CN219527722U - Pile structure for offshore photovoltaic power station in ice region - Google Patents
Pile structure for offshore photovoltaic power station in ice region Download PDFInfo
- Publication number
- CN219527722U CN219527722U CN202320180272.9U CN202320180272U CN219527722U CN 219527722 U CN219527722 U CN 219527722U CN 202320180272 U CN202320180272 U CN 202320180272U CN 219527722 U CN219527722 U CN 219527722U
- Authority
- CN
- China
- Prior art keywords
- concrete
- steel pipe
- pipe pile
- pile
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及海上光伏发电技术领域,具体涉及一种用于冰区海上光伏发电站的桩结构。The utility model relates to the technical field of offshore photovoltaic power generation, in particular to a pile structure used for offshore photovoltaic power stations in ice regions.
背景技术Background technique
我国陆上光伏发电已发展多年,已建成较多路上光伏电站。与此同时,海上光伏也得到了快速的发展,在我国东南沿海地区已建成数个海上光伏电站。然而在部分沿海地区,波浪较大,且冬季存在较厚的海冰,海冰及波流荷载对桩基造成的水平荷载和水平弯矩要远大于传统光伏电站受到的风荷载、雪荷载和波流荷载等。同时,光伏板对于支架的变形控制要求较高,极易因变形过大而造成破坏。因此,传统的海上光伏桩基结构已无法满足冰区及大波浪区光伏支架的基础要求,无法提供借鉴启示。my country's onshore photovoltaic power generation has been developed for many years, and many photovoltaic power stations on the road have been built. At the same time, offshore photovoltaics have also developed rapidly, and several offshore photovoltaic power stations have been built in the southeastern coastal areas of my country. However, in some coastal areas, the waves are relatively large, and there is thick sea ice in winter. The horizontal load and horizontal bending moment caused by sea ice and wave current loads on pile foundations are much greater than the wind load, snow load and horizontal bending moment of traditional photovoltaic power stations. wave loads, etc. At the same time, the photovoltaic panel has high requirements for the deformation control of the support, and it is easy to cause damage due to excessive deformation. Therefore, the traditional offshore photovoltaic pile foundation structure can no longer meet the basic requirements of photovoltaic supports in ice areas and large wave areas, and cannot provide reference.
现有的海上光伏结构技术方案主要针对海上的风荷载和波流荷载,通过光伏支架的结构设计有效改善了风荷载作用下光伏板的变形,但无法对海冰和波流荷载形成有效的抵抗;通过与防波堤等方式有效利用了现有的基础进行光伏发电,但是大部分光伏发电站特别是大型光伏发电站区域主要位于海上,无防波堤设施,因此无法得到广泛应用,且布置在防波堤上光伏板需沿着防波堤排布,容易增加电缆等电气成本,从而提升综合成本;通过利用海上风机基础的方式有效利用了现有的基础进行光伏发电,但海上风电站基础投影面积较小,无法大规模布置海上光伏板,具备较大的局限性。The existing offshore photovoltaic structure technical solutions are mainly aimed at the wind load and wave current load at sea. The structural design of the photovoltaic support can effectively improve the deformation of the photovoltaic panel under the wind load, but it cannot form effective resistance to sea ice and wave current load. ; The existing foundation is effectively used for photovoltaic power generation by means of breakwaters, etc., but most photovoltaic power stations, especially large-scale photovoltaic power stations, are mainly located on the sea without breakwater facilities, so they cannot be widely used, and photovoltaic power plants are arranged on breakwaters. The panels need to be arranged along the breakwater, which is easy to increase the electrical costs such as cables, thereby increasing the overall cost; by using the foundation of offshore wind turbines, the existing foundation is effectively used for photovoltaic power generation, but the projected area of the foundation of the offshore wind power station is small and cannot be enlarged. Large-scale deployment of offshore photovoltaic panels has relatively large limitations.
实用新型内容Utility model content
本实用新型的目的在于,提供一种可使海上光伏发电站抵抗波流和海冰荷载的桩结构。The purpose of the utility model is to provide a pile structure that can make the offshore photovoltaic power station resist wave current and sea ice load.
为此,本实用新型采用以下技术方案:For this reason, the utility model adopts the following technical solutions:
一种用于冰区海上光伏发电站的桩结构,包括钢管桩和混凝土套筒,所述混凝土套筒内贯穿设置通孔,所述混凝土套筒通过所述通孔套设于所述钢管桩外;所述通孔内壁上设置护筒结构,且所述护筒结构围设在所述钢管桩的外部;所述通孔内壁与所述钢管桩外表面之间具有间隔空间,以使所述混凝土套筒在自重作用下在所述钢管桩上呈独立的自沉降式状态;所述混凝土套筒的直径大于所述钢管桩的直径,从而在所述混凝土套筒与所述钢管桩的配合下,使所述钢管桩呈加强型荷载承担状态。A pile structure used for offshore photovoltaic power stations in ice areas, including steel pipe piles and concrete sleeves, through-holes are provided in the concrete sleeves, and the concrete sleeves are sleeved on the steel pipe piles through the through-holes. Outside the pipe pile; a casing structure is set on the inner wall of the through hole, and the casing structure is surrounded by the outside of the steel pipe pile; there is a space between the inner wall of the through hole and the outer surface of the steel pipe pile , so that the concrete sleeve is in an independent self-sinking state on the steel pipe pile under the action of its own weight; the diameter of the concrete sleeve is larger than the diameter of the steel pipe pile, so that the concrete sleeve Cooperating with the steel pipe pile, the steel pipe pile is in a reinforced load-bearing state.
进一步地:所述混凝土套筒包括混凝土板、混凝土外梁和混凝土内梁;所述混凝土外梁和所述混凝土内梁分别突出式设置于所述混凝土板的内外侧,以此在所述混凝土板下方形成中空部分;所述中空部分内设置将所述混凝土外梁和所述混凝土内梁连接的混凝土连接梁。Further: the concrete sleeve includes a concrete slab, a concrete outer beam and a concrete inner beam; the concrete outer beam and the concrete inner beam are protrudingly arranged on the inside and outside of the concrete slab, so that the concrete A hollow part is formed under the plate; a concrete connecting beam connecting the concrete outer beam and the concrete inner beam is arranged in the hollow part.
进一步地:所述混凝土套筒在轴向方向上贯通设置排气孔。Further: the concrete sleeve is provided with exhaust holes through it in the axial direction.
进一步地:所述护筒结构包括中部环形块、上部环形板和下部环形板;所述中部环形块与所述通孔连接配合;所述上部环形板和所述下部环形板沿所述混凝土套筒的轴向方向分别连接设置于所述中部环形块的两端,且所述上部环形板与所述混凝土板顶部连接,所述下部环形板与所述混凝土内梁的底部连接。Further: the casing structure includes a middle annular block, an upper annular plate and a lower annular plate; the middle annular block is connected and matched with the through hole; the upper annular plate and the lower annular plate are aligned along the concrete sleeve The axial direction of the cylinder is respectively connected to the two ends of the middle annular block, and the upper annular plate is connected to the top of the concrete slab, and the lower annular plate is connected to the bottom of the concrete inner beam.
进一步地:所述下部环形板下方连接设置与所述钢管桩形成导向配合的导向块。Further: a guide block that forms a guide fit with the steel pipe pile is connected under the lower annular plate.
进一步地:所述导向块底部不突出于所述混凝土套筒的底部。Further: the bottom of the guide block does not protrude from the bottom of the concrete sleeve.
进一步地:所述上部环形板和所述下部环形板之间连接有肋板。Further: a rib is connected between the upper annular plate and the lower annular plate.
与现有技术相比,本实用新型具有以下有益效果:Compared with the prior art, the utility model has the following beneficial effects:
本实用新型通过钢管桩外设混凝土套筒,不仅可使混凝土套筒能够直接承担钢管桩桩身传递来的波流和海冰荷载产生的弯矩,还可使钢管桩与混凝土套筒联合受力,使钢管桩的水平抗力大幅提高,减小钢管桩桩身弯矩,改善了桩身受力情况。同时钢管桩与混凝土套筒之间分离且竖向变形相互独立,以此使混凝土套筒在冲刷、沉降等因素作用下,可以自由下沉,从而不影响钢管桩的受力和变形。The utility model sets the concrete sleeve outside the steel pipe pile, which not only enables the concrete sleeve to directly bear the wave flow transmitted by the steel pipe pile body and the bending moment generated by the sea ice load, but also makes the steel pipe pile and the concrete sleeve The combined stress of the steel pipe pile greatly improves the horizontal resistance of the steel pipe pile, reduces the bending moment of the steel pipe pile body, and improves the stress on the pile body. At the same time, the steel pipe pile and the concrete sleeve are separated and the vertical deformation is independent of each other, so that the concrete sleeve can sink freely under the action of erosion, settlement and other factors, so as not to affect the stress and deformation of the steel pipe pile.
附图说明Description of drawings
图1为本实用新型的整体结构示意图;Fig. 1 is the overall structural representation of the utility model;
图2为本实用新型混凝土套筒的结构示意图;Fig. 2 is the structural representation of the utility model concrete sleeve;
图3为本实用新型护筒结构的结构示意图;Fig. 3 is the structure schematic diagram of casing structure of the present utility model;
图4为本实用新型护筒结构的立面结构示意图。Fig. 4 is a schematic diagram of the facade structure of the casing structure of the present invention.
附图中的标记为:钢管桩1、混凝土套筒2、护筒结构3、中部环形块4、上部环形板5、下部环形板6、肋板7、导向块8、混凝土板9、混凝土外梁10、混凝土内梁11、混凝土连接梁12、排气孔13、通孔14。The marks in the drawings are: steel pipe pile 1, concrete sleeve 2, casing structure 3, middle annular block 4, upper annular plate 5, lower annular plate 6, rib plate 7, guide block 8, concrete plate 9, concrete Outer beams 10, concrete inner beams 11, concrete connecting beams 12, exhaust holes 13, and through holes 14.
具体实施方式Detailed ways
下面结合附图和实施例对本实用新型作进一步的说明,但并不作为对本实用新型限制的依据。The utility model will be further described below in conjunction with the accompanying drawings and embodiments, but it is not used as a basis for limiting the utility model.
本实施例的冰区海上光伏发电站的桩结构举例应用于:冬季存在海冰,光伏发电站区域水深5m,冬季最大冰厚30cm的海域。The pile structure of the offshore photovoltaic power station in the ice area of this embodiment is applied as an example: there is sea ice in winter, the water depth in the photovoltaic power station area is 5m, and the maximum ice thickness in winter is 30cm.
如图1-4所示,一种用于冰区海上光伏发电站的桩结构,包括钢管桩1和混凝土套筒2,混凝土套筒2内贯穿设置通孔14,混凝土套筒2通过通孔14套设于钢管桩1外;通孔14内壁上设置护筒结构3,且护筒结构3围设在钢管桩1的外部;通孔14内壁与钢管桩1外表面之间具有间隔空间,以使混凝土套筒2在自重作用下在钢管桩1上呈独立的自沉降式状态;混凝土套筒2的直径大于钢管桩1的直径,从而在混凝土套筒2与钢管桩1的配合下,使钢管桩1呈加强型荷载承担状态。As shown in Figure 1-4, a pile structure used for offshore photovoltaic power stations in ice areas includes steel pipe piles 1 and concrete sleeves 2. A through hole 14 is provided in the concrete sleeve 2, and the concrete sleeve 2 passes through the through hole. The hole 14 is sleeved outside the steel pipe pile 1; the casing structure 3 is set on the inner wall of the through hole 14, and the casing structure 3 is arranged outside the steel pipe pile 1; the inner wall of the through hole 14 and the outer surface of the steel pipe pile 1 There is an interval space, so that the concrete sleeve 2 is in an independent self-sinking state on the steel pipe pile 1 under the action of its own weight; the diameter of the concrete sleeve 2 is larger than the diameter of the steel pipe pile 1, so that the concrete sleeve 2 and the steel pipe pile With the cooperation of the pipe pile 1, the steel pipe pile 1 is in a reinforced load-bearing state.
本实施例中,桩基采用小直径桩,且钢管桩1的直径与厚度比小于25,钢材的强度不小于355MPa,从而可有效减小波流和海冰荷载,其中波流和海冰荷载与钢管桩1的桩径直接相关,减小桩径即直接减小波流和海冰荷载;较小的直径厚度比能提高桩身强度,使小直径的钢管桩1具备抵抗海冰和波流荷载的能力,保证海冰和波流荷载作用下桩身强度满足要求。In this embodiment, small-diameter piles are used for the pile foundation, and the diameter-to-thickness ratio of the steel pipe pile 1 is less than 25, and the strength of the steel is not less than 355MPa, so that the wave current and sea ice load can be effectively reduced. The load is directly related to the pile diameter of the steel pipe pile 1. Reducing the pile diameter directly reduces the wave current and sea ice load; the smaller diameter-thickness ratio can improve the strength of the pile body, so that the small-diameter steel pipe pile 1 has the ability to resist sea ice. The capacity of ice and wave current loads ensures that the strength of the pile body meets the requirements under the action of sea ice and wave current loads.
其中,桩基采用直径为600mm的钢管桩1,钢管桩1厚度为24mm,钢材选用强度为Q420的钢材。Among them, the pile foundation adopts steel pipe pile 1 with a diameter of 600 mm, the thickness of the steel pipe pile 1 is 24 mm, and the steel material is selected with a strength of Q420.
本实施例中,通过在钢管桩1外套设混凝土套筒2,提高了钢管桩1的水平抗力,而混凝土套筒2由于自重大、直径大,混凝土套筒2筒底的抗剪面积大,筒侧的抗压面积大,因此混凝土套筒2的水平抗力远大于钢管桩1的水平抗力;混凝土套筒2在套入钢管桩1外侧后,两者联合受力,使钢管桩1的水平抗力大幅提高;同时也提高钢管桩1桩身反弯点高度,减小钢管桩1的悬臂长度,也减小了钢管桩1桩身弯矩,改善了桩身受力。In this embodiment, the horizontal resistance of the steel pipe pile 1 is improved by setting the concrete sleeve 2 outside the steel pipe pile 1, and the concrete sleeve 2 has a large diameter due to its own weight and the shear area of the bottom of the concrete sleeve 2 Therefore, the horizontal resistance of the concrete sleeve 2 is much greater than that of the steel pipe pile 1; after the concrete sleeve 2 is inserted into the outer side of the steel pipe pile 1, the two are jointly stressed to make the steel pipe pile 1 The horizontal resistance of the steel pipe pile 1 is greatly improved; at the same time, the height of the inflection point of the steel pipe pile 1 is increased, the cantilever length of the steel pipe pile 1 is reduced, and the bending moment of the steel pipe pile 1 is also reduced, improving the pile body. Force.
具体的,钢管桩1和混凝土套筒2之间形成无竖向连接配合,确保钢管桩1、混凝土套筒2竖向变形相互独立,因为混凝土套筒2在冲刷、沉降等因素作用下,存在长期下沉的可能,若钢管桩1和混凝土套筒2固结,则混凝土套筒2下沉后筒身自重和倾斜则就钢管桩1承担,可能引起钢管桩1桩身倾斜。而将钢管桩1和混凝土套筒2进行竖向方向上的分离后,混凝土套筒2可以自由下沉,以达到不影响钢管桩1的受力和变形的目的。Specifically, there is no vertical connection and cooperation between the steel pipe pile 1 and the concrete sleeve 2 to ensure that the vertical deformation of the steel pipe pile 1 and the concrete sleeve 2 are independent of each other, because the concrete sleeve 2 is under the influence of factors such as erosion and settlement. , there is a possibility of long-term sinking. If the steel pipe pile 1 and the concrete sleeve 2 are consolidated, the self-weight and inclination of the concrete sleeve 2 will be borne by the steel pipe pile 1 after the concrete sleeve 2 sinks, which may cause the steel pipe pile 1 to tilt. After the steel pipe pile 1 and the concrete sleeve 2 are separated in the vertical direction, the concrete sleeve 2 can sink freely so as not to affect the stress and deformation of the steel pipe pile 1 .
如图1-2所示,具体的,混凝土套筒2包括混凝土板9、混凝土外梁10和混凝土内梁11;混凝土外梁10和混凝土内梁11分别突出式设置于混凝土板9的内外侧,以此在混凝土板9下方形成中空部分;中空部分内设置将混凝土外梁10和混凝土内梁11连接的混凝土连接梁12。As shown in Figure 1-2, specifically, the concrete sleeve 2 includes a concrete slab 9, a concrete outer beam 10 and a concrete inner beam 11; the concrete outer beam 10 and the concrete inner beam 11 are protrudingly arranged on the inside and outside of the concrete slab 9 respectively , so as to form a hollow part under the concrete slab 9; the concrete connecting beam 12 connecting the concrete outer beam 10 and the concrete inner beam 11 is arranged in the hollow part.
本实施例中,采用预制混凝土板、梁结构的方式,预制的混凝土板、梁结构更容易保证混凝土套筒2的强度,特别的,结合钢管桩1在不同方向受到的波流和海冰荷载不同,可对混凝土套筒2中的混凝土板9、混凝土连接梁12在相应的方向进行局部配筋加强,从而有效抵抗钢管桩受发生的变形。In this embodiment, the prefabricated concrete slab and beam structure is adopted, and the prefabricated concrete slab and beam structure are easier to ensure the strength of the concrete sleeve 2. In particular, combined with the wave current and sea ice received by the steel pipe pile 1 in different directions Depending on the load, the concrete slab 9 and the concrete connecting beam 12 in the concrete sleeve 2 can be locally reinforced in the corresponding direction, so as to effectively resist the deformation of the steel pipe pile.
其中,混凝土套筒2在工厂预制生产时,其通孔14使用护筒结构3作为内模板,混凝土套筒2的外径为6000mm,内径为660mm。同时,混凝土外梁10、混凝土内梁11和混凝土连接梁12的上部宽度为300mm,下部宽度为200mm;混凝土连接梁12最佳为在混凝土外梁10和混凝土内梁11之间均匀设置6道,并以此将混凝土外梁10和混凝土内梁11以及混凝土板9连接,其中两道混凝土连接梁12按照东西方向布置,且进行配筋加强,并做好安装方向的标记。Wherein, when the concrete sleeve 2 is prefabricated in the factory, the casing structure 3 is used as the inner formwork for the through hole 14 thereof, and the outer diameter of the concrete sleeve 2 is 6000 mm, and the inner diameter is 660 mm. Simultaneously, the upper width of the concrete outer beam 10, the concrete inner beam 11 and the concrete connecting beam 12 is 300mm, and the lower width is 200mm; , and thus connect the concrete outer beam 10 with the concrete inner beam 11 and the concrete slab 9, wherein the two concrete connecting beams 12 are arranged in the east-west direction, and reinforced with reinforcement, and the installation direction is marked.
其中,混凝土套筒2在轴向方向上贯通设置排气孔13。并且排气孔13最佳设置在混凝土外梁10、混凝土内梁11和混凝土连接梁12之间形成的中间区域内,可及时排出混凝土套筒2在安装过程中底部的空气。Wherein, the concrete sleeve 2 is provided with an exhaust hole 13 penetrating in the axial direction. And the air vent 13 is optimally arranged in the intermediate area formed between the concrete outer beam 10, the concrete inner beam 11 and the concrete connecting beam 12, so that the air at the bottom of the concrete sleeve 2 can be discharged in time during the installation process.
其中,混凝土外梁10顶部、混凝土板9、钢护筒结构3顶部位于同一平面,混凝土外梁10高度要求不小于护筒结构3高度。混凝土内梁11被钢护筒结构3包裹,最佳为混凝土外梁10高度为1000mm,比护筒结构3高20mm。Among them, the top of the concrete outer beam 10, the concrete slab 9, and the top of the steel casing structure 3 are located on the same plane, and the height of the concrete outer beam 10 must not be less than the height of the casing structure 3. The concrete inner beam 11 is wrapped by the steel casing structure 3, and the height of the concrete outer beam 10 is preferably 1000mm, which is 20mm higher than the casing structure 3.
本实施例中,混凝土套筒2内部通过护筒结构3的内衬,提高了混凝土套筒2的强度,使混凝土套筒2能够直接承担钢管桩1桩身传递来的波流和海冰荷载产生的弯矩。同时也可使钢管桩1和混凝土套筒2联合受力,由于两者之间所存在1-2cm的间隙空间,既使于安装,又能使钢管桩1能有效的将变形传递给混凝土套筒2,使混凝土套筒2能够承担水平力和弯矩。In this embodiment, the inner lining of the concrete sleeve 2 through the casing structure 3 improves the strength of the concrete sleeve 2, so that the concrete sleeve 2 can directly bear the wave current and sea ice transmitted by the steel pipe pile 1 pile body The bending moment caused by the load. At the same time, the steel pipe pile 1 and the concrete sleeve 2 can be jointly stressed. Since there is a gap space of 1-2 cm between the two, the steel pipe pile 1 can effectively transmit the deformation to the The concrete sleeve 2 enables the concrete sleeve 2 to bear horizontal force and bending moment.
如图1、3-4所示,具体的,护筒结构3包括相互焊接连接的中部环形块4、上部环形板5和下部环形板6;中部环形块4与通孔14连接配合;上部环形板5和下部环形板6沿混凝土套筒2的轴向方向分别连接设置于中部环形块4的两端,且上部环形板5与混凝土板9顶部连接,下部环形板6与混凝土内梁11的底部连接。As shown in Figures 1 and 3-4, specifically, the casing structure 3 includes a middle annular block 4, an upper annular plate 5 and a lower annular plate 6 that are welded to each other; the middle annular block 4 is connected and matched with the through hole 14; the upper annular The plate 5 and the lower annular plate 6 are respectively connected to the two ends of the middle annular block 4 along the axial direction of the concrete sleeve 2, and the upper annular plate 5 is connected to the top of the concrete plate 9, and the lower annular plate 6 is connected to the concrete inner beam 11. Bottom connection.
具体的,护筒结构3为钢材料的结构形式。其中,中部环形块4内径为620mm,外径为660mm,厚度为20mm,高度为760mm。上部环形板5、下部环形板6分别突出设置于中部环形块4的两侧,且上部环形板5、下部环形板6的突出方向朝混凝土外梁10处设置,上部环形板5、下部环形板6的厚度为20mm,内径为620mm,外径为1020mm。Specifically, the casing structure 3 is a structural form of steel material. Wherein, the inner diameter of the central annular block 4 is 620mm, the outer diameter is 660mm, the thickness is 20mm, and the height is 760mm. The upper annular plate 5 and the lower annular plate 6 protrude from both sides of the middle annular block 4 respectively, and the protruding direction of the upper annular plate 5 and the lower annular plate 6 is set toward the concrete outer beam 10, and the upper annular plate 5 and the lower annular plate 6 has a thickness of 20mm, an inner diameter of 620mm, and an outer diameter of 1020mm.
其中,上部环形板5和下部环形板6之间连接有肋板7。采用肋板7,可有效提升护筒结构3的强度和耐久性,波浪荷载为长期循环荷载,设置肋板7可延长护筒结构3的服役周期,在极端环境下避免护筒结构3失效。最佳为在上部环形板5和下部环形板6之间设置六块肋板7,肋板7的尺寸为160mm×20mm×760mm,肋板7之间的相互夹角为60°。Wherein, a rib 7 is connected between the upper annular plate 5 and the lower annular plate 6 . The use of the ribs 7 can effectively improve the strength and durability of the casing structure 3. The wave load is a long-term cyclic load. The installation of the ribs 7 can prolong the service period of the casing structure 3 and prevent the casing structure 3 from failing in extreme environments. It is best to set six ribs 7 between the upper annular plate 5 and the lower annular plate 6, the size of the ribs 7 is 160mm×20mm×760mm, and the mutual angle between the ribs 7 is 60°.
其中,下部环形板6下方连接设置与钢管桩1形成导向配合的导向块8。本实施例中,导向块8为倾角为45°的倒锥台形,其上底面为内径620mm,外径1020mm的环形平面;下底面为内径980mm,外径1020mm的环形平面,倒锥台形导向块8高度为180mm;以此使护筒结构3的整体高度为980mm。Wherein, a guide block 8 that forms a guide fit with the steel pipe pile 1 is arranged below the lower annular plate 6 . In this embodiment, the guide block 8 is an inverted truncated cone with an inclination angle of 45°, and its upper bottom surface is an annular plane with an inner diameter of 620 mm and an outer diameter of 1020 mm; 8. The height is 180mm; thus the overall height of the casing structure 3 is 980mm.
同时,采用在混凝土套筒2下设导向以方便安装的结构形式,使混凝土套筒2能够顺利套入钢管桩1的桩周;同时导向块8在整个外筒高度范围内,平放时导向块8不突出混凝土套筒2的底面,可以方便在施工和运输时进行混凝土套筒2的存放。At the same time, a structure in which guides are set under the concrete sleeve 2 to facilitate installation is adopted, so that the concrete sleeve 2 can be smoothly inserted into the pile circumference of the steel pipe pile 1; The guide block 8 does not protrude from the bottom surface of the concrete sleeve 2, which can facilitate the storage of the concrete sleeve 2 during construction and transportation.
请参阅图1-3,在桩结构进行安装施工时,具体操作步骤如下:Please refer to Figure 1-3, when the pile structure is installed and constructed, the specific operation steps are as follows:
S1:依据项目基本情况,进行钢管桩1和混凝土套筒2的设计,特别的在混凝土套筒2设计时,结合海冰和波流荷载情况,对混凝土板9和混凝土连接梁12进行局部配筋加强;S1: According to the basic situation of the project, carry out the design of the steel pipe pile 1 and the concrete sleeve 2, especially in the design of the concrete sleeve 2, combined with the sea ice and wave current load conditions, the concrete slab 9 and the concrete connecting beam 12 are partially carried out Reinforcement;
S2:工厂按照设计要求进行钢管桩1和预制混凝土套筒2的生产,并运送至海上施工地点;S2: The factory produces the steel pipe pile 1 and the prefabricated concrete sleeve 2 according to the design requirements, and transports them to the offshore construction site;
S3:施工单位按照要求,进行目标施工地点处钢管桩1的定位、沉桩和打桩;S3: The construction unit performs the positioning, sinking and driving of the steel pipe pile 1 at the target construction site according to the requirements;
S4:将混凝土套筒2通过倒锥台形的导向块8的导向作用套在钢管桩1外部,然后将混凝土套筒2缓慢下沉直至沉入海底,以此完成整体结构的安装。S4: Put the concrete sleeve 2 on the outside of the steel pipe pile 1 through the guiding function of the inverted frustum-shaped guide block 8, and then slowly sink the concrete sleeve 2 until it sinks into the seabed, so as to complete the installation of the overall structure.
以上实施例仅为本实用新型的一种较优技术方案,本领域的技术人员应当理解,在不脱离本实用新型的原理和本质情况下可以对实施例中的技术方案或参数进行修改或者替换,都应涵盖在本实用新型的保护范围之内。The above embodiment is only a preferred technical solution of the present utility model, and those skilled in the art should understand that the technical solutions or parameters in the embodiments can be modified or replaced without departing from the principle and essence of the present utility model , should be covered within the protection scope of the present utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320180272.9U CN219527722U (en) | 2023-02-02 | 2023-02-02 | Pile structure for offshore photovoltaic power station in ice region |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320180272.9U CN219527722U (en) | 2023-02-02 | 2023-02-02 | Pile structure for offshore photovoltaic power station in ice region |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219527722U true CN219527722U (en) | 2023-08-15 |
Family
ID=87645332
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320180272.9U Active CN219527722U (en) | 2023-02-02 | 2023-02-02 | Pile structure for offshore photovoltaic power station in ice region |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219527722U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN120046225A (en) * | 2025-04-24 | 2025-05-27 | 农业农村部成都沼气科学研究所 | Composite pile foundation design method for biogas fermentation tank |
-
2023
- 2023-02-02 CN CN202320180272.9U patent/CN219527722U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN120046225A (en) * | 2025-04-24 | 2025-05-27 | 农业农村部成都沼气科学研究所 | Composite pile foundation design method for biogas fermentation tank |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN113653601B (en) | A semi-submersible floating fan device and system | |
| JP7433859B2 (en) | Support structure for wind power generation equipment and wind power generation equipment | |
| CN101545462B (en) | A steel-concrete combined weight type offshore wind fan foundation structure | |
| CN105862907B (en) | Circular combined super-large diameter offshore wind farm single-pile foundation and its construction technology | |
| US10851513B1 (en) | Combined offshore wind power foundation with duct piles and a bucket | |
| CN112900472A (en) | High-strength grouting pipe joint jacket foundation for offshore wind power and construction method thereof | |
| CN209397621U (en) | A wind power tower foundation ring rib beam foundation based on composite structure | |
| CN110453711B (en) | Elastic transition section multi-cylinder foundation structure and construction method thereof | |
| CN219527722U (en) | Pile structure for offshore photovoltaic power station in ice region | |
| CN205875197U (en) | Polygon marine wind power bucket foundation | |
| CN210766855U (en) | Multi-barrel combined foundation system connected with offshore wind power box-shaped beams | |
| CN108412700A (en) | A kind of ultra-tough fiber concrete generator pylon and its fabrication and installation method | |
| CN218622301U (en) | Foundation structure of steel-concrete tower of wind generating set | |
| CN110453710B (en) | A combined multi-tube jacket base structure and construction method thereof | |
| CN220598371U (en) | A prefabricated concrete steel wave-absorbing structure using tires | |
| CN218027576U (en) | A drilling platform for deep-water shallow overburden riverbed | |
| CN220746998U (en) | Single pile type offshore photovoltaic supporting structure | |
| CN112112188A (en) | Polygonal cylindrical foundation for offshore wind power | |
| CN205776297U (en) | A kind of tidal power generating bored concrete pile foundation with doughnut-shaped steel plate hoop | |
| CN216041288U (en) | Spiral anchor foundation | |
| CN215715470U (en) | High-strength grouting pipe joint jacket foundation for offshore wind power | |
| CN110397068B (en) | Multi-cylinder steel-concrete combined foundation structure and construction method thereof | |
| CN118422710A (en) | A pile structure and construction method for an offshore photovoltaic power station in an ice area | |
| CN209398542U (en) | An offshore wind turbine foundation with adjustable bending moment load distribution of wind turbines | |
| CN209384256U (en) | A reinforcement device for offshore wind power steel pipe piles |