CN219573075U - Measuring pointer - Google Patents
Measuring pointer Download PDFInfo
- Publication number
- CN219573075U CN219573075U CN202223501092.0U CN202223501092U CN219573075U CN 219573075 U CN219573075 U CN 219573075U CN 202223501092 U CN202223501092 U CN 202223501092U CN 219573075 U CN219573075 U CN 219573075U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- positioning
- frame
- fixed
- housing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
本实用新型公开了一种测量用定点器,包括安装架,所述安装架的下端固定连接有多个自锁万向轮,所述安装架的上端左右两侧分别竖直固定连接有第二固定架和第一固定架,所述第一固定架和第二固定架之间设置有安装壳体。本实用新型中,通过将多个定位组件依次置于放置槽和滑槽内,定位块与滑槽滑动,钉杆置于放置槽内,将连接壳体与安装壳体固定后,启动第二伺服电机可以带动滑块移动,从而可以带动推块推动定位组件通过定位沿着滑槽移动,当定位组件移动到连接壳体内部时,电磁铁会与定位块吸附,从而可以对定位组件进行固定,设置的电动伸缩杆可以带动定位组件下降,从而可以将钉杆推出插入到土壤内,使得本装置可以对定位组件进行自动进给。
The utility model discloses a fixed point device for measurement, which comprises a mounting frame, the lower end of the mounting frame is fixedly connected with a plurality of self-locking universal wheels, and the left and right sides of the upper end of the mounting frame are respectively vertically fixedly connected with second The fixing frame and the first fixing frame, an installation shell is arranged between the first fixing frame and the second fixing frame. In the utility model, by placing a plurality of positioning components in the placement groove and the chute in sequence, the positioning block and the chute slide, the nail rod is placed in the placement groove, and after the connecting shell and the installation shell are fixed, the second The servo motor can drive the slider to move, so that it can drive the push block to push the positioning component to move along the chute through positioning. When the positioning component moves to the inside of the connecting shell, the electromagnet will be attracted to the positioning block, so that the positioning component can be fixed. , the set electric telescopic rod can drive the positioning component to descend, so that the nail rod can be pushed out and inserted into the soil, so that the device can automatically feed the positioning component.
Description
技术领域technical field
本实用新型涉及一种测量用定点器技术领域,尤其涉及一种土地管理测量用定点器。The utility model relates to the technical field of a fixed point device for measurement, in particular to a fixed point device for land management measurement.
背景技术Background technique
土地管理测量是指对抵制检测过程中,当在某个地方测量了方向角,高差等,为了对该点的后期复测和施工提供方便,需要在这个位置进行标记;传统的定点方式一般都是测量人员将标记杆沿定点插入土质内部,但是,使用人力手动锤击标记杆,对工作人员的体力是极大的消耗,浪费人力。Land management measurement means that during the process of resistance detection, when the direction angle, height difference, etc. are measured at a certain place, in order to facilitate the later re-measurement and construction of the point, it is necessary to mark this position; the traditional fixed-point method generally All surveyors insert the marking rods into the soil along fixed points. However, manual hammering of the marking rods by manpower consumes a lot of physical strength of the staff and wastes manpower.
专利公开号为CN216246371U的中国专利公开了一种土地管理测量用定点器,在使用该实用新型时,可从主体壳中取出定位桩,将定位桩通过螺钉将定位桩固定在连接槽上,随后开启一号电机,一号电机通过一号齿轮和二号齿轮啮合,带动一号螺杆转动,因方形开口对方管进行限位,方管无法转动,所以方管在一号螺杆上向下移动,从而方管挤压定位桩,使其钉入目标点,在钉入过程中可开启二号电机,二号电机带动定位桩进行旋转,在旋转过程中定位桩更容易插入地面,可避免在对硬质土地进行定点时,定位桩无法钉入土地中,同时避免定位桩在凿入过程中受力过大,导致定位桩折损率较高。The patent publication number is that the Chinese patent of CN216246371U discloses a kind of fixed point device for land management measurement. When using this utility model, the positioning pile can be taken out from the main body shell, and the positioning pile is fixed on the connecting groove by screws, and then Turn on the No. 1 motor, and the No. 1 motor drives the No. 1 screw to rotate through the meshing of the No. 1 gear and the No. 2 gear. Because the square opening limits the square tube, the square tube cannot rotate, so the square tube moves downward on the No. 1 screw. In this way, the square tube squeezes the positioning pile to make it nailed into the target point. During the nailing process, the No. 2 motor can be turned on, and the No. 2 motor drives the positioning pile to rotate. During the rotation, the positioning pile is easier to insert into the ground, which can avoid When the fixed point is fixed on hard soil, the positioning pile cannot be nailed into the ground, and at the same time, it is avoided that the positioning pile is subjected to excessive force during the drilling process, resulting in a high breakage rate of the positioning pile.
上述定点器,需要人工手动将定位桩通过螺钉固定在连接槽上,操作较为麻烦,工作效率较低。The above-mentioned pointing device needs to manually fix the positioning pile on the connecting groove through screws, which is troublesome to operate and low in work efficiency.
实用新型内容Utility model content
本实用新型的目的是为了解决现有技术中存在的缺点,而提出的一种测量用定点器。The purpose of the utility model is to solve the shortcomings in the prior art, and propose a fixed point device for measurement.
为了实现上述目的,本实用新型采用了如下技术方案:一种测量用定点器,包括安装架,所述安装架的下端固定连接有多个自锁万向轮,所述安装架的上端左右两侧分别竖直固定连接有第二固定架和第一固定架,所述第一固定架和第二固定架之间设置有安装壳体,所述安装壳体的前端铰链连接有连接壳体,所述连接壳体的上端固定连接有电动伸缩杆,所述电动伸缩杆的输出端贯穿连接壳体的上端固定固定连接有电磁铁,所述安装壳体的内部下端开设有放置槽,所述放置槽的上端开设有滑槽,所述放置槽的内部设置有定位组件,所述安装壳体的上端滑动连接有滑块,所述滑块的下端固定连接有推块。In order to achieve the above object, the utility model adopts the following technical scheme: a fixed point device for measurement, including a mounting frame, the lower end of the mounting frame is fixedly connected with a plurality of self-locking universal wheels, and the upper end of the mounting frame has two left and right sides. The sides are respectively vertically fixedly connected with a second fixed frame and a first fixed frame, a mounting shell is arranged between the first fixed frame and the second fixed frame, and the front end of the mounting shell is hingedly connected with a connecting shell, The upper end of the connection housing is fixedly connected with an electric telescopic rod, the output end of the electric telescopic rod penetrates through the upper end of the connection housing and is fixedly connected with an electromagnet, and the inner lower end of the installation housing is provided with a placement slot, the A chute is provided at the upper end of the placement slot, a positioning assembly is arranged inside the placement slot, a slider is slidably connected to the upper end of the installation housing, and a push block is fixedly connected to the lower end of the slider.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述定位组件包括位于上端的定位块,所述定位块的下端固定连接有钉杆,所述定位块与滑槽滑动连接。The positioning assembly includes a positioning block at the upper end, a nail rod is fixedly connected to the lower end of the positioning block, and the positioning block is slidably connected with the sliding groove.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述安装壳体的内部上端转动连接有第二螺杆,所述滑块与第二螺杆螺纹连接,所述安装壳体的后侧上端固定连接有第二伺服电机,所述第二伺服电机的输出端与第二螺杆的后端固定连接。The inner upper end of the installation housing is rotatably connected with a second screw rod, the slider is threadedly connected with the second screw rod, and the rear upper end of the installation housing is fixedly connected with a second servo motor. The output end is fixedly connected with the rear end of the second screw rod.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述安装壳体的前端两侧均固定连接有限位板,所述安装壳体的右端前侧上下端均固定连接有内螺纹管,所述连接壳体的右端后侧上下端均固定连接有固定板,所述固定板上均设置有固定螺栓,所述固定螺栓分别与对应内螺纹管螺纹连接。Both sides of the front end of the installation housing are fixedly connected with limiting plates, the upper and lower ends of the right front side of the installation housing are fixedly connected with internal thread pipes, and the upper and lower ends of the right end of the connecting housing are fixedly connected with The fixing plates are all provided with fixing bolts, and the fixing bolts are respectively connected with corresponding internal threaded pipe threads.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述安装壳体的左右两侧中间位置分别固定连接有第二连接块和第一连接块,所述第一固定架的内部转动连接有第一螺杆,所述第二固定架的内部固定连接有限位杆。The middle positions of the left and right sides of the installation housing are respectively fixedly connected with a second connecting block and a first connecting block, the inside of the first fixing frame is connected with a first screw for rotation, and the inside of the second fixing frame is fixedly connected Limit lever.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述第一连接块与第一螺杆螺纹连接,所述第二连接块与限位杆滑动连接,所述第一固定架的上端固定连接有第一伺服电机,所述第一伺服电机与第一螺杆的上端固定连接。The first connecting block is threadedly connected to the first screw rod, the second connecting block is slidably connected to the limit rod, the upper end of the first fixing frame is fixedly connected to the first servo motor, and the first servo motor is connected to the second The upper end of a screw rod is fixedly connected.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述安装架的上端后侧中间位置固定连接有蓄电池,所述安装架的后侧两端固定连接有推行架。A storage battery is fixedly connected to the middle position on the rear side of the upper end of the installation frame, and a pushing frame is fixedly connected to both ends of the rear side of the installation frame.
本实用新型具有如下有益效果:The utility model has the following beneficial effects:
1、该测量用定点器,在使用时,通过将多个定位组件依次置于放置槽和滑槽内,定位块与滑槽滑动,钉杆置于放置槽内,将连接壳体与安装壳体固定后,启动第二伺服电机可以带动滑块移动,从而可以带动推块推动定位组件通过定位沿着滑槽移动,当定位组件移动到连接壳体内部时,设置的电磁铁会与定位块吸附,从而可以对定位组件进行固定,设置的电动伸缩杆可以带动定位组件下降,从而可以将钉杆推出插入到土壤内,使得本装置可以对定位组件进行自动进给,提高工作效率。1. The fixed point for measurement, when in use, by placing multiple positioning components in the placement groove and the chute in turn, the positioning block and the chute slide, the nail rod is placed in the placement groove, and the connection shell and the installation shell are connected. After the body is fixed, start the second servo motor to drive the slider to move, so that the push block can be driven to push the positioning assembly to move along the chute through positioning. Adsorption, so that the positioning component can be fixed, the electric telescopic rod set can drive the positioning component down, so that the nail rod can be pushed out and inserted into the soil, so that the device can automatically feed the positioning component and improve work efficiency.
附图说明Description of drawings
图1为本实用新型的正视图;Fig. 1 is the front view of the utility model;
图2为本实用新型的连接壳体打开结构示意图;Fig. 2 is a schematic diagram of the opening structure of the connection housing of the present invention;
图3为本实用新型的第一螺杆、限位杆安装结构示意图;Fig. 3 is a schematic diagram of the installation structure of the first screw rod and the limit rod of the present utility model;
图4为本实用新型的连接壳体安装结构示意图;Fig. 4 is a schematic diagram of the installation structure of the connection housing of the present invention;
图5为本实用新型的滑槽、放置槽结构示意图;Fig. 5 is the structural representation of the chute of the present utility model, placement groove;
图6为本实用新型的定位组件安装结构示意图。Fig. 6 is a schematic diagram of the installation structure of the positioning assembly of the present invention.
图例说明:illustration:
1、安装架;2、自锁万向轮;3、蓄电池;4、推行架;5、第一固定架;6、安装壳体;7、连接壳体;8、定位组件;9、第一螺杆;10、第一伺服电机;11、第二固定架;12、限位杆;13、第一连接块;14、内螺纹管;15、电动伸缩杆;16、滑槽;17、放置槽;18、第二连接块;19、第二伺服电机;20、固定板;21、电磁铁;22、定位块;23、滑块;24、推块;25、限位板;26、固定螺栓;27、钉杆;28、第二螺杆。1. Mounting frame; 2. Self-locking universal wheels; 3. Battery; 4. Pushing frame; 5. The first fixing frame; 6. Installing the shell; 7. Connecting the shell; Screw; 10, the first servo motor; 11, the second fixed frame; 12, the limit rod; 13, the first connecting block; 14, the internal thread pipe; 15, the electric telescopic rod; 16, the chute; 18, the second connection block; 19, the second servo motor; 20, the fixed plate; 21, the electromagnet; 22, the positioning block; 23, the slider; 24, the push block; 25, the limit plate; 26, the fixing bolt ; 27, the nail rod; 28, the second screw rod.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
在本实用新型的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制;术语“第一”、“第二”、“第三”仅用于描述目的,而不能理解为指示或暗示相对重要性,此外,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" The orientation or positional relationship indicated by etc. is based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, use a specific Therefore, it cannot be construed as a limitation on the present invention; the terms "first", "second", and "third" are only used for descriptive purposes, and cannot be interpreted as indicating or implying relative importance. In addition, Unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be interpreted in a broad sense, for example, it may be a fixed connection, a detachable connection, or an integral connection; it may be a mechanical connection, It can also be an electrical connection; it can be a direct connection, or an indirect connection through an intermediary, or an internal communication between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model in specific situations.
参照图1-6,本实用新型提供的一种实施例:一种测量用定点器,包括安装架1,安装架1的下端固定连接有多个自锁万向轮2,安装架1的上端左右两侧分别竖直固定连接有第二固定架11和第一固定架5,第一固定架5和第二固定架11之间设置有安装壳体6,安装壳体6的前端铰链连接有连接壳体7,连接壳体7的上端固定连接有电动伸缩杆15,电动伸缩杆15的输出端贯穿连接壳体7的上端固定固定连接有电磁铁21,安装壳体6的内部下端开设有放置槽17,放置槽17的上端开设有滑槽16,放置槽17的内部设置有定位组件8,安装壳体6的上端滑动连接有滑块23,滑块23的下端固定连接有推块24。Referring to Figures 1-6, an embodiment provided by the utility model: a fixed point device for measurement, including a mounting frame 1, a plurality of self-locking universal wheels 2 are fixedly connected to the lower end of the mounting frame 1, and the upper end of the mounting frame 1 The left and right sides are respectively vertically fixedly connected with a second fixed frame 11 and a first fixed frame 5, and an installation shell 6 is arranged between the first fixed frame 5 and the second fixed frame 11, and the front end of the installation shell 6 is hingedly connected with Connect the housing 7, the upper end of the connecting housing 7 is fixedly connected with an electric telescopic rod 15, the output end of the electric telescopic rod 15 runs through the upper end of the connecting housing 7 and is fixedly connected with an electromagnet 21, and the inner lower end of the installation housing 6 is provided with Placement groove 17, the upper end of placement groove 17 is provided with chute 16, and the interior of placement groove 17 is provided with positioning assembly 8, and the upper end of installation housing 6 is slidably connected with slide block 23, and the lower end of slide block 23 is fixedly connected with push block 24 .
如图1-6所示,定位组件8包括位于上端的定位块22,定位块22的下端固定连接有钉杆27,定位块22与滑槽16滑动连接。As shown in FIGS. 1-6 , the positioning assembly 8 includes a positioning block 22 located at the upper end, a nail rod 27 is fixedly connected to the lower end of the positioning block 22 , and the positioning block 22 is slidably connected with the slide groove 16 .
如图1-6所示,安装壳体6的内部上端转动连接有第二螺杆28,滑块23与第二螺杆28螺纹连接,安装壳体6的后侧上端固定连接有第二伺服电机19,第二伺服电机19的输出端与第二螺杆28的后端固定连接,启动第二伺服电机19可以带动第二螺杆28转动,从而可以带动滑块23移动,从而可以带动推块24推动定位组件8通过定位沿着滑槽16移动。As shown in Figures 1-6, the inner upper end of the installation housing 6 is rotatably connected with a second screw rod 28, the slider 23 is threadedly connected with the second screw rod 28, and the rear upper end of the installation housing 6 is fixedly connected with a second servo motor 19 , the output end of the second servo motor 19 is fixedly connected with the rear end of the second screw rod 28, starting the second servo motor 19 can drive the second screw rod 28 to rotate, thereby driving the slider 23 to move, thereby driving the push block 24 to push the positioning The assembly 8 is moved along the slide 16 by positioning.
如图1-6所示,安装壳体6的前端两侧均固定连接有限位板25,安装壳体6的右端前侧上下端均固定连接有内螺纹管14,连接壳体7的右端后侧上下端均固定连接有固定板20,固定板20上均设置有固定螺栓26,固定螺栓26分别与对应内螺纹管14螺纹连接,将连接壳体7与安装壳体6通过固定螺栓26与内螺纹管14固定。As shown in Figure 1-6, both sides of the front end of the installation housing 6 are fixedly connected with the limit plate 25, and the upper and lower ends of the right front side of the installation housing 6 are fixedly connected with internal thread pipes 14, after connecting the right end of the housing 7 The upper and lower ends of the side are fixedly connected with a fixed plate 20, and fixed bolts 26 are arranged on the fixed plate 20, and the fixed bolts 26 are respectively threaded with the corresponding internally threaded pipe 14, and the connecting shell 7 and the mounting shell 6 are connected by the fixed bolts 26 and The internally threaded pipe 14 is fixed.
如图1-6所示,安装壳体6的左右两侧中间位置分别固定连接有第二连接块18和第一连接块13,第一固定架5的内部转动连接有第一螺杆9,第二固定架11的内部固定连接有限位杆12,第一连接块13与第一螺杆9螺纹连接,第二连接块18与限位杆12滑动连接,第一固定架5的上端固定连接有第一伺服电机10,第一伺服电机10与第一螺杆9的上端固定连接,通过启动第一伺服电机10可以带动第一螺杆9转动,从而可以带动安装壳体6通过第一连接、第二连接块18沿着限位杆12上下移动,从而可以对连接壳体7的高度进行调节。As shown in Figures 1-6, the middle positions on the left and right sides of the installation housing 6 are respectively fixedly connected with the second connecting block 18 and the first connecting block 13, and the inside of the first fixed frame 5 is connected with the first screw rod 9 for rotation, the second The inside of the two fixed mounts 11 is fixedly connected with the limit rod 12, the first connecting block 13 is threaded with the first screw rod 9, the second connecting block 18 is slidably connected with the limit rod 12, and the upper end of the first fixed mount 5 is fixedly connected with the second A servo motor 10, the first servo motor 10 is fixedly connected to the upper end of the first screw rod 9, and the first screw rod 9 can be driven to rotate by starting the first servo motor 10, thereby driving the installation shell 6 through the first connection and the second connection The block 18 moves up and down along the limit rod 12, so that the height of the connection housing 7 can be adjusted.
如图1-6所示,安装架1的上端后侧中间位置固定连接有蓄电池3,安装架1的后侧两端固定连接有推行架4,设置的自锁万向轮2、推相架可以便于本装置的移动,设置的蓄电池3可以对本装置的用电部件供电。As shown in Figure 1-6, the battery 3 is fixedly connected to the middle position on the rear side of the upper end of the installation frame 1, and the push frame 4 is fixedly connected to both ends of the rear side of the installation frame 1, and the self-locking universal wheels 2 and the photo frame are provided It can facilitate the movement of the device, and the provided storage battery 3 can supply power to the power-consuming parts of the device.
工作原理:在使用时,设置的自锁万向轮2、推相架可以便于本装置的移动,通过启动第一伺服电机10可以带动第一螺杆9转动,从而可以带动安装壳体6通过第一连接、第二连接块18沿着限位杆12上下移动,从而可以对连接壳体7的高度进行调节,通过将多个定位组件8依次置于放置槽17和滑槽16内,定位块22与滑槽16滑动,钉杆27置于放置槽17内,将连接壳体7与安装壳体6通过固定螺栓26与内螺纹管14固定后,启动第二伺服电机19可以带动第二螺杆28转动,从而可以带动滑块23移动,从而可以带动推块24推动定位组件8通过定位沿着滑槽16移动,当定位组件8移动到连接壳体7内部时,设置的电磁铁21会与定位块22吸附,从而可以对定位组件8进行固定,设置的电动伸缩杆15可以带动定位组件8下降,从而可以将钉杆27推出插入到土壤内,此时解除电磁铁21的吸附,将安装壳体6向上移动,电动伸缩杆15带动电磁铁21向上移动,从而可以进行下一次的定位动作。Working principle: when in use, the set self-locking universal wheel 2 and the phase push frame can facilitate the movement of the device, and the first screw 9 can be driven to rotate by starting the first servo motor 10, thereby driving the installation shell 6 to pass through the second The first connection and the second connection block 18 move up and down along the stop rod 12, so that the height of the connection housing 7 can be adjusted. By placing a plurality of positioning components 8 in the placement groove 17 and the chute 16 in sequence, the positioning block 22 slides with the chute 16, the nail rod 27 is placed in the placement groove 17, after the connecting shell 7 and the mounting shell 6 are fixed with the internal threaded pipe 14 by the fixing bolt 26, start the second servo motor 19 to drive the second screw rod 28 rotates, so that the slider 23 can be driven to move, so that the push block 24 can be driven to push the positioning assembly 8 to move along the chute 16 through positioning. The positioning block 22 is adsorbed, so that the positioning assembly 8 can be fixed, and the electric telescopic rod 15 provided can drive the positioning assembly 8 to descend, so that the nail rod 27 can be released and inserted into the soil. At this time, the adsorption of the electromagnet 21 is removed, and the installation The casing 6 moves upwards, and the electric telescopic rod 15 drives the electromagnet 21 to move upwards, so that the next positioning action can be performed.
最后应说明的是:以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Finally, it should be noted that: the above is only a preferred embodiment of the utility model, and is not intended to limit the utility model, although the utility model has been described in detail with reference to the foregoing embodiments, for those skilled in the art , it can still modify the technical solutions recorded in the foregoing embodiments, or perform equivalent replacements on some of the technical features. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model, All should be included within the protection scope of the present utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223501092.0U CN219573075U (en) | 2022-12-28 | 2022-12-28 | Measuring pointer |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223501092.0U CN219573075U (en) | 2022-12-28 | 2022-12-28 | Measuring pointer |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219573075U true CN219573075U (en) | 2023-08-22 |
Family
ID=87660408
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202223501092.0U Expired - Fee Related CN219573075U (en) | 2022-12-28 | 2022-12-28 | Measuring pointer |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219573075U (en) |
-
2022
- 2022-12-28 CN CN202223501092.0U patent/CN219573075U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN112345290B (en) | Soil sampling device based on environmental protection detects | |
| CN211058020U (en) | A connecting device for building external hanging and building main body | |
| CN219573075U (en) | Measuring pointer | |
| CN212105174U (en) | A clamping mechanism for building wall panel installation | |
| CN216049765U (en) | Full-automatic tunnel secondary lining thickness detection instrument | |
| CN213180782U (en) | A survey sampling equipment for underground space | |
| CN214301842U (en) | Utility tunnel reinforcement moving die carrier | |
| CN114754719B (en) | Soil thickness detection device is used in hydraulic engineering construction | |
| CN218346196U (en) | A deep foundation pit support structure | |
| CN218268395U (en) | Three-dimensional ground penetrating radar device for monitoring road diseases | |
| CN217738241U (en) | High-precision deformation monitoring device convenient to install on steel structure | |
| CN214893287U (en) | Multifunctional construction engineering management measuring device | |
| CN116678664A (en) | Soil sampling mechanism for geotechnical engineering investigation | |
| CN210572207U (en) | Environment monitoring device | |
| CN211502148U (en) | Mapping device for construction engineering cost | |
| CN219548858U (en) | Hydraulic engineering surveys sampling drill bit | |
| CN219886761U (en) | Foundation detection sampling device | |
| CN219675510U (en) | Soil volatile organic compounds sampler | |
| CN220540757U (en) | Total powerstation that hydraulic engineering detected | |
| CN220583366U (en) | Measuring device for landscape planning design | |
| CN219711505U (en) | A soil drilling structure for engineering geology | |
| CN219367257U (en) | Holding pole box convenient to install | |
| CN218628147U (en) | Desert propulsion positioning monitor | |
| CN217233416U (en) | A foundation reinforcement device | |
| CN220320927U (en) | Soil and water conservation monitoring information collection pole |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230822 |