CN219496581U - Automatic change circuit board testing arrangement - Google Patents
Automatic change circuit board testing arrangement Download PDFInfo
- Publication number
- CN219496581U CN219496581U CN202320351076.3U CN202320351076U CN219496581U CN 219496581 U CN219496581 U CN 219496581U CN 202320351076 U CN202320351076 U CN 202320351076U CN 219496581 U CN219496581 U CN 219496581U
- Authority
- CN
- China
- Prior art keywords
- wall
- rod
- replacement
- circuit board
- fixed frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
- Y02W30/82—Recycling of waste of electrical or electronic equipment [WEEE]
Landscapes
- Tests Of Electronic Circuits (AREA)
Abstract
本实用新型公开了一种自动化线路板测试装置,包括:测试台,所述测试台的顶部固定安装有安装架,所述更换组件固定安装于电动推杆底端,固定框,所述更换组件的顶部固定安装有固定框,所述固定框的内壁贯穿安装有更换杆,所述弹簧远离固定板的一端固定连接有插杆,且插杆贯穿更换杆的外壁。本实用新型通过安装有更换组件,拉动拉板朝向固定板移动,带动插杆移动,插杆脱离固定框和更换杆,便于拆下针床,安装时,抬动针床带动更换杆贯穿固定框内壁上移,松开拉板后弹簧推动插杆移动,贯穿固定框和更换杆外壁,将更换杆固定,通过安装更换组件,便于拆卸安装更换杆,更换针床,便于对不同型号的线路板进行测试,提高线路板测试装置的实用性。
The utility model discloses an automatic circuit board testing device, comprising: a test bench, a mounting frame is fixedly installed on the top of the test bench, the replacement assembly is fixedly installed on the bottom end of an electric push rod, a fixed frame, the replacement assembly The top of the spring is fixedly installed with a fixed frame, the inner wall of the fixed frame is penetrated by a replacement rod, and the end of the spring away from the fixed plate is fixedly connected with an insertion rod, and the insertion rod penetrates the outer wall of the replacement rod. The utility model installs the replacement assembly, pulls the pull plate to move towards the fixed plate, drives the insertion rod to move, the insertion rod is separated from the fixed frame and the replacement rod, and facilitates the removal of the needle bed. During installation, the needle bed is lifted to drive the replacement rod to penetrate the fixed frame The inner wall moves up, and after the pull plate is released, the spring pushes the insertion rod to move, penetrates the fixed frame and the outer wall of the replacement rod, and fixes the replacement rod. By installing the replacement component, it is easy to disassemble and install the replacement rod and replace the needle bed, which is convenient for different types of circuit boards Carry out tests and improve the practicability of circuit board test equipment.
Description
技术领域technical field
本实用新型涉及线路板测试装置技术领域,具体为一种自动化线路板测试装置。The utility model relates to the technical field of circuit board testing devices, in particular to an automatic circuit board testing device.
背景技术Background technique
线路板又称为电路板,电路板可称为印刷线路板或印刷电路板,在线路板的生产过程中,需要对线路板进行测试,由于人工检查劳动强度大,眼睛容易产生疲劳,漏验率很高,因此在对线路板进行测试时,会使用一种自动化线路板测试装置对线路板进行测试,测试时,利用针床底部的探针连接到电路板上的每一个检测点,在检测软件的控制下,可以对检测点和检测信号进行编程,从而测试点的信息,完成对线路板的自动化测试。The circuit board is also called the circuit board. The circuit board can be called the printed circuit board or the printed circuit board. The rate is very high, so when testing the circuit board, an automatic circuit board testing device is used to test the circuit board. During the test, the probe at the bottom of the needle bed is used to connect to each detection point on the circuit board. Under the control of the detection software, the detection points and detection signals can be programmed, so as to test the information of the points and complete the automatic test of the circuit board.
但现有的一种自动化线路板测试装置在使用时,针床一般为固定安装,不便于更换针床,不便于对不同型号的线路板进行测试,降低了自动化线路板测试装置的实用性。However, when the existing automated circuit board testing device is in use, the needle bed is generally fixedly installed, which is inconvenient to replace the needle bed and to test different types of circuit boards, which reduces the practicability of the automated circuit board testing device.
实用新型内容Utility model content
本实用新型的目的在于提供一种自动化线路板测试装置,以解决上述背景技术中提出的现有的一种自动化线路板测试装置在使用时,不便于更换针床,不便于对不同型号的线路板进行测试的技术问题。The purpose of this utility model is to provide an automatic circuit board testing device to solve the problem that the existing automatic circuit board testing device proposed in the above background technology is inconvenient to replace the needle bed, and it is inconvenient to test different types of circuits. Technical issues with boards for testing.
为实现上述目的,本实用新型提供如下技术方案:一种自动化线路板测试装置,包括:In order to achieve the above purpose, the utility model provides the following technical solutions: an automatic circuit board testing device, comprising:
测试台,所述测试台的顶部固定安装有安装架;A test bench, the top of the test bench is fixedly equipped with a mounting frame;
更换组件,所述更换组件固定安装于电动推杆底端;A replacement component, the replacement component is fixedly installed at the bottom end of the electric push rod;
固定框,所述更换组件的顶部固定安装有固定框,所述固定框的内壁贯穿安装有更换杆,所述更换杆的外壁固定安装有限位块,且限位块的顶部与更换组件的底部贴合,所述更换组件的顶部固定安装有固定板,且固定板位于固定框一侧,所述固定板的外壁固定安装有弹簧,所述弹簧远离固定板的一端固定连接有插杆,且插杆贯穿更换杆的外壁,所述插杆的顶部固定安装有拉板,所述拉板的外壁贯穿安装有导向杆,所述导向杆的一端与固定板的外壁固定连接,且导向杆位于插杆的上方。A fixed frame, a fixed frame is fixedly installed on the top of the replacement component, a replacement rod is installed through the inner wall of the fixed frame, and a limit block is fixedly installed on the outer wall of the replacement rod, and the top of the limit block and the bottom of the replacement component Fitting, the top of the replacement component is fixedly installed with a fixed plate, and the fixed plate is located on one side of the fixed frame, the outer wall of the fixed plate is fixedly installed with a spring, and the end of the spring far away from the fixed plate is fixedly connected with an insertion rod, and The insertion rod runs through the outer wall of the replacement rod, and a pull plate is fixedly installed on the top of the insertion rod, and a guide rod is installed through the outer wall of the pull plate, and one end of the guide rod is fixedly connected with the outer wall of the fixing plate, and the guide rod is located at top of the plunger.
优选的,所述测试台的内壁固定安装有支撑板,支撑板的顶部开设有滑槽。Preferably, a support plate is fixedly installed on the inner wall of the test bench, and a chute is opened on the top of the support plate.
优选的,所述安装架的顶部贯穿安装有电动推杆。Preferably, an electric push rod is installed through the top of the installation frame.
优选的,所述更换杆的底部固定安装有针床,以用于对线路板进行测试。Preferably, a needle bed is fixedly installed on the bottom of the replacement rod for testing the circuit board.
优选的,所述测试台的顶部固定安装有清洁组件,清洁组件的顶部固定安装有转动电机,且转动电机的输出端贯穿清洁组件的顶部,转动电机的输出端外壁固定安装有齿轮一,齿轮一与齿轮二啮合,齿轮二的外壁贯穿安装有转动轴,转动轴的外壁固定安装有毛刷,清洁组件的内壁固定安装有固定架,固定架内壁固定安装有吹风管,清洁组件的顶部固定安装有风机,且吹风管位于清洁组件上方的一端与风机的外壁贯穿连接。Preferably, a cleaning assembly is fixedly installed on the top of the test bench, a rotating motor is fixedly installed on the top of the cleaning assembly, and the output end of the rotating motor runs through the top of the cleaning assembly, and the outer wall of the output end of the rotating motor is fixedly installed with gear one, gear One meshes with the second gear, the outer wall of the second gear is installed with a rotating shaft, the outer wall of the rotating shaft is fixed with a brush, the inner wall of the cleaning component is fixed with a fixing frame, the inner wall of the fixing frame is fixed with a blower, and the top of the cleaning component is fixed. A fan is installed, and one end of the blow pipe above the cleaning component is connected through the outer wall of the fan.
优选的,所述支撑板的顶部固定安装有伺服电机,伺服电机的输出端固定连接有丝杆,丝杆的外壁贯穿连接有滑动块,且滑动块的底部与滑槽的内壁顶部贴合。Preferably, a servo motor is fixedly installed on the top of the support plate, the output end of the servo motor is fixedly connected to a screw, the outer wall of the screw is connected with a sliding block, and the bottom of the sliding block is attached to the top of the inner wall of the chute.
优选的,所述滑动块的顶部固定安装有夹持架,夹持架的内壁滑动安装有夹板,夹持架的外壁贯穿安装有螺纹杆,且螺纹杆的一端与夹板的外壁贴合。Preferably, a clamping frame is fixedly installed on the top of the sliding block, a splint is slidably installed on the inner wall of the clamping frame, a threaded rod is installed through the outer wall of the clamping frame, and one end of the threaded rod is attached to the outer wall of the splint.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:
1.本实用新型通过安装有更换组件、更换杆和插杆,拉动拉板向靠近固定板的方向移动,带动插杆移动,使插杆脱离固定框和更换杆,便于拆下针床,安装时,抬动针床带动更换杆贯穿固定框内壁向上移动,松开拉板后弹簧推动插杆移动,贯穿固定框和更换杆外壁,将更换杆进行固定,通过安装更换组件,便于拆卸安装更换杆,对针床进行更换,便于对不同型号的线路板进行测试,提高线路板测试装置的实用性;1. The utility model installs the replacement assembly, the replacement rod and the insertion rod, and pulls the pull plate to move in the direction close to the fixed plate, and drives the insertion rod to move, so that the insertion rod is separated from the fixed frame and the replacement rod, which is convenient for removing the needle bed and installing When the needle bed is lifted, the replacement rod penetrates the inner wall of the fixed frame and moves upwards. After the pull plate is released, the spring pushes the insertion rod to move, penetrates the fixed frame and the outer wall of the replacement rod, and fixes the replacement rod. By installing the replacement component, it is easy to disassemble, install and replace The needle bar is used to replace the needle bed, which is convenient for testing different types of circuit boards and improves the practicability of the circuit board testing device;
2.本实用新型通过安装有清洁组件,启动转动电机和吹风机,转动电机带动齿轮一转动,齿轮一带动齿轮二转动,齿轮二带动转动轴转动,转动轴带动毛刷转动,对线路板顶部进行清扫,线路板继续移动至吹风管下方时,吹风机吹出气流沿吹风管吹出,将线路板顶部的浮尘吹落,实现对线路板进行清洁的目的,避免线路板上灰尘较多,对测试结果造成影响。2. The utility model starts the rotating motor and the blower by installing the cleaning component, the rotating motor drives the gear one to rotate, the gear one drives the gear two to rotate, the gear two drives the rotating shaft to rotate, and the rotating shaft drives the brush to rotate, and the top of the circuit board is cleaned. Cleaning, when the circuit board continues to move to the bottom of the blower pipe, the blower blows air along the blower pipe to blow off the floating dust on the top of the circuit board, so as to realize the purpose of cleaning the circuit board and avoid more dust on the circuit board, which will affect the test results. Influence.
附图说明Description of drawings
图1为本实用新型的整体结构示意图;Fig. 1 is the overall structural representation of the utility model;
图2为本实用新型的正面结构示意图;Fig. 2 is the front structure schematic diagram of the utility model;
图3为本实用新型的更换组件部分结构示意图;Fig. 3 is a schematic diagram of the partial structure of the replacement assembly of the utility model;
图4为本实用新型的弹簧部分结构示意图;Fig. 4 is a schematic view of the structure of the spring part of the utility model;
图5为本实用新型的更换杆部分结构示意图;Fig. 5 is a structural schematic diagram of the replacement rod part of the utility model;
图6为本实用新型的清洁组件部分结构示意图;Fig. 6 is a schematic diagram of the partial structure of the cleaning assembly of the present invention;
图7为本实用新型的毛刷部分结构示意图。Fig. 7 is a schematic diagram of the brush part of the present invention.
图中:1、测试台;101、支撑板;102、滑槽;2、安装架;201、电动推杆;3、更换组件;301、固定框;302、固定板;303、弹簧;304、插杆;305、拉板;306、导向杆;307、更换杆;308、限位块;4、针床;5、清洁组件;501、转动电机;502、齿轮一;503、齿轮二;504、转动轴;505、毛刷;506、固定架;507、风机;508、吹风管;6、伺服电机;602、丝杆;603、滑动块;7、夹持架;701、夹板;702、螺纹杆。In the figure: 1, test stand; 101, support plate; 102, chute; 2, installation frame; 201, electric push rod; 3, replacement component; 301, fixed frame; 302, fixed plate; 303, spring; 304, Inserting rod; 305, pull plate; 306, guide rod; 307, replacement rod; 308, limit block; 4, needle bed; 5, cleaning component; 501, rotating motor; 502, gear one; 503, gear two; 504 , rotating shaft; 505, brush; 506, fixed frame; 507, fan; 508, blowing pipe; 6, servo motor; 602, screw rod; 603, sliding block; 7, clamping frame; 701, splint; 702, threaded rod.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
在本实用新型的描述中,需要说明的是,术语“上”、“下”、“内”、“外”“前端”、“后端”、“两端”、“一端”、“另一端”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present utility model, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "another end" The orientation or positional relationship indicated by ", etc. is based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, so as to Specific orientation configurations and operations, therefore, should not be construed as limitations on the invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and should not be understood as indicating or implying relative importance.
在本实用新型的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“设置有”、“连接”等,应做广义理解,例如“连接”,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, it should be noted that, unless otherwise specified and limited, the terms "installed", "set with", "connected", etc. should be understood in a broad sense, such as "connected", which can be a fixed The connection can also be a detachable connection or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediary, and it can be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model in specific situations.
请参阅图1、图2和图6,一种自动化线路板测试装置,包括:测试台1,测试台1的顶部固定安装有安装架2,安装架2的顶部贯穿安装有电动推杆201,电动推杆201的安装组数为两组,电动推杆201的底端固定安装有更换组件3,更换杆307的底部固定安装有针床4,针床4的底部固定安装有若干组探针,测试台1的顶板固定安装有控制台,控制台为电脑,安装在安装架2左侧,且控制台与针床4电性连接,测试台1的内壁固定安装有支撑板101,支撑板101的顶部开设有滑槽102,支撑板101的顶部固定安装有伺服电机6,且伺服电机6的右端与测试台1的右侧内壁贴合,伺服电机6的输出端固定连接有丝杆602,且丝杆602的左端延伸至与测试台1的左侧内壁贴合,丝杆602的外壁贯穿连接有滑动块603,滑动块603的安装组数为两组,且滑动块603的底部与滑槽102的内壁顶部贴合,滑动块603的顶布贯穿测试台1的内壁顶部,并延伸至测试台1的上方,滑动块603的顶部固定安装有夹持架7,夹持架7位于测试台1的上方,夹持架7的安装组数为两组,夹持架7用于放置待进行测试的线路板,夹持架7的内壁滑动安装有夹板701,夹持架7的外壁贯穿安装有螺纹杆702,且螺纹杆702的一端与夹板701的外壁贴合,通过转动螺纹杆702,推动夹板701沿夹持架7内壁移动,调节两组夹板701之间的距离,便于对不同尺寸和型号的线路板进行夹持固定,通过启动伺服电机6,带动线路板沿测试台1顶部左右移动,当将待测试的线路板移动至针床4下方时,启动电动推杆201,推动更换组件3带动针床4向下移动,使探针与线路板外壁的测试点进行接触,在控制台的控制下,可以对检测点和检测信号进行编程,将线路板接触点处的测试结果通过探针传递至针床4,再传递至控制器,使检测者获得线路板测试点处的信息,对线路板进行自动化测试。Referring to Fig. 1, Fig. 2 and Fig. 6, an automated circuit board testing device includes: a test bench 1, a mounting frame 2 is fixedly installed on the top of the test bench 1, and an electric push rod 201 is installed through the top of the mounting frame 2, The number of installation groups of the electric push rod 201 is two groups, the bottom end of the electric push rod 201 is fixedly installed with the replacement assembly 3, the bottom of the replacement rod 307 is fixedly installed with the needle bed 4, and the bottom of the needle bed 4 is fixedly installed with several groups of probes , the top plate of the test bench 1 is fixedly installed with a console, the console is a computer, installed on the left side of the installation frame 2, and the console is electrically connected with the needle bed 4, and the inner wall of the test bench 1 is fixedly installed with a support plate 101, the support plate The top of 101 is provided with a chute 102, the top of the support plate 101 is fixedly installed with a servo motor 6, and the right end of the servo motor 6 is attached to the right inner wall of the test bench 1, and the output end of the servo motor 6 is fixedly connected with a screw rod 602 , and the left end of the screw rod 602 extends to fit the left inner wall of the test bench 1, the outer wall of the screw rod 602 is connected with a sliding block 603, the number of installation groups of the sliding block 603 is two groups, and the bottom of the sliding block 603 is connected with the The top of the inner wall of the chute 102 is attached, and the top cloth of the sliding block 603 runs through the top of the inner wall of the test bench 1, and extends to the top of the test bench 1. The top of the sliding block 603 is fixedly equipped with a clamping frame 7, and the clamping frame 7 is located at Above the test bench 1, the number of mounting groups of the clamping frame 7 is two groups. The clamping frame 7 is used to place the circuit board to be tested. A threaded rod 702 is installed through it, and one end of the threaded rod 702 is attached to the outer wall of the splint 701. By rotating the threaded rod 702, the splint 701 is pushed to move along the inner wall of the clamping frame 7, and the distance between the two groups of splints 701 is adjusted to facilitate alignment. Circuit boards of different sizes and types are clamped and fixed. By starting the servo motor 6, the circuit board is driven to move left and right along the top of the test bench 1. When the circuit board to be tested is moved to the bottom of the needle bed 4, the electric push rod 201 is activated. Push the replacement component 3 to drive the needle bed 4 to move downward, so that the probe contacts the test point on the outer wall of the circuit board. Under the control of the console, the detection point and detection signal can be programmed, and the test point at the contact point of the circuit board The result is transmitted to the needle bed 4 through the probe, and then transmitted to the controller, so that the inspector can obtain the information at the test point of the circuit board, and perform automatic testing on the circuit board.
请参阅图3、图4和图5,更换组件3固定安装于电动推杆201底端,更换组件3的顶部固定安装有固定框301,固定框301的安装组数为四组,分布在靠近更换组件3顶壁的四个拐角处,固定框301的内壁贯穿安装有更换杆307,更换杆307的安装组数为四组,更换杆307为方形杆,且更换杆307的外壁与安装框的内壁贴合,更环杆的底部与针床4的顶板固定连接,更换杆307的外壁固定安装有限位块308,且限位块308的顶部与更换组件3的底部贴合,通过安装限位块308,便于确定更换杆307在固定框301内壁的安装位置,更换组件3的顶部固定安装有固定板302,且固定板302位于固定框301一侧,安装在两组固定框301之间,固定板302的外壁固定安装有弹簧303,弹簧303远离固定板302的一端固定连接有插杆304,且插杆304贯穿固定框301和更换杆307的外壁,插杆304的顶部固定安装有拉板305,拉板305的外壁贯穿安装有导向杆306,导向杆306的一端与固定板302的外壁固定连接,导向杆306的另一端与安装框的外壁固定连接,且导向杆306位于插杆304的上方,通过安装导向杆306,有利于提高拉板305移动时的稳定性,从而提高插杆304移动时的稳定性,更换针床4时,拉动两组拉板305向靠近固定板302的方向移动,带动插杆304向靠近固定板302的方向移动,使插杆304脱离固定框301和更换杆307,更换杆307从固定框301内壁向下移动,便于拆下针床4,安装时,拉动固定板302相互靠近,抬动针床4带动更换杆307贯穿固定框301内壁向上移动,当更换杆307移动至限位块308与更换组件3底部贴合时,松开拉板305,弹簧303推动插杆304移动,贯穿固定框301和更换杆307外壁,将更换杆307进行固定,进而固定针床4,通过安装更换组件3,便于拆卸安装插杆304,对针床4进行更换,便于对不同型号的线路板进行测试,提高线路板测试装置的实用性。Please refer to Fig. 3, Fig. 4 and Fig. 5, the replacement component 3 is fixedly installed on the bottom of the electric push rod 201, and the top of the replacement component 3 is fixedly installed with a fixed frame 301, and the number of installation groups of the fixed frame 301 is four groups, which are distributed near At the four corners of the top wall of the replacement assembly 3, a replacement rod 307 is installed through the inner wall of the fixed frame 301. The number of installation groups of the replacement rod 307 is four groups. The replacement rod 307 is a square rod, and the outer wall of the replacement rod 307 and the installation frame The inner wall of the replacement rod 307 is fixedly connected to the top plate of the needle bed 4, and the outer wall of the replacement rod 307 is fixedly installed with a limit block 308, and the top of the limit block 308 is attached to the bottom of the replacement assembly 3. The position block 308 is convenient to determine the installation position of the replacement rod 307 on the inner wall of the fixed frame 301. The top of the replacement component 3 is fixedly installed with a fixed plate 302, and the fixed plate 302 is located on the side of the fixed frame 301, and is installed between two sets of fixed frames 301 , the outer wall of the fixed plate 302 is fixedly installed with a spring 303, and one end of the spring 303 away from the fixed plate 302 is fixedly connected with an insertion rod 304, and the insertion rod 304 runs through the outer wall of the fixed frame 301 and the replacement rod 307, and the top of the insertion rod 304 is fixedly installed with Pull plate 305, the outer wall of pull plate 305 is installed with guide rod 306, one end of guide rod 306 is fixedly connected with the outer wall of fixed plate 302, and the other end of guide rod 306 is fixedly connected with the outer wall of installation frame, and guide rod 306 is positioned at inserting Above the rod 304, by installing the guide rod 306, it is beneficial to improve the stability when the pull plate 305 moves, thereby improving the stability when the insertion rod 304 moves. When replacing the needle bed 4, pull the two sets of pull plates 305 to approach the fixed plate Move in the direction of 302, drive the insertion rod 304 to move towards the direction close to the fixed plate 302, make the insertion rod 304 break away from the fixed frame 301 and the replacement rod 307, and the replacement rod 307 moves downward from the inner wall of the fixed frame 301, so as to facilitate the removal of the needle bed 4, During installation, pull the fixing plate 302 close to each other, lift the needle bed 4 to drive the replacement rod 307 to move upward through the inner wall of the fixing frame 301, and when the replacement rod 307 moves to the limit block 308 and the bottom of the replacement assembly 3 fits, release the pull plate 305, the spring 303 pushes the insertion rod 304 to move, penetrates the outer wall of the fixing frame 301 and the replacement rod 307, fixes the replacement rod 307, and then fixes the needle bed 4. By installing the replacement component 3, it is convenient to disassemble and install the insertion rod 304, and the needle bed 4 The replacement is convenient for testing circuit boards of different types and improves the practicability of the circuit board testing device.
请参阅图2、图6和图7,测试台1的顶部固定安装有清洁组件5,且清洁组件5位于安装架2左侧,清洁组件5的顶部固定安装有转动电机501,转动电机501安装在清洁组件5顶部靠近背面的边缘处,且转动电机501的输出端贯穿清洁组件5的顶部,转动电机501的输出端外壁固定安装有齿轮一502,齿轮一502与齿轮二503啮合,齿轮二503的外壁贯穿安装有转动轴504,且转动轴504的两端分别与固定架506的两侧内壁贴合,转动轴504的外壁固定安装有毛刷505,转动轴504转动时带动毛刷505转动,清洁组件5的内壁固定安装有固定架506,固定架506安装在靠近安装架2的一侧,固定架506内壁固定安装有吹风管508,固定架506用于固定吹风管508,且吹风管508的底端倾斜向下伸出,清洁组件5的顶部固定安装有风机507,且吹风管508位于清洁组件5上方的一端与风机507的外壁贯穿连接,当待测试的线路板移动至清洁组件5下方时,启动转动电机501和吹风机507,转动电机501带动齿轮一502转动,齿轮一502带动齿轮二503转动,齿轮二503带动转动轴504转动,转动轴504带动毛刷505转动,对线路板顶部进行清扫,线路板继续移动至吹风管508下方时,吹风机507吹出气流沿吹风管508吹出,将线路板顶部的浮尘吹落,实现对线路板进行清洁的目的,避免线路板上灰尘较多,对测试结果造成影响。Referring to Fig. 2, Fig. 6 and Fig. 7, a cleaning assembly 5 is fixedly installed on the top of the test bench 1, and the cleaning assembly 5 is located on the left side of the mounting frame 2, and a rotating motor 501 is fixedly installed on the top of the cleaning assembly 5, and the rotating motor 501 is installed At the edge of the cleaning assembly 5 top near the back, and the output end of the rotating motor 501 runs through the top of the cleaning assembly 5, the outer wall of the output end of the rotating motor 501 is fixedly equipped with a gear one 502, and the gear one 502 meshes with the gear two 503, and the gear two The outer wall of 503 is installed with rotating shaft 504 through, and the two ends of rotating shaft 504 are fitted with the inner wall of both sides of fixed frame 506 respectively, and the outer wall of rotating shaft 504 is fixedly installed with hairbrush 505, and rotating shaft 504 drives hairbrush 505 when rotating. Rotate, the inwall of cleaning assembly 5 is fixedly installed with fixed frame 506, and fixed frame 506 is installed on the side near mounting frame 2, and fixed frame 506 inwall is fixedly installed with blowing pipe 508, and fixed frame 506 is used for fixing blowing pipe 508, and blowing The bottom end of the pipe 508 protrudes obliquely downwards, the top of the cleaning assembly 5 is fixedly equipped with a fan 507, and the end of the blowing pipe 508 above the cleaning assembly 5 is connected through the outer wall of the fan 507. When the circuit board to be tested moves to the cleaning When the component 5 is below, start the rotating motor 501 and the blower 507, the rotating motor 501 drives the gear one 502 to rotate, the gear one 502 drives the gear two 503 to rotate, the gear two 503 drives the rotating shaft 504 to rotate, and the rotating shaft 504 drives the hairbrush 505 to rotate. The top of the circuit board is cleaned, and when the circuit board continues to move to the bottom of the blowing pipe 508, the blower 507 blows the airflow along the blowing pipe 508 to blow off the floating dust on the top of the circuit board, so as to realize the purpose of cleaning the circuit board and avoid dust on the circuit board more, which will affect the test results.
工作原理:使用一种自动化线路板测试装置对线路板进行测试时,首先将线路板放置在夹持架7内壁,转动螺纹杆702推动夹板701移动,将待测试的线路板夹持固定,启动伺服电机6带动丝杆602转动,带动滑动块603移动,从而带动线路板移动,当待测试的线路板移动至清洁组件5下方时,启动转动电机501和吹风机507,转动电机501带动齿轮一502转动,齿轮一502带动齿轮二503转动,齿轮二503带动转动轴504转动,带动毛刷505转动,对线路板顶部进行清扫,吹风机507吹出气流沿吹风管508吹出,将线路板顶部的浮尘吹落,实现对线路板进行清洁的目的,避免线路板上灰尘较多,对测试结果造成影响,线路板继续移动至针床4下方时,启动电动推杆201,推动更换组件3带动针床4向下移动,使探针与线路板外壁的测试点进行接触,在控制台的控制下,可以对检测点和检测信号进行编程,将线路板接触点处的测试结果通过探针传递至针床4,再传递至控制器,使检测者获得线路板测试点处的信息,对线路板进行自动化测试,当需要测试不同型号的线路板时,拉动两组拉板305向靠近固定板302的方向移动,带动插杆304向靠近固定板302的方向移动,使插杆304脱离固定框301和插杆304,插杆304从固定框301内壁向下移动,便于拆下针床4,再将对应型号的针床4带动插杆304插入固定框301内,当插杆304移动至限位块308与更换组件3底部贴合时,松开拉板305,弹簧303推动插杆304贯穿固定框301和更换杆307外壁,将更换杆307进行固定,进而固定针床4,便于拆卸安装插杆304,对针床4进行更换,便于对不同型号的线路板进行测试,提高线路板测试装置的实用性。Working principle: When using an automatic circuit board testing device to test the circuit board, first place the circuit board on the inner wall of the clamping frame 7, turn the threaded rod 702 to push the splint 701 to move, clamp and fix the circuit board to be tested, and start The servo motor 6 drives the screw mandrel 602 to rotate, drives the sliding block 603 to move, thereby drives the circuit board to move, when the circuit board to be tested moves to the bottom of the cleaning assembly 5, start the rotating motor 501 and the blower 507, and the rotating motor 501 drives the gear one 502 Rotate, gear one 502 drives gear two 503 to rotate, gear two 503 drives rotating shaft 504 to rotate, drives hair brush 505 to rotate, cleans the top of the circuit board, blower 507 blows out the airflow along the blower pipe 508, blows the floating dust on the top of the circuit board To achieve the purpose of cleaning the circuit board, to avoid more dust on the circuit board, which will affect the test results, when the circuit board continues to move to the bottom of the needle bed 4, start the electric push rod 201, and push the replacement component 3 to drive the needle bed 4 Move down to make the probe contact with the test point on the outer wall of the circuit board. Under the control of the console, the detection point and detection signal can be programmed, and the test result at the contact point of the circuit board can be transmitted to the needle bed through the probe. 4. Then transmit it to the controller, so that the inspector can obtain the information at the test point of the circuit board, and conduct an automatic test on the circuit board. When it is necessary to test different types of circuit boards, pull the two sets of pull plates 305 to the direction close to the fixed plate 302 Move, and drive the insertion rod 304 to move towards the direction close to the fixed plate 302, so that the insertion rod 304 is separated from the fixed frame 301 and the insertion rod 304, and the insertion rod 304 moves downward from the inner wall of the fixed frame 301, so as to facilitate the removal of the needle bed 4, and then the corresponding The model needle bed 4 drives the insertion rod 304 to insert into the fixed frame 301. When the insertion rod 304 moves to the limit block 308 and fits the bottom of the replacement component 3, release the pull plate 305, and the spring 303 pushes the insertion rod 304 to penetrate the fixed frame 301 and the outer wall of the replacement rod 307, the replacement rod 307 is fixed, and then the needle bed 4 is fixed, which is convenient for dismounting and installing the insertion rod 304, and the needle bed 4 is replaced, which is convenient for testing different types of circuit boards and improves the practicality of the circuit board testing device. sex.
对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, no matter from all points of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, so it is intended to fall within the scope of the claims All changes within the meaning and range of equivalents of the required elements are included in the present invention. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320351076.3U CN219496581U (en) | 2023-02-28 | 2023-02-28 | Automatic change circuit board testing arrangement |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320351076.3U CN219496581U (en) | 2023-02-28 | 2023-02-28 | Automatic change circuit board testing arrangement |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219496581U true CN219496581U (en) | 2023-08-08 |
Family
ID=87477922
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320351076.3U Expired - Fee Related CN219496581U (en) | 2023-02-28 | 2023-02-28 | Automatic change circuit board testing arrangement |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219496581U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118604577A (en) * | 2024-06-19 | 2024-09-06 | 苏州聚悦信息科技有限公司 | A kind of online rapid detection equipment for circuit board manufacturing |
-
2023
- 2023-02-28 CN CN202320351076.3U patent/CN219496581U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118604577A (en) * | 2024-06-19 | 2024-09-06 | 苏州聚悦信息科技有限公司 | A kind of online rapid detection equipment for circuit board manufacturing |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN219496581U (en) | Automatic change circuit board testing arrangement | |
| CN105842643A (en) | Non-contact electrostatic test instrument automatic calibration device | |
| CN115356613A (en) | Novel anti-interference high-speed backplane connector test system | |
| CN207036990U (en) | The automatic plug power device of LED display module | |
| CN220019429U (en) | Press-down detection device based on printed circuit board | |
| CN211478540U (en) | A positioning device for circuit board detection | |
| CN113960447A (en) | Continuous automatic checkout device of thick copper multilayer PCB board of jumbo size | |
| CN207516484U (en) | A kind of multistation socket test device | |
| CN108258565A (en) | A kind of wiring board autopatching mechanism | |
| CN218974578U (en) | Meter test device | |
| CN111812447A (en) | Test device for arrayed components and detection method for arrayed components | |
| CN115902715B (en) | A data cable plug-in/plug-out testing device | |
| CN219039285U (en) | A test tool for the logic board of a smart meter | |
| CN117214468A (en) | Maintenance and detection platform for power dispatching control board | |
| CN213023451U (en) | BMS module circuit board detection device and its test fixture | |
| CN216470425U (en) | An efficient test fixture device | |
| CN222145426U (en) | A test device for a vehicle body controller | |
| CN115586422A (en) | Circuit board test fixture | |
| CN113740566A (en) | Auxiliary tool for disassembling and assembling electronic connector | |
| CN219369932U (en) | Printed Circuit Board Test Fixtures | |
| CN111736072A (en) | Automatic test device, test method and air conditioner | |
| CN223455830U (en) | Detection device is used in wind-powered electricity generation blade production | |
| CN216209682U (en) | Universal test device for ATE test system | |
| CN223065445U (en) | Automatic detection device | |
| CN221811652U (en) | A battery tray air tightness inspection device that is easy to repair |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230808 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |