CN219621764U CN202320823852.5U CN202320823852U CN219621764U CN 219621764 U CN219621764 U CN 219621764U CN 202320823852 U CN202320823852 U CN 202320823852U CN 219621764 U CN219621764 U CN 219621764U
Authority
CN
China
Prior art keywords
plate
stakeout
pile
chute
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202320823852.5U
Other languages
Chinese (zh)
Inventor
牛畅
苏亚东
吴强兵
王孟瑶
吴贻旭
吕凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
Beijing Road and Bridge Branch of China Railway Construction Engineering Group Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
Beijing Road and Bridge Branch of China Railway Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd, Beijing Road and Bridge Branch of China Railway Construction Engineering Group Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN202320823852.5U priority Critical patent/CN219621764U/en
Application granted granted Critical
Publication of CN219621764U publication Critical patent/CN219621764U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a pile position lofting device for hole digging pile construction, which comprises a positioning seat and a lofting disc, wherein the lofting disc is connected with the positioning seat through a chute; compared with the prior art, the utility model has the beneficial effects that: the standard pile is placed in the clamping portion, the position of the clamping portion is locked, the standard pile can be hammered at the moment, the standard pile is driven into the ground, the standard pile is limited through the clamping portion, and the construction influence of vibration on the standard pile is reduced.

Description

一种挖孔桩施工用桩位放样装置A pile position setting-out device for hole-digging pile construction

技术领域technical field

本实用新型属于挖孔桩施工设备领域,具体涉及的是一种挖孔桩施工用的桩位放样装置。The utility model belongs to the field of hole-digging pile construction equipment, in particular to a pile position setting-out device for hole-digging pile construction.

背景技术Background technique

在挖孔桩施工中,先通过全站仪对施工点位进行测量定位,然后在该测量点位的四周打入基准桩,使斜对着的两个基准桩的连接线构成标准线,此时标准线为两组,两组标准线的交点应当位于施工点位的正上方,并且在开挖后需要通过基准桩对开挖孔进行复核,确保开挖孔的垂直度,然而在对基准桩进行定位时,由于基准桩为四根,存在施工的先后顺序,在对后续基准桩进行定位施工时,容易由于震动因素影响前序已经施工完成的基准桩的垂直度,导致前序施工完成的基准桩发生偏斜,影响对开挖孔的复核。In the construction of hole-digging piles, the construction point is first measured and positioned by a total station, and then benchmark piles are driven into the surroundings of the measurement point so that the connecting line of the two diagonally opposite benchmark piles constitutes a standard line. There are two sets of standard lines, and the intersection point of the two sets of standard lines should be located directly above the construction point, and after excavation, the excavation hole needs to be rechecked with reference piles to ensure the verticality of the excavation hole. When positioning piles, since there are four reference piles, there is a sequence of construction. When positioning and constructing subsequent reference piles, it is easy to affect the verticality of the previously constructed reference piles due to vibration factors, resulting in the completion of the previous construction. The deflection of the benchmark piles affects the review of the excavation holes.

现有技术中,公开了一种用于护筒垂直度检测及桩位放样辅助定位的装置,文献号为:CN211696396U,其主旋转盘、副旋转盘和水准尺,水准尺由四个独立的水平尺构成,四个水平尺均布在主旋转盘的圆周方向上,旋转盘可带动水准尺在同一平面上旋转90°,通过直接读取水准尺两个方向上的倾斜角度,可以对护筒桩的倾斜角度进行检测,在上述方案中,其虽然能够检测基准桩是否倾斜,在检测到基准桩倾斜后,需要对基准桩进行调整,但是其无法保证基准桩在钉入地面的过程中的稳定性,无法提高施工效率。In the prior art, a device for verticality detection of casing and auxiliary positioning of pile position is disclosed. Consists of a spirit level, four levels are evenly distributed in the circumferential direction of the main rotating disk, the rotating disk can drive the leveling ruler to rotate 90° on the same plane, by directly reading the inclination angles of the leveling ruler in two directions, the protection can be adjusted In the above scheme, although it can detect whether the reference pile is inclined, after detecting the inclination of the reference pile, it is necessary to adjust the reference pile, but it cannot guarantee that the reference pile is in the process of being nailed into the ground. The stability cannot improve the construction efficiency.

发明内容Contents of the invention

本实用新型的目的在于,提供一种在将基准桩施工时,可以使基准桩稳定的钉入地面,减小震动对基准桩影响的挖孔桩施工用桩位放样装置。The purpose of the utility model is to provide a pile position setting-out device for hole-digging pile construction that can stably nail the reference pile into the ground and reduce the impact of vibration on the reference pile when the reference pile is being constructed.

为实现上述目的,本实用新型采用的技术方案是,一种挖孔桩施工用桩位放样装置,包括定位座和放样盘,放样盘与定位座通过滑槽连接,其结构要点是,定位座可沿着滑槽滑动,使放样盘的中心点位与施工标记点对齐,放样盘上设置有数个条形豁口,数个条形豁口围绕放样盘的中心阵列设置,每个条形豁口沿着放样盘的径向方向延伸,在每个条形豁口上均设置有夹扶部,夹扶部包括挡块和扶板,挡块和扶板可同时沿条形豁口的长度方向滑动,扶板上设置有可向挡块移动的夹板,通过挡块和夹板对位于条形豁口内的基准桩夹持。In order to achieve the above purpose, the technical solution adopted by the utility model is a pile position stakeout device for hole-digging pile construction, which includes a positioning seat and a stakeout plate, and the stakeout plate and the positioning seat are connected through a chute. The main points of the structure are that the positioning seat It can slide along the chute so that the center point of the stakeout plate is aligned with the construction mark point. Several bar-shaped notches are arranged on the set-out plate, and several bar-shaped notches are arranged around the center of the stakeout plate. Each bar-shaped notch is along the The radial direction of the lofting plate is extended, and each strip-shaped gap is provided with a clamping part. The clamping part includes a stopper and a support plate. The stopper and the support plate can slide along the length direction of the strip-shaped notch at the same time. The support plate A splint that can move toward the block is arranged on the top, and the datum pile located in the bar-shaped gap is clamped by the block and the splint.

进一步的,挡块上固定有上档条和下托条,上挡条和下托条分别设置在放样盘的上方和下方,上档条通过拉杆与扶板连接。Further, an upper bar and a lower support bar are fixed on the block, and the upper bar and the lower support bar are respectively arranged above and below the stakeout tray, and the upper bar is connected with the support plate through a tie rod.

进一步的,下托条上设置有标准板,夹板和挡块对基准桩进行夹持时,基准桩贴靠在标准板上。Further, a standard plate is provided on the lower support bar, and when the splint and the stopper clamp the reference pile, the reference pile leans against the standard plate.

进一步的,滑槽沿放样盘的径向方向延伸,滑槽的内端位于放样盘的中心位置。Further, the chute extends along the radial direction of the lofting pan, and the inner end of the chute is located at the center of the lofting pan.

进一步的,滑槽的内端设置有置纳槽,置纳槽连接有竖向设置且将放样盘贯穿的穿孔,置纳槽内放置有标准块,标准块通过吊绳连接有卷收盘,吊绳由穿孔穿过。Further, the inner end of the chute is provided with a storage slot, and the storage slot is connected with a vertically arranged perforation through which the stakeout plate penetrates. A standard block is placed in the storage slot, and the standard block is connected with a take-up pan through a sling. The cord is passed through the perforation.

进一步的,定位座的上端设置有滑座,滑座配合在滑槽内,滑座上设置有锁位装置,锁位装置将放样盘的位置锁定。Further, the upper end of the positioning seat is provided with a sliding seat, which fits in the sliding groove, and a locking device is provided on the sliding seat, and the locking device locks the position of the stakeout plate.

进一步的,放样盘上设置有用于穿过锁位装置的条状滑口,条状滑口与滑槽平行设置且位于滑槽的两侧。Further, the stakeout plate is provided with a strip-shaped slide for passing through the locking device, and the strip-shaped slide is arranged parallel to the chute and located on both sides of the chute.

与现有技术相对比,本实用新型的有益效果是:在进行放样施工时,将本装置移动至施工位置,并对放样盘进行调整,使标准块位于施工点位的正上方,此时将定位座的位置锁定,同时将放样盘与定位座锁定,然后将基准桩放置在夹扶部内,并将夹扶部的位置锁定,此时即可将基准桩进行锤击,使基准桩钉入至地面内,通过夹扶部对基准桩进行限位,减少震动对基准桩的施工影响;Compared with the prior art, the beneficial effect of the utility model is: during the lofting construction, the device is moved to the construction position, and the lofting plate is adjusted so that the standard block is located directly above the construction point. Lock the position of the positioning seat, lock the stakeout plate and the positioning seat at the same time, then place the reference pile in the clamping part, and lock the position of the clamping part, then the reference pile can be hammered to make the reference pile into To the ground, the reference pile is limited by the clamping part to reduce the impact of vibration on the construction of the reference pile;

可以直观的观测到基准桩的状态,可以即使的对基准桩的位置及状态进行调整,提高施工效率。The state of the benchmark pile can be observed intuitively, and the position and state of the benchmark pile can be adjusted instantly to improve construction efficiency.

附图说明Description of drawings

图1为本实用新型的定位座与放样盘连接状态示意图;Fig. 1 is a schematic diagram of the connection state between the positioning seat and the lofting plate of the utility model;

图2为本实用新型的标准块与施工点位对齐状态示意图;Fig. 2 is a schematic diagram of the alignment state between the standard block and the construction point of the utility model;

图3为本实用新型的俯视结构示意图;Fig. 3 is the top view structure schematic diagram of the utility model;

图4为本实用新型的放样盘仰视结构示意图;Fig. 4 is the schematic view of the structure of the lofting plate of the present utility model;

图5为本实用新型的锁位装置的第一种结构示意图;Fig. 5 is a first structural schematic diagram of the locking device of the present invention;

图6为本实用新型的锁位装置的第二种结构示意图;Fig. 6 is a second structural schematic diagram of the locking device of the present invention;

图7为本实用新型的定位座与放样盘连接示意图;Figure 7 is a schematic diagram of the connection between the positioning seat and the lofting tray of the present invention;

图8为本实用新型的夹扶部俯视结构示意图;Fig. 8 is a schematic structural diagram of the top view of the clamping part of the present invention;

其中,1-定位座,2-放样盘,3-滑槽,4-支腿,5-滑座,6-条形豁口,7-夹扶部,8-置纳槽,9-标准块,10-卷收盘,11-吊绳,12-条状滑口,13-立轴,14-锁紧盘,15-螺纹盲孔,16-压位套体,17-紧位环,18-封挡盘,19-螺纹锁杆,20-卡位盘,21-压缩复位弹簧,22-底座盘,23-撑柱,24-脚轮,25-定位销杆,26-端位套体,27-托盘,28-中心柱,29-防托盘,30-限位槽,31-挡块,32-扶板,33-上挡条,34-下托条,35-立耳板,36-拉杆,37-夹板,38-吊耳,39-拉伸复位弹簧,40-螺纹推杆,41-标准板,42-锁紧螺杆。Among them, 1-positioning seat, 2-stakeout plate, 3-sliding groove, 4-outrigger, 5-sliding seat, 6-strip notch, 7-clamping part, 8-storage slot, 9-standard block, 10-roller, 11-sling, 12-slip, 13-vertical shaft, 14-shrink disc, 15-threaded blind hole, 16-press sleeve, 17-tight ring, 18-block Plate, 19-Threaded locking rod, 20-Catching plate, 21-Compressed return spring, 22-Base plate, 23-Pillar, 24-Caster, 25-Location pin rod, 26-End position sleeve, 27-Tray , 28-central column, 29-anti-tray, 30-limiting groove, 31-block, 32-support plate, 33-upper bar, 34-bottom bar, 35-vertical ear plate, 36-tie rod, 37 -splint, 38-hanging lug, 39-tension return spring, 40-threaded push rod, 41-standard plate, 42-locking screw.

具体实施方式Detailed ways

将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例,基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. , based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present invention.

在进行挖孔桩施工时,需要通过全站仪测定开挖孔的中心点位,并对该点位进行标记形成施工标记点,然后在该点位周围打入基准桩。During the construction of excavated piles, it is necessary to measure the central point of the excavated hole with a total station, mark the point to form a construction mark point, and then drive the reference pile around the point.

参阅图1至图4所示,为提高施工效率本方案提供一种挖孔桩施工用桩位放样装置,包括定位座1和放样盘2,定位座1连接在放样盘2的下表面,在放样盘2的下表面上设置有直条状的滑槽3,滑槽3沿放样盘2的径向方向延伸,在放样盘2上设置支腿4,支腿4的下端安装有轮子,支腿4与放样盘2的连接点位于滑槽3的延长线上,滑槽3的内端位于放样盘2的中心位置处,支腿4和定位座1对放样盘2进行支撑,在定位座1的上端安装有配合在滑槽3内的滑座5,可以放样盘2进行移动,在未施工时,通过控制放样盘2的移动,使放样盘2的中心与施工点位对应后对放样盘进行锁位,在放样盘2上设置有四个条形豁口6,条形豁口2还可以为六个,当条形豁口为四个时,四个条形豁口6围绕放样盘2的中心阵列设置,四个条形豁口6的延长线形成交点,且此交点位于放样盘2的中心点位处,每个条形豁口均沿着放样盘2的径向方向延伸,这样就能够使该交点与放样盘的中心点位重合,条形豁口的外端为开放状态,在每个条形豁口6内均设置夹扶部7,将需要待钉入地面的基准桩时,先将基准桩放置在夹扶部7内,然后对夹扶部7进行定位,此时可将基准桩进行锤击,从而将待施工的那根基准桩进行安装,而后在对另一根基准桩进行施工时,通过放样盘的限制,能够降低震动对已经完成安装的基准桩的影响。Referring to Fig. 1 to Fig. 4, in order to improve the construction efficiency, this scheme provides a kind of stake position setting-out device for hole-digging pile construction, including positioning seat 1 and setting-out plate 2, and positioning seat 1 is connected on the lower surface of setting-out plate 2, and A straight chute 3 is provided on the lower surface of the lofting tray 2, and the chute 3 extends along the radial direction of the lofting tray 2. Legs 4 are set on the lofting tray 2. Wheels are installed on the lower ends of the legs 4. The connection point between the leg 4 and the lofting tray 2 is located on the extension line of the chute 3, the inner end of the chute 3 is located at the center of the lofting tray 2, the legs 4 and the positioning seat 1 support the lofting tray 2, and the positioning seat The upper end of 1 is equipped with a sliding seat 5 fitted in the chute 3, which can move the stakeout plate 2. When not in construction, by controlling the movement of the stakeout plate 2, the center of the stakeout plate 2 corresponds to the construction point and then the stakeout The plate is locked, and four bar-shaped notches 6 are arranged on the lofting plate 2, and the bar-shaped notches 2 can also be six. When there are four bar-shaped notches, the four bar-shaped notches 6 surround the center of the stake-out plate 2 Arranged in an array, the extension lines of the four strip-shaped notches 6 form intersections, and this intersection is located at the central point of the lofting dish 2, and each strip-shaped notch extends along the radial direction of the lofting dish 2, so that the The intersection point coincides with the central point of the stakeout plate, and the outer end of the strip-shaped gap is open. A clamping part 7 is provided in each strip-shaped gap 6. When the benchmark pile to be nailed into the ground is needed, the benchmark pile Place it in the clamping part 7, and then position the clamping part 7. At this time, the reference pile can be hammered, so that the reference pile to be constructed can be installed, and then the other reference pile can be constructed. , the impact of vibration on the installed datum piles can be reduced through the limitation of the stakeout plate.

另外,在对放样盘2的位置进行调整后锁定时,在放样盘2的下表面设置有位于滑槽3的内端的置纳槽8,置纳槽8连接有竖向设置且将放样盘2贯穿的穿孔,在置纳槽8内放置有标准块9,在放样盘2的上表面设置有可旋转的卷收盘10,卷收盘10上卷收有吊绳11,吊绳11的另一端由穿孔穿过后与标准块9连接,在常规状态下,吊绳11为卷收状态,此时标准块9位于置纳槽8内,而当对放样盘2进行移动后,可通过卷收盘10的旋转实现对吊绳11的松放,此时标准块9向下移动,当标准块9移动至接近地面时,观察标准块9是否位于施工点位的正上方,从而便于对放样盘2的及时调整,同时在对某一个基准桩安装施工完成后,能够通过标准块9进行观察,直观的判断放样盘2是否发生倾斜。In addition, when the position of the lofting tray 2 is adjusted and locked, the lower surface of the lofting tray 2 is provided with a receiving groove 8 located at the inner end of the chute 3, and the receiving groove 8 is connected to a vertically arranged and the lofting tray 2 Through the perforation, a standard block 9 is placed in the storage groove 8, a rotatable take-up disk 10 is arranged on the upper surface of the lofting disk 2, a suspension rope 11 is retracted on the winding disk 10, and the other end of the suspension rope 11 is provided by After the perforation passes through, it is connected with the standard block 9. Under normal conditions, the suspension rope 11 is in a retracted state. At this time, the standard block 9 is located in the receiving groove 8. Rotate to realize the loosening of the suspension rope 11. At this time, the standard block 9 moves downward. When the standard block 9 moves close to the ground, observe whether the standard block 9 is located directly above the construction point, so as to facilitate timely inspection of the stakeout plate 2. Adjustment, and at the same time, after the installation and construction of a certain reference pile is completed, it can be observed through the standard block 9 to intuitively judge whether the stakeout plate 2 is tilted.

在将放样盘2与定位座1进行锁位时,在滑座5上连接有锁位装置,在放样盘2上设置与滑槽3平行的条状滑口12,条状滑口12位于滑槽3的两侧,锁位装置由条状滑口12内穿过,当对放样盘2进行调整完成后,通过锁位装置将放样盘2与定位座1进行锁定;When locking the lofting plate 2 and the positioning seat 1, a locking device is connected to the sliding seat 5, and a strip-shaped slide 12 parallel to the chute 3 is set on the lofting plate 2, and the strip-shaped slide 12 is located on the slide On both sides of the slot 3, the locking device passes through the strip-shaped sliding opening 12. After the adjustment of the lofting tray 2 is completed, the lofting tray 2 and the positioning seat 1 are locked by the locking device;

其中参阅图5和图6所示,锁位装置包括固定在滑座5上的立轴13,立轴13与滑座5垂直连接,在立轴13上设置外螺纹,在立轴13上拧接有位于放样盘2的上方的锁紧盘14,锁紧盘14旋转后向下移动,此时形成对放样盘2的锁紧,此时将放样盘的位置锁定;Wherein referring to Fig. 5 and shown in Fig. 6, locking device comprises the vertical shaft 13 that is fixed on the sliding seat 5, and vertical shaft 13 is vertically connected with sliding seat 5, and external screw thread is set on vertical shaft 13, is screwed on vertical shaft 13 and is positioned at lofting. The locking disc 14 on the top of the disc 2, the locking disc 14 rotates and moves downwards, at this time, the locking of the lofting disc 2 is formed, and the position of the lofting disc is locked at this time;

上述的立轴13还可设置为表面光滑状态,即不在立轴13上设置外螺纹,而是在立轴13上设置有由上端面向下延伸的螺纹盲孔15,此时在立轴13上套设有压位套体16,压位套体16套设在立轴13上,在压位套体16与放样盘2之间设置有紧位环17,此时压位套体16为竖向状态,在压位套体16的上端固定封挡盘18,在封挡盘18上设置中心孔,中心孔与螺纹盲孔同轴线设置,在中心孔内穿过螺纹锁杆19,螺纹锁杆19的下端位于螺纹盲孔15内,在螺纹锁杆19上固定有位于封挡盘18的上方的卡位盘20,通过螺纹锁杆19的旋转,能够控制压位套体16向下以移动,从而对紧位环17施加向下的推力,实现对放样盘2的夹紧,同时在压位套体16内设置有套在螺纹锁杆19上的压缩复位弹簧21,压缩复位弹簧21位于立轴13的上端面与封挡盘18之间,当压位套体16向下移动时,压缩复位弹簧21为压缩状态,而当螺纹锁杆19反向移动时,压缩复位弹簧21进行复位,从而使紧位环17失去压力,此时可将放样盘2进行调整移动。The above-mentioned vertical shaft 13 can also be set to a smooth surface, that is, the vertical shaft 13 is not provided with external threads, but the vertical shaft 13 is provided with a threaded blind hole 15 extending downward from the upper end face. Bit sleeve body 16, the press-bit sleeve body 16 is sleeved on the vertical shaft 13, and a tightening ring 17 is arranged between the press-bit sleeve body 16 and the lofting plate 2. At this time, the press-bit sleeve body 16 is in a vertical state. The upper end of the bit sleeve body 16 fixes the blocking disk 18, and a central hole is set on the blocking disk 18. The central hole and the threaded blind hole are arranged on the same axis, and the threaded locking rod 19 passes through the central hole. The lower end of the threaded locking rod 19 Located in the threaded blind hole 15, on the threaded locking rod 19 is fixed a clamping disc 20 above the blocking disc 18, through the rotation of the threaded locking rod 19, the pressing sleeve 16 can be controlled to move downwards, thereby The tightening ring 17 exerts a downward thrust to realize the clamping of the lofting plate 2. At the same time, a compression return spring 21 sleeved on the threaded locking rod 19 is arranged in the press sleeve body 16. The compression return spring 21 is located on the side of the vertical shaft 13. Between the upper end surface and the blocking plate 18, when the pressing sleeve body 16 moves downward, the compression return spring 21 is in a compressed state, and when the thread lock rod 19 moves in the reverse direction, the compression return spring 21 is reset, so that the tightening The position ring 17 loses pressure, and the lofting plate 2 can be adjusted and moved at this moment.

参阅图1、图2和图7所示,在基准桩放样之前,需要将整体移动至待施工位置,定位座1包括底座盘22,底座盘22的中心位置固定有撑柱23,撑柱23的上端与滑座5连接,在底座盘22上设置脚轮24,这样当定位座1位于放样盘2的中间位置时,就能够将整体进行移动,而在对放样盘2进行移动之前,需要将定位座1进行定位,在底座盘22上设置定位孔或定位管,定位孔或定位管内穿过且拧接有定位销杆25,定位销杆25的下端为尖锐端,通过对定位销杆25的旋转,使定位销杆25旋入底面,实现对定位座1的定位;Referring to Fig. 1, Fig. 2 and Fig. 7, before setting out the benchmark pile, the whole needs to be moved to the position to be constructed. The upper end of the upper end is connected with the sliding seat 5, and casters 24 are set on the base plate 22, so that when the positioning seat 1 is located in the middle position of the lofting plate 2, the whole body can be moved, and before the lofting plate 2 is moved, it is necessary to move the The positioning seat 1 is positioned, and a positioning hole or a positioning tube is set on the base plate 22. The positioning hole or the positioning tube passes through and is screwed with a positioning pin 25. The lower end of the positioning pin 25 is a sharp end. The rotation of the positioning pin rod 25 is screwed into the bottom surface to realize the positioning of the positioning seat 1;

其中的滑座5包括端位套体26和托盘27,端位套体26套设在撑柱23的顶端,托盘27固定在端位套体26的上端,锁位装置的下端固定在托盘27上,在托盘27上设置有中心柱28,中心柱28与撑柱23同轴线设置,中心柱28位于滑槽3,中心柱28的上端固定有防脱盘29,而滑槽3的侧壁上设置限位槽30,防脱盘29的边缘处位于限位槽30内,这样就能够避免放样盘2在滑动的过程中与撑柱23分离,在端位套体26上穿过有顶丝杆,当顶丝杆拧紧时,顶丝杆的内端与撑柱23进行紧密接触,此时将滑座5与撑柱23进行锁定,然后在将放样盘2进行调整后,通过锁位装置对放样盘2进行锁定。The sliding seat 5 includes an end sleeve body 26 and a tray 27, the end sleeve body 26 is sleeved on the top of the support column 23, the tray 27 is fixed on the upper end of the end sleeve body 26, and the lower end of the locking device is fixed on the tray 27. Above, a center column 28 is provided on the tray 27, and the center column 28 and the support column 23 are arranged on the same axis. Limiting groove 30 is set on the wall, and the edge of anti-falling disc 29 is located in limiting groove 30, so just can avoid lofting plate 2 in the process of sliding and separates with strut 23, on end position cover body 26, passes through Jacking screw, when the jacking screw is tightened, the inner end of the jacking screw is in close contact with the support column 23, at this time, the slide seat 5 and the support column 23 are locked, and then after adjusting the lofting plate 2, through the lock The bit device locks the stakeout tray 2.

参阅体8所示,在本方案中的夹扶部7可以沿着条形豁口6的长度方向进行滑动,从而进行基准桩的预设位置调整,然后将夹扶部7进行锁位,具体的夹扶部7包括挡块31和扶板32,挡块31设置在条形豁口6内,扶板与挡块平行设置,挡块31和扶板32均可沿条形豁口的长度方向滑动,来实现位置的调整;As shown in reference body 8, the clamping part 7 in this solution can slide along the length direction of the strip-shaped notch 6, so as to adjust the preset position of the reference pile, and then lock the clamping part 7, specifically The holding part 7 includes a block 31 and a support plate 32, the block 31 is arranged in the strip gap 6, the support plate is arranged in parallel with the block, the block 31 and the support plate 32 can slide along the length direction of the strip gap, to adjust the position;

具体在挡块滑动时,挡块31的上端和下端分别固定有上挡条33和下托条34,上挡条33和下托条34的长度均大于挡块的长度,放样盘2位于上挡条33和下托条34之间,在上档条33上设置有位于条形豁口6的两侧的立耳板35,每个立耳板35均通过拉杆36与扶板32固定,拉杆与条形豁口平行设置,从而使挡块与扶板同时滑动;Specifically, when the block slides, the upper end and the lower end of the block 31 are respectively fixed with an upper block 33 and a lower support bar 34, the lengths of the upper block 33 and the lower support bar 34 are all greater than the length of the block, and the lofting plate 2 is located on the upper block. Between the retaining bar 33 and the lower supporting bar 34, the upper retaining bar 33 is provided with vertical ear plates 35 positioned on both sides of the strip-shaped notch 6, and each vertical ear plate 35 is fixed with the buttress 32 by a pull rod 36, and the pull rod Set in parallel with the strip notch, so that the stopper and the support plate slide at the same time;

在扶板32的中间位置设置螺纹孔,扶板32与挡块31之间设置有夹板37,夹板37位于条形豁口6内,且夹板37上设置有被拉杆36穿过的吊耳38,在夹板37与扶板32之间连接有套设在拉杆36上的拉伸复位弹簧39,而在扶板32上的螺纹孔内穿过有螺纹推杆40,当螺纹推杆40进行旋转时,螺纹推杆40进行轴向移动,此时螺纹推杆40的内端对夹板37进行推挤,使夹板37向挡块移动,从而通过夹板37和挡块31对基准桩进行夹持,但不宜夹持过紧;A threaded hole is set in the middle of the support plate 32, and a splint 37 is arranged between the support plate 32 and the block 31. The splint 37 is located in the strip-shaped gap 6, and the splint 37 is provided with a lifting ear 38 passed by the pull rod 36, Between the splint 37 and the buttress 32, a stretch return spring 39 sleeved on the pull rod 36 is connected, and a threaded push rod 40 passes through the threaded hole on the buttress 32. When the threaded push rod 40 rotates , the threaded push rod 40 moves axially, at this time, the inner end of the threaded push rod 40 pushes the splint 37, so that the splint 37 moves toward the stopper, thereby clamping the reference pile by the splint 37 and the stopper 31, but It should not be clamped too tightly;

在下托条34上设置有标准板41,标准板41与下托条34为垂直连接,在放样盘2为水平状态时,标准板41为竖直状态,并且在夹板37和挡块31对基准桩进行夹持时,基准桩贴靠在标准板41上,可直观的观察到基准桩的状态。A standard board 41 is provided on the lower bracket 34, and the standard board 41 is vertically connected with the lower bracket 34. When the lofting tray 2 is in a horizontal state, the standard board 41 is in a vertical state, and the clamping plate 37 and the stopper 31 align the reference When the pile is clamped, the reference pile is attached to the standard plate 41, and the state of the reference pile can be visually observed.

在将基准桩与夹扶部7连接完成后,需要将夹扶部7进行定位,进行在上档条33上设置有靠近两端设置有锁紧螺杆42,锁紧螺杆42将上挡条33穿过且与上挡条33螺纹连接,在将位置调整完毕后,通过锁紧螺杆42的旋转可以将夹扶部7锁位。After the reference pile is connected with the clamping and supporting part 7, the clamping and supporting part 7 needs to be positioned, and the upper bar 33 is provided with locking screws 42 near both ends, and the locking screw 42 will lock the upper bar 33 It passes through and is threadedly connected with the upper bar 33 , and after the position is adjusted, the clamping portion 7 can be locked in place by the rotation of the locking screw 42 .

这样一来将基准桩打入地下的过程中,就能够避免由于震动的影响,导致已经打入地下的基准桩发生倾斜的情况。In this way, in the process of driving the benchmark piles into the ground, it is possible to avoid the tilting of the benchmark piles driven into the ground due to the influence of the vibration.

对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内,不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, no matter from all points of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, so it is intended to fall within the scope of the claims All changes within the meaning and range of equivalency of the required elements are embraced in the present invention, and any reference sign in a claim shall not be construed as limiting the claim involved.

此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only includes an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.

Claims (7)

1.一种挖孔桩施工用桩位放样装置,包括定位座和放样盘,放样盘与定位座通过滑槽连接,其特征在于:所述的定位座可沿着滑槽滑动,使放样盘的中心点位与施工标记点对齐,所述的放样盘上设置有数个条形豁口,数个条形豁口围绕放样盘的中心阵列设置,每个条形豁口沿着放样盘的径向方向延伸,在每个条形豁口上均设置有夹扶部,夹扶部包括挡块和扶板,挡块和扶板可同时沿条形豁口的长度方向滑动,扶板上设置有可向挡块移动的夹板,通过挡块和夹板对位于条形豁口内的基准桩夹持。1. A stake position stakeout device for hole-digging pile construction, comprising a positioning seat and a stakeout plate, the stakeout plate and the positioning seat are connected by a chute, and it is characterized in that: the described positioning seat can slide along the chute, so that the stakeout plate The central point of the stakeout plate is aligned with the construction mark point, and several bar-shaped notches are arranged on the stakeout plate, and several bar-shaped notches are arranged around the center array of the stakeout plate, and each bar-shaped notch extends along the radial direction of the stakeout plate , each strip-shaped opening is provided with a clamping part, the clamping part includes a block and a support plate, the block and the support plate can slide along the length direction of the strip-shaped opening at the same time, and the support plate is provided with a direction-moving block The movable splint clamps the datum pile in the bar-shaped gap through the stopper and the splint. 2.根据权利要求1所述的一种挖孔桩施工用桩位放样装置,其特征在于:所述的挡块上固定有上档条和下托条,上挡条和下托条分别设置在放样盘的上方和下方,上档条通过拉杆与扶板连接。2. A pile position setting-out device for hole-digging pile construction according to claim 1, characterized in that: the upper retaining bar and the lower supporting bar are fixed on the described stopper, and the upper retaining bar and the lower supporting bar are respectively arranged Above and below the lofting pan, the upper rail is connected with the support plate through a tie rod. 3.根据权利要求2所述的一种挖孔桩施工用桩位放样装置,其特征在于:所述的下托条上设置有标准板,夹板和挡块对基准桩进行夹持时,基准桩贴靠在标准板上。3. A pile position stakeout device for hole-digging pile construction according to claim 2, characterized in that: a standard plate is arranged on the said bottom bracket, and when the splint and the stopper clamp the reference pile, the reference The stake rests against the standard slab. 4.根据权利要求1所述的一种挖孔桩施工用桩位放样装置,其特征在于:所述的滑槽沿放样盘的径向方向延伸,滑槽的内端位于放样盘的中心位置。4. A stake position stakeout device for hole-digging pile construction according to claim 1, characterized in that: said chute extends along the radial direction of the stakeout plate, and the inner end of the chute is located at the center of the stakeout plate . 5.根据权利要求4所述的一种挖孔桩施工用桩位放样装置,其特征在于:所述的滑槽的内端设置有置纳槽,置纳槽连接有竖向设置且将放样盘贯穿的穿孔,置纳槽内放置有标准块,标准块通过吊绳连接有卷收盘,吊绳由穿孔穿过。5. a kind of digging pile construction according to claim 4 is characterized in that: the inner end of described chute is provided with and puts receiving groove, puts receiving groove and is connected with vertical setting and will stake out The plate runs through the perforation, and the standard block is placed in the receiving groove. The standard block is connected to the take-up plate through the suspension rope, and the suspension rope passes through the perforation. 6.根据权利要求1所述的一种挖孔桩施工用桩位放样装置,其特征在于:所述的定位座的上端设置有滑座,滑座配合在滑槽内,滑座上设置有锁位装置,锁位装置将放样盘的位置锁定。6. A pile position setting out device for hole-digging pile construction according to claim 1, characterized in that: the upper end of the positioning seat is provided with a sliding seat, the sliding seat is fitted in the chute, and the sliding seat is provided with Locking device, the locking device locks the position of the stakeout plate. 7.根据权利要求6所述的一种挖孔桩施工用桩位放样装置,其特征在于:所述的放样盘上设置有用于穿过锁位装置的条状滑口,条状滑口与滑槽平行设置且位于滑槽的两侧。7. A kind of stake position setting-out device for hole-digging pile construction according to claim 6, is characterized in that: the described set-out plate is provided with the strip sliding mouth that is used to pass through the locking device, and the strip sliding mouth and The chute is arranged in parallel and is located on both sides of the chute.
CN202320823852.5U 2023-04-14 2023-04-14 Pile position lofting device for hole digging pile construction Expired - Fee Related CN219621764U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320823852.5U CN219621764U (en) 2023-04-14 2023-04-14 Pile position lofting device for hole digging pile construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320823852.5U CN219621764U (en) 2023-04-14 2023-04-14 Pile position lofting device for hole digging pile construction

Publications (1)

Publication Number Publication Date
CN219621764U true CN219621764U (en) 2023-09-01

Family

ID=87773845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320823852.5U Expired - Fee Related CN219621764U (en) 2023-04-14 2023-04-14 Pile position lofting device for hole digging pile construction

Country Status (1)

Country Link
CN (1) CN219621764U (en)

Similar Documents

Publication Publication Date Title
CN114857434B (en) A measuring device for urban and rural planning engineering that is convenient for leveling
CN219621764U (en) Pile position lofting device for hole digging pile construction
CN211260223U (en) A construction project cost on-site surveying and mapping device
CN209568439U (en) A pile hole diameter detection device
CN220686057U (en) Anchor rod construction device
CN215330079U (en) Engineering is managed and is used foundation ditch displacement measurement device
CN219470905U (en) A Precisely Positioned Reinforcement Cage
CN215803300U (en) Ground leveling auxiliary device for building construction
CN217237464U (en) Jointed rock mass dynamic load test device
CN206496710U (en) A kind of anchor pole tension pull out force displacement tester
CN110700607B (en) Pre-embedded steel plate installation device for seismic isolation support
CN222480100U (en) Level gauge for municipal road repair
CN208996108U (en) A kind of axle power monitoring device in pit retaining monitoring
CN222186032U (en) A water conservancy project pipeline support
CN217654529U (en) Prism rod not prone to overturning
CN223940150U (en) Geotechnical engineering side slope displacement detection device
CN216948186U (en) Road settlement monitoring pile structure
CN207007156U (en) A kind of point equipment suitable for shallow tunnel ground settlement
CN206161445U (en) A horizontal oblique strutting arrangement for large -scale shear test vertical loading of normal position
CN217557717U (en) A post-casting belt elevation control tool
CN214497112U (en) A central line positioner for road engineering
CN219508672U (en) An anchored test frame
CN217953474U (en) Detection device for verticality of high pier
CN217422801U (en) Level gauge
CN220602512U (en) Be applied to high pier stud construction and possess and detect slide rule of straightness that hangs down

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230901