CN219416686U - A proportional valve test device - Google Patents

A proportional valve test device Download PDF

Info

Publication number
CN219416686U
CN219416686U CN202320490669.8U CN202320490669U CN219416686U CN 219416686 U CN219416686 U CN 219416686U CN 202320490669 U CN202320490669 U CN 202320490669U CN 219416686 U CN219416686 U CN 219416686U
Authority
CN
China
Prior art keywords
proportional valve
connecting pipe
frame
valve body
device frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320490669.8U
Other languages
Chinese (zh)
Inventor
张红松
肖猛
刘奇
张潇
黄大令
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Shengyao Automatic Control Technology Co ltd
Original Assignee
Xuzhou Shengying Construction Machinery Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Shengying Construction Machinery Technology Co ltd filed Critical Xuzhou Shengying Construction Machinery Technology Co ltd
Priority to CN202320490669.8U priority Critical patent/CN219416686U/en
Application granted granted Critical
Publication of CN219416686U publication Critical patent/CN219416686U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

本实用新型公开了一种比例阀试验装置,包括有装置架,所述装置架上端靠近左侧设置有显示控制屏,且装置架上端设置着收集盒,所述装置架左侧设置着放置架,所述装置架包括有设置在装置架上端的夹架,且夹架上放置这比例阀本体,同时比例阀本体设置在收集盒的上方。该比例阀试验装置,在电动伸缩杆作用下推动夹板可对试验测试的比例阀本体稳定夹持,将第一接管、第二接管、第三接管和第四接管和比例阀本体连接,通过外部显示控制屏发出的电气信号控制比例阀本体打开,通过第一流量计和第二流量计对第一接管和第二接管内流动的油液进行流量测量,从而测量比例阀本体的控制效果,通过收集盒可在比例阀本体更换时滴落的油液收集。

The utility model discloses a proportional valve test device, which comprises a device frame. A display control panel is arranged on the upper end of the device frame close to the left side, and a collecting box is arranged on the upper end of the device frame. A placing frame is arranged on the left side of the device frame. In the proportional valve test device, the splint is pushed under the action of the electric telescopic rod to stably clamp the proportional valve body for testing. The first connecting pipe, the second connecting pipe, the third connecting pipe and the fourth connecting pipe are connected to the proportional valve body. The electrical signal sent by the external display control panel is used to control the opening of the proportional valve body. The first flowmeter and the second flowmeter are used to measure the flow rate of the oil flowing in the first connecting pipe and the second connecting pipe, so as to measure the control effect of the proportional valve body.

Description

一种比例阀试验装置A proportional valve test device

技术领域technical field

本实用新型涉及比例阀试验技术领域,具体为一种比例阀试验装置。The utility model relates to the technical field of proportional valve testing, in particular to a proportional valve testing device.

背景技术Background technique

比例阀是一种新型的液压控制装置。在普通压力阀、流量阀和方向阀上,用比例电磁铁替代原有的控制部分,按输入的电气信号连续地、按比例地对油流的压力、流量或方向进行远距离控制,比例阀试验装置主要用于比例阀通过设定的输入电气信号按比例控制油流流量的测量装置,用于测量比例阀的控制效果,现有的比例阀试验装置不便对测量过程的比例阀稳定固定,且在更换比例阀试验测量时,容易有测量用油液滴落,影响卫生。Proportional valve is a new type of hydraulic control device. On ordinary pressure valves, flow valves and directional valves, the proportional electromagnet is used to replace the original control part, and the pressure, flow or direction of the oil flow is continuously and proportionally controlled remotely according to the input electrical signal. The proportional valve test device is mainly used for the proportional valve to control the oil flow in proportion to the set input electrical signal. It is used to measure the control effect of the proportional valve. The existing proportional valve test device is inconvenient to stably fix the proportional valve during the measurement process.

实用新型内容Utility model content

本实用新型的目的在于提供一种比例阀试验装置,以解决上述背景技术中提出的现有的比例阀试验装置不便对测量过程的比例阀稳定固定,且在更换比例阀试验测量时,容易有测量用油液滴落,影响卫生的问题。The purpose of this utility model is to provide a proportional valve test device to solve the problem that the existing proportional valve test device proposed in the above-mentioned background technology is inconvenient to stably fix the proportional valve in the measurement process, and when the proportional valve is replaced for test measurement, it is easy to have oil dripping for measurement, which affects sanitation.

为实现上述目的,本实用新型提供如下技术方案:一种比例阀试验装置,包括有装置架,所述装置架上端靠近左侧设置有显示控制屏,且装置架上端设置着收集盒,所述装置架左侧设置着放置架,所述装置架包括有设置在装置架上端的夹架,且夹架上放置这比例阀本体,同时比例阀本体设置在收集盒的上方。In order to achieve the above object, the utility model provides the following technical solutions: a proportional valve test device, including a device frame, the upper end of the device frame is provided with a display control panel near the left side, and the upper end of the device frame is provided with a collection box, the left side of the device frame is provided with a shelf, the device frame includes a clamp frame arranged at the upper end of the device frame, and the proportional valve body is placed on the clamp frame, and the proportional valve body is arranged above the collection box.

优选的,所述夹架包括有贯穿设置在夹架上的电动伸缩杆,且电动伸缩杆内端和夹板相连接。Preferably, the clamp frame includes an electric telescopic rod penetrating through the clip frame, and the inner end of the electric telescopic rod is connected to the splint.

通过采用上述技术方案,通过电动伸缩杆推动夹板对比例阀本体稳定夹持。By adopting the above technical solution, the splint is pushed by the electric telescopic rod to stably clamp the proportional valve body.

优选的,所述比例阀本体下方连接有第一接管和第二接管,且第一接管和第二接管均和箱体相连接,同时箱体贯穿设置在装置架内。Preferably, a first connecting pipe and a second connecting pipe are connected under the proportional valve body, and both the first connecting pipe and the second connecting pipe are connected to the box body, and the box body is arranged through the device rack.

通过采用上述技术方案,第一接管和第二接管用于比例阀本体测试时油液流出。By adopting the above technical solution, the first connecting pipe and the second connecting pipe are used for oil flow out when the proportional valve body is tested.

优选的,所述第一接管和第二接管上分别设置着第一流量计和第二流量计。Preferably, the first connecting pipe and the second connecting pipe are respectively provided with a first flow meter and a second flow meter.

通过采用上述技术方案,第一流量计和第二流量计用于第一接管和第二接管内流量检测。By adopting the above technical solution, the first flow meter and the second flow meter are used for flow detection in the first connecting pipe and the second connecting pipe.

优选的,所述箱体包括有贯穿设置在箱体内的滤网,且滤网前端和密封拉板相连接。Preferably, the box body includes a filter screen penetrating through the box body, and the front end of the filter screen is connected to the sealing pull plate.

通过采用上述技术方案,滤网用于循环使用的油液过滤使用。By adopting the above technical solution, the filter screen is used for circulating oil filtration.

优选的,所述放置架包括有设置在放置架内壁上的第一支辊和第二支辊,且第一支辊设置在第二支辊的后侧。Preferably, the placement stand includes a first branch roller and a second branch roller arranged on the inner wall of the placement stand, and the first branch roller is arranged on the rear side of the second branch roller.

通过采用上述技术方案,第一支辊上可放置合格的比例阀本体,第二支辊上放置检测不合格的比例阀本体。By adopting the above technical scheme, the qualified proportional valve body can be placed on the first roller, and the unqualified proportional valve body can be placed on the second roller.

与现有技术相比,本实用新型的有益效果是:该比例阀试验装置,在电动伸缩杆作用下推动夹板可对试验测试的比例阀本体稳定夹持,将第一接管、第二接管、第三接管和第四接管和比例阀本体连接,通过外部显示控制屏发出的电气信号控制比例阀本体打开,通过第一流量计和第二流量计对第一接管和第二接管内流动的油液进行流量测量,从而测量比例阀本体的控制效果,滤网可对循环使用的油液过滤使用,测试合格的比例阀本体摆放在第一支辊上沥油液,测试不合格的比例阀本体摆放在第二支辊上沥油液,减少油液滴落影响卫生,另外通过收集盒可在比例阀本体更换时滴落的油液收集。Compared with the prior art, the beneficial effect of the utility model is that the proportional valve test device can stably clamp the proportional valve body tested by pushing the splint under the action of the electric telescopic rod, connect the first connecting pipe, the second connecting pipe, the third connecting pipe and the fourth connecting pipe with the proportional valve body, control the opening of the proportional valve body through the electrical signal sent by the external display control panel, measure the flow rate of the oil flowing in the first connecting pipe and the second connecting pipe through the first flowmeter and the second flowmeter, thereby measuring the control effect of the proportional valve body, and the filter screen can filter the recycled oil In use, the proportional valve body that passes the test is placed on the first roller to drain the oil, and the proportional valve body that fails the test is placed on the second roller to drain the oil, reducing oil dripping and affecting hygiene. In addition, the dripping oil can be collected when the proportional valve body is replaced through the collection box.

附图说明Description of drawings

图1为本实用新型装置架正视剖面结构示意图;Fig. 1 is the schematic diagram of the front view section structure of the device frame of the present invention;

图2为本实用新型装置架俯视结构示意图;Fig. 2 is a structural schematic diagram of a top view of a device frame of the present invention;

图3为本实用新型装置架正视结构示意图;Fig. 3 is the front structural schematic view of the device frame of the present invention;

图4为本实用新型放置架立体结构示意图。Fig. 4 is a schematic diagram of the three-dimensional structure of the placing rack of the present invention.

图中:1、装置架;101、夹架;1011、电动伸缩杆;1012、夹板;102、比例阀本体;103、第一接管;104、第二接管;105、箱体;1051、滤网;1052、密封拉板;1053、手拧螺栓;106、第一流量计;107、第二流量计;108、第一输液泵;109、第三接管;110、第二输液泵;111、第四接管;2、显示控制屏;3、收集盒;4、放置架;401、第一支辊;402、第二支辊;403、收集箱;404、滚轮。In the figure: 1, device frame; 101, clamp frame; 1011, electric telescopic rod; 1012, splint; 102, proportional valve body; 103, first connecting pipe; 104, second connecting pipe; 105, box body; 1051, filter screen; 1052, sealing pull plate; 110, the second infusion pump; 111, the fourth connecting pipe; 2, the display control panel; 3, the collection box; 4, the placement frame; 401, the first roller; 402, the second roller; 403, the collection box;

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

请参阅图1-4,本实用新型提供一种技术方案:一种比例阀试验装置,如图1、图2和图3所示,包括有装置架1,夹架101包括有贯穿设置在夹架101上的电动伸缩杆1011,且电动伸缩杆1011内端和夹板1012相连接,具体的,电动伸缩杆1011关于夹架101前后对称设置,夹架101设置有两个。Please refer to Figs. 1-4, the utility model provides a technical solution: a proportional valve test device, as shown in Fig. 1, Fig. 2 and Fig. 3, includes a device frame 1, and the clip frame 101 includes an electric telescopic rod 1011 which is arranged through the clip frame 101, and the inner end of the electric telescopic rod 1011 is connected with a splint 1012.

在本实施例优选方案中,电动伸缩杆1011推动夹板1012可对比例阀本体102稳定夹持。In the preferred solution of this embodiment, the electric telescopic rod 1011 pushes the splint 1012 to stably clamp the proportional valve body 102 .

如图1和图3所示,进一步的,比例阀本体102下方连接有第一接管103和第二接管104,且第一接管103和第二接管104均和箱体105相连接,同时箱体105贯穿设置在装置架1内,其中,第一接管103和第二接管104上分别设置着第一流量计106和第二流量计107,具体的,箱体105内设置有第一输液泵108和第二输液泵110,第一输液泵108和第二输液泵110设置滤网1051下方,第一输液泵108通过第三接管109和比例阀本体102相连接,第二输液泵110通过第四接管111与比例阀本体102相连接。As shown in Figures 1 and 3, further, a first connecting pipe 103 and a second connecting pipe 104 are connected below the proportional valve body 102, and the first connecting pipe 103 and the second connecting pipe 104 are connected to the box body 105, and the box body 105 is installed in the device frame 1 at the same time, wherein the first connecting pipe 103 and the second connecting pipe 104 are respectively provided with a first flowmeter 106 and a second flowmeter 107, specifically, a first infusion pump 108 is arranged in the box body 105 And the second infusion pump 110, the first infusion pump 108 and the second infusion pump 110 are arranged below the filter screen 1051, the first infusion pump 108 is connected to the proportional valve body 102 through the third connecting pipe 109, and the second infusion pump 110 is connected to the proportional valve body 102 through the fourth connecting pipe 111.

在本实施例优选方案中,通过显示控制屏2发出的电气信号控制比例阀本体102打开,在第一输液泵108和第三接管109以及第二输液泵110和第四接管111作用下将油液输入比例阀本体102内,油液分别通过第一接管103和第二接管104流回箱体105内,通过第一流量计106和第二流量计107对第一接管103和第二接管104流量测试。In the preferred solution of this embodiment, the proportional valve body 102 is controlled to open by the electrical signal sent by the display control panel 2, and oil is input into the proportional valve body 102 under the actions of the first infusion pump 108 and the third connecting pipe 109, the second infusion pump 110 and the fourth connecting pipe 111, and the oil flows back into the tank 105 through the first connecting pipe 103 and the second connecting pipe 104 respectively, and the first connecting pipe 103 and the second connecting pipe 103 are connected by the first flow meter 106 and the second flow meter 107. 04 Flow test.

在上述进一步的方案中,箱体105包括有贯穿设置在箱体105内的滤网1051,且滤网1051前端和密封拉板1052相连接,具体的,密封拉板1052上贯穿设置有手拧螺栓1053,手拧螺栓1053一端螺纹连接在密封拉板1052上。In the above-mentioned further solution, the box body 105 includes a filter screen 1051 that is installed through the box body 105, and the front end of the filter screen 1051 is connected to the sealing pull plate 1052. Specifically, the sealing pull plate 1052 is provided with a hand-tightening bolt 1053, and one end of the hand-tightening bolt 1053 is threadedly connected to the sealing pull plate 1052.

在本实施例优选方案中,滤网1051可对循环使用的油液过滤,拆卸手拧螺栓1053,通过密封拉板1052拉出滤网1051,可对其清理维护。In the preferred solution of this embodiment, the filter screen 1051 can filter the circulating oil, disassemble the thumb bolt 1053, pull out the filter screen 1051 through the sealing pull plate 1052, and clean and maintain it.

如图1、图2和图4所示,装置架1上端靠近左侧设置有显示控制屏2,且装置架1上端设置着收集盒3,装置架1左侧设置着放置架4,装置架1包括有设置在装置架1上端的夹架101,且夹架101上放置这比例阀本体102,同时比例阀本体102设置在收集盒3的上方,收集盒3可在比例阀本体102测试更换时滴落的油液收集,放置架4包括有设置在放置架4内壁上的第一支辊401和第二支辊402,且第一支辊401设置在第二支辊402的后侧,具体的,放置架4内贯穿设置有收集箱403,且收集箱403下端设置有滚轮404。As shown in Fig. 1, Fig. 2 and Fig. 4, the display control panel 2 is arranged on the upper end of the device frame 1 near the left side, and the collection box 3 is arranged on the upper end of the device frame 1, and the placement frame 4 is arranged on the left side of the device frame 1. The first branch roller 401 and the second branch roller 402 arranged on the inner wall of the placement frame 4, and the first branch roller 401 is arranged on the rear side of the second branch roller 402, specifically, a collection box 403 is provided through the placement shelf 4, and the lower end of the collection box 403 is provided with a roller 404.

在本实施例优选方案中,第一支辊401上可放置测试合格的比例阀本体102,第二支辊402可放置测试不合格的比例阀本体102进行沥油液,通过收集箱403对油液收集,定期将收集箱403通过滚轮404抽出清理。In the preferred solution of this embodiment, the proportional valve body 102 that has passed the test can be placed on the first branch roller 401, and the proportional valve body 102 that has failed the test can be placed on the second branch roller 402 to drain the oil, and the oil is collected through the collection box 403, and the collection box 403 is regularly pulled out and cleaned through the roller 404.

接通电源,电动伸缩杆1011推动夹板1012可对比例阀本体102稳定夹持,将第一接管103、第二接管104、第三接管109和第四接管111和比例阀本体102连接,通过显示控制屏2发出的电气信号控制比例阀本体102打开,在第一输液泵108和第三接管109以及第二输液泵110和第四接管111作用下将油液输入比例阀本体102内,油液分别通过第一接管103和第二接管104流回箱体105内,通过第一流量计106和第二流量计107对第一接管103和第二接管104流量测试。When the power is turned on, the electric telescopic rod 1011 pushes the splint 1012 to hold the proportional valve body 102 stably, and connects the first connecting pipe 103, the second connecting pipe 104, the third connecting pipe 109 and the fourth connecting pipe 111 to the proportional valve body 102, and the proportional valve body 102 is controlled to open by the electrical signal sent by the display control panel 2, and the oil is input into the proportional valve under the action of the first infusion pump 108, the third connecting pipe 109, the second infusion pump 110 and the fourth connecting pipe 111. In the valve body 102, the oil flows back into the tank body 105 through the first connecting pipe 103 and the second connecting pipe 104 respectively, and the flow rate of the first connecting pipe 103 and the second connecting pipe 104 is tested by the first flow meter 106 and the second flow meter 107 .

术语“中心”、“纵向”、“横向”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为便于描述本实用新型的简化描述,而不是指示或暗指所指的装置或元件必须具有特定的方位、为特定的方位构造和操作,因而不能理解为对本实用新型保护内容的限制。The orientations or positional relationships indicated by the terms "center", "longitudinal", "transverse", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing the simplified description of the present utility model, rather than indicating or implying that the device or element referred to must have a specific orientation, configuration and operation in a specific orientation, so it cannot be understood as protecting the utility model Content Restrictions.

尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Although the utility model has been described in detail with reference to the aforementioned embodiments, for those skilled in the art, they can still modify the technical solutions described in the aforementioned embodiments, or perform equivalent replacements to some of the technical features. Within the spirit and principles of the utility model, any modifications, equivalent replacements, improvements, etc., should be included in the protection scope of the utility model.

Claims (6)

1.一种比例阀试验装置,包括有装置架(1),其特征在于:所述装置架(1)上端靠近左侧设置有显示控制屏(2),且装置架(1)上端设置着收集盒(3),所述装置架(1)左侧设置着放置架(4),所述装置架(1)包括有设置在装置架(1)上端的夹架(101),且夹架(101)上放置着比例阀本体(102),同时比例阀本体(102)设置在收集盒(3)的上方。1. A proportional valve test device, comprising a device frame (1), is characterized in that: the upper end of the device frame (1) is provided with a display control panel (2) near the left side, and the upper end of the device frame (1) is provided with a collection box (3), the left side of the device frame (1) is provided with a placement frame (4), and the device frame (1) includes a clip frame (101) that is arranged on the device frame (1) upper end, and the proportional valve body (102) is placed on the clip frame (101), and the proportional valve body ( 102) is arranged above the collection box (3). 2.根据权利要求1所述的一种比例阀试验装置,其特征在于:所述夹架(101)包括有贯穿设置在夹架(101)上的电动伸缩杆(1011),且电动伸缩杆(1011)内端和夹板(1012)相连接。2. A kind of proportional valve test device according to claim 1, characterized in that: the clamp frame (101) includes an electric telescopic rod (1011) penetratingly arranged on the clamp frame (101), and the inner end of the electric telescopic rod (1011) is connected to the splint (1012). 3.根据权利要求1所述的一种比例阀试验装置,其特征在于:所述比例阀本体(102)下方连接有第一接管(103)和第二接管(104),且第一接管(103)和第二接管(104)均和箱体(105)相连接,同时箱体(105)贯穿设置在装置架(1)内。3. A proportional valve test device according to claim 1, characterized in that: a first connecting pipe (103) and a second connecting pipe (104) are connected below the proportional valve body (102), and both the first connecting pipe (103) and the second connecting pipe (104) are connected to the box body (105), and the box body (105) is installed through the device frame (1). 4.根据权利要求3所述的一种比例阀试验装置,其特征在于:所述第一接管(103)和第二接管(104)上分别设置着第一流量计(106)和第二流量计(107)。4. A proportional valve testing device according to claim 3, characterized in that: a first flow meter (106) and a second flow meter (107) are respectively arranged on the first connecting pipe (103) and the second connecting pipe (104). 5.根据权利要求3所述的一种比例阀试验装置,其特征在于:所述箱体(105)包括有贯穿设置在箱体(105)内的滤网(1051),且滤网(1051)前端和密封拉板(1052)相连接。5. A proportional valve test device according to claim 3, characterized in that: the box body (105) includes a filter screen (1051) penetratingly arranged in the box body (105), and the front end of the filter screen (1051) is connected to the sealing pull plate (1052). 6.根据权利要求1所述的一种比例阀试验装置,其特征在于:所述放置架(4)包括有设置在放置架(4)内壁上的第一支辊(401)和第二支辊(402),且第一支辊(401)设置在第二支辊(402)的后侧。6. a kind of proportional valve testing device according to claim 1, is characterized in that: described placement frame (4) comprises the first branch roller (401) that is arranged on the placement frame (4) inner wall and the second branch roller (402), and the first branch roller (401) is arranged on the rear side of the second branch roller (402).
CN202320490669.8U 2023-03-13 2023-03-13 A proportional valve test device Active CN219416686U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320490669.8U CN219416686U (en) 2023-03-13 2023-03-13 A proportional valve test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320490669.8U CN219416686U (en) 2023-03-13 2023-03-13 A proportional valve test device

Publications (1)

Publication Number Publication Date
CN219416686U true CN219416686U (en) 2023-07-25

Family

ID=87233513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320490669.8U Active CN219416686U (en) 2023-03-13 2023-03-13 A proportional valve test device

Country Status (1)

Country Link
CN (1) CN219416686U (en)

Similar Documents

Publication Publication Date Title
CN111624327B (en) Karst pipeline slip casting shutoff test device
CN207199161U (en) Multifunctional fluid mechanics experimental installation
CN209311005U (en) Butterfly valve detection device
CN219416686U (en) A proportional valve test device
CN209356499U (en) It is a kind of for detecting the detection device of concrete expansion rate
CN207745377U (en) A kind of metering primary and secondary urinal with warning reminding function
CN207717329U (en) Siphon drainge system testing stand
CN218936046U (en) Intelligent real-time monitoring's gas regulator cubicle
CN219084180U (en) Liquid level meter with anti-interference function
CN106053739B (en) A kind of multi-functional testing stand of metalling run out
CN204085597U (en) A kind of Pitot bar mass flowmeter
CN208076355U (en) A kind of short rock core displacement test device of normal temperature and pressure
CN207991815U (en) A collection device for pump characteristic test
CN206593830U (en) Intelligence repacking reynolds experiment platform based on STM32
CN108152474B (en) Particle collection and diversion device and method in filling medium seepage instability test
CN208654139U (en) A kind of solid water monitoring device
CN209264352U (en) A kind of sensor proportioning device
CN208011314U (en) Be used for oil field oil well oil circuit pipeline information acquisition device
CN205898769U (en) Multi -functional test bench of metalling run out
CN209203283U (en) Automatic blood sampling device
CN203572556U (en) Novel meter verification control device
CN221535044U (en) Intelligent accurate urine volume monitoring system
CN206725398U (en) A kind of device for being used to determine geotechnological GCL barrier performance
CN222762027U (en) Urine measuring device for urine monitoring
CN219475084U (en) A portable medical test collector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20250409

Address after: 237400 Shimiao Group, Wutasi Village, Shidian Town, Huoqiu County, Lu'an City, Anhui Province

Patentee after: Guan Junsheng

Country or region after: China

Address before: Room 331, Xuzhuang Star Maker Space, 66 Fuzhong Road, Xuzhuang Town, Xuzhou Economic and Technological Development Zone, Jiangsu Province, 221000

Patentee before: Xuzhou Shengying Construction Machinery Technology Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20250429

Address after: 1 / F, building 28, 6055 Jinhai highway, Fengxian District, Shanghai, 201403

Patentee after: Shanghai Shengyao Automatic Control Technology Co.,Ltd.

Country or region after: China

Address before: 237400 Shimiao Group, Wutasi Village, Shidian Town, Huoqiu County, Lu'an City, Anhui Province

Patentee before: Guan Junsheng

Country or region before: China