CN219567250U - Detachable stay wire anchor used on pole standard joint - Google Patents

Detachable stay wire anchor used on pole standard joint Download PDF

Info

Publication number
CN219567250U
CN219567250U CN202320136939.5U CN202320136939U CN219567250U CN 219567250 U CN219567250 U CN 219567250U CN 202320136939 U CN202320136939 U CN 202320136939U CN 219567250 U CN219567250 U CN 219567250U
Authority
CN
China
Prior art keywords
plate
clamping plate
pole
splint
wire anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320136939.5U
Other languages
Chinese (zh)
Inventor
靳义奎
张君
于昊
甘生霖
韩学文
朱岩
马斌
张小龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinghai Power Transmission And Distribution Engineering Co ltd
State Grid Qinghai Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Qinghai Power Transmission And Distribution Engineering Co ltd
State Grid Qinghai Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinghai Power Transmission And Distribution Engineering Co ltd, State Grid Qinghai Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Qinghai Power Transmission And Distribution Engineering Co ltd
Priority to CN202320136939.5U priority Critical patent/CN219567250U/en
Application granted granted Critical
Publication of CN219567250U publication Critical patent/CN219567250U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型公开了一种用于抱杆标准节上的可拆卸式拉线锚,涉及电力施工设备技术领域。该拉线锚包括用于夹紧抱杆角钢的内层夹板和外层夹板,且所述的内层夹板和外层夹板均包括第一夹紧板和第二夹紧板。所述内层夹板的第一夹紧板和所述外层夹板的第一夹紧板通过第一螺栓组件夹紧所述抱杆角钢的一个翼板。所述内层夹板的第二夹紧板和所述外层夹板的第二夹紧板通过第二螺栓组件夹紧所述抱杆角钢的另一个翼板。所述外层夹板的第一夹紧板和/或第二夹紧板的外侧面上设置有挂环。该拉线锚可以根据实际施工中拉线的布置而调整拉线锚的安装位置,避免影响抱杆标准节的结构和受力强度。

The utility model discloses a detachable stay wire anchor used on a standard joint of a pole, and relates to the technical field of electric power construction equipment. The stay anchor includes an inner splint and an outer splint for clamping the angle steel of the pole, and the inner splint and the outer splint both include a first clamping plate and a second clamping plate. The first clamping plate of the inner layer clamping plate and the first clamping plate of the outer layer clamping plate clamp a wing plate of the pole angle steel through the first bolt assembly. The second clamping plate of the inner layer clamping plate and the second clamping plate of the outer layer clamping plate clamp the other wing plate of the pole angle steel through the second bolt assembly. Hanging rings are provided on the outer surfaces of the first clamping plate and/or the second clamping plate of the outer clamping plate. The guy wire anchor can adjust the installation position of the guy wire anchor according to the layout of the guy wires in actual construction, so as to avoid affecting the structure and stress strength of the standard section of the pole.

Description

一种用于抱杆标准节上的可拆卸式拉线锚A detachable stay wire anchor used on standard joints of poles

技术领域technical field

本实用新型涉及电力施工设备技术领域,具体地说是一种用于抱杆标准节上的可拆卸式拉线锚。The utility model relates to the technical field of electric power construction equipment, in particular to a detachable stay wire anchor used on a standard joint of a pole.

背景技术Background technique

在输电线路施工中,抱杆可以和卷扬机、滑轮组、钢丝绳共同形成吊具,用于起吊重物。抱杆通常由角钢焊接的标准节组装而成,施工时,抱杆通过拉线进行固定。In the construction of transmission lines, the pole can form a spreader together with the hoist, pulley block, and wire rope for lifting heavy objects. The poles are usually assembled by standard joints welded by angle steel. During construction, the poles are fixed by pull wires.

然而,由于设置于抱杆上的用于连接拉线的拉线猫一般是焊接固定在抱杆上,其位置固定,因此在施工的过程中无法根据拉线的设置而调整拉线锚的位置。Yet, because the stay wire cat that is arranged on the holding pole and is used for connecting stay wire is generally welded and fixed on the holding pole, its position is fixed, therefore can't adjust the position of stay wire anchor according to the setting of stay wire in the process of construction.

为了解决这一问题,相关技术中,施工人员会根据拉线的设置在抱杆上焊接新的拉线锚或者在抱杆上钻孔,但是焊接新的拉线锚会影响抱杆标准节的结构,钻孔会影响标准节的受力强度。In order to solve this problem, in related technologies, construction personnel will weld new anchors on the poles or drill holes on the poles according to the setting of the poles, but welding new anchors will affect the structure of the standard joints of the poles. Holes affect the strength of the standard joint.

实用新型内容Utility model content

针对上述问题,本实用新型提供了一种用于抱杆标准节上的可拆卸式拉线锚,该拉线锚采用可拆卸的结构,这样,就可以根据实际施工中拉线的布置而调整拉线锚的安装位置,避免影响抱杆标准节的结构和受力强度。In view of the above problems, the utility model provides a detachable stay wire anchor used on the standard section of the pole. The installation position should avoid affecting the structure and stress strength of the standard section of the pole.

本实用新型解决其技术问题所采取的技术方案是:The technical scheme that the utility model solves its technical problem to take is:

一种用于抱杆标准节上的可拆卸式拉线锚,包括用于夹紧抱杆角钢的内层夹板和外层夹板,且所述的内层夹板和外层夹板均包括第一夹紧板和第二夹紧板;A detachable stay wire anchor for a standard section of a pole, comprising an inner splint and an outer splint for clamping a pole angle steel, and the inner splint and the outer splint both include a first clamping plate and a second clamping plate;

所述内层夹板的第一夹紧板和所述外层夹板的第一夹紧板通过第一螺栓组件夹紧所述抱杆角钢的一个翼板;The first clamping plate of the inner layer splint and the first clamping plate of the outer layer splint clamp a wing plate of the pole angle steel through the first bolt assembly;

所述内层夹板的第二夹紧板和所述外层夹板的第二夹紧板通过第二螺栓组件夹紧所述抱杆角钢的另一个翼板;The second clamping plate of the inner layer clamping plate and the second clamping plate of the outer layer clamping plate clamp the other wing plate of the pole angle steel through the second bolt assembly;

所述外层夹板的第一夹紧板和/或第二夹紧板的外侧面上设置有挂环。Hanging rings are provided on the outer surfaces of the first clamping plate and/or the second clamping plate of the outer clamping plate.

可选的,所述的第一螺栓组件和第二螺栓组件均包括锁紧螺栓,所述的内层夹板和外层夹板上分别设置有用于容纳所述锁紧螺栓的第一安装孔和第二安装孔,且所述的第一安装孔和第二安装孔为长圆孔。Optionally, both the first bolt assembly and the second bolt assembly include locking bolts, and the inner plywood and the outer plywood are respectively provided with a first mounting hole and a second mounting hole for accommodating the locking bolts. Two mounting holes, and the first mounting hole and the second mounting hole are oblong holes.

可选的,还包括结构相同,且关于所述外层夹板的第一对称面对称布置的限位架,所述的限位架包括位于所述内层夹板和外层夹板之间的限位板,所述的限位板上设置有用于容纳所述锁紧螺栓的限位孔,所述的限位板上位于所述外层夹板的上侧和/或下侧设置有垂直于所述的限位板向两侧延伸的压紧板,所述压紧板的内端和外端分别设置有垂直于所述的压紧板向远离所述限位板的一侧延伸的顶板和拉板,所述拉板的悬空端设置有连接板,两个所述限位架的连接板之间设置有第三螺栓组件。Optionally, it also includes a limiting frame with the same structure and arranged symmetrically with respect to the first symmetrical plane of the outer splint, and the limiting frame includes a limiting frame between the inner layer splint and the outer layer splint. Position plate, the limit plate is provided with limit holes for accommodating the locking bolts, and the limit plate is located on the upper side and/or lower side of the outer plywood. The compression plate extending to both sides of the limiting plate, the inner end and the outer end of the pressing plate are respectively provided with a top plate and a top plate extending perpendicular to the pressing plate to a side away from the limiting plate A tie plate, the hanging end of the tie plate is provided with a connecting plate, and a third bolt assembly is arranged between the connecting plates of the two limit frames.

可选的,所述限位板的外侧面位于所述拉板的内侧面的内侧,所述限位板的厚度小于最小规格抱杆角钢的翼板的厚度,所述拉板和顶板之间的距离大于最大规格抱杆角钢的翼板的厚度。Optionally, the outer side of the limiting plate is located inside the inner side of the pulling plate, the thickness of the limiting plate is smaller than the thickness of the wing plate of the minimum specification pole angle steel, and the gap between the pulling plate and the top plate The distance is greater than the thickness of the wing plate of the largest specification pole angle steel.

可选的,所述限位板的外侧面到所述拉板的内侧面之间的距离为0.5mm-1mm。Optionally, the distance between the outer surface of the limiting plate and the inner surface of the pulling plate is 0.5mm-1mm.

可选的,所述的顶板上设置有顶紧螺栓。Optionally, jacking bolts are arranged on the top plate.

可选的,所述的顶紧螺栓采用蝶形螺栓。Optionally, the jacking bolts are butterfly bolts.

可选的,所述的第三螺栓组件包括连接螺栓,所述的连接板上设置有多个用于容纳所述连接螺栓的连接孔。Optionally, the third bolt assembly includes connecting bolts, and the connecting plate is provided with a plurality of connecting holes for accommodating the connecting bolts.

可选的,所述的挂环采用马蹄形挂环。Optionally, the hanging ring adopts a horseshoe-shaped hanging ring.

本实用新型的有益效果是:The beneficial effects of the utility model are:

本申请实施例提供的一种用于抱杆标准节上的可拆卸式拉线锚,该拉线锚通过夹板夹紧固定在抱杆的角钢上,实现了拉线锚的可拆卸安装,这样,在实际施工的过程中,就可以根据实际拉线的布置来调整拉线锚的安装位置,避免焊接新的拉线锚和钻孔所造成的影响抱杆标准节结构和受力强度降低的问题。The embodiment of the present application provides a detachable stay anchor for the standard section of the pole. The stay anchor is clamped and fixed on the angle steel of the pole through the splint, so that the detachable installation of the stay anchor is realized. In this way, in practice During the construction process, the installation position of the anchors can be adjusted according to the actual layout of the anchors, so as to avoid the problems caused by welding new anchors and drilling holes that affect the structure of the standard section of the pole and reduce the strength of the force.

附图说明Description of drawings

图1为本申请一实施例提供的一种用于抱杆标准节上的可拆卸式拉线锚的立体结构示意图一;Fig. 1 is a three-dimensional structural schematic diagram 1 of a detachable stay wire anchor used on a standard section of a pole provided by an embodiment of the present application;

图2为本申请一实施例提供的种用于抱杆标准节上的可拆卸式拉线锚的俯视图;Fig. 2 is a top view of a detachable stay wire anchor used on a standard section of a pole provided by an embodiment of the present application;

图3为图2中A部分的放大结构示意图;Fig. 3 is a schematic diagram of an enlarged structure of part A in Fig. 2;

图4为本申请一实施例提供的种用于抱杆标准节上的可拆卸式拉线锚的立体结构示意图二;Fig. 4 is a three-dimensional structural schematic diagram II of a detachable stay wire anchor used on a standard section of a pole provided by an embodiment of the present application;

图5为本申请一实施例提供的种用于抱杆标准节上的可拆卸式拉线锚的立体结构示意图三;Fig. 5 is a three-dimensional structural schematic diagram of a detachable stay wire anchor used on a standard section of a pole provided by an embodiment of the present application;

图6为限位架的立体结构示意图一;Fig. 6 is a three-dimensional structural schematic diagram 1 of the spacer;

图7为限位架的立体结构示意图二;Fig. 7 is the three-dimensional structural schematic diagram II of the spacer;

图8为本申请一实施例提供的一种用于抱杆标准节上的可拆卸式拉线锚与小号角钢配合的立体结构示意图。Fig. 8 is a three-dimensional structural schematic view of a detachable stay wire anchor used on a standard section of a pole and a small angle steel provided by an embodiment of the present application.

图中:11、内层夹板;111、第一安装孔;12、外层夹板;121、第二安装孔;122、挂环;131、锁紧螺栓;132、锁紧螺母;14、限位架;141、限位板;1411、限位孔;142、压紧板;143、拉板;144、顶板;1441、螺纹孔;145、连接板;1451、连接孔;15、顶紧螺栓;161、连接螺栓;162、固定螺母;In the figure: 11, the inner splint; 111, the first mounting hole; 12, the outer splint; 121, the second mounting hole; 122, the hanging ring; 131, the locking bolt; 132, the locking nut; 14, the limit Frame; 141, limiting plate; 1411, limiting hole; 142, pressing plate; 143, pulling plate; 144, top plate; 1441, threaded hole; 145, connecting plate; 1451, connecting hole; 15, jacking bolt; 161, connecting bolts; 162, fixing nuts;

2、抱杆角钢。2. Pole angle steel.

具体实施方式Detailed ways

为了使本技术领域的人员更好地理解本申请中的技术方案,下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行详细地描述,且所描述的实施例仅仅是本申请的一部分实施例,而非全部的实施例。在本申请实施例的基础之上,本领域技术人员没有付出创造性劳动而获得的所有其他实施例,均应当属于本申请的保护范围。In order to enable those skilled in the art to better understand the technical solutions in the present application, the technical solutions in the embodiments of the present application will be described in detail below in conjunction with the drawings in the embodiments of the present application, and the described embodiments are only It is a part of the embodiments of the present application, but not all of the embodiments. On the basis of the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative efforts shall belong to the protection scope of the present application.

如图1图4和图5所示,一种用于抱杆标准节上的可拆卸式拉线锚包括用于夹紧抱杆角钢2的内层夹板11和外层夹板12,所述的内层夹板11位于所述抱杆角钢2的内侧,所述的外层夹板12位于所述抱杆角钢2的外侧。As shown in Fig. 1, Fig. 4 and Fig. 5, a detachable stay wire anchor used on a pole standard joint includes an inner splint 11 and an outer splint 12 for clamping the pole angle steel 2, the inner splint The layer plywood 11 is located inside the pole-holding angle steel 2 , and the outer plywood 12 is located outside the pole-holding angle steel 2 .

所述的内层夹板11和外层夹板12均包括第一夹紧板和第二夹紧板,所述的第二夹紧板固定设置于所述第一夹紧板的一端,且垂直与所述的第一夹紧板向一侧延伸。所述的第一夹紧板和第二夹紧板共同形成L型结构。The inner layer splint 11 and the outer layer splint 12 both include a first clamping plate and a second clamping plate, and the second clamping plate is fixedly arranged at one end of the first clamping plate, and is perpendicular to The first clamping plate extends to one side. The first clamping plate and the second clamping plate together form an L-shaped structure.

所述内层夹板11的第一夹紧板和所述外层夹板12的第一夹紧板之间设置有第一螺栓组件,且所述抱杆角钢2的一个翼板通过第一螺栓组件被夹紧在所述内层夹板11的第一夹紧板和外层夹板12的第一夹紧板之间。A first bolt assembly is arranged between the first clamping plate of the inner layer splint 11 and the first clamping plate of the outer layer splint 12, and a wing plate of the pole angle 2 passes through the first bolt assembly Clamped between the first clamping plate of the inner layer splint 11 and the first clamping plate of the outer layer splint 12 .

所述内层夹板11的第二夹紧板和所述外层夹板12的第二夹紧板之间设置有第二螺栓组件,且所述抱杆角钢2的另一个翼板通过第二螺栓组件被夹紧在所述内层夹板11的第二夹紧板和外层夹板12的第二夹紧板之间。A second bolt assembly is arranged between the second clamping plate of the inner layer splint 11 and the second clamping plate of the outer layer splint 12, and the other wing plate of the pole angle 2 is passed through the second bolt assembly. The assembly is clamped between the second clamping plate of the inner clamping plate 11 and the second clamping plate of the outer clamping plate 12 .

所述的第一螺栓组件和第二螺栓组件均包括锁紧螺栓131和设置于所述锁紧螺栓131上的锁紧螺母132。所述的锁紧螺栓131上位于所述锁紧螺栓131的头部和外层夹板12之间套设有弹簧垫圈(图中未示出)。所述内层夹板11的第一夹紧板和第二夹紧板上设置有用于容纳所述锁紧螺栓131的端部的第一安装孔111,所述外层夹板12的第一夹紧板和第二夹紧板上设置有用于容纳所述锁紧螺栓131的端部的第二安装孔121。Both the first bolt assembly and the second bolt assembly include a locking bolt 131 and a locking nut 132 disposed on the locking bolt 131 . A spring washer (not shown in the figure) is sleeved on the locking bolt 131 between the head of the locking bolt 131 and the outer splint 12 . The first clamping plate and the second clamping plate of the inner layer clamping plate 11 are provided with a first mounting hole 111 for receiving the end of the locking bolt 131, and the first clamping plate of the outer layer clamping plate 12 The plate and the second clamping plate are provided with a second mounting hole 121 for receiving the end of the locking bolt 131 .

所述外层夹板12的第一夹紧板或第二夹紧板的外侧面上通过焊接的方式固定设置有挂环122。作为一种具体实施方式,本实施例中所述的挂环122采用马蹄形挂环122。A hanging ring 122 is fixedly arranged on the outer surface of the first clamping plate or the second clamping plate of the outer layer clamping plate 12 by welding. As a specific implementation manner, the hanging ring 122 described in this embodiment adopts a horseshoe-shaped hanging ring 122 .

进一步地,由于不同的抱杆所采用的角钢型号是不一样的,有的尺寸大,有的尺寸小。而第一螺栓组件和第二螺栓组件的安装位置却有一定要求,即所述第一螺栓组件和第二螺栓组件距离所述抱杆角钢2的距离N不能过大。若所述的距离N过大,则外层夹板12和内层夹板11在所述第一螺栓组件和第二螺栓组件的锁紧力作用下容易发生变形,造成无法夹紧抱杆角钢2,造成安装不可靠。Furthermore, because the angle steel types used by different poles are different, some are large in size and some are small in size. However, there are certain requirements for the installation positions of the first bolt assembly and the second bolt assembly, that is, the distance N between the first bolt assembly and the second bolt assembly and the pole angle steel 2 cannot be too large. If the distance N is too large, the outer splint 12 and the inner splint 11 are easily deformed under the locking force of the first bolt assembly and the second bolt assembly, resulting in the inability to clamp the pole angle steel 2, resulting in unreliable installation.

针对这一情况,若所述的第一安装孔111和第二安装孔121采用圆孔,则当所述抱杆角钢2的尺寸大时,所述第一螺栓组件和第二螺栓组件的安装位置能够满足要求或者能够大体满足要求,而当将本申请实施例所提供的拉线锚安装在抱杆角钢2尺寸较小的抱杆上时,则所述第一螺栓组件和第二螺栓组件距离所述抱杆角钢2的距离N就会过大,不能满足安装要求。In view of this situation, if the first installation hole 111 and the second installation hole 121 adopt round holes, when the size of the pole angle steel 2 is large, the installation of the first bolt assembly and the second bolt assembly The position can meet the requirements or can generally meet the requirements, and when the stay wire anchor provided by the embodiment of the present application is installed on a pole with a smaller size of the pole angle steel 2, the distance between the first bolt assembly and the second bolt assembly The distance N of the pole-holding angle steel 2 will be too large, which cannot meet the installation requirements.

为此,如图4和图5所示,所述的第一安装孔111和第二安装孔121均为长圆孔。这样就能够根据抱杆角钢2的尺寸来调节第一螺栓组件和第二螺栓组件的安装位置,从而使所述第一螺栓组件和第二螺栓组件到所述抱杆角钢2的距离满足要求。For this reason, as shown in FIG. 4 and FIG. 5 , the first installation hole 111 and the second installation hole 121 are oblong holes. In this way, the installation positions of the first bolt assembly and the second bolt assembly can be adjusted according to the size of the pole-holding angle steel 2 , so that the distance from the first bolt assembly and the second bolt assembly to the pole-holding angle steel 2 meets requirements.

为了方便描述,现将所述外层夹板12的第一夹紧板和所述外层夹板12的第二夹紧板的对称面定义为第一对称面。For the convenience of description, the symmetrical plane of the first clamping plate of the outer layer clamping plate 12 and the second clamping plate of the outer layer clamping plate 12 is defined as the first symmetrical plane.

进一步地,为了避免在工作的过程中,第一螺栓组件和第二螺栓组件的位置发生移动改变。如图4和图5所示,本申请提供的一种用于抱杆标准节上的可拆卸式拉线锚还包括结构相同,且关于所述的第一对称面对称布置的限位架14。Further, in order to avoid movement and change of the positions of the first bolt assembly and the second bolt assembly during the working process. As shown in Fig. 4 and Fig. 5, a detachable stay wire anchor used on a pole standard joint provided by the present application also includes a limit frame 14 with the same structure and arranged symmetrically with respect to the first symmetrical plane. .

如图1和图6所示,所述的限位架14包括位于所述内层夹板11和外层夹板12之间的限位板141,所述的限位板141上设置有用于容纳所述锁紧螺栓131的端部的限位孔1411,所述的限位孔1411为圆孔。As shown in Figures 1 and 6, the limit frame 14 includes a limit plate 141 located between the inner splint 11 and the outer splint 12, and the limit plate 141 is provided with a The limiting hole 1411 at the end of the locking bolt 131 is described, and the limiting hole 1411 is a round hole.

所述的限位板141上位于所述外层夹板12的上侧或下侧设置有垂直于所述的限位板141向两侧延伸的压紧板142。所述压紧板142的外端(以朝向抱杆角钢2外侧的一端为外端)通过焊接的方式固定设置有垂直于所述的压紧板142向远离所述限位板141的一侧延伸的拉板143,所述压紧板142的内端(以朝向抱杆角钢2内侧的一端为内端)通过焊接的方式固定设置有垂直于所述的压紧板142向远离所述限位板141的一侧延伸的顶板144。所述拉板143的悬空端通过焊接的方式固定设置有连接板145。示例性的,两个所述限位架14的连接板145平行,即所述限位架14中所述连接板145和拉板143之间的夹角为135°。The limiting plate 141 is located on the upper or lower side of the outer splint 12 and is provided with a pressing plate 142 perpendicular to the limiting plate 141 extending to both sides. The outer end of the pressing plate 142 (with the end facing the outside of the pole angle 2 as the outer end) is fixedly arranged by welding to a side perpendicular to the pressing plate 142 and away from the limiting plate 141. Extended pull plate 143, the inner end of the pressing plate 142 (with the end facing the inner side of the pole angle 2 as the inner end) is fixedly arranged by welding to be perpendicular to the pressing plate 142 and away from the limit A top plate 144 extends from one side of the bit plate 141 . The hanging end of the pulling plate 143 is fixedly provided with a connecting plate 145 by means of welding. Exemplarily, the connecting plates 145 of the two limiting frames 14 are parallel, that is, the angle between the connecting plates 145 and the pulling plate 143 in the limiting frames 14 is 135°.

两个所述限位架14的连接板145之间设置有第三螺栓组件,两个所述的限位架14的压紧板142在所述第三螺栓组件的锁紧作用下分别压紧在所述抱杆角钢2的两个翼板的端面上,从而将两个所述的限位架14固定在所述的抱杆角钢2上。A third bolt assembly is arranged between the connecting plates 145 of the two limit frames 14, and the pressing plates 142 of the two limit frames 14 are respectively compressed under the locking action of the third bolt assembly. On the end surfaces of the two wing plates of the pole-holding angle steel 2 , the two spacer frames 14 are fixed on the pole-holding angle steel 2 .

所述限位板141的后端小于所述抱杆角钢2的翼板的厚度,这样,所述的限位板141不仅不会影响所述第一螺栓组件和第二螺栓组件的锁紧力,保证内层夹板11和外层夹板12可靠的夹紧固定在所述的抱杆角钢2上,而且还能够对第一螺栓组件和第二螺栓组件的安装位置进行定量的限定,保证第一螺栓组件和第二螺栓组件到抱杆角钢2之间的距离满足要求,且此过程不需要测量,在工作的过程中所述第一螺栓组件和第二螺栓组件的安装位置也不会发生移动改变。The rear end of the limiting plate 141 is smaller than the thickness of the wing plate of the pole angle 2, so that the limiting plate 141 will not affect the locking force of the first bolt assembly and the second bolt assembly , to ensure that the inner splint 11 and the outer splint 12 are reliably clamped and fixed on the pole angle 2, and the installation positions of the first bolt assembly and the second bolt assembly can also be quantitatively limited to ensure that the first The distance between the bolt assembly and the second bolt assembly and the pole angle steel 2 meets the requirements, and this process does not need to be measured, and the installation positions of the first bolt assembly and the second bolt assembly will not move during the working process Change.

进一步地,如图2和图3所示,所述限位板141的外侧面(以朝向抱杆角钢2外侧的一面为外侧面)位于所述拉板143的内侧面(以朝向抱杆角钢2外侧的一面为外侧面)的内侧(以朝向抱杆角钢2外侧的一面为外侧面)。所述限位板141的厚度小于最小规格抱杆角钢2的翼板的厚度,所述拉板143和顶板144之间的距离大于最大规格抱杆角钢2的翼板的厚度。Further, as shown in Figures 2 and 3, the outer side of the limiting plate 141 (with the side facing the outside of the pole holding angle 2 as the outside) is located on the inside of the pull plate 143 (to face the outside of the pole holding angle 2). 2, the inner side of the outer side is the outer side) (with the side facing the outside of the pole angle steel 2 as the outer side). The thickness of the limiting plate 141 is smaller than the thickness of the wing plate of the minimum specification pole holding angle steel 2 , and the distance between the pull plate 143 and the top plate 144 is greater than the thickness of the wing plate of the maximum specification pole holding angle steel 2 .

作为一种具体实施方式,本实施例中所述限位板141的外侧面到所述拉板143的内侧面之间的距离M为0.5mm-1mm。As a specific implementation manner, the distance M between the outer surface of the limiting plate 141 and the inner surface of the pulling plate 143 in this embodiment is 0.5mm-1mm.

这样,可以提高所述拉线锚的通用性,能够适应不同规格的抱杆角钢2。In this way, the versatility of the guy wire anchor can be improved, and it can be adapted to pole angle steels 2 of different specifications.

进一步地,为了保证所述限位架14的拉板143能够靠的贴紧在抱杆角钢2的翼板的外侧面上。如图4和图7所示,所述的顶板144上设置有顶紧螺栓15,所述的顶板144与所述的顶紧螺栓15螺纹连接,所述的顶板144上设置有用于与所述的顶紧螺栓15相配合的螺纹孔1441。所述顶紧螺栓15的端面顶紧在所述抱杆角钢2的翼板上,从而使所述的拉板143贴紧所述抱杆角钢2的翼板的外侧面。Further, in order to ensure that the pull plate 143 of the limit frame 14 can be tightly attached to the outer surface of the wing plate of the pole angle steel 2 . As shown in Figures 4 and 7, the top plate 144 is provided with jacking bolts 15, the top plate 144 is threadedly connected with the jacking bolts 15, and the top plate 144 is provided with a The threaded holes 1441 that match the jacking bolts 15. The end surface of the tightening bolt 15 is pressed against the wing plate of the pole holding angle steel 2 , so that the pull plate 143 is tightly attached to the outer surface of the wing plate of the pole holding angle steel 2 .

作为一种具体实施方式,本实施例中所述的顶紧螺栓15采用蝶形螺栓。As a specific implementation manner, the tightening bolts 15 described in this embodiment adopt butterfly bolts.

进一步地,所述的第三螺栓组件包括连接螺栓161和设置于所述连接螺栓161上的固定螺母162。如图6所示,所述的连接板145上设置有多个用于容纳所述连接螺栓161的端部的连接孔1451,且多个所述的连接孔1451呈一字排布。Further, the third bolt assembly includes a connecting bolt 161 and a fixing nut 162 disposed on the connecting bolt 161 . As shown in FIG. 6 , the connecting plate 145 is provided with a plurality of connecting holes 1451 for receiving the ends of the connecting bolts 161 , and the plurality of connecting holes 1451 are arranged in a line.

这样设计的原因在于,如图1和图8所示,这样可以根据抱杆角钢2的规格尺寸选择合适的连接孔1451,从而使连接螺栓161尽可能的靠近所述的抱杆角钢2,从而保证限位架14的压紧板142能够正向压紧在所述抱杆角钢2的端面上。The reason for this design is that, as shown in Figures 1 and 8, a suitable connecting hole 1451 can be selected according to the specification and size of the pole-holding angle steel 2, so that the connecting bolt 161 is as close as possible to the pole-holding angle steel 2, thereby It is ensured that the pressing plate 142 of the limit frame 14 can be positively pressed against the end face of the pole angle steel 2 .

安装过程为:The installation process is:

第一,将两个限位架14分别钩挂在所述抱杆角钢2的两个翼板上,并保证限位架14的拉板143与所述抱杆角钢2的翼板的外侧面贴合,压紧板142压紧在所述翼板的端面上。然后将连接螺栓161穿过所述连接板145上的连接孔1451,并拧紧固定螺母162,从而将限位架14固定在抱杆角钢2上。First, the two spacer frames 14 are respectively hooked on the two wing plates of the pole-holding angle steel 2, and the pull plate 143 of the space-limiting frame 14 is connected to the outer side of the wing plate of the pole-holding angle steel 2. Fitting, the pressing plate 142 is pressed against the end surface of the wing plate. Then, the connecting bolt 161 is passed through the connecting hole 1451 on the connecting plate 145 , and the fixing nut 162 is tightened, so that the limiting frame 14 is fixed on the pole angle steel 2 .

第二,拧紧所述的顶紧螺栓15,使所述顶紧螺栓15的端部顶紧在所述抱杆角钢2的翼板上。Second, tighten the tightening bolts 15 so that the ends of the tightening bolts 15 are tightened on the wing plates of the pole angle steel 2 .

第三,将内层夹板11和外层夹板12分别放置在抱杆角钢2的内侧和外侧,并使安装孔与所述的限位孔1411上下对齐。然后将锁紧螺栓131依次穿过第二安装孔121、限位孔1411和第一安装孔111,并拧紧锁紧螺母132。Thirdly, place the inner splint 11 and the outer splint 12 on the inner side and outer side of the pole angle steel 2 respectively, and make the mounting holes align up and down with the limiting holes 1411 . Then the locking bolt 131 passes through the second mounting hole 121 , the limiting hole 1411 and the first mounting hole 111 in sequence, and the locking nut 132 is tightened.

实施例二Embodiment two

所述外层夹板12的第一夹紧板和第二夹紧板的外侧面上均通过焊接的方式固定设置有挂环122。其余结构同实施例一。Both the outer surfaces of the first clamping plate and the second clamping plate of the outer layer clamping plate 12 are fixedly provided with hanging rings 122 by means of welding. All the other structures are the same as in Embodiment 1.

实施例三Embodiment three

所述的限位板141上位于所述外层夹板12的上侧和下侧均设置有垂直于所述的限位板141向两侧延伸的压紧板142。其余结构同实施例一。The limiting plate 141 is located on the upper side and the lower side of the outer splint 12 and is provided with a pressing plate 142 perpendicular to the limiting plate 141 extending to both sides. All the other structures are the same as in Embodiment 1.

实施例四Embodiment four

所述的挂环122通过焊接的方式固定设置于所述锁紧螺栓131的头部。其余结构同实施例一。The hanging ring 122 is fixed on the head of the locking bolt 131 by welding. All the other structures are the same as in Embodiment 1.

本领域技术人员在本申请提供的实施例的基础上,通过对本申请的实施例进行结合、拆分、重组等手段而得到的其他实施例,均没有超出本申请的保护范围。Other embodiments obtained by those skilled in the art on the basis of the embodiments provided in this application by combining, splitting, recombining and other means of the embodiments of this application do not exceed the protection scope of this application.

以上的具体实施方式,对本申请实施例的目的、技术方案和有益效果进行了详细说明,以上仅为本申请实施例的具体实施方式而已,并不用于限定本申请实施例的保护范围,即在本申请实施例的基础之上,所做的任何修改、等同替换、改进等,均应包括在本申请实施例的保护范围之内。The specific implementation above has described the purpose, technical solutions and beneficial effects of the embodiment of the application in detail. The above is only the specific implementation of the embodiment of the application and is not used to limit the scope of protection of the embodiment of the application. Based on the embodiments of the present application, any modifications, equivalent replacements, improvements, etc., should be included in the scope of protection of the embodiments of the present application.

Claims (9)

1.一种用于抱杆标准节上的可拆卸式拉线锚,其特征在于:包括用于夹紧抱杆角钢(2)的内层夹板(11)和外层夹板(12),且所述的内层夹板(11)和外层夹板(12)均包括第一夹紧板和第二夹紧板;1. A detachable stay wire anchor for the standard section of the pole, characterized in that: it includes an inner splint (11) and an outer splint (12) for clamping the angle steel (2) of the pole, and the Described inner layer clamping plate (11) and outer layer clamping plate (12) all comprise the first clamping plate and the second clamping plate; 所述内层夹板(11)的第一夹紧板和所述外层夹板(12)的第一夹紧板通过第一螺栓组件夹紧所述抱杆角钢(2)的一个翼板;The first clamping plate of the inner layer clamping plate (11) and the first clamping plate of the outer layer clamping plate (12) clamp a wing plate of the pole holding angle steel (2) through the first bolt assembly; 所述内层夹板(11)的第二夹紧板和所述外层夹板(12)的第二夹紧板通过第二螺栓组件夹紧所述抱杆角钢(2)的另一个翼板;The second clamping plate of the inner layer clamping plate (11) and the second clamping plate of the outer layer clamping plate (12) clamp the other wing plate of the pole holding angle steel (2) through the second bolt assembly; 所述外层夹板(12)的第一夹紧板和/或第二夹紧板的外侧面上设置有挂环(122)。A hanging ring (122) is arranged on the outer surface of the first clamping plate and/or the second clamping plate of the outer layer clamping plate (12). 2.根据权利要求1所述的一种用于抱杆标准节上的可拆卸式拉线锚,其特征在于:所述的第一螺栓组件和第二螺栓组件均包括锁紧螺栓(131),所述的内层夹板(11)和外层夹板(12)上分别设置有用于容纳所述锁紧螺栓(131)的第一安装孔(111)和第二安装孔(121),且所述的第一安装孔(111)和第二安装孔(121)为长圆孔。2. A detachable stay wire anchor for a standard section of a pole according to claim 1, characterized in that: the first bolt assembly and the second bolt assembly both include locking bolts (131), The first installation hole (111) and the second installation hole (121) for accommodating the locking bolt (131) are respectively arranged on the inner layer splint (11) and the outer layer splint (12), and the The first installation hole (111) and the second installation hole (121) are oblong holes. 3.根据权利要求2所述的一种用于抱杆标准节上的可拆卸式拉线锚,其特征在于:还包括结构相同,且关于所述外层夹板(12)的第一对称面对称布置的限位架(14),所述的限位架(14)包括位于所述内层夹板(11)和外层夹板(12)之间的限位板(141),所述的限位板(141)上设置有用于容纳所述锁紧螺栓(131)的限位孔(1411),所述的限位板(141)上位于所述外层夹板(12)的上侧和/或下侧设置有垂直于所述的限位板(141)向两侧延伸的压紧板(142),所述压紧板(142)的内端和外端分别设置有垂直于所述的压紧板(142)向远离所述限位板(141)的一侧延伸的顶板(144)和拉板(143),所述拉板(143)的悬空端设置有连接板(145),两个所述限位架(14)的连接板(145)之间设置有第三螺栓组件。3. A detachable stay wire anchor for a standard joint of a pole according to claim 2, characterized in that: it also includes the same structure, and the first symmetrical face with respect to the outer splint (12) Said limit frame (14) of arrangement, described limit frame (14) comprises the limit plate (141) between described inner plywood (11) and outer layer splint (12), described limit A limit hole (1411) for accommodating the locking bolt (131) is provided on the position plate (141), and the position limit plate (141) is located on the upper side of the outer splint (12) and/or Or the lower side is provided with a pressing plate (142) extending to both sides perpendicular to the limiting plate (141), and the inner and outer ends of the pressing plate (142) are respectively provided with The top plate (144) and the pull plate (143) extending from the pressing plate (142) to the side away from the limit plate (141), the hanging end of the pull plate (143) is provided with a connecting plate (145), A third bolt assembly is arranged between the connecting plates (145) of the two limit frames (14). 4.根据权利要求3所述的一种用于抱杆标准节上的可拆卸式拉线锚,其特征在于:所述限位板(141)的外侧面位于所述拉板(143)的内侧面的内侧,所述限位板(141)的厚度小于最小规格抱杆角钢(2)的翼板的厚度,所述拉板(143)和顶板(144)之间的距离大于最大规格抱杆角钢(2)的翼板的厚度。4. A detachable stay wire anchor for a pole standard joint according to claim 3, characterized in that: the outer surface of the limiting plate (141) is located inside the pulling plate (143) On the inner side of the side, the thickness of the limiting plate (141) is smaller than the thickness of the wing plate of the minimum specification pole angle steel (2), and the distance between the pull plate (143) and the top plate (144) is greater than that of the maximum specification pole holding angle Thickness of the wing of the angle (2). 5.根据权利要求4所述的一种用于抱杆标准节上的可拆卸式拉线锚,其特征在于:所述限位板(141)的外侧面到所述拉板(143)的内侧面之间的距离为0.5mm-1mm。5. A detachable stay wire anchor for pole standard joints according to claim 4, characterized in that: the outer side of the limiting plate (141) is connected to the inner side of the pulling plate (143) The distance between the sides is 0.5mm-1mm. 6.根据权利要求4所述的一种用于抱杆标准节上的可拆卸式拉线锚,其特征在于:所述的顶板(144)上设置有顶紧螺栓(15)。6 . The detachable stay wire anchor used on the standard section of the pole according to claim 4 , characterized in that: the top plate ( 144 ) is provided with jacking bolts ( 15 ). 7.根据权利要求6所述的一种用于抱杆标准节上的可拆卸式拉线锚,其特征在于:所述的顶紧螺栓(15)采用蝶形螺栓。7. A detachable stay wire anchor for a standard section of a pole according to claim 6, characterized in that: said jacking bolts (15) are butterfly bolts. 8.根据权利要求3所述的一种用于抱杆标准节上的可拆卸式拉线锚,其特征在于:所述的第三螺栓组件包括连接螺栓(161),所述的连接板(145)上设置有多个用于容纳所述连接螺栓(161)的连接孔(1451)。8. A detachable stay wire anchor used on a standard section of a pole according to claim 3, characterized in that: the third bolt assembly includes a connecting bolt (161), and the connecting plate (145 ) is provided with a plurality of connection holes (1451) for accommodating the connection bolts (161). 9.根据权利要求1所述的一种用于抱杆标准节上的可拆卸式拉线锚,其特征在于:所述的挂环(122)采用马蹄形挂环(122)。9. A detachable stay wire anchor used on a standard section of a pole according to claim 1, characterized in that: the hanging ring (122) adopts a horseshoe-shaped hanging ring (122).
CN202320136939.5U 2023-01-31 2023-01-31 Detachable stay wire anchor used on pole standard joint Active CN219567250U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320136939.5U CN219567250U (en) 2023-01-31 2023-01-31 Detachable stay wire anchor used on pole standard joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320136939.5U CN219567250U (en) 2023-01-31 2023-01-31 Detachable stay wire anchor used on pole standard joint

Publications (1)

Publication Number Publication Date
CN219567250U true CN219567250U (en) 2023-08-22

Family

ID=87657035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320136939.5U Active CN219567250U (en) 2023-01-31 2023-01-31 Detachable stay wire anchor used on pole standard joint

Country Status (1)

Country Link
CN (1) CN219567250U (en)

Similar Documents

Publication Publication Date Title
CN201635476U (en) Steel Tower Assembly Construction Fixtures
CN207392772U (en) Cable-free wind rope steel stand alignment system
CN219567250U (en) Detachable stay wire anchor used on pole standard joint
CN211496607U (en) Steel beam hoisting clamp
CN202215040U (en) Telescopic adjustable temporary wire drawing device for transmission line pole/tower
CN102767139A (en) Combined clip of double main cables of suspension bridge
WO2025232570A1 (en) Vertical rail lifting anti-slip clamp structure
CN202644404U (en) Combined rope clip of suspension bridge
CN211769817U (en) Lifting appliance for chemical tower sections
CN203624808U (en) Detachable steel structure hanger
CN210134658U (en) Special tool for adjusting verticality of large steel column
CN204096924U (en) Concrete pumping pipe connector anchor fitting
CN202730652U (en) Combined type cable clip for two main cables of suspension bridge
CN202729660U (en) Support strengthening device for tower crane attached frame
CN114737770A (en) Method for quickly installing multi-lug-plate concentric large-diameter pin shaft
CN210134420U (en) Composite hoop for trestle steel pipe pile parallel connection
CN216687076U (en) A hoist device for roofing material promotes
CN222783116U (en) Urban rail underground line concrete pumping construction pump pipe reinforcing device
CN222392120U (en) Symmetrical tensioning device for HDPE pipeline construction
CN220766282U (en) Precast shear wallboard lifting device
CN221545624U (en) Self-adaptive quick-dismantling steel bar structure hoisting interface
CN220036183U (en) Clamp type code plate for steel beam installation
CN207484291U (en) A kind of fixing device of cable saddle
CN217934800U (en) Fixing clamp convenient to install and used for electric power design
CN221879045U (en) Semicircle cross arm staple bolt that usefulness was laid to electric power

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant