CN219431280U - Installation device is used in construction of assembled wallboard - Google Patents

Installation device is used in construction of assembled wallboard Download PDF

Info

Publication number
CN219431280U
CN219431280U CN202222838234.6U CN202222838234U CN219431280U CN 219431280 U CN219431280 U CN 219431280U CN 202222838234 U CN202222838234 U CN 202222838234U CN 219431280 U CN219431280 U CN 219431280U
Authority
CN
China
Prior art keywords
rod
plate
electric push
push rod
moving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222838234.6U
Other languages
Chinese (zh)
Inventor
马锦
王超
徐剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Co Ltd
China Railway Construction Group Architecture Development Co Ltd
Original Assignee
China Railway Construction Group Co Ltd
China Railway Construction Group Architecture Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Co Ltd, China Railway Construction Group Architecture Development Co Ltd filed Critical China Railway Construction Group Co Ltd
Application granted granted Critical
Publication of CN219431280U publication Critical patent/CN219431280U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种装配式墙板施工用安装装置,包括底板,底板上端面的左右两侧对称焊接有两个箱体,箱体的顶部通过螺栓连接有第一电机,第一电机的转轴贯穿至箱体的内腔并固定连接有螺纹杆,螺纹杆的表面螺纹套设有螺纹套,两个箱体相对的两个侧面上均开设有长孔,位于两个箱体中相对的两个螺纹套之间焊接有纵向杆,纵向杆贯穿所述长孔,纵向杆的表面活动套设有移动板,纵向杆的表面固定套设有固定板,固定板通过第一电动推杆连接移动板,移动板的一端设置有夹紧机构,箱体的表面通过螺栓连接有控制器。本实用新型具备对不同大小的墙板进行快速夹持升起的优点,墙板夹持后可旋转调节其角度,便于墙板的安装,提高了装配式墙板的安装效率。

The utility model discloses an installation device for the construction of an assembled wallboard, which comprises a base plate, two boxes are welded symmetrically on the left and right sides of the end surface of the base plate, and the top of the box is connected with a first motor through bolts. The rotating shaft penetrates into the inner cavity of the box and is fixedly connected with a threaded rod. The threaded sleeve on the surface of the threaded rod is provided with a threaded sleeve. There are long holes on the opposite sides of the two boxes, which are located on the opposite sides of the two boxes. A longitudinal rod is welded between the two threaded sleeves, the longitudinal rod runs through the long hole, the surface movable sleeve of the longitudinal rod is provided with a moving plate, the surface fixed sleeve of the longitudinal rod is provided with a fixed plate, and the fixed plate is connected by the first electric push rod The moving plate is provided with a clamping mechanism at one end of the moving plate, and the surface of the box body is connected with a controller through bolts. The utility model has the advantage of quickly clamping and raising wall panels of different sizes, and the angle of the wall panels can be rotatably adjusted after being clamped, which facilitates the installation of the wall panels and improves the installation efficiency of the assembled wall panels.

Description

一种装配式墙板施工用安装装置An installation device for the construction of a prefabricated wall panel

技术领域technical field

本实用新型涉及墙板施工用安装的技术领域,具体来说,涉及一种装配式墙板施工用安装装置。The utility model relates to the technical field of installation for wallboard construction, in particular to an installation device for assembled wallboard construction.

背景技术Background technique

墙板位于家具左右两侧,呈垂直面的板材统称“旁板”或称“墙板”,现指一种建材,是由墙和楼板组成承重体系的房屋结构,墙板结构的承重墙可用砖、砌块、预制或现浇混凝土做成,按所用材料和建造方法的不同可分为混合结构、装配式大板结构、现浇式墙板结构三类。The wall panels are located on the left and right sides of the furniture. The vertical panels are collectively referred to as "side panels" or "wall panels". Made of bricks, blocks, prefabricated or cast-in-place concrete, according to the materials used and construction methods, it can be divided into three types: hybrid structure, assembled large-slab structure, and cast-in-place wall panel structure.

装配式墙板在装配安装过程中,需要使用吊机一块一块将其从运输车辆上吊起,并配合人工进行安装,安装效率十分低下,不便于将不同大小的墙板进行快速夹持升起,墙板夹持后不便于调节其旋转角度,从而不便于墙板的安装。During the assembly and installation process of prefabricated wall panels, it is necessary to use a crane to lift them one by one from the transport vehicle, and cooperate with manual installation. The installation efficiency is very low, and it is not convenient to quickly clamp and lift wall panels of different sizes. After the wallboard is clamped, it is inconvenient to adjust its rotation angle, so that it is inconvenient to install the wallboard.

实用新型内容Utility model content

针对相关技术中的上述技术问题,本实用新型提供一种装配式墙板施工用安装装置,能够解决上述问题。Aiming at the above-mentioned technical problems in the related art, the utility model provides an installation device for prefabricated wall panel construction, which can solve the above-mentioned problems.

为实现上述技术目的,本实用新型的技术方案是这样实现的:For realizing above-mentioned technical purpose, technical scheme of the present utility model is realized like this:

一种装配式墙板施工用安装装置,包括底板,所述底板上端面的左右两侧对称焊接有两个箱体,所述箱体的顶部通过螺栓连接有第一电机,所述第一电机的转轴贯穿至所述箱体的内腔并固定连接有螺纹杆,所述螺纹杆的表面螺纹套设有螺纹套,两个所述箱体相对的两个侧面上均开设有长孔,位于两个所述箱体中相对的两个所述螺纹套之间焊接有纵向杆,所述纵向杆贯穿所述长孔,所述纵向杆的表面活动套设有移动板,所述纵向杆的表面固定套设有固定板,所述固定板通过第一电动推杆连接所述移动板,所述移动板的一端设置有夹紧机构,所述箱体的表面通过螺栓连接有控制器。An installation device for prefabricated wall panel construction, including a bottom plate, two boxes are welded symmetrically on the left and right sides of the upper surface of the bottom plate, and the top of the box is connected with a first motor by bolts, and the first motor The rotating shaft penetrates to the inner cavity of the box and is fixedly connected with a threaded rod. The threaded sleeve on the surface of the threaded rod is provided with a threaded sleeve, and long holes are opened on the two opposite sides of the two boxes. A longitudinal rod is welded between the two opposite threaded sleeves in the two boxes, and the longitudinal rod passes through the long hole, and the surface of the longitudinal rod is movably sleeved with a moving plate. The fixed sleeve on the surface is provided with a fixed plate, the fixed plate is connected to the movable plate through the first electric push rod, a clamping mechanism is arranged at one end of the movable plate, and a controller is connected to the surface of the box through bolts.

进一步的,所述夹紧机构包括第二电动推杆,所述第二电动推杆的左端通过支块与所述移动板固定连接,所述第二电动推杆的右端通过支块固定连接有移动杆,所述移动杆的外侧端设置有第二电机,所述第二电机的转轴贯穿所述移动杆并固定连接有U型板,所述U型板的顶部贯穿设置有第三电动推杆,所述第三电动推杆的底部固定连接有压板,所述第一电机、所述第二电机、所述第一电动推杆、所述第二电动推杆和所述第三电动推杆均电连接所述控制器。Further, the clamping mechanism includes a second electric push rod, the left end of the second electric push rod is fixedly connected with the moving plate through a support block, and the right end of the second electric push rod is fixedly connected with a A moving rod, the outer end of the moving rod is provided with a second motor, the rotating shaft of the second motor passes through the moving rod and is fixedly connected with a U-shaped plate, and the top of the U-shaped plate is provided with a third electric pusher. rod, the bottom of the third electric push rod is fixedly connected with a pressure plate, the first motor, the second motor, the first electric push rod, the second electric push rod and the third electric push rod The rods are electrically connected to the controller.

进一步的,所述压板的底部设置有防滑纹,所述移动杆的左端延伸至所述移动板的内腔并与所述移动板活动连接。Further, the bottom of the pressing plate is provided with anti-slip lines, and the left end of the moving rod extends to the inner cavity of the moving plate and is movably connected with the moving plate.

进一步的,所述箱体内腔中还设有与所述螺纹杆平行的导向杆,所述导向杆的表面套设有导向套,位于两个所述箱体中相对的两个所述导向套之间焊接有平衡杆,所述平衡杆的一端依次贯穿所述长孔、所述固定板和所述移动板,所述平衡杆与所述固定板固定连接,所述平衡杆与所述移动板活动连接。Further, a guide rod parallel to the threaded rod is also provided in the inner cavity of the box, and guide sleeves are sheathed on the surface of the guide rod, and the two guide sleeves opposite to each other in the two boxes are A balance bar is welded between them, and one end of the balance bar passes through the long hole, the fixed plate and the moving plate in sequence, the balance bar is fixedly connected with the fixed plate, and the balance bar is connected with the moving plate. board activity connection.

进一步的,所述底板底部的四角均通过螺栓连接有万向轮,所述万向轮的一侧活动连接有刹车块。Further, the four corners of the bottom of the bottom plate are all connected with universal wheels through bolts, and one side of the universal wheels is movably connected with brake blocks.

进一步的,所述底板上端面位于所述箱体的左侧固定连接有配重箱,所述配重箱的内腔放置有配重块,所述配重块的顶部焊接有把手。Further, a counterweight box is fixedly connected to the upper surface of the bottom plate on the left side of the box body, a counterweight is placed in the inner cavity of the counterweight box, and a handle is welded on the top of the counterweight.

本实用新型的有益效果:本实用新型具备对不同大小的墙板进行快速夹持升起的优点,墙板夹持后可旋转调节其角度,便于墙板的安装,提高了装配式墙板的安装效率。Beneficial effects of the utility model: the utility model has the advantages of quickly clamping and lifting wallboards of different sizes, and the angle of the wallboards can be rotated and adjusted after being clamped, which facilitates the installation of the wallboards and improves the safety of the assembled wallboards. Installation efficiency.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the accompanying drawings required in the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only the present invention. For some embodiments of the present invention, those of ordinary skill in the art can also obtain other drawings based on these drawings on the premise of not paying creative efforts.

下面根据附图对本实用新型作进一步详细说明。Below according to accompanying drawing, the utility model is described in further detail.

图1是本实用新型实施例所述的一种装配式墙板施工用安装装置的结构示意图;Fig. 1 is a structural schematic diagram of an installation device for the construction of a prefabricated wallboard described in an embodiment of the present invention;

图2是图1向右旋转90°的结构示意图;Fig. 2 is a structural schematic view of Fig. 1 rotated 90° to the right;

图3是本实用新型实施例所述的箱体的内部连接结构示意图;Fig. 3 is a schematic diagram of the internal connection structure of the box described in the embodiment of the present invention;

图4是图1中A的放大图。Fig. 4 is an enlarged view of A in Fig. 1 .

图中:1、底板;2、箱体;3、第一电机;4、螺纹杆;5、螺纹套;6、长孔;7、纵向杆;8、移动板;9、固定板;10、第一电动推杆;11、夹紧机构;12、控制器;13、第二电动推杆;14、移动杆;15、第二电机;16 、U型板;17、第三电动推杆;18、压板;19、导向杆;20、导向套;21、平衡杆;22、万向轮;23、配重箱;24、配重块。In the figure: 1, bottom plate; 2, box body; 3, first motor; 4, threaded rod; 5, threaded sleeve; 6, long hole; 7, longitudinal rod; 8, moving plate; 9, fixed plate; 10, 11. Clamping mechanism; 12. Controller; 13. Second electric push rod; 14. Moving rod; 15. Second motor; 16. U-shaped plate; 17. Third electric push rod; 18. Press plate; 19. Guide rod; 20. Guide sleeve; 21. Balance bar; 22. Universal wheel; 23. Counterweight box; 24. Counterweight.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. All other embodiments obtained by persons of ordinary skill in the art based on the embodiments of the present invention belong to the protection scope of the present invention.

如图1-4所示,根据本实用新型实施例所述的一种装配式墙板施工用安装装置,包括底板1,底板1上端面左右两侧侧对称焊接有两个箱体2,箱体2的顶部通过螺栓连接有第一电机3,第一电机3的转轴贯穿至箱体2的内腔并固定连接有螺纹杆4,螺纹杆4的表面螺纹套设有螺纹套5,两个箱体2相对的两个侧面上均开设有长孔6,位于两个箱体(2)中相对的两个螺纹套(5)之间焊接有纵向杆7,纵向杆7的表面活动套设有移动板8,纵向杆7的表面固定套设有固定板9,固定板9相对的一侧通过螺栓连接有第一电动推杆10,第一电动推杆10的另一端与移动板8固定连接,移动板8的一侧设置有夹紧机构11,箱体2的表面通过螺栓连接有控制器12,夹紧机构11包括第二电动推杆13,第二电动推杆13的左端通过支块与移动板8固定连接,第二电动推杆13的右端通过支块固定连接有移动杆14,移动杆14外侧端面设置有第二电机15,第二电机15的转轴贯穿移动杆14并固定连接有U型板16,U型板16的顶部贯穿设置有第三电动推杆17,第三电动推杆17的底部固定连接有压板18,控制器12的输出端分别与第一电机3、第二电机15、第一电动推杆10、第二电动推杆13和第三电动推杆17电性连接,压板18的底部设置有防滑纹,第三电动推杆17与U型板16固定连接,移动杆14的左端延伸至移动板8的内腔并与移动板8活动连接,第二电机15的转轴与移动杆14的内壁可通过轴承过渡连接,箱体2内腔的顶部固定连接有导向杆19,导向杆19的底部与底板1固定连接,导向杆19的表面套设有导向套20,导向套20相对的一侧焊接有平衡杆21,平衡杆21的一端依次贯穿长孔6、固定板9和移动板8,平衡杆21与固定板9固定连接,平衡杆21与移动板8活动连接,底板1底部的四角均通过螺栓连接有万向轮22,万向轮22的一侧活动连接有刹车块,底板1顶部的左侧固定连接有配重箱23,配重箱23的内腔放置有配重块24,配重块24的顶部焊接有把手,螺纹杆4的底部与底板1的顶部可通过轴承过渡连接,纵向杆7贯穿长孔6并与长孔6活动连接。As shown in Figure 1-4, according to the installation device for the construction of a prefabricated wall panel described in the embodiment of the present invention, it includes a bottom plate 1, two boxes 2 are welded symmetrically on the left and right sides of the upper end surface of the bottom plate 1, and the box The top of the body 2 is connected with the first motor 3 by bolts, the rotating shaft of the first motor 3 penetrates into the inner cavity of the box body 2 and is fixedly connected with the threaded rod 4, the surface threaded sleeve of the threaded rod 4 is provided with a threaded sleeve 5, two There are long holes 6 on the two opposite sides of the box body 2, and a longitudinal rod 7 is welded between the two opposite threaded sleeves (5) in the two boxes (2), and the surface of the longitudinal rod 7 is movable There is a moving plate 8, and the surface of the longitudinal bar 7 is fixedly covered with a fixed plate 9, and the opposite side of the fixed plate 9 is connected with a first electric push rod 10 by bolts, and the other end of the first electric push rod 10 is fixed to the moving plate 8 One side of the moving plate 8 is provided with a clamping mechanism 11, and the surface of the box body 2 is connected with a controller 12 through bolts. The clamping mechanism 11 includes a second electric push rod 13, and the left end of the second electric push rod 13 passes through the support The block is fixedly connected with the moving plate 8, and the right end of the second electric push rod 13 is fixedly connected with the moving rod 14 through the supporting block, and the outer end surface of the moving rod 14 is provided with a second motor 15, and the rotating shaft of the second motor 15 runs through the moving rod 14 and is fixed. Connected with a U-shaped plate 16, the top of the U-shaped plate 16 is penetrated with a third electric push rod 17, and the bottom of the third electric push rod 17 is fixedly connected with a pressure plate 18, and the output ends of the controller 12 are respectively connected to the first motor 3, The second motor 15, the first electric push rod 10, the second electric push rod 13 and the third electric push rod 17 are electrically connected, the bottom of the pressure plate 18 is provided with anti-slip lines, and the third electric push rod 17 is fixed to the U-shaped plate 16 connection, the left end of the moving rod 14 extends to the inner cavity of the moving plate 8 and is flexibly connected with the moving plate 8, the rotating shaft of the second motor 15 and the inner wall of the moving rod 14 can be transitionally connected through bearings, and the top of the inner cavity of the box body 2 is fixedly connected There is a guide rod 19, the bottom of the guide rod 19 is fixedly connected with the bottom plate 1, the surface of the guide rod 19 is covered with a guide sleeve 20, and the opposite side of the guide sleeve 20 is welded with a balance rod 21, and one end of the balance rod 21 passes through the long hole in turn 6. The fixed plate 9 and the mobile plate 8, the balance bar 21 is fixedly connected with the fixed plate 9, the balance bar 21 is movably connected with the mobile plate 8, the four corners of the bottom of the base plate 1 are connected with universal wheels 22 by bolts, and the universal wheels 22 One side is movably connected with a brake block, and the left side of the bottom plate 1 top is fixedly connected with a counterweight box 23, and the inner cavity of the counterweight box 23 is placed with a counterweight 24, and the top of the counterweight 24 is welded with a handle, and the bottom of the threaded rod 4 is connected with the The top of the bottom plate 1 can be transitionally connected by a bearing, and the longitudinal rod 7 runs through the long hole 6 and is movably connected with the long hole 6 .

在本实用新型具体的一个实施例中,通过设置防滑纹,增大了压板18底部的粗糙度,便于对墙板进行夹紧固定,通过设置导向杆19和导向套20,能够对平衡杆21进行导向支撑,便于平衡杆21的竖向移动,通过设置平衡杆21,能够对移动板8进行平衡支撑,便于移动板8的左右移动,通过设置长孔6,便于纵向杆7和平衡杆21的竖向移动,通过设置万向轮22,便于安装装置的移动,通过设置刹车块,能够对万向轮22进行锁止固定,通过设置配重箱23和配重块24,能够对安装装置进行配重,保持安装装置的稳定支撑。In a specific embodiment of the present invention, the roughness of the bottom of the pressing plate 18 is increased by setting the anti-slip pattern, which is convenient for clamping and fixing the wallboard. By setting the guide rod 19 and the guide sleeve 20, the balance bar 21 can be Conduct guide support to facilitate the vertical movement of the balance bar 21. By setting the balance bar 21, the mobile plate 8 can be balanced and supported to facilitate the left and right movement of the mobile plate 8. By setting the long hole 6, it is convenient for the longitudinal bar 7 and the balance bar 21. The vertical movement of the universal wheel 22 is provided to facilitate the movement of the installation device. By setting the brake block, the universal wheel 22 can be locked and fixed. By setting the counterweight box 23 and the counterweight 24, the installation device can be adjusted. Counterweight to maintain a stable support for the mounting device.

具体使用时,控制器12控制第一电机3运行带动螺纹杆4旋转,螺纹杆4螺纹带动螺纹套5向下移动,螺纹套5带动纵向杆7、移动板8和夹紧机构11向下移动至低处,将墙板放置于两个U型板16之间,控制器12控制第一电动推杆10伸长带动移动板8移动,移动板8带动夹紧机构11相互靠近,从而带动U型板16卡接在墙板的左右两侧,控制器12控制第三电动推杆17伸长带动压板18向下移动压紧墙板,然后控制器12控制第一电机3转轴反向旋转,带动墙板移动至高处,控制器12控制第二电动推杆13伸长带动移动杆14移动,移动杆14带动第二电机15、U型板16和墙板移动,调节墙板的横向位置,控制器12控制第二电机15运行带动U型板16旋转,U型板16带动墙板旋转,可调节墙板的旋转角度,便于对墙板进行安装。During specific use, the controller 12 controls the operation of the first motor 3 to drive the threaded rod 4 to rotate, the threads of the threaded rod 4 drive the threaded sleeve 5 to move downwards, and the threaded sleeve 5 drives the longitudinal rod 7, the moving plate 8 and the clamping mechanism 11 to move downwards To the lower part, place the wallboard between two U-shaped boards 16, the controller 12 controls the extension of the first electric push rod 10 to drive the moving plate 8 to move, and the moving plate 8 drives the clamping mechanism 11 to approach each other, thereby driving the U-shaped The pattern plate 16 is clamped on the left and right sides of the wallboard, the controller 12 controls the extension of the third electric push rod 17 to drive the pressure plate 18 to move down to press the wallboard, and then the controller 12 controls the first motor 3 to rotate in reverse. Drive the wall board to move to a high place, the controller 12 controls the extension of the second electric push rod 13 to drive the moving rod 14 to move, and the moving rod 14 drives the second motor 15, the U-shaped board 16 and the wall board to move, and adjust the lateral position of the wall board. The controller 12 controls the operation of the second motor 15 to drive the U-shaped plate 16 to rotate, and the U-shaped plate 16 drives the wall plate to rotate, and the rotation angle of the wall plate can be adjusted to facilitate the installation of the wall plate.

以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in the Within the protection scope of the present utility model.

Claims (6)

1.一种装配式墙板施工用安装装置,其特征在于:包括底板(1),所述底板(1)上端面的左右两侧对称焊接有两个箱体(2),所述箱体(2)的顶部通过螺栓连接有第一电机(3),所述第一电机(3)的转轴贯穿至所述箱体(2)的内腔并固定连接有螺纹杆(4),所述螺纹杆(4)的表面螺纹套设有螺纹套(5),两个所述箱体(2)相对的两个侧面上均开设有长孔(6),位于两个所述箱体(2)中相对的两个所述螺纹套(5)之间焊接有纵向杆(7),所述纵向杆(7)贯穿所述长孔(6),所述纵向杆(7)的表面活动套设有移动板(8),所述纵向杆(7)的表面固定套设有固定板(9),所述固定板(9)通过第一电动推杆(10)连接所述移动板(8),所述移动板(8)的一端设置有夹紧机构(11),所述箱体(2)的表面通过螺栓连接有控制器(12)。1. An installation device for prefabricated wall panel construction, characterized in that: it includes a bottom plate (1), and two boxes (2) are welded symmetrically on the left and right sides of the upper end surface of the bottom plate (1), and the box body The top of (2) is connected with a first motor (3) by bolts, and the rotating shaft of the first motor (3) penetrates into the inner cavity of the box (2) and is fixedly connected with a threaded rod (4). The threaded sleeve on the surface of the threaded rod (4) is provided with a threaded sleeve (5), and the two opposite sides of the two boxes (2) are provided with long holes (6), which are located in the two boxes (2) ) is welded with a longitudinal rod (7) between the two opposite threaded sleeves (5), the longitudinal rod (7) runs through the long hole (6), and the surface movable sleeve of the longitudinal rod (7) A moving plate (8) is provided, and the surface of the longitudinal rod (7) is fixedly covered with a fixed plate (9), and the fixed plate (9) is connected to the moving plate (8) through the first electric push rod (10) ), one end of the moving plate (8) is provided with a clamping mechanism (11), and the surface of the box (2) is connected with a controller (12) by bolts. 2.根据权利要求1所述的一种装配式墙板施工用安装装置,其特征在于:所述夹紧机构(11)包括第二电动推杆(13),所述第二电动推杆(13)的左端通过支块与所述移动板(8)固定连接,所述第二电动推杆(13)的右端通过支块固定连接有移动杆(14),所述移动杆(14)的外侧端设置有第二电机(15),所述第二电机(15)的转轴贯穿所述移动杆(14)并固定连接有U型板(16),所述U型板(16)的顶部贯穿设置有第三电动推杆(17),所述第三电动推杆(17)的底部固定连接有压板(18),所述第一电机(3)、所述第二电机(15)、所述第一电动推杆(10)、所述第二电动推杆(13)和所述第三电动推杆(17)均电连接所述控制器(12)。2. The installation device for prefabricated wall panel construction according to claim 1, characterized in that: the clamping mechanism (11) includes a second electric push rod (13), and the second electric push rod ( The left end of 13) is fixedly connected with the moving plate (8) through a support block, and the right end of the second electric push rod (13) is fixedly connected with a moving rod (14) through a supporting block, and the moving rod (14) The outer end is provided with a second motor (15), the rotating shaft of the second motor (15) passes through the moving rod (14) and is fixedly connected with a U-shaped plate (16), and the top of the U-shaped plate (16) A third electric push rod (17) is installed through it, and a pressing plate (18) is fixedly connected to the bottom of the third electric push rod (17). The first motor (3), the second motor (15), The first electric push rod (10), the second electric push rod (13) and the third electric push rod (17) are all electrically connected to the controller (12). 3.根据权利要求2所述的一种装配式墙板施工用安装装置,其特征在于:所述压板(18)的底部设置有防滑纹,所述移动杆(14)的左端延伸至所述移动板(8)的内腔并与所述移动板(8)活动连接。3. The installation device for prefabricated wall panel construction according to claim 2, characterized in that: the bottom of the pressing plate (18) is provided with anti-slip lines, and the left end of the moving rod (14) extends to the The inner cavity of the moving plate (8) is movably connected with the moving plate (8). 4.根据权利要求1所述的一种装配式墙板施工用安装装置,其特征在于:所述箱体(2)内腔中还设有与所述螺纹杆(4)平行的导向杆(19),所述导向杆(19)的表面套设有导向套(20),位于两个所述箱体(2)中相对的两个所述导向套(20)之间焊接有平衡杆(21),所述平衡杆(21)的一端依次贯穿所述长孔(6)、所述固定板(9)和所述移动板(8),所述平衡杆(21)与所述固定板(9)固定连接,所述平衡杆(21)与所述移动板(8)活动连接。4. The installation device for prefabricated wall panel construction according to claim 1, characterized in that: the inner cavity of the box body (2) is also provided with a guide rod parallel to the threaded rod (4) ( 19), the surface of the guide rod (19) is covered with a guide sleeve (20), and a balance bar ( 21), one end of the balance bar (21) runs through the long hole (6), the fixed plate (9) and the moving plate (8) in turn, the balance bar (21) and the fixed plate (9) Fixedly connected, the balance bar (21) is movably connected with the moving plate (8). 5.根据权利要求1所述的一种装配式墙板施工用安装装置,其特征在于:所述底板(1)底部的四角均通过螺栓连接有万向轮(22),所述万向轮(22)的一侧活动连接有刹车块。5. The installation device for prefabricated wall panel construction according to claim 1, characterized in that: the four corners of the bottom of the bottom plate (1) are all connected with universal wheels (22) by bolts, and the universal wheels One side of (22) is movably connected with brake block. 6.根据权利要求1所述的一种装配式墙板施工用安装装置,其特征在于:所述底板(1)上端面位于所述箱体(2)的左侧固定连接有配重箱(23),所述配重箱(23)的内腔放置有配重块(24),所述配重块(24)的顶部焊接有把手。6. The installation device for prefabricated wall panel construction according to claim 1, characterized in that: the upper end surface of the bottom plate (1) is located on the left side of the box body (2) and is fixedly connected with a counterweight box (23 ), the inner cavity of the counterweight box (23) is placed with a counterweight (24), and the top of the counterweight (24) is welded with a handle.
CN202222838234.6U 2022-08-08 2022-10-27 Installation device is used in construction of assembled wallboard Active CN219431280U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202222076032 2022-08-08
CN2022220760322 2022-08-08

Publications (1)

Publication Number Publication Date
CN219431280U true CN219431280U (en) 2023-07-28

Family

ID=87333392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222838234.6U Active CN219431280U (en) 2022-08-08 2022-10-27 Installation device is used in construction of assembled wallboard

Country Status (1)

Country Link
CN (1) CN219431280U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117027439A (en) * 2023-09-15 2023-11-10 中国十七冶集团有限公司 Auxiliary connecting device and connecting method for assembled components
CN117208818A (en) * 2023-09-14 2023-12-12 青建集团股份公司 A kind of lifting equipment suitable for the installation of the main structure of partition walls

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117208818A (en) * 2023-09-14 2023-12-12 青建集团股份公司 A kind of lifting equipment suitable for the installation of the main structure of partition walls
CN117027439A (en) * 2023-09-15 2023-11-10 中国十七冶集团有限公司 Auxiliary connecting device and connecting method for assembled components

Similar Documents

Publication Publication Date Title
CN203475853U (en) Light wall board construction work vehicle
CN219431280U (en) Installation device is used in construction of assembled wallboard
CN209143545U (en) Boom hoisting is used in ventilation shaft installation
CN113788413A (en) A kind of highway steel box girder stable hoisting equipment and hoisting construction method
CN111519500A (en) Telescopic concrete road trowelling machine
CN112373548A (en) ALC panel installation auxiliary device
CN217497889U (en) Brick clamping device convenient for loading finished concrete bricks
CN209163729U (en) A kind of hole-forming device of the soil nail wall with locomotive function
CN214134619U (en) A double-girder crane beam box assembly device
CN219569621U (en) Assistant installation equipment for assembled building wallboard
CN218810003U (en) U type groove prefab installation hoisting accessory
CN216503553U (en) Clamping device convenient to adjust and used for machining tower crane lifting hook
CN218201778U (en) A prefabricated building wall panel hoisting device
CN212151383U (en) Novel concrete precast slab is with upset device
CN219100877U (en) A stable lifting device for a car lifting platform
CN221565623U (en) Fixed support for crane
CN210884982U (en) An upper module gantry composition unit for escalator
CN221875762U (en) PC coincide floor stacking machine
CN221742071U (en) External wall panel hoisting positioning device
CN224105480U (en) Portable small-size material hoisting device is used on building site
CN216566499U (en) A new type of high-speed elevator
CN219279314U (en) Hoisting machinery limit switch detection device
CN221641369U (en) Wall perforating device for construction
CN221343795U (en) A mechanical and electrical equipment support device that is easy to install
CN220564247U (en) A movable lifting mechanism that facilitates loading and unloading

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant