CN219553123U - Kinetic energy verification device - Google Patents

Kinetic energy verification device Download PDF

Info

Publication number
CN219553123U
CN219553123U CN202223467766.XU CN202223467766U CN219553123U CN 219553123 U CN219553123 U CN 219553123U CN 202223467766 U CN202223467766 U CN 202223467766U CN 219553123 U CN219553123 U CN 219553123U
Authority
CN
China
Prior art keywords
plate
kinetic energy
base plate
block
verification device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202223467766.XU
Other languages
Chinese (zh)
Inventor
沙睿宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202223467766.XU priority Critical patent/CN219553123U/en
Application granted granted Critical
Publication of CN219553123U publication Critical patent/CN219553123U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Toys (AREA)

Abstract

The utility model provides a kinetic energy verification device. The kinetic energy verification device comprises a base plate; the two support plates are symmetrically and fixedly arranged at the bottom of the base plate; the mounting frame is fixedly arranged at the bottom of the base plate; the screw is rotatably arranged on the mounting frame; the sleeve plate is sleeved on the screw rod in a threaded manner, and the top end of the sleeve plate penetrates through the base plate; the guide rod is slidably mounted on the sleeve plate, and two ends of the guide rod are fixedly connected with the base plate and the mounting frame respectively. The kinetic energy verification device provided by the utility model has the advantages of convenience in flexibly adjusting the track plate according to actual use requirements and simplicity in operation.

Description

一种动能验证装置A kinetic energy verification device

技术领域technical field

本实用新型涉及实验用具技术领域,尤其涉及一种动能验证装置。The utility model relates to the technical field of experimental appliances, in particular to a kinetic energy verification device.

背景技术Background technique

众所周知,在物理教学过程中,会涉及到到动能定理的验证实验,在进行动能定理的验证实验时会使用到动能验证装置。As we all know, in the process of physics teaching, the verification experiment of the kinetic energy theorem will be involved, and the kinetic energy verification device will be used in the verification experiment of the kinetic energy theorem.

目前教学人员在使用动能验证装置进行实验时,需要用对动能验证装置中的轨道板进行调节,以便小车能够匀速滑动,对于轨道板的调节操作较为不便,例如:目前调节轨道板时,人员通常都是使用垫木或书本垫起轨道板使其倾斜一定角度,而垫木与书本的高度是一定的,无法根据实际需要灵活调节。At present, when teaching personnel use the kinetic energy verification device to conduct experiments, they need to adjust the track plate in the kinetic energy verification device so that the trolley can slide at a constant speed, which is inconvenient for the adjustment operation of the track plate. All are to use skids or books to pad the track board to make it incline at a certain angle, and the height of skids and books is fixed, which cannot be adjusted flexibly according to actual needs.

因此,有必要提供一种新的动能验证装置解决上述技术问题。Therefore, it is necessary to provide a new kinetic energy verification device to solve the above technical problems.

实用新型内容Utility model content

本实用新型解决的技术问题是提供一种方便根据实际使用需求灵活调节轨道板,操作简单的动能验证装置。The technical problem solved by the utility model is to provide a kinetic energy verification device that is convenient to flexibly adjust the track plate according to actual use requirements and is easy to operate.

为解决上述技术问题,本实用新型提供的动能验证装置包括:底座板;两个支撑板,两个所述支撑板对称固定安装在所述底座板的底部;安装架,所述安装架固定安装在所述底座板的底部;螺杆,所述螺杆转动安装在所述安装架上;套板,所述套板螺纹套设在所述螺杆上,所述套板的顶端贯所述底座板;导向杆,所述导向杆滑动安装在所述套板上,所述导向杆的两端分别与所述底座板和所述安装架固定连接;旋钮,所述旋钮固定安装在所述螺杆的底端上;U形架,所述U形架固定安装在所述底座板的顶部;轨道板,所述轨道板铰接在所述U形架上,所述轨道板的底部与所述套板的顶部贴合;验证机构,所述验证机构设置在所述轨道板上。In order to solve the above-mentioned technical problems, the kinetic energy verification device provided by the utility model includes: a base plate; two support plates, and the two support plates are symmetrically and fixedly installed on the bottom of the base plate; a mounting frame, and the mounting frame is fixedly installed At the bottom of the base plate; a screw, the screw is rotatably mounted on the mounting frame; a cover plate, the thread of the cover plate is set on the screw rod, and the top end of the cover plate passes through the base plate; guide rod, the guide rod is slidably installed on the cover plate, and the two ends of the guide rod are fixedly connected with the base plate and the mounting frame respectively; the knob is fixedly installed on the bottom of the screw rod end; U-shaped frame, the U-shaped frame is fixedly installed on the top of the base plate; track plate, the track plate is hinged on the U-shaped frame, the bottom of the track plate and the cover plate Top bonding; verification mechanism, the verification mechanism is arranged on the track plate.

优选的,所述验证机构包括电火花计时器、小车、绳环、软绳、限位板、调节架、定滑轮、挂环和砝码,所述电火花计时器和所述小车均设置在所述轨道板的顶部,所述绳环固定安装在所述小车的一侧上,所述软绳固定安装在所述绳环上,所述限位板固定安装在所述轨道板的顶部,所述调节架固定安装在所述轨道板的一端上,所述定滑轮转动安装在所述调节架上,所述定滑轮与所述软绳相适配,所述挂环固定安装在所述软绳的另一端上,所述砝码设置在所述挂环上。Preferably, the verification mechanism includes an electric spark timer, a trolley, a rope ring, a soft rope, a limit plate, an adjustment frame, a fixed pulley, a hanging ring and weights, and the electric spark timer and the trolley are arranged on The top of the track plate, the rope ring is fixedly installed on one side of the trolley, the soft rope is fixedly installed on the rope ring, the limit plate is fixedly installed on the top of the track plate, The adjusting frame is fixedly installed on one end of the track plate, the fixed pulley is rotatably installed on the adjusting frame, the fixed pulley is matched with the soft rope, and the hanging ring is fixedly installed on the On the other end of the soft rope, the weight is arranged on the hanging ring.

优选的,所述小车上设置有纸带固定机构,所述纸带固定机构包括安装槽、固定块、第一螺栓和压块,所述安装槽开设在所述小车上,所述固定块固定安装在所述安装槽的底部内壁上,所述第一螺栓螺纹安装在所述小车上,所述第一螺栓的底端延伸入所述安装槽内,所述压块固定在所述第一螺栓的底端上。Preferably, a paper tape fixing mechanism is provided on the trolley, and the paper tape fixing mechanism includes a mounting groove, a fixing block, a first bolt and a pressure block, the mounting groove is opened on the trolley, and the fixing block is fixed Installed on the bottom inner wall of the installation groove, the first bolt is threadedly installed on the trolley, the bottom end of the first bolt extends into the installation groove, and the pressure block is fixed on the first on the bottom of the bolt.

优选的,所述轨道板上设置有限位机构,所述限位机构包括第一限位块、滑槽、第二限位块、安装块和第二螺栓,所述第一限位块固定安装在所述轨道板的顶部,所述第一限位块的一侧与所述电火花计时器的外壳贴合,所述滑槽开设在所述轨道板的顶部,所述第二限位块滑动安装在所述滑槽内,所述第二限位块的一侧与所述电火花计时器的外壳贴合,所述安装块固定安装在所述轨道板的顶部,所述第二螺栓螺纹安装在所述安装块上,所述第二螺栓的一端与所述第二限位块转动连接。Preferably, a limiting mechanism is provided on the track plate, and the limiting mechanism includes a first limiting block, a chute, a second limiting block, a mounting block and a second bolt, and the first limiting block is fixedly installed On the top of the track plate, one side of the first limit block is attached to the shell of the electric spark timer, the chute is opened on the top of the track plate, and the second limit block Slidingly installed in the chute, one side of the second limit block is attached to the shell of the electric spark timer, the installation block is fixedly installed on the top of the track plate, and the second bolt The thread is installed on the mounting block, and one end of the second bolt is rotatably connected with the second limiting block.

优选的,所述底座板的底部固定安装有安装箱,所述安装箱内滑动安装有收纳盒。Preferably, an installation box is fixedly installed on the bottom of the base plate, and a storage box is slidably installed in the installation box.

优选的,所述限位板的一侧上固定安装有减震垫,所述减震垫与所述限位板上均开设有绳孔,所述绳孔与所述软绳相适配。Preferably, a shock-absorbing pad is fixedly installed on one side of the limiting plate, and both the shock-absorbing pad and the limiting plate are provided with a rope hole, and the rope hole is adapted to the soft rope.

优选的,所述底座板上开设有通口,所述通口与所述套板相适配,两个所述支撑板均为L形,两个所述支撑板的底部均固定安装有多个脚垫,两个所述支撑板的一侧上均固定安装有握把。Preferably, a port is opened on the base plate, and the port is adapted to the cover plate, both of the support plates are L-shaped, and the bottoms of the two support plates are fixedly installed with multiple a foot pad, and handles are fixedly installed on one side of the two support plates.

与相关技术相比较,本实用新型提供的动能验证装置具有如下有益效果:Compared with related technologies, the kinetic energy verification device provided by the utility model has the following beneficial effects:

本实用新型提供一种动能验证装置:The utility model provides a kinetic energy verification device:

1、通过设置的底座板可安装组件,通过设置的支撑板,可稳定支撑底座板使其平稳,通过设置的螺杆,在转动时可带动套板运动,便于根据实际使用需求灵活调节轨道板的倾斜角度,方便进行动能验证;1. The components can be installed through the set base plate, and the set support plate can stably support the base plate to make it stable. The set screw can drive the movement of the sleeve plate when rotating, which is convenient for flexible adjustment of the track plate according to actual use requirements. Tilt angle, convenient for kinetic energy verification;

2、通过设置的验证机构,教学人员按照公知的常规的动能验证操作步骤,可进行动能验证试验,通过设置的纸带固定机构,方便将动能验证所使用到的纸带一端固定到小车上,通过设置的限位机构,可对电火花计时器限位固定,避免实验时电火花计时器偏移掉落,通过设置的安装箱可安装收纳盒,通过设置的收纳盒,可收纳放置验证机构中的组件。2. Through the set verification mechanism, the teaching staff can carry out the kinetic energy verification test according to the known conventional kinetic energy verification operation steps. Through the set paper tape fixing mechanism, it is convenient to fix one end of the paper tape used in the kinetic energy verification to the trolley. Through the set limit mechanism, the limit of the electric spark timer can be fixed to avoid the deviation and drop of the electric spark timer during the experiment. The storage box can be installed through the set installation box, and the verification mechanism can be stored and placed through the set storage box. components in .

附图说明Description of drawings

图1为本实用新型提供的动能验证装置的一种较佳实施例的主视剖视结构示意图;Fig. 1 is a front view sectional structural schematic diagram of a preferred embodiment of the kinetic energy verification device provided by the utility model;

图2为图1中所示A部分的放大结构示意图;Fig. 2 is the enlarged structural representation of part A shown in Fig. 1;

图3为图1中所示B部分的放大结构示意图;Fig. 3 is the enlarged structural representation of part B shown in Fig. 1;

图4为本实用新型的主视结构示意图;Fig. 4 is the main view structure schematic diagram of the utility model;

图5为本实用新型中收纳盒的结构示意图。Fig. 5 is a schematic diagram of the structure of the storage box in the present invention.

图中标号:1、底座板;2、支撑板;3、安装架;4、螺杆;5、套板;6、导向杆;7、旋钮;8、U形架;9、轨道板;10、电火花计时器;11、小车;12、绳环;13、软绳;14、限位板;15、调节架;16、定滑轮;17、挂环;18、砝码;19、安装槽;20、固定块;21、第一螺栓;22、压块;23、第一限位块;24、滑槽;25、第二限位块;26、安装块;27、第二螺栓;28、安装箱;29、收纳盒。Symbols in the figure: 1, base plate; 2, support plate; 3, mounting frame; 4, screw rod; 5, cover plate; 6, guide rod; 7, knob; 8, U-shaped frame; 9, track plate; 10, Electric spark timer; 11, trolley; 12, rope ring; 13, soft rope; 14, limit plate; 15, adjustment frame; 16, fixed pulley; 17, hanging ring; 18, weight; 19, installation groove; 20, fixed block; 21, first bolt; 22, pressure block; 23, first limit block; 24, chute; 25, second limit block; 26, installation block; 27, second bolt; 28, Installation box; 29. Storage box.

具体实施方式Detailed ways

下面结合附图和实施方式对本实用新型作进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.

请结合参阅图1-图5,其中,图1为本实用新型提供的动能验证装置的一种较佳实施例的主视剖视结构示意图;图2为图1中所示A部分的放大结构示意图;图3为图1中所示B部分的放大结构示意图;Please refer to Fig. 1-Fig. 5 in combination, wherein Fig. 1 is a schematic diagram of the front view of a preferred embodiment of the kinetic energy verification device provided by the present invention; Fig. 2 is an enlarged structure of part A shown in Fig. 1 Schematic diagram; Fig. 3 is the enlarged structural representation of part B shown in Fig. 1;

图4为本实用新型的主视结构示意图;图5为本实用新型中收纳盒的结构示意图。动能验证装置包括:底座板1;两个支撑板2,两个所述支撑板2对称固定安装在所述底座板1的底部;安装架3,所述安装架3固定安装在所述底座板1的底部;螺杆4,所述螺杆4转动安装在所述安装架3上;套板5,所述套板5螺纹套设在所述螺杆4上,所述套板5的顶端贯所述底座板1;导向杆6,所述导向杆6滑动安装在所述套板5上,所述导向杆6的两端分别与所述底座板1和所述安装架3固定连接;旋钮7,所述旋钮7固定安装在所述螺杆4的底端上;U形架8,所述U形架8固定安装在所述底座板1的顶部;轨道板9,所述轨道板9铰接在所述U形架8上,所述轨道板9的底部与所述套板5的顶部贴合;验证机构,所述验证机构设置在所述轨道板9上,通过设置的底座板1可安装组件,通过设置的支撑板2,可稳定支撑底座板1使其平稳,通过设置的螺杆4,在转动时可带动套板5运动,便于根据实际使用需求灵活调节轨道板9的倾斜角度,方便进行动能验证。Fig. 4 is a schematic diagram of the front view of the utility model; Fig. 5 is a schematic diagram of the structure of the storage box in the utility model. The kinetic energy verification device includes: a base plate 1; two support plates 2, and the two support plates 2 are symmetrically and fixedly mounted on the bottom of the base plate 1; a mounting frame 3, and the mounting frame 3 is fixedly mounted on the base plate 1; the screw 4, the screw 4 is rotated and installed on the mounting frame 3; the cover plate 5, the cover plate 5 is threaded on the screw 4, and the top of the cover plate 5 passes through the base plate 1; guide rod 6, the guide rod 6 is slidably installed on the cover plate 5, and the two ends of the guide rod 6 are respectively fixedly connected with the base plate 1 and the mounting frame 3; knob 7, The knob 7 is fixedly installed on the bottom end of the screw rod 4; the U-shaped frame 8 is fixedly installed on the top of the base plate 1; the track plate 9 is hinged on the On the U-shaped frame 8, the bottom of the track plate 9 is attached to the top of the cover plate 5; the verification mechanism, the verification mechanism is arranged on the track plate 9, and components can be installed through the set base plate 1 , through the set support plate 2, the base plate 1 can be stably supported to make it stable, and the set screw 4 can drive the cover plate 5 to move when rotating, so that it is convenient to flexibly adjust the inclination angle of the track plate 9 according to the actual use requirements, and it is convenient to carry out Kinetic verification.

所述验证机构包括电火花计时器10、小车11、绳环12、软绳13、限位板14、调节架15、定滑轮16、挂环17和砝码18,所述电火花计时器10和所述小车11均设置在所述轨道板9的顶部,所述绳环12固定安装在所述小车11的一侧上,所述软绳13固定安装在所述绳环12上,所述限位板14固定安装在所述轨道板9的顶部,所述调节架15固定安装在所述轨道板9的一端上,所述定滑轮16转动安装在所述调节架15上,所述定滑轮16与所述软绳13相适配,所述挂环17固定安装在所述软绳13的另一端上,所述砝码18设置在所述挂环17上,过设置的验证机构,教学人员按照公知的常规的动能验证操作步骤,可进行动能验证试验。Described verification mechanism comprises electric spark timer 10, dolly 11, rope ring 12, soft rope 13, limit plate 14, adjusting frame 15, fixed pulley 16, hanging ring 17 and weight 18, described electric spark timer 10 and the trolley 11 are all arranged on the top of the track plate 9, the rope loop 12 is fixedly installed on one side of the trolley 11, the soft rope 13 is fixedly installed on the rope loop 12, the The limiting plate 14 is fixedly mounted on the top of the track plate 9, the adjusting frame 15 is fixedly mounted on one end of the track plate 9, the fixed pulley 16 is rotatably mounted on the adjusting frame 15, and the fixed The pulley 16 is adapted to the soft rope 13, the hanging ring 17 is fixedly installed on the other end of the soft rope 13, the weight 18 is arranged on the hanging ring 17, and the verification mechanism is set, The teaching staff can carry out the kinetic energy verification test according to the known conventional kinetic energy verification operation steps.

所述小车11上设置有纸带固定机构,所述纸带固定机构包括安装槽19、固定块20、第一螺栓21和压块22,所述安装槽19开设在所述小车11上,所述固定块20固定安装在所述安装槽19的底部内壁上,所述第一螺栓21螺纹安装在所述小车11上,所述第一螺栓21的底端延伸入所述安装槽19内,所述压块22固定在所述第一螺栓21的底端上,通过设置的纸带固定机构,方便将动能验证所使用到的纸带一端固定到小车11上。The dolly 11 is provided with a paper tape fixing mechanism, and the paper tape fixing mechanism includes a mounting groove 19, a fixing block 20, a first bolt 21 and a pressure block 22, and the mounting groove 19 is provided on the dolly 11, so that The fixed block 20 is fixedly installed on the bottom inner wall of the installation groove 19, the first bolt 21 is threadedly installed on the trolley 11, and the bottom end of the first bolt 21 extends into the installation groove 19, The pressure block 22 is fixed on the bottom end of the first bolt 21 , and through the provided paper tape fixing mechanism, one end of the paper tape used for kinetic energy verification is conveniently fixed to the trolley 11 .

所述轨道板9上设置有限位机构,所述限位机构包括第一限位块23、滑槽24、第二限位块25、安装块26和第二螺栓27,所述第一限位块23固定安装在所述轨道板9的顶部,所述第一限位块23的一侧与所述电火花计时器10的外壳贴合,所述滑槽24开设在所述轨道板9的顶部,所述第二限位块25滑动安装在所述滑槽24内,所述第二限位块25的一侧与所述电火花计时器10的外壳贴合,所述安装块26固定安装在所述轨道板9的顶部,所述第二螺栓27螺纹安装在所述安装块26上,所述第二螺栓27的一端与所述第二限位块25转动连接,通过设置的限位机构,可对电火花计时器10限位固定,避免实验时电火花计时器10偏移掉落。A limit mechanism is arranged on the track plate 9, and the limit mechanism includes a first limit block 23, a chute 24, a second limit block 25, a mounting block 26 and a second bolt 27, and the first limit block The block 23 is fixedly installed on the top of the track plate 9, and one side of the first limiting block 23 fits with the shell of the electric spark timer 10, and the chute 24 is opened on the top of the track plate 9. At the top, the second limiting block 25 is slidably installed in the chute 24, one side of the second limiting block 25 is attached to the shell of the electric spark timer 10, and the mounting block 26 is fixed Installed on the top of the track plate 9, the second bolt 27 is threadedly installed on the mounting block 26, and one end of the second bolt 27 is rotatably connected with the second limiting block 25, and the limiting The position mechanism can limit and fix the electric spark timer 10, so as to prevent the electric spark timer 10 from shifting and falling during the experiment.

所述底座板1的底部固定安装有安装箱28,所述安装箱28内滑动安装有收纳盒29,通过设置的安装箱28可安装收纳盒29,通过设置的收纳盒29,可收纳放置验证机构中的组件。The bottom of the base plate 1 is fixedly installed with an installation box 28, and a storage box 29 is slidably installed in the installation box 28. The storage box 29 can be installed through the installed installation box 28, and can be stored and placed for verification. Components in the organization.

所述限位板14的一侧上固定安装有减震垫,所述减震垫与所述限位板14上均开设有绳孔,所述绳孔与所述软绳13相适配。A shock-absorbing pad is fixedly installed on one side of the limiting plate 14 , and a rope hole is provided on the shock-absorbing pad and the limiting plate 14 , and the rope hole is adapted to the soft rope 13 .

所述底座板1上开设有通口,所述通口与所述套板5相适配,两个所述支撑板2均为L形,两个所述支撑板2的底部均固定安装有多个脚垫,两个所述支撑板2的一侧上均固定安装有握把。The base plate 1 is provided with a port, the port is compatible with the cover plate 5, the two support plates 2 are L-shaped, and the bottoms of the two support plates 2 are fixedly installed with A plurality of foot pads, handles are fixedly installed on one side of the two support plates 2 .

本实用新型提供的动能验证装置的工作原理如下:The working principle of the kinetic energy verification device provided by the utility model is as follows:

教学人员使用此动能验证装置进行验证试验,当需要对轨道板9进行调节时,人员先取下砝码18,然后教学人员可转动旋钮7带动螺杆4转动,转动的螺杆4驱动套板5向上运动,随着套板5缓缓运动会顶起轨道板9,而铰接在U形架8上的轨道板9一端也会随之缓缓向下倾斜,依此操作便可对轨道板9进行调节,无需使用到垫木或书本等物品,操作调节较为灵活方便,待调节完成后,教学人员便可根据公知的试验步骤进行动能验证。Teaching personnel use this kinetic energy verification device to conduct verification tests. When the track plate 9 needs to be adjusted, the personnel first remove the weight 18, and then the teaching personnel can turn the knob 7 to drive the screw 4 to rotate, and the rotating screw 4 drives the sleeve plate 5 to move upward , along with the slow movement of the sleeve plate 5, the track plate 9 will be lifted up, and one end of the track plate 9 hinged on the U-shaped frame 8 will also be inclined downward slowly, and the track plate 9 can be adjusted according to this operation. There is no need to use items such as skids or books, and the operation and adjustment are more flexible and convenient. After the adjustment is completed, the teaching staff can perform kinetic energy verification according to known test procedures.

与相关技术相比较,本实用新型提供的动能验证装置具有如下有益效果:Compared with related technologies, the kinetic energy verification device provided by the utility model has the following beneficial effects:

本实用新型提供一种动能验证装置,通过设置的底座板1可安装组件,通过设置的支撑板2,可稳定支撑底座板1使其平稳,通过设置的螺杆4,在转动时可带动套板5运动,便于根据实际使用需求灵活调节轨道板9的倾斜角度,方便进行动能验证,通过设置的验证机构,教学人员按照公知的常规的动能验证操作步骤,可进行动能验证试验,通过设置的纸带固定机构,方便将动能验证所使用到的纸带一端固定到小车11上,通过设置的限位机构,可对电火花计时器10限位固定,避免实验时电火花计时器10偏移掉落,通过设置的安装箱28可安装收纳盒29,通过设置的收纳盒29,可收纳放置验证机构中的组件。The utility model provides a kinetic energy verification device. The set base plate 1 can be used to install components, the set support plate 2 can stably support the base plate 1 to make it stable, and the set screw rod 4 can drive the cover plate when rotating. 5 movement, it is convenient to flexibly adjust the inclination angle of the track plate 9 according to the actual use requirements, and it is convenient to carry out kinetic energy verification. Through the verification mechanism provided, the teaching staff can perform the kinetic energy verification test according to the known conventional kinetic energy verification operation steps. With a fixing mechanism, it is convenient to fix one end of the paper tape used in the kinetic energy verification to the trolley 11. Through the set limit mechanism, the electric spark timer 10 can be limited and fixed to avoid the electric spark timer 10 from shifting during the experiment. The storage box 29 can be installed through the provided installation box 28, and the components in the verification mechanism can be stored and placed through the provided storage box 29.

需要说明的是,本实用新型的设备结构和附图主要对本实用新型的原理进行描述,在该设计原理的技术上,装置的动力机构、供电系统及控制系统等的设置并没有完全描述清楚,而在本领域技术人员理解上述实用新型的原理的前提下,可清楚获知其动力机构、供电系统及控制系统的具体。It should be noted that the equipment structure and drawings of the utility model mainly describe the principle of the utility model. In terms of the technology of the design principle, the settings of the power mechanism, power supply system and control system of the device are not fully described clearly. On the premise that those skilled in the art understand the principles of the above-mentioned utility model, they can clearly know the details of its power mechanism, power supply system and control system.

以上所述仅为本实用新型的实施例,并非因此限制本实用新型的专利范围,凡是利用本实用新型说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其它相关的技术领域,均同理包括在本实用新型的专利保护范围内。The above descriptions are only examples of the utility model, and are not intended to limit the patent scope of the utility model. Any equivalent structure or equivalent process transformation made by using the utility model specification and accompanying drawings may be directly or indirectly used in other applications. Related technical fields are all included in the patent protection scope of the present utility model in the same way.

Claims (7)

1. A kinetic energy verification device, comprising:
a base plate;
the two support plates are symmetrically and fixedly arranged at the bottom of the base plate;
the mounting frame is fixedly arranged at the bottom of the base plate;
the screw is rotatably arranged on the mounting frame;
the sleeve plate is sleeved on the screw rod in a threaded manner, and the top end of the sleeve plate penetrates through the base plate;
the guide rod is slidably arranged on the sleeve plate, and two ends of the guide rod are fixedly connected with the base plate and the mounting frame respectively;
the knob is fixedly arranged at the bottom end of the screw rod;
the U-shaped frame is fixedly arranged at the top of the base plate;
the track plate is hinged to the U-shaped frame, and the bottom of the track plate is attached to the top of the sleeve plate;
and the verification mechanism is arranged on the track plate.
2. The kinetic energy verification device of claim 1, wherein the verification mechanism comprises an electric spark timer, a trolley, a rope ring, a rope, a limiting plate, an adjusting frame, a fixed pulley, a hanging ring and a weight, wherein the electric spark timer and the trolley are arranged on the top of the track plate, the rope ring is fixedly arranged on one side of the trolley, the rope is fixedly arranged on the rope ring, the limiting plate is fixedly arranged on the top of the track plate, the adjusting frame is fixedly arranged on one end of the track plate, the fixed pulley is rotatably arranged on the adjusting frame, the fixed pulley is matched with the rope, the hanging ring is fixedly arranged on the other end of the rope, and the weight is arranged on the hanging ring.
3. The kinetic energy verification device according to claim 2, wherein the trolley is provided with a paper tape fixing mechanism, the paper tape fixing mechanism comprises a mounting groove, a fixing block, a first bolt and a pressing block, the mounting groove is formed in the trolley, the fixing block is fixedly mounted on the inner wall of the bottom of the mounting groove, the first bolt is mounted on the trolley in a threaded manner, the bottom end of the first bolt extends into the mounting groove, and the pressing block is fixed on the bottom end of the first bolt.
4. The kinetic energy verification device according to claim 2, wherein the track plate is provided with a limiting mechanism, the limiting mechanism comprises a first limiting block, a sliding groove, a second limiting block, a mounting block and a second bolt, the first limiting block is fixedly mounted at the top of the track plate, one side of the first limiting block is attached to the shell of the electric spark timer, the sliding groove is formed in the top of the track plate, the second limiting block is slidably mounted in the sliding groove, one side of the second limiting block is attached to the shell of the electric spark timer, the mounting block is fixedly mounted at the top of the track plate, the second bolt is mounted on the mounting block in a threaded manner, and one end of the second bolt is rotatably connected with the second limiting block.
5. The kinetic energy verification device of claim 1, wherein a mounting box is fixedly mounted at the bottom of the base plate, and a storage box is slidably mounted in the mounting box.
6. The kinetic energy verification device according to claim 2, wherein a shock pad is fixedly installed on one side of the limiting plate, rope holes are formed in the shock pad and the limiting plate, and the rope holes are matched with the soft ropes.
7. The kinetic energy verification device of claim 1, wherein the base plate is provided with a through hole, the through hole is matched with the sleeve plate, the two support plates are L-shaped, a plurality of foot pads are fixedly arranged at the bottoms of the two support plates, and a handle is fixedly arranged at one side of the two support plates.
CN202223467766.XU 2022-12-26 2022-12-26 Kinetic energy verification device Expired - Fee Related CN219553123U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223467766.XU CN219553123U (en) 2022-12-26 2022-12-26 Kinetic energy verification device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223467766.XU CN219553123U (en) 2022-12-26 2022-12-26 Kinetic energy verification device

Publications (1)

Publication Number Publication Date
CN219553123U true CN219553123U (en) 2023-08-18

Family

ID=87731535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223467766.XU Expired - Fee Related CN219553123U (en) 2022-12-26 2022-12-26 Kinetic energy verification device

Country Status (1)

Country Link
CN (1) CN219553123U (en)

Similar Documents

Publication Publication Date Title
CN207621621U (en) A kind of computer display
WO2021017554A1 (en) Adjustable height oscilloscope fixing apparatus
CN110477622B (en) A desk with a tabletop that can hover at any angle
CN205984040U (en) Gravity presentation device for student's physics experiments
CN211402700U (en) Sampling performance test platform for single-phase remote cost control intelligent electric energy meter
CN219246260U (en) Lens experimental instrument for physical teaching
CN217273039U (en) Multimedia intelligent teaching management platform
CN218969960U (en) Foundation bearing capacity testing device
CN212112943U (en) Combined optical mirror device for physical experiment
CN209559405U (en) A Flywheel Mass Balancing Machine for Large Size
CN109346032A (en) A kind of installation equipment for caster of piano
CN212165365U (en) Architectural design display platform
CN218634462U (en) But electric power operation detects with height-adjusting's insulating protector
CN210348944U (en) Physical mechanics experiment external member
CN222527322U (en) A national land space planning building measurement device
CN216210771U (en) Gas generating set operation and maintenance service platform
CN105214752B (en) Thermostatic water tank
CN219122834U (en) Teaching simulation device of CPU
CN116825151B (en) Financial big data information processing device based on blockchain and its use method
CN211006620U (en) Foundation compaction equipment for building engineering
CN223428720U (en) A detection device for electronic information engineering
CN206951262U (en) A kind of combined type student experimenting operation equipment for physics teaching
CN218879348U (en) Fortress machine installation auxiliary device
CN219046026U (en) A kind of sediment sampling equipment
CN213840192U (en) Stand-shooting foot stand for film and television production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230818

CF01 Termination of patent right due to non-payment of annual fee