CN219450465U - Prestress tensioning device for bridge - Google Patents

Prestress tensioning device for bridge Download PDF

Info

Publication number
CN219450465U
CN219450465U CN202320668430.5U CN202320668430U CN219450465U CN 219450465 U CN219450465 U CN 219450465U CN 202320668430 U CN202320668430 U CN 202320668430U CN 219450465 U CN219450465 U CN 219450465U
Authority
CN
China
Prior art keywords
fixedly connected
tensioning device
workbench
support plate
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202320668430.5U
Other languages
Chinese (zh)
Inventor
张兴德
刘洋
李景昭
张振
郑贵文
刘其晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Binzhou Highway Engineering Co ltd
Original Assignee
Shandong Binzhou Highway Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Binzhou Highway Engineering Co ltd filed Critical Shandong Binzhou Highway Engineering Co ltd
Priority to CN202320668430.5U priority Critical patent/CN219450465U/en
Application granted granted Critical
Publication of CN219450465U publication Critical patent/CN219450465U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00—Adapting or protecting infrastructure or their operation
    • Y02A30/30—Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本申请涉及桥梁工程的领域,公开了一种桥梁用预应力张拉装置,其包括移动架、作业台、张拉千斤顶和升降机构,所述移动架行走在桥面上,所述作业台连接在所述移动架上,所述升降机构连接在所述移动架上,所述升降机构与所述作业台连接以驱动所述作业台升降,所述张拉千斤顶与所述升降机构连接,所述升降机构驱动所述张拉千斤顶升降。本申请使得施工人员无需搭设支架即可进行张拉作业,具有提高预应力钢筋张拉施工便捷性的效果。

This application relates to the field of bridge engineering, and discloses a prestressed tensioning device for bridges, which includes a mobile frame, a working table, a tension jack and a lifting mechanism. The mobile frame walks on the bridge surface, and the working table is connected On the moving frame, the lifting mechanism is connected to the moving frame, the lifting mechanism is connected with the workbench to drive the workbench up and down, and the tensioning jack is connected with the lifting mechanism, so The lifting mechanism drives the tension jack up and down. The application enables construction personnel to carry out tensioning operations without setting up supports, and has the effect of improving the convenience of stretching construction of prestressed steel bars.

Description

一种桥梁用预应力张拉装置A prestressed tensioning device for a bridge

技术领域technical field

本申请涉及桥梁工程的领域,尤其是涉及一种桥梁用预应力张拉装置。The present application relates to the field of bridge engineering, in particular to a prestress tensioning device for bridges.

背景技术Background technique

随着我国经济的快速发展,各种高架桥梁建设也越来越多,现在桥梁主要由钢筋混凝土浇筑而成,在桥梁施工过程中,浇筑的桥梁达到规定强度后,需要对桥梁中的预应力钢筋进行张拉处理。With the rapid development of my country's economy, more and more viaducts are being constructed. Now the bridges are mainly made of reinforced concrete. Steel bars are tensioned.

目前,公告号为CN213296070U的中国实用新型专利,公开了一种桥梁横向预应力张拉装置,其包括千斤顶、杆件、锁扣和小车;所述杆件的长向中间位置通过所述锁扣支撑连接于所述小车上;所述千斤顶连接于所述杆件的长向一端,所述杆件的另一端为手持操作端。At present, the Chinese utility model patent with the notification number CN213296070U discloses a bridge transverse prestressed tensioning device, which includes a jack, a rod, a lock and a trolley; the lengthwise middle position of the rod passes through the lock The support is connected to the trolley; the jack is connected to one long end of the rod, and the other end of the rod is a hand-held operation end.

针对上述中的相关技术,发明人发现利用张拉装置对桥梁上各个位置的预应力钢筋进行张拉施工时,由于桥梁往往具有一定高度,需要不断的搭建支架平台,使施工人员站在支架平台上通过张拉千斤顶进行张拉施工,搭建支架平台将占用较多的时间,存在对桥梁进行张拉施工过程中施工便捷性较低的缺陷。In view of the related technologies mentioned above, the inventors found that when the tensioning device is used to tension the prestressed steel bars at various positions on the bridge, since the bridge often has a certain height, it is necessary to continuously build a support platform, so that the construction personnel stand on the support platform. On the bridge, the tensioning construction is carried out by tensioning jacks, and it will take more time to build the support platform, and there is a defect that the construction convenience is low during the tensioning construction process of the bridge.

实用新型内容Utility model content

为了缓解对桥梁进行张拉施工过程中施工便捷性较低的问题,本申请提供一种桥梁用预应力张拉装置。In order to alleviate the problem of low construction convenience during the tensioning construction of bridges, the present application provides a prestressed tensioning device for bridges.

本申请提供的一种桥梁用预应力张拉装置,采用如下的技术方案:A prestressed tensioning device for a bridge provided by the application adopts the following technical scheme:

一种桥梁用预应力张拉装置,包括移动架、作业台、张拉千斤顶和升降机构,所述移动架行走在桥面上,所述作业台连接在所述移动架上,所述升降机构连接在所述移动架上,所述升降机构与所述作业台连接以驱动所述作业台升降,所述张拉千斤顶与所述升降机构连接,所述升降机构驱动所述张拉千斤顶升降。A prestressed tensioning device for a bridge, comprising a mobile frame, an operation platform, a tension jack and a lifting mechanism, the mobile frame walks on the bridge surface, the operation platform is connected to the mobile frame, and the lifting mechanism Connected to the moving frame, the lifting mechanism is connected to the workbench to drive the workbench to lift, the tension jack is connected to the lift mechanism, and the lift mechanism drives the tension jack to lift.

通过采用上述技术方案,在移动架上设置作业台,在对桥梁一侧的预应力钢筋进行张拉作业时,利用升降机构驱动作业台和张拉千斤顶下降,使作业台的张拉千斤顶下降至需要进行张拉的预应力钢筋的位置,然后施工人员在作业台对预应力钢筋进行作业即可,施工人员无需搭设支架进行张拉作业,提高预应力钢筋张拉施工的便捷性。By adopting the above-mentioned technical scheme, a working platform is set on the mobile frame, and when tensioning the prestressed steel bars on one side of the bridge, the lifting mechanism is used to drive the working platform and the tensioning jack down, so that the tensioning jack of the working platform is lowered to The position of the prestressed steel bar that needs to be stretched, and then the construction personnel can work on the prestressed steel bar on the workbench. The construction personnel do not need to set up a bracket to perform the tensioning operation, which improves the convenience of the prestressed steel bar tensioning construction.

优选的,所述升降机构包括支撑板、第一卷扬机和两个第二卷扬机,所述支撑板连接在所述移动架上,两个所述第二卷扬机均固定连接在所述支撑板上,两个所述第二卷扬机上的钢绳分别与所述作业台长度方向的两端固定连接,所述第一卷扬机连接在所述支撑板上,所述第一卷扬机的钢绳与所述张拉千斤顶连接。Preferably, the lifting mechanism includes a support plate, a first hoist and two second hoists, the support plate is connected to the moving frame, and the two second hoists are fixedly connected to the support plate, The steel ropes on the two second hoists are respectively fixedly connected to the two ends of the workbench in the length direction, the first hoist is connected to the support plate, and the steel ropes of the first hoist are connected to the tensioner. Pull the jack connection.

通过采用上述技术方案,将作业台与两个第二卷扬机的钢绳固定连接,通过控制两个第二卷扬机上的钢绳收放即可驱动作业台升降,然后启动第一卷扬机,即可将张拉千斤顶下放至使用位置,利用第一卷扬机的钢绳对张拉千斤顶进行起吊支撑,提高张拉千斤顶高度调节的便捷性。By adopting the above technical scheme, the workbench is fixedly connected to the steel ropes of the two second winches, and the workbench can be driven up and down by controlling the retraction and retraction of the steel ropes on the two second winches, and then the first winch is started, and the The tension jack is lowered to the use position, and the steel rope of the first winch is used to lift and support the tension jack, thereby improving the convenience of height adjustment of the tension jack.

优选的,所述支撑板上滑动连接有滑移板,所述滑移板沿所述支撑板的长度方向滑移,所述第一卷扬机固定连接在所述滑移板上。Preferably, a sliding plate is slidably connected to the supporting plate, and the sliding plate slides along the length direction of the supporting plate, and the first winch is fixedly connected to the sliding plate.

通过采用上述技术方案,将第一卷扬机固定连接在滑移板上,对其中一组预应力钢筋张拉完成后,推动张拉千斤顶即可对带动滑移板滑移,使张拉千斤顶能够滑移至一侧的另一组预应力钢筋处,减少移动架的移动次数,同时提高张拉千斤顶使用的灵活性。By adopting the above-mentioned technical scheme, the first hoist is fixedly connected to the sliding plate, and after the tensioning of one group of prestressed steel bars is completed, the tensioning jack can be pushed to drive the sliding plate to slide, so that the tensioning jack can slide Moved to another group of prestressed steel bars on one side, reducing the number of times the mobile frame moves, while improving the flexibility of the tension jack.

优选的,所述第一卷扬机的钢绳上固定连接有弹簧,所述弹簧远离所述第一卷扬机钢绳的一端与所述张拉千斤顶连接。Preferably, a spring is fixedly connected to the steel rope of the first winch, and the end of the spring away from the steel rope of the first winch is connected to the tension jack.

通过采用上述技术方案,在第一卷扬机的钢绳与张拉千斤顶之间设置弹簧,在将张拉千斤顶安装至预应力钢筋上时,施工人员的向下按动张拉千斤顶,即可对张拉千斤顶的下放高度进行调节,在进行较小高度的调节使,无需频繁启动第一卷扬机,提高张拉千斤顶高度调节的便捷性。By adopting the above technical scheme, a spring is provided between the steel rope of the first winch and the tension jack, and when the tension jack is installed on the prestressed steel bar, the construction personnel can press the tension jack downward to adjust the tension. The lowering height of the tensioning jack is adjusted. When adjusting a smaller height, it is not necessary to frequently start the first hoist, which improves the convenience of the height adjustment of the tensioning jack.

优选的,所述移动架上设置有连接杆,所述支撑板固定连接在所述连接杆的一端,所述连接杆远离所述支撑板的一端设置有配重块,所述支撑板与所述配重块分别位于所述移动架相对两侧的位置。Preferably, the mobile frame is provided with a connecting rod, the support plate is fixedly connected to one end of the connecting rod, and the end of the connecting rod far away from the support plate is provided with a counterweight, and the support plate and the The counterweights are respectively located on opposite sides of the moving frame.

通过采用上述技术方案,在连接杆的一端设置配重块,利用配重块对移动架进行配重,提高移动架的稳定性,降低移动架受力发生侧翻的可能。By adopting the above technical solution, a counterweight is provided at one end of the connecting rod, and the counterweight is used to counterweight the mobile frame, thereby improving the stability of the mobile frame and reducing the possibility of rollover due to force on the mobile frame.

优选的,所述移动架上转动连接有转动杆,所述转动杆的转动轴线垂直于桥面,所述连接杆与转动杆固定连接,所述移动架上设置有动力组件,所述动力组件与所述转动杆连接以驱动所述转动杆转动。Preferably, a rotating rod is rotatably connected to the moving frame, the rotating axis of the rotating rod is perpendicular to the bridge deck, the connecting rod is fixedly connected to the rotating rod, a power assembly is provided on the moving frame, and the power assembly It is connected with the rotating rod to drive the rotating rod to rotate.

通过采用上述技术方案,利用动力组件驱动转动杆转动,即可带动连接杆转动,从而能够带动作业台转动,实现作业台在桥面与桥梁一侧位置的变化,从而便于施工人员在作业台上上下,无需调节移动架的位置来实现施工人员进入或走出作业台。By adopting the above-mentioned technical scheme, using the power assembly to drive the rotating rod to rotate, the connecting rod can be driven to rotate, thereby driving the operation platform to rotate, realizing the position change of the operation platform on the bridge deck and one side of the bridge, so that it is convenient for construction personnel to work on the operation platform. Up and down, no need to adjust the position of the mobile frame to realize the construction personnel entering or exiting the work platform.

优选的,所述动力组件包括第一电机和两个第一齿轮,所述第一电机固定连接在所述移动架上,其中一个所述第一齿轮与所述第一电机的主轴固定连接,另一个所述第一齿轮与所述转动杆同轴固定连接,两个所述第一齿轮啮合连接。Preferably, the power assembly includes a first motor and two first gears, the first motor is fixedly connected to the moving frame, one of the first gears is fixedly connected to the main shaft of the first motor, The other first gear is coaxially fixedly connected to the rotating rod, and the two first gears are meshedly connected.

通过采用上述技术方案,启动第一电机,利用第一电机的主轴转动带动与其同轴固定连接的第一齿轮转动,第一齿轮转动带动与其啮合连接的另一个第一齿轮转动,从而实现转动杆的转动。By adopting the above technical solution, start the first motor, use the rotation of the main shaft of the first motor to drive the first gear fixedly connected with the coaxial axis to rotate, and the rotation of the first gear drives the rotation of another first gear meshed with it, thereby realizing the rotation of the lever rotation.

优选的,所述作业台上设置有推动机构,所述推动机构包括承托台、推动杆、推动组件和用于卡接所述第一卷扬机钢绳的卡块,所述承托台连接在所述作业台上,所述推动杆滑动连接在所述承托台上,所述推动杆沿靠近或远离桥梁的方向滑移,所述卡块固定连接在所述推动杆上,所述推动组件连接在所述承托台上,所述推动组件与所述推动杆连接以驱动所述推动杆滑移。Preferably, a pushing mechanism is provided on the workbench, and the pushing mechanism includes a supporting platform, a pushing rod, a pushing assembly and a block for clamping the steel rope of the first winch, and the supporting platform is connected to On the workbench, the push rod is slidably connected to the supporting platform, and the push rod slides in a direction approaching or away from the bridge, and the clamping block is fixedly connected to the push rod, and the push rod The assembly is connected to the support platform, and the push assembly is connected with the push rod to drive the push rod to slide.

通过采用上述技术方案,张拉千斤顶下放后,将第一卷扬机的钢绳卡在推动杆上的卡块上,然后推动组件驱动推动杆滑移即可推动张拉千斤顶向靠近桥梁的方向移动,降低需要工作人员的手动推动的可能,提高预应力钢筋张拉作业的便捷性。By adopting the above technical scheme, after the tension jack is lowered, the steel rope of the first hoist is clamped on the block on the push rod, and then the component is pushed to drive the push rod to slide to push the tension jack to move in the direction close to the bridge. Reduce the possibility of manual push by the staff, and improve the convenience of prestressed steel tensioning operations.

优选的,所述承托台滑动连接在所述作业台上,所述承托台沿所述作业台的长度方向滑移。Preferably, the support platform is slidably connected to the workbench, and the support platform slides along the length direction of the workbench.

通过采用上述技术方案,在拉动张拉千斤顶沿支撑板的长度方向滑移调节张拉千斤顶的位置时,同时推动承托台滑动连接即可保证对张拉千斤顶的推动效果,提高推动机构使用的灵活性。By adopting the above technical scheme, when the tension jack is pulled to slide along the length direction of the support plate to adjust the position of the tension jack, and the sliding connection of the support platform is pushed at the same time, the pushing effect on the tension jack can be ensured, and the efficiency of the pushing mechanism can be improved. flexibility.

综上所述,本申请至少包括以下有益技术效果:In summary, the present application at least includes the following beneficial technical effects:

1.通过在移动架上设置作业台,利用升降机构驱动作业台和张拉千斤顶下降,使作业台的张拉千斤顶下降至需要进行张拉的预应力钢筋的位置,然后施工人员在作业台对预应力钢筋进行作业即可,施工人员无需搭设支架进行张拉作业,提高预应力钢筋张拉施工的便捷性;1. By setting up the workbench on the mobile frame, use the lifting mechanism to drive the workbench and the tensioning jack down, so that the tension jack of the workbench is lowered to the position of the prestressed steel bar that needs to be stretched, and then the construction personnel are on the workbench. The prestressed steel bars can be used for work, and the construction personnel do not need to set up supports for tensioning operations, which improves the convenience of prestressed steel bar tensioning construction;

2.通过将第一卷扬机固定连接在滑移板上,对其中一组预应力钢筋张拉完成后,推动张拉千斤顶即可对带动滑移板滑移,使张拉千斤顶能够滑移至一侧的另一组预应力钢筋处,减少移动架的移动次数,同时提高张拉千斤顶使用的灵活性;2. By connecting the first hoist to the sliding plate, after the tensioning of one group of prestressed steel bars is completed, push the tensioning jack to slide the driving sliding plate, so that the tensioning jack can slide to a At another group of prestressed steel bars on the side, the number of times of moving the mobile frame is reduced, and the flexibility of the tension jack is improved at the same time;

3.通过在连接杆的一端设置配重块,利用配重块对移动架进行配重,提高移动架的稳定性,降低移动架受力发生侧翻的可能。3. By setting a counterweight at one end of the connecting rod, the counterweight is used to counterweight the mobile frame to improve the stability of the mobile frame and reduce the possibility of rollover due to force on the mobile frame.

附图说明Description of drawings

图1是本申请实施例的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the embodiment of the present application;

图2是本申请实施例中移动架的结构示意图;Fig. 2 is the structural representation of mobile frame in the embodiment of the present application;

图3是本申请实施例中升降机构的结构示意图;Fig. 3 is a schematic structural view of the lifting mechanism in the embodiment of the present application;

图4是本申请实施例中张拉千斤顶的结构示意图;Fig. 4 is the structural representation of tension jack in the embodiment of the present application;

图5是本申请实施例中推动机构的结构示意图。Fig. 5 is a schematic structural diagram of the pushing mechanism in the embodiment of the present application.

附图标记:100、移动架;110、张拉千斤顶;200、升降机构;210、支撑板;220、第一卷扬机;231、弹簧;230、第二卷扬机;240、滑移板;250、导向杆;300、作业台;400、连接杆;410、配重块;500、转动杆;510、动力组件;511、第一电机;512、第一齿轮;600、推动机构;610、承托台;620、推动杆;630、卡块;640、推动组件;641、第二电机;642、第二齿轮;643、齿条;650、导轨。Reference signs: 100, mobile frame; 110, tension jack; 200, lifting mechanism; 210, support plate; 220, first hoist; 231, spring; 230, second hoist; 240, sliding plate; 250, guide Rod; 300, workbench; 400, connecting rod; 410, counterweight; 500, rotating rod; 510, power assembly; 511, first motor; 512, first gear; 600, pushing mechanism; 620, push rod; 630, block; 640, push assembly; 641, second motor; 642, second gear; 643, rack; 650, guide rail.

具体实施方式Detailed ways

以下结合附图1-5对本申请作进一步详细说明。The present application will be described in further detail below in conjunction with accompanying drawings 1-5.

本申请实施例公开一种桥梁用预应力张拉装置。The embodiment of the present application discloses a prestress tensioning device for a bridge.

参照图1和图2,一种桥梁用预应力张拉装置包括移动架100,移动架100行走在桥面上,移动架100上安装有升降机构200,升降机构200包括支撑板210,支撑板210安装在移动架100上,支撑板210与移动架100长度方向平行,支撑板210上固定连接有两个第二卷扬机230,两个第二卷扬机230分别位于靠近支撑板210长度方向两端的位置,两个第二卷扬机230的钢绳上固定连接有作业台300,两个第二卷扬机230的钢绳分别位于靠近作业台300长度方向两端的位置。支撑板210上穿设有两根导向杆250,两根导向杆250均垂直于桥面,两根导向杆250与支撑板210滑动连接,每根导向杆250的下端均与作业台300固定连接。支撑板210上安装有第一卷扬机220,第一卷扬机220的钢绳上安装有张拉千斤顶110。在需要对桥梁上的预应力钢筋进行张拉作业时,施工人员首先进入作业台300上,然后利用两个第二卷扬机230驱动作业台300下放至合适高度,然后启动第一卷扬机220,利用第一卷扬机220驱动张拉千斤顶110下放,将张拉千斤顶110下放至预应力钢筋的高度,然后施工人员在作业台300操作千斤顶对预应力钢筋进行张拉施工即可,施工人员无需搭设支架平台进行张拉作业,提高预应力钢筋的张拉施工的便捷性。With reference to Fig. 1 and Fig. 2, a kind of prestressed tensioning device for bridge comprises mobile frame 100, and mobile frame 100 walks on bridge deck, and lifting mechanism 200 is installed on mobile frame 100, and lifting mechanism 200 comprises support plate 210, and support plate 210 is installed on the mobile frame 100, the support plate 210 is parallel to the longitudinal direction of the mobile frame 100, two second winches 230 are fixedly connected to the support plate 210, and the two second hoists 230 are respectively located near the two ends of the support plate 210 in the longitudinal direction , the steel ropes of the two second winches 230 are fixedly connected with the working platform 300 , and the steel ropes of the two second winching machines 230 are respectively located near two ends of the working platform 300 in the length direction. Two guide rods 250 are pierced on the support plate 210, and the two guide rods 250 are perpendicular to the bridge deck. The two guide rods 250 are slidingly connected with the support plate 210, and the lower end of each guide rod 250 is fixedly connected with the workbench 300. . A first hoist 220 is installed on the support plate 210 , and a tension jack 110 is installed on the steel rope of the first hoist 220 . When it is necessary to perform tensioning work on the prestressed steel bars on the bridge, construction workers first enter the workbench 300, then use two second hoists 230 to drive the workbench 300 down to a suitable height, then start the first hoist 220, use the second hoist A hoist 220 drives the tensioning jack 110 to lower down, and lowers the tensioning jack 110 to the height of the prestressed steel bar, and then the construction personnel operate the jack on the workbench 300 to perform tensioning construction on the prestressed steel bar, and the construction personnel do not need to set up a support platform to carry out the construction. Tensioning operation, improving the convenience of tensioning construction of prestressed steel bars.

参照图2,为了提高张拉千斤顶110使用的灵活性,支撑板210上滑动连接有滑移板240,滑移板240沿支撑板210的长度方向滑移。第一卷扬机220固定连接在滑移板240上。在对预应力钢筋进行张拉过程中,完成其中一组预应力钢筋的张拉后,推动张拉千斤顶110,即可使张拉千斤顶110随滑移板240滑移至下一组预应力钢筋的位置,继而能够对下一组预应力钢筋进行张拉作业,无需频繁移动移动架100,提高张拉千斤顶110使用的灵活性。Referring to FIG. 2 , in order to improve the flexibility of the tension jack 110 , a sliding plate 240 is slidably connected to the supporting plate 210 , and the sliding plate 240 slides along the length direction of the supporting plate 210 . The first winch 220 is fixedly connected to the sliding plate 240 . In the process of stretching the prestressed steel bars, after the tensioning of one group of prestressed steel bars is completed, the tensioning jack 110 is pushed, so that the tensioning jack 110 can slide with the sliding plate 240 to the next group of prestressed steel bars position, and then the next group of prestressed steel bars can be stretched without frequent movement of the mobile frame 100, improving the flexibility of the use of the tensioning jack 110.

参照图2、图3和图4,第一卷扬机220的钢绳上安装有弹簧231,弹簧231的一端与第一卷扬机220的钢绳固定连接,弹簧231的另一端固定连接有挂钩,张拉千斤顶110挂设在挂钩上,弹簧231对张拉千斤顶110施加向上移动的力。在将张拉千斤顶110安装在预应力钢筋上时,利用弹簧231的弹性设置施工人员可以向下按动张拉千斤顶110实现张拉千斤顶110下放高度的微调,在调节较小的高度时,无需频繁的启动第一卷扬机220,提高张拉千斤顶110高度调节的便捷性。Referring to Fig. 2, Fig. 3 and Fig. 4, a spring 231 is installed on the steel rope of the first hoist 220, one end of the spring 231 is fixedly connected with the steel rope of the first hoist 220, and the other end of the spring 231 is fixedly connected with a hook, tensioned The jack 110 is hung on the hook, and the spring 231 exerts upward force on the tension jack 110 . When the tension jack 110 is installed on the prestressed steel bar, the construction personnel can press the tension jack 110 downwards to realize the fine adjustment of the lowering height of the tension jack 110 by utilizing the elasticity of the spring 231. Start the first winch 220 frequently to improve the convenience of height adjustment of the tensioning jack 110 .

参照图2,为了保证移动架100在使用过程中的稳定性,移动架100上安装有连接杆400,连接杆400水平设置,支撑板210固定连接在连接杆400的一端,支撑板210与连接杆400垂直设置,连接杆400远离支撑板210的一端固定连接有配重块410,连接杆400位于移动架100背离支撑板210的一侧。利用配重块410对移动架100进行配重,提高移动架100在使用过程中的稳定性,降低受力发生倾翻的可能。Referring to Fig. 2, in order to ensure the stability of the mobile frame 100 during use, a connecting rod 400 is installed on the mobile frame 100, the connecting rod 400 is horizontally arranged, the supporting plate 210 is fixedly connected to one end of the connecting rod 400, and the supporting plate 210 is connected to The rod 400 is arranged vertically, and the end of the connecting rod 400 away from the support plate 210 is fixedly connected with a counterweight 410 , and the connecting rod 400 is located on the side of the mobile frame 100 away from the support plate 210 . The counterweight 410 is used to counterweight the mobile frame 100 to improve the stability of the mobile frame 100 during use and reduce the possibility of overturning due to force.

参照图1和图2,为了便于施工人员进入或离开作业台300,移动架100上转动连接有转动杆500,转动杆500竖直设置,转动杆500沿自身的轴线转动,连接杆400固定连接在转动杆500上,移动架100上安装有动力组件510,动力组件510用于驱动转动杆500转动。Referring to Fig. 1 and Fig. 2, in order to make it easier for construction workers to enter or leave the workbench 300, a rotating rod 500 is rotatably connected to the mobile frame 100, the rotating rod 500 is vertically arranged, the rotating rod 500 rotates along its own axis, and the connecting rod 400 is fixedly connected On the rotating rod 500 , a power assembly 510 is installed on the moving frame 100 , and the power assembly 510 is used to drive the rotating rod 500 to rotate.

动力组件510包括固定连接在移动架100上的第一电机511,第一电机511的主轴同轴固定连接有一个第一齿轮512,转动杆500同轴固定连接有另一个第一齿轮512,两个第一齿轮512啮合连接。利用第一电机511的主轴转动带动与其同轴连接的第一齿轮512转动,利用两个第一齿轮512的配合即可带动支撑板210转动,从而带动作业台300转动,在对桥梁上的预应力钢筋进行张拉时,利用第一电机511带动作业台300转动即可实现在桥面与桥梁一侧位置的变化,从而便于施工人员在作业台300上上下。The power assembly 510 includes a first motor 511 fixedly connected to the moving frame 100, the main shaft of the first motor 511 is fixedly connected with a first gear 512 coaxially, and the rotating rod 500 is fixedly connected with another first gear 512 coaxially. A first gear 512 is meshingly connected. Utilize the rotation of the main shaft of the first motor 511 to drive the first gear 512 coaxially connected with it to rotate, and utilize the cooperation of the two first gears 512 to drive the support plate 210 to rotate, thereby driving the workbench 300 to rotate, and the pre-set on the bridge When the stress steel bar is stretched, the first motor 511 is used to drive the operation platform 300 to rotate to realize the position change between the bridge deck and one side of the bridge, so that construction personnel can get up and down on the operation platform 300 conveniently.

参照图1、图3和图5,在张拉千斤定随着作业台300下降,张拉千斤定往往会与预应力钢筋之间有一定距离,工作人员通过推动张拉千斤顶110靠近预应力钢筋较为费力,为了便于推动张拉千斤顶110向靠近预应力钢筋的方向移动,作业台300上安装有推动机构600。Referring to Fig. 1, Fig. 3 and Fig. 5, when the tensioning jack is lowered with the operation table 300, there is often a certain distance between the tensioning jack and the prestressed steel bar, and the staff pushes the tensioning jack 110 close to the prestressed steel bar It is relatively laborious. In order to facilitate the movement of the tensioning jack 110 to the direction close to the prestressed steel bar, a pushing mechanism 600 is installed on the workbench 300 .

推动机构600包括安装在作业台300上的承托台610,承托台610上穿设有推动杆620,推动杆620水平设置,推动杆620与作业台300的长度方向平行,推动杆620与承托台610滑动连接,推动杆620沿自身的长度方向滑移,推动杆620靠近桥梁的一端固定连接有卡块630,卡块630用于卡接第一卷扬机220上的钢绳。承托台610上安装有推动组件640,推动组件640包括固定连接在承托台610上的第二电机641,第二电机641的主轴同轴固定连接有第二齿轮642,推动杆620上固定连接有齿条643,齿条643的长度方向与推动杆620的长度方向平行,第二齿轮642与齿条643啮合连接。下放张拉千斤顶110后,将第一卷扬机220的钢绳卡在推动杆620上固定连接的卡块630上,启动第二电机641,利用给第二电机641驱动第二齿轮642转动即可驱动齿条643滑移,从而驱动推动杆620滑移,使得推动杆620能够推动张拉千斤顶110移动,减少工作人员的体力消耗,提高预应力钢筋张拉作业的便捷性。The pushing mechanism 600 includes a support platform 610 installed on the workbench 300. The support platform 610 is pierced with a push rod 620. The push rod 620 is horizontally arranged. The push rod 620 is parallel to the length direction of the workbench 300. The push rod 620 and the The supporting platform 610 is slidably connected, and the push rod 620 slides along its length direction. The end of the push rod 620 close to the bridge is fixedly connected with a clamping block 630 , and the clamping block 630 is used for clamping the steel rope on the first winch 220 . A pusher assembly 640 is installed on the support platform 610, and the push assembly 640 includes a second motor 641 fixedly connected to the support platform 610. The main shaft of the second motor 641 is coaxially fixedly connected with a second gear 642. A rack 643 is connected, the length direction of the rack 643 is parallel to the length direction of the push rod 620 , and the second gear 642 is engaged with the rack 643 . After lowering the tension jack 110, the steel rope of the first hoist 220 is stuck on the block 630 fixedly connected to the push rod 620, the second motor 641 is started, and the second motor 641 is used to drive the second gear 642 to rotate. The rack 643 slides, thereby driving the push rod 620 to slide, so that the push rod 620 can push the tension jack 110 to move, which reduces the physical exertion of the staff and improves the convenience of the prestressed steel bar tensioning operation.

参照图3,作业台300上固定连接有两根导轨650,两根导轨650均沿作业台300的长度方向设置,承托台610滑动连接在两根导轨650上。在拉动张拉千斤顶110沿支撑板210的长度方向滑移调节张拉千斤顶110的位置时,同时推动承托台610滑动连接即可保证对张拉千斤顶110的推动效果,提高推动机构600使用的灵活性。Referring to FIG. 3 , two guide rails 650 are fixedly connected to the workbench 300 , and the two guide rails 650 are arranged along the length direction of the workbench 300 , and the supporting platform 610 is slidably connected to the two guide rails 650 . When pulling the tension jack 110 to slide along the length direction of the support plate 210 to adjust the position of the tension jack 110, simultaneously pushing the support platform 610 to slide and connect can ensure the pushing effect on the tension jack 110, and improve the efficiency of the pushing mechanism 600. flexibility.

本申请实施例一种桥梁用预应力张拉装置的实施原理为:通过将支撑板210设置在移动架100上,在需要对桥梁上的预应力钢筋进行张拉施工时,首先将移动架100移动靠近预应力钢筋的位置,然后同时启动两个第二卷扬机230,使两个第二卷扬机230带动承载有施工人员的作业台300下移,然后启动第一卷扬机220,利用第一卷扬机220上的钢绳下放即可对张拉千斤顶110进行下放至需要进行张拉的预应力钢筋的位置,然后施工人员在作业台300对预应力钢筋进行作业即可,施工人员无需搭设支架进行张拉作业,提高预应力钢筋的张拉施工的便捷性。The implementation principle of a prestressed tensioning device for bridges in the embodiment of the present application is as follows: by setting the support plate 210 on the mobile frame 100, when the prestressed steel bars on the bridge need to be tensioned, first the mobile frame 100 Move the position close to the prestressed steel bar, then start the two second hoists 230 at the same time, so that the two second hoists 230 drive the workbench 300 carrying the construction personnel to move down, then start the first hoist 220, and use the first hoist 220 to go up The tensioning jack 110 can be lowered to the position of the prestressed steel bar that needs to be tensioned, and then the construction personnel can work on the prestressed steel bar at the workbench 300, and the construction personnel do not need to set up a bracket for tensioning work , Improve the convenience of tensioning construction of prestressed steel bars.

以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。All of the above are preferred embodiments of the application, and are not intended to limit the protection scope of the application. Therefore, all equivalent changes made according to the structure, shape, and principle of the application should be covered by the protection scope of the application. Inside.

Claims (9)

1.一种桥梁用预应力张拉装置,其特征在于:包括移动架(100)、作业台(300)、张拉千斤顶(110)和升降机构(200),所述移动架(100)行走在桥面上,所述作业台(300)连接在所述移动架(100)上,所述升降机构(200)连接在所述移动架(100)上,所述升降机构(200)与所述作业台(300)连接以驱动所述作业台(300)升降,所述张拉千斤顶(110)与所述升降机构(200)连接,所述升降机构(200)驱动所述张拉千斤顶(110)升降。1. A prestressed tensioning device for a bridge, characterized in that: it includes a mobile frame (100), a working table (300), a tension jack (110) and a lifting mechanism (200), and the mobile frame (100) travels On the bridge deck, the workbench (300) is connected to the moving frame (100), the lifting mechanism (200) is connected to the moving frame (100), and the lifting mechanism (200) is connected to the moving frame (100). The workbench (300) is connected to drive the workbench (300) up and down, the tension jack (110) is connected to the lifting mechanism (200), and the lifting mechanism (200) drives the tension jack ( 110) Lifting. 2.根据权利要求1所述的一种桥梁用预应力张拉装置,其特征在于:所述升降机构(200)包括支撑板(210)、第一卷扬机(220)和两个第二卷扬机(230),所述支撑板(210)连接在所述移动架(100)上,两个所述第二卷扬机(230)均固定连接在所述支撑板(210)上,两个所述第二卷扬机(230)上的钢绳分别与所述作业台(300)长度方向的两端固定连接,所述第一卷扬机(220)连接在所述支撑板(210)上,所述第一卷扬机(220)的钢绳与所述张拉千斤顶(110)连接。2. A prestressed tensioning device for bridges according to claim 1, characterized in that: the lifting mechanism (200) includes a support plate (210), a first winch (220) and two second winches ( 230), the support plate (210) is connected to the mobile frame (100), the two second winches (230) are fixedly connected to the support plate (210), the two second The steel ropes on the hoist (230) are fixedly connected to both ends of the workbench (300) in the length direction, the first hoist (220) is connected to the support plate (210), and the first hoist ( 220) is connected with the tension jack (110). 3.根据权利要求2所述的一种桥梁用预应力张拉装置,其特征在于:所述支撑板(210)上滑动连接有滑移板(240),所述滑移板(240)沿所述支撑板(210)的长度方向滑移,所述第一卷扬机(220)固定连接在所述滑移板(240)上。3. A prestressed tensioning device for bridges according to claim 2, characterized in that: a sliding plate (240) is slidably connected to the supporting plate (210), and the sliding plate (240) is The support plate (210) slides in the longitudinal direction, and the first winch (220) is fixedly connected to the slide plate (240). 4.根据权利要求2所述的一种桥梁用预应力张拉装置,其特征在于:所述第一卷扬机(220)的钢绳上固定连接有弹簧(231),所述弹簧(231)远离所述第一卷扬机(220)钢绳的一端与所述张拉千斤顶(110)连接。4. A prestressed tensioning device for a bridge according to claim 2, characterized in that: a spring (231) is fixedly connected to the steel rope of the first winch (220), and the spring (231) is far away from One end of the steel rope of the first winch (220) is connected to the tension jack (110). 5.根据权利要求2所述的一种桥梁用预应力张拉装置,其特征在于:所述移动架(100)上设置有连接杆(400),所述支撑板(210)固定连接在所述连接杆(400)的一端,所述连接杆(400)远离所述支撑板(210)的一端设置有配重块(410),所述支撑板(210)与所述配重块(410)分别位于所述移动架(100)相对两侧的位置。5. A prestressed tensioning device for a bridge according to claim 2, characterized in that: the moving frame (100) is provided with a connecting rod (400), and the support plate (210) is fixedly connected to the One end of the connecting rod (400), the end of the connecting rod (400) away from the support plate (210) is provided with a counterweight (410), the support plate (210) and the counterweight (410) ) are respectively located on opposite sides of the moving frame (100). 6.根据权利要求5所述的一种桥梁用预应力张拉装置,其特征在于:所述移动架(100)上转动连接有转动杆(500),所述转动杆(500)的转动轴线垂直于桥面,所述连接杆(400)与转动杆(500)固定连接,所述移动架(100)上设置有动力组件(510),所述动力组件(510)与所述转动杆(500)连接以驱动所述转动杆(500)转动。6. A prestressed tensioning device for bridges according to claim 5, characterized in that: the moving frame (100) is rotatably connected with a rotating rod (500), and the rotating axis of the rotating rod (500) Vertical to the bridge deck, the connecting rod (400) is fixedly connected to the rotating rod (500), the moving frame (100) is provided with a power assembly (510), and the power assembly (510) is connected to the rotating rod ( 500) to drive the rotating rod (500) to rotate. 7.根据权利要求6所述的一种桥梁用预应力张拉装置,其特征在于:所述动力组件(510)包括第一电机(511)和两个第一齿轮(512),所述第一电机(511)固定连接在所述移动架(100)上,其中一个所述第一齿轮(512)与所述第一电机(511)的主轴固定连接,另一个所述第一齿轮(512)与所述转动杆(500)同轴固定连接,两个所述第一齿轮(512)啮合连接。7. The prestressed tensioning device for bridges according to claim 6, characterized in that: the power assembly (510) includes a first motor (511) and two first gears (512), and the first A motor (511) is fixedly connected to the moving frame (100), one of the first gears (512) is fixedly connected to the main shaft of the first motor (511), and the other first gear (512 ) is coaxially and fixedly connected with the rotating rod (500), and the two first gears (512) are meshedly connected. 8.根据权利要求2所述的一种桥梁用预应力张拉装置,其特征在于:所述作业台(300)上设置有推动机构(600),所述推动机构(600)包括承托台(610)、推动杆(620)、推动组件(640)和用于卡接所述第一卷扬机(220)钢绳的卡块(630),所述承托台(610)连接在所述作业台(300)上,所述推动杆(620)滑动连接在所述承托台(610)上,所述推动杆(620)沿靠近或远离桥梁的方向滑移,所述卡块(630)固定连接在所述推动杆(620)上,所述推动组件(640)连接在所述承托台(610)上,所述推动组件(640)与所述推动杆(620)连接以驱动所述推动杆(620)滑移。8. A prestressed tensioning device for bridges according to claim 2, characterized in that: the workbench (300) is provided with a push mechanism (600), and the push mechanism (600) includes a supporting platform (610), a push rod (620), a push assembly (640) and a block (630) for clamping the steel rope of the first winch (220), the supporting platform (610) is connected to the working On the platform (300), the push rod (620) is slidably connected to the supporting platform (610), the push rod (620) slides in a direction approaching or away from the bridge, and the clamping block (630) fixedly connected to the push rod (620), the push assembly (640) is connected to the support platform (610), the push assembly (640) is connected to the push rod (620) to drive the The push rod (620) slips. 9.根据权利要求8所述的一种桥梁用预应力张拉装置,其特征在于:所述承托台(610)滑动连接在所述作业台(300)上,所述承托台(610)沿所述作业台(300)的长度方向滑移。9. A prestressed tensioning device for bridges according to claim 8, characterized in that: the supporting platform (610) is slidably connected to the working platform (300), and the supporting platform (610) ) slides along the length direction of the working table (300).
CN202320668430.5U 2023-03-28 2023-03-28 Prestress tensioning device for bridge Expired - Fee Related CN219450465U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320668430.5U CN219450465U (en) 2023-03-28 2023-03-28 Prestress tensioning device for bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320668430.5U CN219450465U (en) 2023-03-28 2023-03-28 Prestress tensioning device for bridge

Publications (1)

Publication Number Publication Date
CN219450465U true CN219450465U (en) 2023-08-01

Family

ID=87413523

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320668430.5U Expired - Fee Related CN219450465U (en) 2023-03-28 2023-03-28 Prestress tensioning device for bridge

Country Status (1)

Country Link
CN (1) CN219450465U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117248451A (en) * 2023-08-11 2023-12-19 中国一冶集团有限公司 A jack positioning auxiliary device and positioning method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117248451A (en) * 2023-08-11 2023-12-19 中国一冶集团有限公司 A jack positioning auxiliary device and positioning method

Similar Documents

Publication Publication Date Title
CN101700555A (en) Automatic wielding mechanical device for forming machine of numerical control reinforcing cage
CN220467321U (en) A special lifting tool for retractable ALC board walls
CN114687299B (en) Bridge cast-in-situ continuous Liang Duowei hanging basket
CN111285262A (en) Steel coil lifting appliance device for unmanned crane and working method thereof
CN112919361B (en) Pipeline vertical hoisting device
CN219386020U (en) Movable tensioning device for cast-in-situ box girder
CN114809955B (en) An automated hydraulic lifting oil pipe conveyor
CN118495422A (en) Lifting device for construction operation platform
CN217106885U (en) Automatic hydraulic lifting type oil pipe conveyor
CN217148367U (en) Guide rail section bar lifting device for elevator production
CN112027966B (en) A kind of prestressed jack mobile installation equipment
CN116551830A (en) Integrated high-speed rail track slab demoulding device
CN214240903U (en) A light-weight mobile fairlead installation and adjustment device
CN222138470U (en) An adjustable steel truss floor deck hoisting tool
CN220241887U (en) Precast beam stretch-draw equipment operation frame
CN219196777U (en) Interior wall ALC slat installation auxiliary device
CN112252195A (en) Prefabricated continuous beam prestressed steel bundle tensioning work trolley and its use method
CN220618160U (en) Anti-swing pulley connecting device of grab crane
CN112678047A (en) Light movable type cable guider installation adjusting device and method thereof
CN117231012B (en) A steel structure sandalwood installation device
CN217780585U (en) Subway construction is with lift portal frame
CN216767258U (en) High embankment is consolidated and is used rig moving platform
CN119461024B (en) A device for placing and hanging steel structures at construction sites
CN222895827U (en) Anchor grip test device
CN219862227U (en) Municipal road construction flattening device that shakes

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230801