CN219430872U - Hydraulic engineering dredging device - Google Patents

Hydraulic engineering dredging device Download PDF

Info

Publication number
CN219430872U
CN219430872U CN202320316354.1U CN202320316354U CN219430872U CN 219430872 U CN219430872 U CN 219430872U CN 202320316354 U CN202320316354 U CN 202320316354U CN 219430872 U CN219430872 U CN 219430872U
Authority
CN
China
Prior art keywords
rod
bevel gear
dredging
water conservancy
slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320316354.1U
Other languages
Chinese (zh)
Inventor
凌志媚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Yajiushan Construction Engineering Co ltd
Original Assignee
Jiangxi Linyue Traffic Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Linyue Traffic Engineering Co ltd filed Critical Jiangxi Linyue Traffic Engineering Co ltd
Priority to CN202320316354.1U priority Critical patent/CN219430872U/en
Application granted granted Critical
Publication of CN219430872U publication Critical patent/CN219430872U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

本实用新型公开了一种水利工程清淤装置,包括:浮筒和移动结构;所述浮筒侧面安装有移动结构,所述浮筒之间连接有固定杆,所述固定杆上连接有固定结构,所述固定结构上连接有清淤泵。该水利工程清淤装置,内螺纹套筒螺纹滑动的同时可以带动滑轮进行移动,当滑轮移出收藏槽内部时会与地面产生接触,滑轮与地面产生接触时可将清淤装置撑起,清淤装置撑起后可以通过滑轮进行移动,方便清淤装置在需要时可以进行移动,当内螺纹插块的侧面滑出插槽内部时可以对清淤泵进行拉动,清淤泵受到拉动时可以带动安装块进行移动,安装块移动时可以通过卡槽与固定杆进行滑动分离,方便清淤泵在维修时可以进行快速拆卸。

The utility model discloses a dredging device for a water conservancy project, which comprises: buoys and a moving structure; a moving structure is installed on the side of the buoys; a fixed rod is connected between the buoys; A dredging pump is connected to the fixed structure. In this dredging device for water conservancy projects, the inner threaded sleeve can drive the pulley to move while the thread slides. When the pulley moves out of the storage tank, it will come into contact with the ground. When the pulley contacts the ground, the dredging device can be propped up and dredged After the device is propped up, it can be moved by pulleys, so that the dredging device can be moved when needed. When the side of the internal thread insert slides out of the slot, the dredging pump can be pulled, and the dredging pump can be driven when pulled The installation block moves, and when the installation block moves, it can be slid and separated from the fixed rod through the card slot, so that the dredging pump can be quickly disassembled during maintenance.

Description

一种水利工程清淤装置A water conservancy project dredging device

技术领域technical field

本实用新型涉及水利工程技术领域,具体为一种水利工程清淤装置。The utility model relates to the technical field of water conservancy engineering, in particular to a dredging device for water conservancy engineering.

背景技术Background technique

水利工程是指为了控制、调节和利用自然界的地面水和地下水,以达到除害兴利的目的而兴建的各种工程。水利工程按其服务对象可以分为防洪工程,堤防、水库、蓄滞分洪区、涵闸、排水工程等、农田水利工程(灌溉工程)、水力发电工程、航运及城市供水、排水工程,现有的水利工程清淤装置在使用时还存在一定缺陷,就比如;Water conservancy projects refer to various projects built to control, regulate and utilize natural surface water and groundwater to achieve the purpose of eliminating harm and rejuvenating profits. Water conservancy projects can be divided into flood control projects, dikes, reservoirs, flood storage and diversion areas, culverts, drainage projects, etc., farmland water conservancy projects (irrigation projects), hydropower projects, shipping and urban water supply and drainage projects, existing There are still some defects in the use of water conservancy dredging equipment, such as;

现有的水利工程是指防洪、排涝、灌溉、水力发电、引(供)水、滩涂治理、水土保持、水资源保护、河道清淤等各类工程,河道清淤一般指治理河道,河道清淤主要的任务是将沉积河底的淤泥进行清理,通过机械设备将河道内的淤泥进行抽取清理,传统的清淤装置是将清淤泵安装在固定杆上,固定杆的两端连接在浮筒上,浮筒可以在水面上漂浮,清淤泵可以对河底的淤泥进行抽送清理,一般清淤装置在使用时是通过车辆运输到河边,再由工作人员搬运到河里,工作人员搬运非常的麻烦,且需要由多人进行操作,非常的浪费人力,清淤装置不方便移动。Existing water conservancy projects refer to various projects such as flood control, drainage, irrigation, hydropower generation, water diversion (supply), tidal flat treatment, water and soil conservation, water resource protection, and river dredging. The main task of silting is to clean up the silt deposited on the bottom of the river, and to pump and clean the silt in the river channel through mechanical equipment. The traditional dredging device is to install the dredging pump on the fixed rod, and the two ends of the fixed rod are connected to the buoy. In addition, the buoy can float on the water surface, and the dredging pump can pump and clean the silt at the bottom of the river. Generally, the dredging device is transported to the river by vehicles when it is in use, and then transported to the river by the staff. It is troublesome, and it needs to be operated by many people, which is a waste of manpower, and the dredging device is inconvenient to move.

实用新型内容Utility model content

本实用新型提供如下技术方案:本实用新型的目的在于提供一种水利工程清淤装置,以解决上述背景技术提出的目前市场上的水利工程清淤装置存在许多缺陷,不方便移动,不方便检修的问题。The utility model provides the following technical solutions: the purpose of the utility model is to provide a dredging device for water conservancy projects, so as to solve the problems in the dredging devices for water conservancy projects on the market proposed by the above-mentioned background technology, which are inconvenient to move and overhaul The problem.

为实现上述目的,本实用新型提供如下技术方案:一种水利工程清淤装置,包括:浮筒和移动结构;In order to achieve the above purpose, the utility model provides the following technical solutions: a dredging device for water conservancy projects, including: a buoy and a moving structure;

所述浮筒侧面安装有移动结构,所述浮筒之间连接有固定杆,所述固定杆上连接有固定结构,所述固定结构上连接有清淤泵。A moving structure is installed on the side of the buoys, a fixed rod is connected between the buoys, a fixed structure is connected to the fixed rod, and a dredging pump is connected to the fixed structure.

优选的,所述移动结构还设置有固定块、收藏槽、螺纹杆、转动盘、内螺纹套筒、导向板、导向杆、限位块与滑轮;Preferably, the moving structure is also provided with a fixed block, a storage groove, a threaded rod, a rotating disc, an internally threaded sleeve, a guide plate, a guide rod, a limit block and a pulley;

所述固定块固定连接在浮筒的侧面,所述固定块底部开设有收藏槽。The fixed block is fixedly connected to the side of the buoy, and a storage groove is opened at the bottom of the fixed block.

优选的,所述收藏槽内部贯穿转动连接有螺纹杆,所述螺纹杆顶端固定连接有转动盘;Preferably, a threaded rod is rotatably connected inside the storage tank, and a rotating disk is fixedly connected to the top of the threaded rod;

所述螺纹杆侧面螺纹连接有内螺纹套筒,所述内螺纹套筒的顶端固定连接有导向板。The side of the threaded rod is threadedly connected with an internally threaded sleeve, and the top end of the internally threaded sleeve is fixedly connected with a guide plate.

优选的,所述导向板与收藏槽之间贯穿连接有导向杆,所述导向杆底端固定连接有限位块;Preferably, a guide rod is connected between the guide plate and the storage slot, and the bottom end of the guide rod is fixedly connected with a limit block;

所述内螺纹套筒底端安装有滑轮。A pulley is installed at the bottom end of the internally threaded sleeve.

优选的,所述固定结构还设置有操作槽、旋钮、第一锥齿轮、旋转杆、第二锥齿轮、第三锥齿轮、连接槽、螺杆、第四锥齿轮、内螺纹插块、安装块、卡槽与插槽;Preferably, the fixed structure is also provided with an operation slot, a knob, a first bevel gear, a rotating rod, a second bevel gear, a third bevel gear, a connecting groove, a screw rod, a fourth bevel gear, an internal thread insert block, and a mounting block , card slot and slot;

所述操作槽开设在固定杆的内部,所述操作槽内部贯穿转动连接有旋钮。The operation slot is opened inside the fixed rod, and a knob is connected to the inside of the operation slot for rotation.

优选的,所述旋钮的端部固定连接有第一锥齿轮,所述操作槽内部转动连接有旋转杆;Preferably, the end of the knob is fixedly connected with a first bevel gear, and the inside of the operation slot is rotatably connected with a rotating rod;

所述旋转杆与第一锥齿轮之间连接有第二锥齿轮,所述旋转杆侧面固定连接有第三锥齿轮。A second bevel gear is connected between the rotating rod and the first bevel gear, and a third bevel gear is fixedly connected to the side of the rotating rod.

优选的,所述连接槽开设在固定杆的侧面,所述连接槽内部贯穿转动连接有螺杆;Preferably, the connection groove is opened on the side of the fixed rod, and the inside of the connection groove is rotatably connected with a screw;

所述螺杆与第三锥齿轮之间连接有第四锥齿轮,所述螺杆与连接槽之间连接有内螺纹插块。A fourth bevel gear is connected between the screw rod and the third bevel gear, and an internal thread insert is connected between the screw rod and the connecting groove.

优选的,所述清淤泵侧面固定连接有安装块,所述安装块底部开设有卡槽;Preferably, a mounting block is fixedly connected to the side of the dredging pump, and a slot is provided at the bottom of the mounting block;

所述卡槽卡合连接在固定杆的侧面,所述卡槽内壁开设有插槽。The card slot is engaged and connected to the side of the fixing rod, and the inner wall of the card slot is provided with a slot.

与现有技术相比,本实用新型的有益效果是:该水利工程清淤装置,内螺纹套筒螺纹滑动的同时可以带动滑轮进行移动,当滑轮移出收藏槽内部时会与地面产生接触,滑轮与地面产生接触时可将清淤装置撑起,清淤装置撑起后可以通过滑轮进行移动,方便清淤装置在需要时可以进行移动,当内螺纹插块的侧面滑出插槽内部时可以对清淤泵进行拉动,清淤泵受到拉动时可以带动安装块进行移动,安装块移动时可以通过卡槽与固定杆进行滑动分离,方便清淤泵在维修时可以进行快速拆卸。Compared with the prior art, the beneficial effect of the utility model is that the dredging device for water conservancy projects can drive the pulley to move while the inner threaded sleeve slides. When the pulley moves out of the storage tank, it will come into contact with the ground. When it comes into contact with the ground, the dredging device can be propped up. After the dredging device is propped up, it can be moved by the pulley, which is convenient for the dredging device to move when needed. When the side of the internal thread insert slides out of the slot, it can Pull the dredging pump. When the dredging pump is pulled, it can drive the installation block to move. When the installation block moves, it can slide and separate from the fixed rod through the card slot, so that the dredging pump can be quickly disassembled during maintenance.

1.当河道需要清淤时可以通过车辆两清淤装置运输到河边,然后可以对转动盘进行转动,转动盘转动时可以带动螺纹杆进行转动,螺纹杆转动时可以通过收藏槽进行旋转,螺纹杆旋转时可以带动内螺纹套筒进行螺纹滑动,内螺纹套筒螺纹滑动时可以带动导向板进行移动,导向板移动时可以通过导向杆进行导向滑动,内螺纹套筒螺纹滑动的同时可以带动滑轮进行移动,当滑轮移出收藏槽内部时会与地面产生接触,滑轮与地面产生接触时可将清淤装置撑起,清淤装置撑起后可以通过滑轮进行移动,方便清淤装置在需要时可以进行移动;1. When the river needs to be dredged, it can be transported to the riverside through the two dredging devices of the vehicle, and then the rotating disk can be rotated. When the rotating disk rotates, it can drive the threaded rod to rotate. When the threaded rod rotates, it can rotate through the storage tank. When the threaded rod rotates, it can drive the inner threaded sleeve to slide. When the inner threaded sleeve is threaded, it can drive the guide plate to move. When the guide plate moves, it can be guided and slid through the guide rod. The pulley moves, and when the pulley moves out of the storage tank, it will contact the ground. When the pulley contacts the ground, the dredging device can be propped up. After the dredging device is propped up, it can be moved by the pulley, which is convenient for the dredging device when needed. can move

2.清淤泵长时间的进行清淤工作会产生损坏,清淤泵损坏后需要进行拆卸维修,转动旋钮可以带动第一锥齿轮进行转动,第一锥齿轮转动时可以带动旋转杆、第二锥齿轮、第三锥齿轮与第四锥齿轮进行联动,第四锥齿轮转动时可以带动螺杆进行转动,螺杆转动时可以通过连接槽进行旋转,螺杆旋转时可以带动内螺纹插块进行螺纹滑动,内螺纹插块螺纹滑动时可以通过连接槽与插槽进行滑动,当内螺纹插块的侧面滑出插槽内部时可以对清淤泵进行拉动,清淤泵受到拉动时可以带动安装块进行移动,安装块移动时可以通过卡槽与固定杆进行滑动分离,方便清淤泵在维修时可以进行快速拆卸。2. The dredging pump will be damaged if the dredging work is carried out for a long time. After the dredging pump is damaged, it needs to be disassembled for maintenance. Turning the knob can drive the first bevel gear to rotate. When the first bevel gear rotates, it can drive the rotating rod and the second bevel gear. The bevel gear, the third bevel gear and the fourth bevel gear are linked. When the fourth bevel gear rotates, it can drive the screw to rotate. When the screw rotates, it can rotate through the connecting groove. When the screw rotates, it can drive the internal thread insert to slide. When the thread of the internal thread insert slides, it can slide through the connecting groove and the slot. When the side of the internal thread insert slides out of the slot, it can pull the dredging pump. When the dredging pump is pulled, it can drive the installation block to move , When the installation block moves, it can slide and separate from the fixed rod through the card slot, so that the dredging pump can be quickly disassembled during maintenance.

附图说明Description of drawings

图1为本实用新型前视结构示意图;Fig. 1 is a schematic diagram of the front view structure of the utility model;

图2为本实用新型前视剖面结构示意图;Fig. 2 is a schematic diagram of the front view section structure of the utility model;

图3为本实用新型侧视剖面结构示意图;Fig. 3 is the utility model side view sectional structure schematic diagram;

图4为本实用新型移动结构剖面放大结构示意图;Fig. 4 is a schematic diagram of the enlarged structure of the mobile structure section of the utility model;

图5为本实用新型A部放大结构示意图;Fig. 5 is the schematic diagram of enlarged structure of part A of the utility model;

图6为本实用新型B部放大结构示意图。Fig. 6 is a schematic diagram of enlarged structure of part B of the utility model.

图中:1、浮筒;2、移动结构;201、固定块;202、收藏槽;203、螺纹杆;204、转动盘;205、内螺纹套筒;206、导向板;207、导向杆;208、限位块;209、滑轮;3、固定杆;4、固定结构;401、操作槽;402、旋钮;403、第一锥齿轮;404、旋转杆;405、第二锥齿轮;406、第三锥齿轮;407、连接槽;408、螺杆;409、第四锥齿轮;410、内螺纹插块;411、安装块;412、卡槽;413、插槽;5、清淤泵。Among the figure: 1, buoy; 2, moving structure; 201, fixed block; 202, storage tank; 203, threaded rod; 204, rotating disk; 205, internal thread sleeve; 206, guide plate; 207, guide rod; , limit block; 209, pulley; 3, fixed rod; 4, fixed structure; 401, operation groove; 402, knob; 403, first bevel gear; 404, rotating rod; 405, second bevel gear; 406, the first 407, connection groove; 408, screw rod; 409, fourth bevel gear; 410, internal thread insert block; 411, installation block; 412, card slot; 413, slot; 5, dredging pump.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

请参阅图1-3,本实用新型提供一种技术方案:一种水利工程清淤装置,包括:浮筒1和移动结构2;Please refer to Figures 1-3, the utility model provides a technical solution: a dredging device for water conservancy projects, including: a buoy 1 and a moving structure 2;

浮筒1侧面安装有移动结构2,浮筒1之间连接有固定杆3,固定杆3上连接有固定结构4,固定结构4上连接有清淤泵5。A mobile structure 2 is installed on the side of the buoy 1, and a fixed rod 3 is connected between the buoys 1, and a fixed structure 4 is connected to the fixed rod 3, and a dredging pump 5 is connected to the fixed structure 4.

移动结构2还设置有固定块201、收藏槽202、螺纹杆203、转动盘204、内螺纹套筒205、导向板206、导向杆207、限位块208与滑轮209,固定块201固定连接在浮筒1的侧面,固定块201底部开设有收藏槽202,螺纹杆203转动时可以通过收藏槽202进行旋转。The mobile structure 2 is also provided with a fixed block 201, a storage groove 202, a threaded rod 203, a rotating disc 204, an internally threaded sleeve 205, a guide plate 206, a guide rod 207, a limit block 208 and a pulley 209, and the fixed block 201 is fixedly connected to the The side of the buoy 1 and the bottom of the fixed block 201 are provided with a storage groove 202, and the threaded rod 203 can rotate through the storage groove 202 when rotating.

收藏槽202内部贯穿转动连接有螺纹杆203,螺纹杆203顶端固定连接有转动盘204,当河道需要清淤时可以通过车辆两清淤装置运输到河边,然后可以对转动盘204进行转动,转动盘204转动时可以带动螺纹杆203进行转动,螺纹杆203侧面螺纹连接有内螺纹套筒205,螺纹杆203旋转时可以带动内螺纹套筒205进行螺纹滑动,内螺纹套筒205的顶端固定连接有导向板206,内螺纹套筒205螺纹滑动时可以带动导向板206进行移动。The inside of the storage tank 202 is connected with a threaded rod 203 for rotation, and the top of the threaded rod 203 is fixedly connected with a rotating disc 204. When the river needs to be dredged, it can be transported to the riverside by two dredging devices of the vehicle, and then the rotating disc 204 can be rotated. When the rotating disc 204 rotates, it can drive the threaded rod 203 to rotate. The threaded rod 203 side is threadedly connected with an internally threaded sleeve 205. When the threaded rod 203 rotates, it can drive the internally threaded sleeve 205 to slide, and the top of the internally threaded sleeve 205 is fixed. A guide plate 206 is connected, and the inner threaded sleeve 205 can drive the guide plate 206 to move when the thread slides.

导向板206与收藏槽202之间贯穿连接有导向杆207,导向板206移动时可以通过导向杆207进行导向滑动,导向杆207底端固定连接有限位块208,内螺纹套筒205底端安装有滑轮209,内螺纹套筒205螺纹滑动的同时可以带动滑轮209进行移动,当滑轮209移出收藏槽202内部时会与地面产生接触,滑轮209与地面产生接触时可将清淤装置撑起,清淤装置撑起后可以通过滑轮209进行移动。There is a guide rod 207 connected between the guide plate 206 and the storage groove 202. When the guide plate 206 moves, the guide rod 207 can be used to guide and slide. There is a pulley 209, and the internally threaded sleeve 205 can drive the pulley 209 to move while the thread slides. When the pulley 209 moves out of the storage tank 202, it will come into contact with the ground. When the pulley 209 comes into contact with the ground, the dredging device can be propped up. The dredging device can be moved by pulley 209 after propped up.

固定结构4还设置有操作槽401、旋钮402、第一锥齿轮403、旋转杆404、第二锥齿轮405、第三锥齿轮406、连接槽407、螺杆408、第四锥齿轮409、内螺纹插块410、安装块411、卡槽412与插槽413,操作槽401开设在固定杆3的内部,操作槽401内部贯穿转动连接有旋钮402,旋钮402转动时可以通过操作槽401进行旋转。The fixed structure 4 is also provided with an operation groove 401, a knob 402, a first bevel gear 403, a rotating rod 404, a second bevel gear 405, a third bevel gear 406, a connecting groove 407, a screw rod 408, a fourth bevel gear 409, an internal thread Inserting block 410, mounting block 411, draw-in slot 412 and slot 413, operating slot 401 is provided in the inside of fixed rod 3, and operating slot 401 inside runs through and is connected with knob 402 for rotation, and can rotate through operating slot 401 when knob 402 rotates.

旋钮402的端部固定连接有第一锥齿轮403,转动旋钮402可以带动第一锥齿轮403进行转动,操作槽401内部转动连接有旋转杆404,第二锥齿轮405转动时可以带动旋转杆404进行转动,旋转杆404转动时可以通过操作槽401进行旋转,旋转杆404与第一锥齿轮403之间连接有第二锥齿轮405,第一锥齿轮403转动时可以带动第二锥齿轮405进行转动,旋转杆404侧面固定连接有第三锥齿轮406,旋转杆404转动时可以带动第三锥齿轮406进行转动。The end of the knob 402 is fixedly connected with the first bevel gear 403, turning the knob 402 can drive the first bevel gear 403 to rotate, the inside of the operation groove 401 is connected with the rotation rod 404, and the rotation of the second bevel gear 405 can drive the rotation rod 404 To rotate, the rotating rod 404 can be rotated through the operation groove 401 when rotating, the second bevel gear 405 is connected between the rotating rod 404 and the first bevel gear 403, and the second bevel gear 405 can be driven when the first bevel gear 403 rotates. Rotate, the side of the rotating rod 404 is fixedly connected with the third bevel gear 406, when the rotating rod 404 rotates, it can drive the third bevel gear 406 to rotate.

连接槽407开设在固定杆3的侧面,连接槽407内部贯穿转动连接有螺杆408,第四锥齿轮409转动时可以带动螺杆408进行转动,螺杆408转动时可以通过连接槽407进行旋转,螺杆408与第三锥齿轮406之间连接有第四锥齿轮409,第三锥齿轮406转动时可以带动第四锥齿轮409进行转动,螺杆408与连接槽407之间连接有内螺纹插块410,螺杆408旋转时可以带动内螺纹插块410进行螺纹滑动,内螺纹插块410螺纹滑动时可以通过连接槽407与插槽413进行滑动。The connecting groove 407 is provided on the side of the fixed rod 3, and the inside of the connecting groove 407 is connected with a screw rod 408 for rotation. When the fourth bevel gear 409 rotates, it can drive the screw rod 408 to rotate. When the screw rod 408 rotates, it can rotate through the connecting groove 407. The screw rod 408 A fourth bevel gear 409 is connected with the third bevel gear 406. When the third bevel gear 406 rotates, it can drive the fourth bevel gear 409 to rotate. An internal thread insert 410 is connected between the screw rod 408 and the connecting groove 407. The screw rod When 408 rotates, it can drive the internal thread insert 410 to slide. When the internal thread insert 410 slides, it can slide through the connecting groove 407 and the slot 413 .

清淤泵5侧面固定连接有安装块411,安装块411底部开设有卡槽412,清淤泵5受到拉动时可以带动安装块411进行移动,安装块411移动时可以通过卡槽412与固定杆3进行滑动分离,卡槽412卡合连接在固定杆3的侧面,卡槽412内壁开设有插槽413,当内螺纹插块410的侧面滑出插槽413内部时可以对清淤泵5进行拉动。The side of the dredging pump 5 is fixedly connected with an installation block 411, and the bottom of the installation block 411 is provided with a slot 412. When the dredging pump 5 is pulled, the installation block 411 can be driven to move, and the installation block 411 can pass through the slot 412 and the fixed rod when moving. 3 to slide and separate, the card slot 412 is snapped and connected to the side of the fixed rod 3, and the inner wall of the card slot 412 is provided with a slot 413, when the side of the internal thread insert 410 slides out of the slot 413, the dredging pump 5 can be carried out. pull.

工作原理:在使用该水利工程清淤装置时,首先当河道需要清淤时可以通过车辆两清淤装置运输到河边,然后可以对转动盘204进行转动,转动盘204转动时可以带动螺纹杆203进行转动,螺纹杆203转动时可以通过收藏槽202进行旋转,螺纹杆203旋转时可以带动内螺纹套筒205进行螺纹滑动,内螺纹套筒205螺纹滑动时可以带动导向板206进行移动,导向板206移动时可以通过导向杆207进行导向滑动,内螺纹套筒205螺纹滑动的同时可以带动滑轮209进行移动,当滑轮209移出收藏槽202内部时会与地面产生接触,滑轮209与地面产生接触时可将清淤装置撑起,清淤装置撑起后可以通过滑轮209进行移动,使清淤装置在需要时可以进行移动,当清淤装置移动到河里时可以通过清淤泵5进行清淤,清淤泵5长时间的进行清淤工作会产生损坏,清淤泵5损坏后需要进行拆卸维修,转动旋钮402可以带动第一锥齿轮403进行转动,第一锥齿轮403转动时可以带动旋转杆404、第二锥齿轮405、第三锥齿轮406与第四锥齿轮409进行联动,第四锥齿轮409转动时可以带动螺杆408进行转动,螺杆408转动时可以通过连接槽407进行旋转,螺杆408旋转时可以带动内螺纹插块410进行螺纹滑动,内螺纹插块410螺纹滑动时可以通过连接槽407与插槽413进行滑动,当内螺纹插块410的侧面滑出插槽413内部时可以对清淤泵5进行拉动,清淤泵5受到拉动时可以带动安装块411进行移动,安装块411移动时可以通过卡槽412与固定杆3进行滑动分离,方便清淤泵5在维修时可以进行快速拆卸,本说明中未作详细描述的内容属于本领域专业技术人员公知的现有技术。Working principle: When using the dredging device for water conservancy projects, first when the river channel needs to be dredged, it can be transported to the river by the two dredging devices of the vehicle, and then the rotating disc 204 can be rotated, and the threaded rod can be driven when the rotating disc 204 rotates 203 rotates, threaded rod 203 can rotate through storage groove 202 when rotating, and threaded rod 203 can drive internal thread sleeve 205 to carry out thread sliding when threaded rod 203 rotates, and internal thread sleeve 205 can drive guide plate 206 to move when thread sliding, guiding When the plate 206 moves, it can be guided and slid by the guide rod 207, and the internally threaded sleeve 205 can drive the pulley 209 to move while the thread slides. When the pulley 209 moves out of the storage tank 202, it will come into contact with the ground, and the pulley 209 will come into contact with the ground. When the dredging device can be propped up, the dredging device can be moved by the pulley 209 after the dredging device is propped up, so that the dredging device can be moved when needed. Desilting, the desilting pump 5 will be damaged if the desilting work is carried out for a long time. After the desilting pump 5 is damaged, it needs to be disassembled and repaired. Turning the knob 402 can drive the first bevel gear 403 to rotate. When the first bevel gear 403 rotates, it can drive The rotating rod 404, the second bevel gear 405, the third bevel gear 406 and the fourth bevel gear 409 are linked. When the fourth bevel gear 409 rotates, it can drive the screw rod 408 to rotate. When the screw rod 408 rotates, it can rotate through the connecting groove 407. When the screw 408 rotates, it can drive the internally threaded insert 410 to slide. When the internally threaded insert 410 slides, it can slide through the connection groove 407 and the slot 413. When the side of the internally threaded insert 410 slides out of the slot 413 The dredging pump 5 can be pulled. When the dredging pump 5 is pulled, it can drive the installation block 411 to move. When the installation block 411 moves, it can slide and separate from the fixed rod 3 through the slot 412, which is convenient for the dredging pump 5 during maintenance. Quick disassembly is possible, and the content not described in detail in this specification belongs to the prior art known to those skilled in the art.

尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Although the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments, or perform equivalent replacements for some of the technical features. Within the spirit and principles of the utility model, any modification, equivalent replacement, improvement, etc., should be included in the protection scope of the utility model.

Claims (8)

1.一种水利工程清淤装置,包括:浮筒(1)和移动结构(2),其特征在于;1. A dredging device for water conservancy projects, comprising: a buoy (1) and a mobile structure (2), characterized in that; 所述浮筒(1)侧面安装有移动结构(2),所述浮筒(1)之间连接有固定杆(3),所述固定杆(3)上连接有固定结构(4),所述固定结构(4)上连接有清淤泵(5)。A moving structure (2) is installed on the side of the buoy (1), a fixed rod (3) is connected between the buoys (1), and a fixed structure (4) is connected to the fixed rod (3). The structure (4) is connected with a dredging pump (5). 2.根据权利要求1所述的一种水利工程清淤装置,其特征在于:所述移动结构(2)还设置有固定块(201)、收藏槽(202)、螺纹杆(203)、转动盘(204)、内螺纹套筒(205)、导向板(206)、导向杆(207)、限位块(208)与滑轮(209);2. A dredging device for water conservancy projects according to claim 1, characterized in that: the moving structure (2) is also provided with a fixed block (201), a storage tank (202), a threaded rod (203), a rotating Disk (204), internal thread sleeve (205), guide plate (206), guide rod (207), limit block (208) and pulley (209); 所述固定块(201)固定连接在浮筒(1)的侧面,所述固定块(201)底部开设有收藏槽(202)。The fixed block (201) is fixedly connected to the side of the buoy (1), and a storage groove (202) is opened at the bottom of the fixed block (201). 3.根据权利要求2所述的一种水利工程清淤装置,其特征在于:所述收藏槽(202)内部贯穿转动连接有螺纹杆(203),所述螺纹杆(203)顶端固定连接有转动盘(204);3. A dredging device for water conservancy projects according to claim 2, characterized in that: the inside of the storage tank (202) is connected with a threaded rod (203) for rotation, and the top of the threaded rod (203) is fixedly connected with a rotating disc (204); 所述螺纹杆(203)侧面螺纹连接有内螺纹套筒(205),所述内螺纹套筒(205)的顶端固定连接有导向板(206)。The side of the threaded rod (203) is threadedly connected with an internally threaded sleeve (205), and the top end of the internally threaded sleeve (205) is fixedly connected with a guide plate (206). 4.根据权利要求2所述的一种水利工程清淤装置,其特征在于:所述导向板(206)与收藏槽(202)之间贯穿连接有导向杆(207),所述导向杆(207)底端固定连接有限位块(208);4. The desilting device for water conservancy projects according to claim 2, characterized in that: a guide rod (207) runs through and connects between the guide plate (206) and the storage tank (202), and the guide rod ( 207) The bottom end is fixedly connected to the limit block (208); 所述内螺纹套筒(205)底端安装有滑轮(209)。A pulley (209) is installed at the bottom end of the internally threaded sleeve (205). 5.根据权利要求1所述的一种水利工程清淤装置,其特征在于:所述固定结构(4)还设置有操作槽(401)、旋钮(402)、第一锥齿轮(403)、旋转杆(404)、第二锥齿轮(405)、第三锥齿轮(406)、连接槽(407)、螺杆(408)、第四锥齿轮(409)、内螺纹插块(410)、安装块(411)、卡槽(412)与插槽(413);5. A dredging device for water conservancy projects according to claim 1, characterized in that: the fixed structure (4) is also provided with an operation slot (401), a knob (402), a first bevel gear (403), Rotating rod (404), second bevel gear (405), third bevel gear (406), connecting groove (407), screw rod (408), fourth bevel gear (409), internal thread insert (410), installation block (411), card slot (412) and slot (413); 所述操作槽(401)开设在固定杆(3)的内部,所述操作槽(401)内部贯穿转动连接有旋钮(402)。The operation slot (401) is opened inside the fixed rod (3), and a knob (402) is connected to the inside of the operation slot (401) for rotation. 6.根据权利要求5所述的一种水利工程清淤装置,其特征在于:所述旋钮(402)的端部固定连接有第一锥齿轮(403),所述操作槽(401)内部转动连接有旋转杆(404);6. A dredging device for water conservancy projects according to claim 5, characterized in that: the end of the knob (402) is fixedly connected with a first bevel gear (403), and the operation slot (401) rotates inside Connected with a rotating rod (404); 所述旋转杆(404)与第一锥齿轮(403)之间连接有第二锥齿轮(405),所述旋转杆(404)侧面固定连接有第三锥齿轮(406)。A second bevel gear (405) is connected between the rotating rod (404) and the first bevel gear (403), and a third bevel gear (406) is fixedly connected to the side of the rotating rod (404). 7.根据权利要求5所述的一种水利工程清淤装置,其特征在于:所述连接槽(407)开设在固定杆(3)的侧面,所述连接槽(407)内部贯穿转动连接有螺杆(408);7. A dredging device for water conservancy projects according to claim 5, characterized in that: the connecting groove (407) is set on the side of the fixed rod (3), and the connecting groove (407) is connected with a rotating connection inside the connecting groove (407). screw (408); 所述螺杆(408)与第三锥齿轮(406)之间连接有第四锥齿轮(409),所述螺杆(408)与连接槽(407)之间连接有内螺纹插块(410)。A fourth bevel gear (409) is connected between the screw rod (408) and the third bevel gear (406), and an internal thread insert (410) is connected between the screw rod (408) and the connecting groove (407). 8.根据权利要求5所述的一种水利工程清淤装置,其特征在于:所述清淤泵(5)侧面固定连接有安装块(411),所述安装块(411)底部开设有卡槽(412);8. A water conservancy dredging device according to claim 5, characterized in that: the side of the dredging pump (5) is fixedly connected with a mounting block (411), and the bottom of the mounting block (411) is provided with a card slot(412); 所述卡槽(412)卡合连接在固定杆(3)的侧面,所述卡槽(412)内壁开设有插槽(413)。The card slot (412) is engaged and connected to the side of the fixing rod (3), and the inner wall of the card slot (412) is provided with a slot (413).
CN202320316354.1U 2023-02-25 2023-02-25 Hydraulic engineering dredging device Active CN219430872U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320316354.1U CN219430872U (en) 2023-02-25 2023-02-25 Hydraulic engineering dredging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320316354.1U CN219430872U (en) 2023-02-25 2023-02-25 Hydraulic engineering dredging device

Publications (1)

Publication Number Publication Date
CN219430872U true CN219430872U (en) 2023-07-28

Family

ID=87344465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320316354.1U Active CN219430872U (en) 2023-02-25 2023-02-25 Hydraulic engineering dredging device

Country Status (1)

Country Link
CN (1) CN219430872U (en)

Similar Documents

Publication Publication Date Title
CN219430872U (en) Hydraulic engineering dredging device
CN214656878U (en) River channel dam structure capable of conducting water body transformation
CN207905001U (en) A river ecological restoration dredging device for water conservancy projects
CN111926874B (en) A kind of canal bottom sludge cleaning machine and cleaning method for water conservancy projects
CN211006824U (en) A no-power consumption sand disturbance and silt removal device
CN217811299U (en) Do benefit to quick river course desilting device
CN214005793U (en) Mud pollution discharge device for water conservancy construction
CN217651738U (en) River course rubbish cleaning device that hydraulic engineering used
CN211621489U (en) River sluice for hydraulic engineering
CN211816068U (en) A novel manger plate dam for hydraulic and hydroelectric engineering
CN219753155U (en) Hydraulic engineering drainage device
CN221741154U (en) A water conservancy project drainage device
CN219386215U (en) Gate for water supply and drainage engineering
CN219621728U (en) Water conservancy and hydropower gate with dredging function
CN217678902U (en) Siphon drainage device for hydraulic engineering
CN221052535U (en) Dykes and dams flood control drainage structures for hydraulic engineering
CN217399545U (en) Water conservancy construction is water conservancy diversion drainage structures in hole
CN219118339U (en) A prevent stifled cistern for hydraulic engineering
CN219690451U (en) Water gate for hydraulic engineering
CN220470105U (en) Power generation device for hydraulic engineering
CN219471055U (en) A river dredging equipment for water conservancy project construction
CN217927482U (en) Pipeline embedding device for hydraulic engineering
CN217204364U (en) A desilting device for water conservancy projects
CN222435381U (en) A river dredging and desilting device for water conservancy construction
CN217782190U (en) River sludge cleaning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240517

Address after: 246000 Next to Liangquan Township Government, Wangjiang County, Anqing City, Anhui Province

Patentee after: Anhui Hongqian Construction Engineering Co.,Ltd.

Country or region after: China

Address before: No. 113, Fuqian Road, Jingkou Street, Jingkou Township, Nanchang County, Nanchang, Jiangxi Province 330000

Patentee before: Jiangxi Linyue Traffic Engineering Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20250609

Address after: 364000 floor 3, No. 2-11, Nancheng South Ring Middle Road (East Lake Garden), Xinluo District, Longyan City, Fujian Province

Patentee after: Fujian yajiushan Construction Engineering Co.,Ltd.

Country or region after: China

Address before: 246000 Next to Liangquan Township Government, Wangjiang County, Anqing City, Anhui Province

Patentee before: Anhui Hongqian Construction Engineering Co.,Ltd.

Country or region before: China