CN219569385U - An assembled roof overhanging system - Google Patents

An assembled roof overhanging system Download PDF

Info

Publication number
CN219569385U
CN219569385U CN202320815097.6U CN202320815097U CN219569385U CN 219569385 U CN219569385 U CN 219569385U CN 202320815097 U CN202320815097 U CN 202320815097U CN 219569385 U CN219569385 U CN 219569385U
Authority
CN
China
Prior art keywords
overhanging
cornice
embedded parts
assembled roof
parapet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320815097.6U
Other languages
Chinese (zh)
Inventor
邓嘉伟
刘立鼎
徐亚男
左锐
贾维学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN202320815097.6U priority Critical patent/CN219569385U/en
Application granted granted Critical
Publication of CN219569385U publication Critical patent/CN219569385U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model relates to the technical field of building cornice structures, in particular to an assembled roof cornice system, which comprises cornice frameworks and waterproof panels coated on the outer sides of the cornice frameworks, wherein each cornice framework comprises cornice framework units which are uniformly arranged, two adjacent cornice framework units are fixedly connected through secondary beams, when the cornice framework units are preassembled, the upper parts of the cornice framework units are connected with embedded parts on a parapet through bolts, and the lower parts of the cornice framework units are spliced with the embedded parts on the parapet; when the cornice framework unit is installed, the upper part and the lower part of the cornice framework unit are welded and connected with embedded parts on the parapet wall. The utility model has the beneficial effects that: adopt the bolt to add welded method when cornice skeleton installation, fix cornice skeleton through the bolt earlier, carry out welding work again, effectively avoid appearing hoist and mount limit welded condition, make the welding make cornice firmware stable can not rock, be convenient for weld, reduce the construction degree of difficulty, improve the efficiency of construction.

Description

一种拼装式屋顶挑檐系统An assembled roof overhanging system

技术领域technical field

本实用新型涉及建筑挑檐结构技术领域,特别是指一种拼装式屋顶挑檐系统。The utility model relates to the technical field of building cornice structures, in particular to an assembled roof cornice system.

背景技术Background technique

随着科技、经济、文化发展以及人们审美层次的提高,建筑结构形式的设计均已超越了传统的局限,大量新颖独特的结构应运而生。在高层建筑设计中,引入了大量悬挑结构的造型,以凸显现代化风格。目前屋顶设计挑檐是最常见的结构之一,该结构通常采用钢结构体系,但处于屋顶处的悬挑结构往往会增大施工难度以及施工成本。With the development of science and technology, economy, and culture, as well as the improvement of people's aesthetic level, the design of architectural structures has surpassed the traditional limitations, and a large number of novel and unique structures have emerged as the times require. In the design of high-rise buildings, a large number of overhanging structures are introduced to highlight the modern style. At present, the roof overhang is one of the most common structures. The structure usually adopts a steel structure system, but the overhang structure on the roof often increases the construction difficulty and construction cost.

公开号CN113417412A公开了一种单元式屋面异型防水面板挑檐及其施工方法,包括防水面板挑檐主体、桁架、吊装转换梁和连接稳固件、定位辅助组件,防水面板挑檐主体上等距设置有桁架,并且桁架上通过连接稳固件与吊装转换梁进行快速连接固定,并且吊装转换梁对称设置在防水面板挑檐主体上,防水面板挑檐主体通过设置的定位辅助组件进行安装预定位。但是在进行挑檐安装过程中,是在将挑檐结构吊装时进行焊接,挑檐结构容易产生晃动导致焊接难度增大,不利于进行施工。Publication No. CN113417412A discloses a unit roof special-shaped waterproof panel cornice and its construction method, including waterproof panel cornice main body, trusses, hoisting conversion beams and connecting stabilizers, positioning auxiliary components, and the waterproof panel cornice main body is equidistantly arranged There are trusses, and the trusses are quickly connected and fixed by connecting stabilizers and hoisting conversion beams, and the hoisting conversion beams are symmetrically arranged on the main body of the waterproof panel eaves, and the main body of the waterproof panel eaves is pre-installed through the set positioning auxiliary components. However, in the process of installing the overhanging eaves, welding is carried out when the overhanging eaves structure is hoisted, and the overhanging eaves structure is prone to shaking, resulting in increased welding difficulty, which is not conducive to construction.

实用新型内容Utility model content

本实用新型提出一种拼装式屋顶挑檐系统,解决了现有技术中挑檐结构安装焊接难度大的问题。The utility model provides an assembled roof overhanging eaves system, which solves the problem of difficulty in installation and welding of overhanging eaves structures in the prior art.

本实用新型的技术方案是这样实现的:The technical scheme of the utility model is achieved in that:

一种拼装式屋顶挑檐系统,包括挑檐骨架和包覆在挑檐骨架外侧的防水面板,挑檐骨架包括均匀布置的挑檐骨架单元,相邻两个挑檐骨架单元通过次梁固定连接,挑檐骨架单元预装时,挑檐骨架单元的上部与女儿墙上的预埋件通过螺栓连接,挑檐骨架单元的下部与女儿墙上的预埋件插接;挑檐骨架单元安装时,挑檐骨架单元的上部和下部均与女儿墙上的预埋件焊接连接。挑檐骨架安装时采用螺栓加焊接的方法,先通过螺栓对挑檐骨架进行固定,再进行焊接工作,有效避免出现边吊装边焊接的情况,使焊接使挑檐固件稳定不会晃动,便于进行焊接,降低施工难度,提高施工效率。An assembled roof overhanging system, comprising a overhanging frame and a waterproof panel covering the outside of the overhanging frame, the overhanging frame includes evenly arranged overhanging frame units, and two adjacent overhanging frame units are fixedly connected by secondary beams , when the overhanging frame unit is pre-installed, the upper part of the overhanging frame unit is connected with the embedded parts on the parapet by bolts, and the lower part of the overhanging frame unit is plugged into the embedded part on the parapet; when the overhanging frame unit is installed , the upper and lower parts of the overhanging eaves skeleton unit are welded to the embedded parts on the parapet wall. The method of bolts and welding is used for the installation of the overhanging eaves frame. First, the bolts are used to fix the overhanging eaves frame, and then the welding work is carried out, which effectively avoids the situation of welding while hoisting, so that the welding makes the overhanging eaves firmware stable and does not shake, which is convenient for installation. Welding reduces construction difficulty and improves construction efficiency.

所述挑檐骨架单元包括上横梁和下横梁,上横梁通过次梁与下横梁连接,上横梁和下横梁均与次梁焊接连接。挑檐骨架单元在吊装前进行焊接组装,便于进行焊接施工。The overhanging eaves skeleton unit includes an upper beam and a lower beam, the upper beam is connected to the lower beam through a secondary beam, and both the upper beam and the lower beam are welded to the secondary beam. The overhanging eaves skeleton unit is welded and assembled before hoisting, which is convenient for welding construction.

所述上横梁倾斜布置,上横梁的倾斜角度为0°~10°。倾斜布置的上横梁使包覆在挑檐骨架上的防水面板产生倾斜的坡度,有利于进行雨天的排水。The upper beam is arranged obliquely, and the inclination angle of the upper beam is 0°~10°. The obliquely arranged upper beams make the waterproof panels covering the overhanging eaves have an inclined slope, which is conducive to drainage in rainy days.

所述预埋件包括设置在女儿墙外侧的侧边预埋件和设置在女儿墙顶端的顶部预埋件,侧边预埋件与下横梁的左端连接,顶部预埋件与上横梁的左端通过连接座连接。The embedded parts include a side embedded part arranged on the outside of the parapet wall and a top embedded part arranged on the top of the parapet wall. The side embedded part is connected with the left end of the lower beam, and the top embedded part is connected with the left end of the upper beam. Connect via connection socket.

所述连接座包括两个竖向设置的槽钢,槽钢的下端与顶部预埋件焊接连接,两个槽钢的开口朝向方向相反,上横梁与两个槽钢底面贴合。两个槽钢的底面对上横梁进行定位,保证上横梁安装位置准确。The connecting seat includes two vertically arranged channel steels, the lower ends of the channel steels are welded to the top embedded parts, the openings of the two channel steels face in opposite directions, and the upper cross beam is attached to the bottom surfaces of the two channel steels. The bottom faces of the two channel steels are positioned on the upper beam to ensure that the installation position of the upper beam is accurate.

所述槽钢的底面设有竖向布置的长圆孔,长圆孔内穿设有用于固定上横梁的螺栓。长圆孔便于调整上横梁的相对高度,便于进行挑檐骨架的安装。The bottom surface of the channel steel is provided with vertically arranged oblong holes, and bolts for fixing the upper beam are pierced in the oblong holes. The oblong holes are convenient for adjusting the relative height of the upper beam and for the installation of the overhanging eaves framework.

所述侧边预埋件上焊接有方管,下横梁的左端与方管插接。A square pipe is welded on the side embedded part, and the left end of the lower beam is inserted into the square pipe.

所述防水面板通过自攻螺钉与挑檐骨架连接。The waterproof panel is connected to the cornice frame by self-tapping screws.

本实用新型产生的有益效果是:挑檐骨架安装时采用螺栓加焊接的方法,先通过螺栓对挑檐骨架进行固定,再进行焊接工作,有效避免出现边吊装边焊接的情况,使焊接使挑檐固件稳定不会晃动,便于进行焊接,降低施工难度,提高施工效率。连接座可对上横梁的安装位置进行限位,进而保证挑檐骨架单元安装位置准确。长圆孔便于进行上横梁相对高度的调节,便于进行挑檐骨架的安装,同时比那与进行挑檐骨架的调平。The beneficial effects produced by the utility model are: when the overhanging eaves framework is installed, bolts and welding are adopted, and the overhanging eaves framework is first fixed by bolts, and then the welding work is carried out, which effectively avoids the situation of welding while hoisting, so that the welding can make the overhanging The eaves firmware is stable and will not shake, which is convenient for welding, reduces construction difficulty, and improves construction efficiency. The connecting seat can limit the installation position of the upper beam, thereby ensuring the accurate installation position of the overhanging eaves skeleton unit. The oblong holes facilitate the adjustment of the relative height of the upper beam, the installation of the overhanging eaves framework, and the leveling of the overhanging eaves framework.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are only some embodiments of the utility model, and those skilled in the art can also obtain other drawings based on these drawings without creative work.

图1为本实用新型一种拼装式屋顶挑檐系统结构示意图。Fig. 1 is a structural schematic diagram of an assembled roof overhanging system of the present invention.

图2为女儿墙连接座结构示意图。Figure 2 is a schematic diagram of the structure of the connecting seat of the parapet wall.

图中:1-上横梁,2-下横梁,3-次梁,4-防水面板,5-女儿墙,6-侧边预埋件,7-顶部预埋件,8-连接座,81-槽钢,82-长圆孔。In the figure: 1-upper beam, 2-lower beam, 3-secondary beam, 4-waterproof panel, 5-parapet wall, 6-side embedded parts, 7-top embedded parts, 8-connecting seat, 81- Channel steel, 82-long round hole.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有付出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

实施例1,如图1所示,一种拼装式屋顶挑檐系统,包括挑檐骨架和包覆在挑檐骨架外侧的防水面板4,,挑檐骨架对防水面板4提供支撑,本实施例中,防水面板4为铝板,防水面板4通过自攻螺钉与挑檐骨架连接,且在自攻螺钉位置设置有密封垫,保证防水面板4的密封性,避免雨水进入防水面板4内侧造成挑檐骨架锈蚀。Embodiment 1, as shown in Figure 1, an assembled roof overhanging system includes an overhanging frame and a waterproof panel 4 covering the outside of the overhanging frame, and the overhanging frame provides support for the waterproof panel 4. This embodiment Among them, the waterproof panel 4 is an aluminum plate, and the waterproof panel 4 is connected to the overhanging eaves frame by self-tapping screws, and a gasket is provided at the position of the self-tapping screws to ensure the sealing of the waterproof panel 4 and prevent rainwater from entering the inner side of the waterproof panel 4 to cause overhanging eaves. The frame is corroded.

进一步,挑檐骨架包括均匀布置的挑檐骨架单元,相邻两个挑檐骨架单元通过次梁3固定连接,挑檐骨架单元预装时,挑檐骨架单元的上部与女儿墙5上的预埋件通过螺栓连接,挑檐骨架单元的下部与女儿墙5上的预埋件插接;挑檐骨架单元安装时,挑檐骨架单元的上部和下部均与女儿墙5上的预埋件焊接连接。在进行挑檐骨架安装施工时,挑檐骨架单元吊装到指定位置后,先使用螺栓对挑檐骨架单元进行预固定,然后再对挑檐骨架单元进行焊接固定,降低挑檐骨架单元焊接难度,使挑檐骨架施工更加便捷,结构更加稳定。Further, the overhanging eaves skeleton includes evenly arranged overhanging eaves skeleton units, and two adjacent overhanging eaves skeleton units are fixedly connected through the secondary beam 3. The embedded parts are connected by bolts, and the lower part of the overhanging frame unit is inserted into the embedded part on the parapet 5; when the overhanging frame unit is installed, the upper and lower parts of the overhanging frame unit are welded to the embedded part on the parapet 5 connect. During the installation and construction of the overhanging eaves skeleton, after the overhanging eaves skeleton unit is hoisted to the designated position, the bolts are used to pre-fix the overhanging eaves skeleton unit, and then the overhanging eaves skeleton unit is welded and fixed to reduce the difficulty of welding the overhanging eaves skeleton unit. It makes the construction of the overhanging eaves skeleton more convenient and the structure more stable.

进一步,挑檐骨架单元包括上横梁1和下横梁2,上横梁1通过次梁3与下横梁2连接,上横梁1和下横梁2均与次梁3焊接连接。所述次梁3包括竖梁和斜梁,竖梁和斜梁共同作用连接上横梁1和下横梁2,进而形成三角结构,保证挑檐骨架单元的结构稳定性。所述上横梁1倾斜布置,上横梁1的倾斜角度为0°~10°。本实施例中,上横梁1的倾斜角度为1°,倾斜布置的上横梁1使包覆在挑檐骨架上的防水面板4产生倾斜的坡度,有利于进行雨天的排水。Further, the overhanging eaves skeleton unit includes an upper beam 1 and a lower beam 2 , the upper beam 1 is connected to the lower beam 2 through a secondary beam 3 , and both the upper beam 1 and the lower beam 2 are welded to the secondary beam 3 . The secondary beam 3 includes vertical beams and inclined beams, and the vertical beams and inclined beams work together to connect the upper beam 1 and the lower beam 2, thereby forming a triangular structure and ensuring the structural stability of the overhanging eaves skeleton unit. The upper beam 1 is arranged obliquely, and the inclination angle of the upper beam 1 is 0°~10°. In this embodiment, the inclination angle of the upper beam 1 is 1°, and the oblique arrangement of the upper beam 1 makes the waterproof panel 4 covered on the overhanging eaves skeleton produce an inclined slope, which is beneficial for drainage in rainy days.

实施例2,与实施例1的区别在于,预埋件包括设置在女儿墙5外侧的侧边预埋件6和设置在女儿墙5顶端的顶部预埋件7,侧边预埋件6与下横梁2的左端连接,顶部预埋件7与上横梁1的左端通过连接座8连接。具体的,侧边预埋件6和顶部预埋件7均包括与女儿墙5表面齐平的钢板,钢板底部设有埋设在女儿墙5内的钢筋,侧边预埋件6的钢板上焊接有方管,方管横向布置,下横梁2的左端与方管插接,方管可对下横梁2进行定位,保证下横梁2安装位置准确,并且方管与下横梁1之间设有间隙,便于进行挑檐结构整体高度的微调。The difference between embodiment 2 and embodiment 1 is that the embedded parts include side embedded parts 6 arranged on the outside of parapet wall 5 and top embedded parts 7 arranged on the top of parapet wall 5, and side embedded parts 6 and The left end of the lower beam 2 is connected, and the top embedded part 7 is connected with the left end of the upper beam 1 through a connecting seat 8 . Specifically, the side embedded parts 6 and the top embedded parts 7 all include steel plates flush with the surface of the parapet 5, and the bottom of the steel plates is provided with reinforcing bars embedded in the parapet 5, and the steel plates of the side embedded parts 6 are welded There are square tubes, the square tubes are arranged horizontally, the left end of the lower beam 2 is inserted into the square tube, and the square tube can position the lower beam 2 to ensure that the installation position of the lower beam 2 is accurate, and there is a gap between the square tube and the lower beam 1 , to facilitate the fine-tuning of the overall height of the overhanging eaves structure.

进一步,如图2所示,连接座8包括两个竖向设置的槽钢81,槽钢81的下端与顶部预埋件7的钢板焊接连接,两个槽钢81的开口朝向方向相反,上横梁1与两个槽钢81底面贴合,两个槽钢81对上横梁1的位置进行限位,保证挑檐骨架单元安装位置准确,进而保证相邻两个挑檐骨架单元的间距一致,便于进行后续次梁3的焊接安装。槽钢81的底面设有竖向布置的长圆孔82,长圆孔82内穿设有用于固定上横梁1的螺栓。螺栓可在长圆孔内上下移动,降低挑檐骨架单元安装时的精度尺寸要求,进而实现对挑檐骨架单元的标高进行微调,降低调平的施工难度。Further, as shown in FIG. 2, the connecting base 8 includes two vertically arranged channel steels 81, the lower ends of which are welded to the steel plate of the top embedded part 7, and the openings of the two channel steels 81 face in opposite directions. The beam 1 is attached to the bottom surface of the two channel steels 81, and the two channel steels 81 limit the position of the upper beam 1 to ensure that the installation position of the overhanging frame unit is accurate, thereby ensuring that the distance between two adjacent overhanging frame units is consistent. It is convenient for subsequent welding and installation of the secondary beam 3 . The bottom surface of the channel steel 81 is provided with vertically arranged oblong holes 82 , and bolts for fixing the upper beam 1 are pierced in the oblong holes 82 . Bolts can move up and down in the oblong holes, which reduces the accuracy and size requirements for the installation of the overhanging frame unit, and then realizes fine-tuning of the elevation of the overhanging frame unit, reducing the construction difficulty of leveling.

以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in the Within the protection scope of the present utility model.

Claims (8)

1.一种拼装式屋顶挑檐系统,其特征在于,包括挑檐骨架和包覆在挑檐骨架外侧的防水面板(4),挑檐骨架包括均匀布置的挑檐骨架单元,相邻两个挑檐骨架单元通过次梁(3)固定连接,挑檐骨架单元预装时,挑檐骨架单元的上部与女儿墙(5)上的预埋件通过螺栓连接,挑檐骨架单元的下部与女儿墙(5)上的预埋件插接;挑檐骨架单元安装时,挑檐骨架单元的上部和下部均与女儿墙(5)上的预埋件焊接连接。1. An assembled roof overhanging system, characterized in that it includes an overhanging frame and a waterproof panel (4) covering the outside of the overhanging frame, the overhanging frame includes evenly arranged overhanging frame units, two adjacent The overhanging frame unit is fixedly connected by the secondary beam (3). When the overhanging frame unit is preassembled, the upper part of the overhanging frame unit is connected to the embedded parts on the parapet (5) by bolts, and the lower part of the overhanging frame unit is connected to the daughter wall. The embedded parts on the wall (5) are inserted; when the overhanging eaves skeleton unit is installed, the upper and lower parts of the overhanging eaves skeleton unit are welded and connected with the embedded parts on the parapet (5). 2.根据权利要求1所述的拼装式屋顶挑檐系统,其特征在于,挑檐骨架单元包括上横梁(1)和下横梁(2),上横梁(1)通过次梁(3)与下横梁(2)连接,上横梁(1)和下横梁(2)均与次梁(3)焊接连接。2. The assembled roof overhanging system according to claim 1, characterized in that the overhanging frame unit includes an upper beam (1) and a lower beam (2), and the upper beam (1) passes through the secondary beam (3) and the lower beam The beam (2) is connected, and the upper beam (1) and the lower beam (2) are welded to the secondary beam (3). 3.根据权利要求2所述的拼装式屋顶挑檐系统,其特征在于,上横梁(1)倾斜布置,上横梁(1)的倾斜角度为0°~10°。3. The assembled roof overhanging system according to claim 2, characterized in that the upper beam (1) is arranged obliquely, and the inclination angle of the upper beam (1) is 0°~10°. 4.根据权利要求2或3所述的拼装式屋顶挑檐系统,其特征在于,预埋件包括设置在女儿墙(5)外侧的侧边预埋件(6)和设置在女儿墙(5)顶端的顶部预埋件(7),侧边预埋件(6)与下横梁(2)的左端连接,顶部预埋件(7)与上横梁(1)的左端通过连接座(8)连接。4. The assembled roof overhanging system according to claim 2 or 3, characterized in that the embedded parts include side embedded parts (6) arranged on the outside of the parapet wall (5) and side embedded parts (6) arranged on the parapet wall (5) ) The top embedded part (7) at the top, the side embedded part (6) is connected with the left end of the lower beam (2), and the top embedded part (7) and the left end of the upper beam (1) pass through the connecting seat (8) connect. 5.根据权利要求4所述的拼装式屋顶挑檐系统,其特征在于,连接座(8)包括两个竖向设置的槽钢(81),槽钢(81)的下端与顶部预埋件(7)焊接连接,两个槽钢(81)的开口朝向方向相反,上横梁(1)与两个槽钢(81)底面贴合。5. The assembled roof eaves system according to claim 4, characterized in that the connecting seat (8) includes two vertically arranged channel steels (81), and the lower ends of the channel steels (81) and the top embedded parts (7) Welding connection, the openings of the two channel steels (81) face opposite directions, and the upper beam (1) is attached to the bottom surfaces of the two channel steels (81). 6.根据权利要求5所述的拼装式屋顶挑檐系统,其特征在于,槽钢(81)的底面设有竖向布置的长圆孔(82),长圆孔(82)内穿设有用于固定上横梁(1)的螺栓。6. The assembled roof overhanging system according to claim 5, characterized in that, the bottom surface of the channel steel (81) is provided with vertically arranged oblong holes (82), and the oblong holes (82) are pierced with holes for fixing Bolts for the upper cross member (1). 7.根据权利要求5或6所述的拼装式屋顶挑檐系统,其特征在于,侧边预埋件(6)上焊接有方管,下横梁(2)的左端与方管插接。7. The assembled roof overhanging system according to claim 5 or 6, characterized in that square pipes are welded on the side embedded parts (6), and the left end of the lower beam (2) is plugged into the square pipes. 8.根据权利要求7所述的拼装式屋顶挑檐系统,其特征在于,防水面板(4)通过自攻螺钉与挑檐骨架连接。8. The assembled roof overhanging system according to claim 7, characterized in that the waterproof panel (4) is connected to the overhanging frame by self-tapping screws.
CN202320815097.6U 2023-04-13 2023-04-13 An assembled roof overhanging system Active CN219569385U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320815097.6U CN219569385U (en) 2023-04-13 2023-04-13 An assembled roof overhanging system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320815097.6U CN219569385U (en) 2023-04-13 2023-04-13 An assembled roof overhanging system

Publications (1)

Publication Number Publication Date
CN219569385U true CN219569385U (en) 2023-08-22

Family

ID=87648441

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320815097.6U Active CN219569385U (en) 2023-04-13 2023-04-13 An assembled roof overhanging system

Country Status (1)

Country Link
CN (1) CN219569385U (en)

Similar Documents

Publication Publication Date Title
CN112360146B (en) Detachable steel bar truss floor bearing plate supporting system
CN211421637U (en) A connection structure of a prefabricated gutter
CN219569385U (en) An assembled roof overhanging system
CN205475677U (en) Steel house room unit
CN214614570U (en) Assembled steel truss beam column connection part
CN207568016U (en) A kind of U-shaped glass curtain wall system of achievable super-span
CN204983335U (en) Furred ceiling is staple bolt device for conversion layer
CN220828037U (en) Truss floor carrier plate supporting structure
CN105133770B (en) The roof structure of underpass entrance
CN219732311U (en) A hyperboloid V-shaped column installation node structure
CN218438252U (en) Assembled formwork system based on steel structure building outer cantilever cast-in-place concrete member
CN212200935U (en) Assembled steel structure concrete side fascia, assembled steel structure girder steel and couple formula lightweight concrete side fascia node
CN117027163A (en) Fully assembled frame structure for low-rise building and construction method thereof
CN210289112U (en) Through type support template system
CN209779870U (en) Connecting structure for assembled steel structure house steel beam and combined special-shaped column
CN218028145U (en) An adjustable leveling cantilevered supporting balcony structure for steel structures
CN107386465B (en) Column-beam intersection node structure of steel structure antique second mountain building roof
CN206128405U (en) Take whole roof boarding of eaves mouth
CN117052163B (en) Method for fixing bracket at upper part of through-length door and window at position vertical to steel structure steel beam
CN223853827U (en) Concrete precast secondary beam and composite floor slab horizontal structure refined construction structure
CN216475738U (en) Assembled exterior wall cladding
CN221118986U (en) An anti-leakage structure of an external cantilevered canopy
CN218204906U (en) A combined steel structure purlin
CN218667929U (en) Pre-buried structure of concrete beam and steel truss connection usefulness
CN120719774B (en) Construction methods for curved sloping walls of large venues

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant