country Link
CN (1) CN219622022U (en)

Similar Documents

Publication Publication Date Title
CN114562140B (en) Joint structure of assembled integral pool with superimposed plate structure
CN214739251U (en) Assembled combination tie-beam window opening component and connection structure thereof
CN113356370A (en) Mutual anchoring connection construction method for shear wall, frame column and concrete beam bracket
CN219622022U (en) Secondary structure infilled wall guide wall waterproof construction
CN215759634U (en) Mutual anchor connection structure of shear force wall and frame post and concrete beam bracket
KR200469319Y1 (en) Construction structure for joining steel or reinforced steel concrete column and beam with reinforcing end part
CN107700747A (en) A kind of prefabricated building
CN210658442U (en) Roof plate upturning beam structure of subway station
CN215167179U (en) Fireproof separation structure between box girder layers
CN217734420U (en) Mix assembled built-up connection wall frame construction
CN215594604U (en) Bolt connection assembly type prefabricated transfer beam
CN214739012U (en) Assembled double-connecting-beam combined shear wall component and connecting structure thereof
CN116950302A (en) Construction method of floor slab with industrial factory building steel-concrete combined structure and floor slab
CN110258639B (en) Upward beam turning structure of top plate of subway station and construction method of upward beam turning structure
CN207160388U (en) A kind of prefabricated building
CN222847531U (en) Concrete conversion beam node for supporting steel column and building
CN216664466U (en) Concrete beam column connecting joint
CN222632580U (en) Connecting structure of prefabricated external wall panel and floor structure
CN114232840A (en) Frame structure of assembled combined connecting wall and construction method
CN113944261A (en) Cast-in-situ light external wall panel with embedded light steel keel
CN223256041U (en) Tower crane foundation structure in wide foundation pit
CN222745725U (en) Bottom reinforcement structure of floor
CN219931248U (en) Connecting structure of externally-hung prefabricated wall body of assembled steel structure and basement top plate
CN216948780U (en) Connecting node of anti-bank of full prefabricated bathroom and roof beam
CN216195402U (en) Assembled special-shaped column and beam connecting node structure and shear wall building structure