CN219411467U - Assembled hyperboloid aluminum plate furred ceiling structure - Google Patents
Assembled hyperboloid aluminum plate furred ceiling structure Download PDFInfo
- Publication number
- CN219411467U CN219411467U CN202221207684.9U CN202221207684U CN219411467U CN 219411467 U CN219411467 U CN 219411467U CN 202221207684 U CN202221207684 U CN 202221207684U CN 219411467 U CN219411467 U CN 219411467U
- Authority
- CN
- China
- Prior art keywords
- aluminum plate
- cavity
- hanger
- wall
- hanging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Casings For Electric Apparatus (AREA)
Abstract
本实用新型属于室内装修吊顶技术领域,具体涉及一种装配式双曲面铝板吊顶结构,包括墙体,墙体的底部固定安装有两个开口相背离的第一吊件和第二吊件,第一吊件的顶端开设有等间距的多个第一固定腔,第一吊件的底部开设有等间距的多个第二固定腔,第一吊件的两侧开设有第一凹槽,第一吊件的底部固定安装有“匚”字形的第一连接件,第一连接件的顶部对应第二固定腔开设有第一连接腔,第一连接件的底部对应第二固定腔开设有第二连接腔,第一连接件底部安装有螺栓,第一连接腔的内部和第一吊件底部顶端均安装有螺母,本实用新型能够实现美观度高,施工难度小、环保效果好、安装效率较高和对劳动力需求量小。
The utility model belongs to the technical field of interior decoration ceilings, and in particular relates to an assembled double-curved aluminum plate ceiling structure, which includes a wall. The bottom of the wall is fixedly equipped with a first hanging part and a second hanging part with two openings facing away from each other. The top of the first hanging part is provided with a plurality of first fixing cavities at equal intervals, the bottom of the first hanging part is provided with a plurality of second fixing cavities at equal intervals, the two sides of the first hanging part are provided with first grooves, the bottom of the first hanging part is fixedly installed with a "匚"-shaped first connecting part, and the top of the first connecting part corresponds to the second fixing cavity. In the connection cavity, the bottom of the first connecting piece corresponds to the second fixing cavity, and a second connecting cavity is provided. Bolts are installed on the bottom of the first connecting piece, and nuts are installed inside the first connecting cavity and the top of the bottom of the first hanging piece. The utility model can achieve high aesthetics, low construction difficulty, good environmental protection effect, high installation efficiency and small labor demand.
Description
技术领域technical field
本实用新型属于室内装修吊顶技术领域,具体涉及一种装配式双曲面铝板吊顶结构。The utility model belongs to the technical field of indoor decoration ceilings, in particular to an assembled double-curved aluminum plate ceiling structure.
背景技术Background technique
第一部分:如今的建筑装饰施工项目,铝板的生产应用得到迅速发展,铝板越来越多的成为一个新兴的重要的行业受到建筑装饰以及各界的极大重视,特别是随着人们生活质量的提高,对科技感和艺术的美感追求也越来越高,在室内装修吊顶模块也追求更具科技感和艺术感,但现有技术中,室内装修吊顶均以平面为主,只有大型公共工程考虑到室内大空间的设计效果及防火要求采用较为美观和艺术感的吊顶方式,这种大型场合的传统的吊顶采用钢架焊接转换层吊顶施工,这种结构存在吊顶基层施工难度大、环保效果差、安装效率较低和对劳动力需求量大的缺点。The first part: Today’s architectural decoration construction projects, the production and application of aluminum panels have been rapidly developed, and aluminum panels have become an emerging and important industry. They have received great attention from architectural decoration and all walks of life, especially with the improvement of people’s quality of life. The pursuit of technological and artistic aesthetics is also getting higher and higher. The interior decoration ceiling module also pursues a more technological and artistic sense. However, in the existing technology, interior decoration ceilings are mainly flat. The suspended ceiling is constructed with steel frame welded transfer layer ceiling. This structure has the disadvantages of difficult construction of the suspended ceiling base, poor environmental protection effect, low installation efficiency and large labor demand.
本实用新型的目的是提供一种装配式双曲面铝板吊顶结构,要解决据居民室内装修吊顶的美观度不足,和现有大型场合吊顶施工难度大、环保效果差、安装效率较低和对劳动力需求量大导致的无法将至运用到居民室内装修吊顶的技术问题。The purpose of the utility model is to provide a prefabricated double-curved aluminum plate ceiling structure, to solve the technical problems of insufficient aesthetics of the indoor decoration ceiling for residents, and difficulty in the construction of the existing large-scale ceiling, poor environmental protection effect, low installation efficiency and large demand for labor force.
实用新型内容Utility model content
本实用新型的目的是提供一种装配式双曲面铝板吊顶结构,能够实现美观度高,施工难度小、环保效果好、安装效率较高和对劳动力需求量小。The purpose of the utility model is to provide an assembled double-curved aluminum plate ceiling structure, which can achieve high aesthetics, low construction difficulty, good environmental protection effect, high installation efficiency and small labor demand.
本实用新型采取的技术方案具体如下:The technical scheme that the utility model takes is specifically as follows:
一种装配式双曲面铝板吊顶结构,包括墙体,所述墙体的底部固定安装有两个开口相背离的第一吊件和第二吊件,所述第一吊件的顶端开设有等间距的多个第一固定腔,所述第一吊件的底部开设有等间距的多个第二固定腔,所述第一吊件的两侧开设有第一凹槽,所述第一吊件的底部固定安装有“匚”字形的第一连接件,所述第一连接件的顶部对应第二固定腔开设有第一连接腔,所述第一连接件的底部对应第二固定腔开设有第二连接腔,所述第一连接件底部安装有螺栓,所述第一连接腔的内部和第一吊件底部顶端均安装有螺母,所述第一连接件的内壁固定安装有第一双曲面铝板,所述第一双曲面铝板对应第二连接腔开设有第一腔室;A prefabricated double-curved aluminum plate ceiling structure, comprising a wall, the bottom of the wall is fixedly installed with two first hanging parts and a second hanging part with openings facing away from each other, the top of the first hanging part is provided with a plurality of first fixed cavities at equal intervals, the bottom of the first hanging part is provided with a plurality of second fixed cavities at equal intervals, first grooves are opened on both sides of the first hanging part, the bottom of the first hanging part is fixed with a "匚"-shaped first connecting part, and the top of the first connecting part corresponds to the second fixed cavity. The bottom of the part is provided with a second connection cavity corresponding to the second fixed cavity, the bottom of the first connection part is equipped with bolts, the inside of the first connection cavity and the bottom top of the first hanger are equipped with nuts, the inner wall of the first connection part is fixedly installed with a first hyperboloid aluminum plate, and the first hyperboloid aluminum plate is provided with a first chamber corresponding to the second connection cavity;
所述第二吊件的顶端开设有等间距的多个第三固定腔,所述第二吊件的底部开设有等间距的多个第四固定腔,所述第二吊件的两侧开设有第二凹槽,所述第二吊件的底部固定安装有“匚”字形的第二连接件,所述第二连接件的顶部对应第四固定腔开设有第三连接腔,所述第二连接件的底部对应第四固定腔开设有第四连接腔,所述第二连接件的内壁固定安装有第二双曲面铝板,所述第二双曲面铝板对应第四连接腔开设有第二腔室;The top of the second hanger is provided with a plurality of third fixed cavities at equal intervals, the bottom of the second hanger is provided with a plurality of fourth fixed cavities at equal intervals, and the two sides of the second hanger are provided with second grooves. The fourth connecting chamber is provided with a second chamber;
所述第一吊件和第二吊件的两侧且位于墙体的下方固定安装有横架。Horizontal frames are fixedly installed on both sides of the first hanger and the second hanger and below the wall.
所述横架上开设有等间距的螺孔,所述横架通过螺孔固定安装有膨胀螺栓,所述横架通过膨胀螺栓紧固安装在墙体内侧壁。The horizontal frame is provided with equally spaced screw holes, the horizontal frame is fixedly installed with expansion bolts through the screw holes, and the horizontal frame is fastened and installed on the inner wall of the wall through the expansion bolts.
所述第一吊件和横架通过膨胀螺栓紧固安装在墙体底部。The first hanger and the cross frame are fastened and installed on the bottom of the wall through expansion bolts.
所述螺栓通过第二连接腔、第一腔室、第一连接腔、第二固定腔依次贯穿第一连接件、第一双曲面铝板、第一吊件,所述螺栓通过螺纹连接的螺母紧固第一吊件、第一连接件和第一双曲面铝板。The bolt passes through the second connecting cavity, the first cavity, the first connecting cavity, and the second fixed cavity sequentially through the first connecting piece, the first hyperboloid aluminum plate, and the first hanging piece, and the bolt fastens the first hanging piece, the first connecting piece, and the first hyperboloid aluminum plate through threaded nuts.
所述第一吊件和第二吊件设置相同且尺寸不同,所述第一连接件和第二连接件设置相同且尺寸不同。The first hanger and the second hanger are set the same but have different sizes, and the first connecting piece and the second connecting piece are set the same but are different in size.
所述第一双曲面铝板设置为顶部相对水平延伸且两侧相对弯曲向内延伸至底部重合的劣弧状。The first hyperboloid aluminum plate is arranged in a minor arc shape with the top extending relatively horizontally and the two sides being relatively curved and extending inward until the bottom coincides.
所述第二双曲面铝板设置为顶部相对水平延伸且两侧相背离向外弯曲延伸,所述第二双曲面铝板的两侧底部相对弯曲延伸呈劣弧状。The second double-curved aluminum plate is arranged such that its top extends relatively horizontally and its two sides bend away from each other and extends outward.
本实用新型取得的技术效果为:The technical effect that the utility model obtains is:
本实用新型,安装时,在工厂先预制好所有材料,测量好所需数据,然后先将两个横架卡接在多个第一吊件和多个第二吊件的两侧,再用膨胀螺栓通过第一固定腔将第一吊件和第二吊件固定在墙体的底部,接着用膨胀螺栓通过螺孔将横架固定在墙体的下方,即安装好骨架结构,上述结构采用多个膨胀螺栓的使用其装置固定更加紧密,第一吊件、第二吊件和横架的纵横交错分布使安装结构更加稳固,提前预制好材料使安装更加简单,效率更高且环保,对劳动力要求更小。In the utility model, when installing, all the materials are prefabricated in the factory, the required data is measured, and then two horizontal frames are clipped on both sides of multiple first hanging parts and multiple second hanging parts, and then the first hanging parts and the second hanging parts are fixed on the bottom of the wall through the first fixing cavity with expansion bolts, and then the horizontal frames are fixed below the wall with expansion bolts through screw holes, that is, the skeleton structure is installed. More stable, prefabricated materials in advance make installation easier, more efficient and environmentally friendly, and require less labor.
本实用新型,从第一双曲面铝板顶部的开口处将两个相背离的第一连接件对应卡接在第一双曲面铝板顶部凸出延伸处,再将螺栓依次穿过第二连接腔、第一腔室和第一连接腔,接着用螺母螺纹连接螺栓且旋进第一连接腔内部,然后将第一连接件的顶面吊接第一吊件的底面,且螺栓穿过第二固定腔螺纹连接螺母,上述安装结构采用先将第一连接件和螺栓连接紧密再吊起连接在第一吊件上,且将螺母设置在第一连接件内部使整体结构顶面平整美观且不影响第一双曲面铝板的承重结构和寿命,安装好第一连接件和第一双曲面铝板之后,再依次安装第二吊件和第一双曲面铝板,安装步骤相同,接着重复上述安装步骤即可,第一双曲面铝板和第一双曲面铝板的形状设置美观大方,且安装设置高低错落有空间感,分布间距空间和弧形设计使视线无限延伸,安装方式施工简单,结构稳固。This utility model, connect the two first connecting parts from the top of the first dual -curved aluminum plate at the opening of the top of the first bilateral aluminum plate at the top of the top dual -curved aluminum plate, protruding the extension, and then the bolt passes through the second connection, the first cavity, and the first connector. The bottom surface, and the bolt passes through the second fixed cavity thread connection nut. The above installation structure uses the first connection and bolt connection of the first connection and bolt, and then lifts it on the first hanging part. Set the nut in the first connector to make the overall structure flat and beautiful without affecting the load structure and life of the first double -curved aluminum plate. After the board, install the second hanging parts and the first dual -curved aluminum plate in turn. The installation steps are the same. Then repeat the above installation steps. The shape of the first double -curved aluminum plate and the first bilateral aluminum plate is beautifully set, and the installation setting is high and low. The distribution spacing space and the arc design extend the lines unlimited. The installation method is simple and the structure is stable.
附图说明Description of drawings
图1是本实用新型的整体结构示意图;Fig. 1 is the overall structural representation of the utility model;
图2是本实用新型的立体结构示意图;Fig. 2 is the three-dimensional structural representation of the utility model;
图3是本实用新型中第一吊件的立体结构示意图;Fig. 3 is a schematic diagram of the three-dimensional structure of the first hanger in the utility model;
图4是本实用新型中第一连接件的剖面结构示意图;Fig. 4 is a schematic cross-sectional structure diagram of the first connector in the utility model;
图5是本实用新型中第一双曲面铝板的立体结构示意图;Fig. 5 is a schematic diagram of the three-dimensional structure of the first hyperboloid aluminum plate in the utility model;
图6是本实用新型中第二双曲面铝板的立体的结构示意图。Fig. 6 is a three-dimensional structural schematic diagram of the second double-curved aluminum plate in the present invention.
附图中,各标号所代表的部件列表如下:In the accompanying drawings, the list of parts represented by each label is as follows:
1、墙体;2、第一吊件;201、第一固定腔;202、第二固定腔;203、第一凹槽;3、第二吊件;301、第三固定腔;302、第四固定腔;303、第二凹槽;4、第一连接件;401、第一连接腔;402、第二连接腔;5、第二连接件;501、第三连接腔;502、第四连接腔;6、第一双曲面铝板;601、第一腔室;7、第二双曲面铝板;701、第二腔室;8、横架;801、螺孔; 9、螺栓;10、螺母;11、膨胀螺栓。1. Wall; 2. First hanger; 201. First fixed cavity; 202. Second fixed cavity; 203. First groove; 3. Second hanger; 301. Third fixed cavity; 302. Fourth fixed cavity; 303. Second groove; Chamber; 7. Second hyperboloid aluminum plate; 701. Second chamber; 8. Horizontal frame; 801. Screw hole; 9. Bolt; 10. Nut; 11. Expansion bolt.
具体实施方式Detailed ways
为了使本实用新型的目的及优点更加清楚明白,以下结合实施例对本实用新型进行具体说明。应当理解,以下文字仅仅用以描述本实用新型的一种或几种具体的实施方式,并不对本实用新型具体请求的保护范围进行严格限定。In order to make the purpose and advantages of the utility model clearer, the utility model will be described in detail below in conjunction with the embodiments. It should be understood that the following words are only used to describe one or several specific implementation modes of the utility model, and do not strictly limit the protection scope of the specific claims of the utility model.
如图1-2所示,一种装配式双曲面铝板吊顶结构,墙体1的底部固定安装有两个开口相背离的第一吊件2和第二吊件3,第一吊件2的底部固定安装有“匚”字形的第一连接件4,第一连接件4底部安装有螺栓9,第一连接件4的内部和第一吊件2底部顶端均安装有螺母10,第一连接件4的内壁固定安装有第一双曲面铝板6,第二吊件3的顶端开设有等间距的多个第三固定腔301,第二吊件3的底部开设有等间距的多个第四固定腔302,第二吊件3的两侧开设有第二凹槽303,第二吊件3的底部固定安装有“匚”字形的第二连接件5,第二连接件5的顶部对应第四固定腔302开设有第三连接腔501,第二连接件5的底部对应第四固定腔302开设有第四连接腔502,第二连接件5的内壁固定安装有第一双曲面铝板7,第一吊件2和第二吊件3的两侧且位于墙体1的下方固定安装有横架8,横架8朝向墙体1的一侧开设有等间距的801,横架8通过螺孔801固定安装有膨胀螺栓11,横架8通过膨胀螺栓11 紧固在墙体1内侧壁,第一吊件2和横架8通过被膨胀螺栓11贯穿紧固在墙体1底部;As shown in Figure 1-2, a prefabricated double-curved aluminum plate ceiling structure, the bottom of the wall 1 is fixedly installed with two first hanging parts 2 and second hanging parts 3 with two openings facing away from each other. The bottom of the second hanger 3 is provided with a plurality of fourth fixed cavities 302 at equal intervals, the two sides of the second hanger 3 are provided with second grooves 303, the bottom of the second hanger 3 is fixedly installed with a "匚"-shaped second connecting piece 5, the top of the second connecting piece 5 is provided with a third connecting cavity 501 corresponding to the fourth fixed cavity 302, and the bottom of the second connecting piece 5 is provided with a fourth connecting cavity 502 corresponding to the fourth fixed cavity 302. The plate 7, the two sides of the first hanger 2 and the second hanger 3 and located below the wall 1 are fixedly installed with a horizontal frame 8, and the horizontal frame 8 is provided with equidistant 801 on the side facing the wall 1, and the horizontal frame 8 is fixedly installed with expansion bolts 11 through the screw holes 801, and the horizontal frame 8 is fastened to the inner wall of the wall 1 by the expansion bolt 11, and the first hanger 2 and the horizontal frame 8 are fastened to the bottom of the wall 1 through the expansion bolts 11;
根据上述结构第一吊件2、第二吊件3和横架8的纵横交错分布使安装结构更加稳固,采用多个膨胀螺栓11的使用其装置固定更加紧密,且螺栓9贯穿式的连接结构使整体连接更加紧密牢固,进一步是采用将第一连接件4和螺栓9连接紧密再吊起连接在第一吊件2上的设置,且将螺母10设置在第一连接件4内部使整体结构顶面平整美观且不影响第一双曲面铝板6的承重结构和寿命,可安装好第一连接件4和第一双曲面铝板6之后,再依次安装第二吊件3和第一双曲面铝板7,安装步骤简单且相同,所需劳动力较小且施工简单。According to the above-mentioned structure, the criss-cross distribution of the first hanger 2, the second hanger 3 and the cross frame 8 makes the installation structure more stable, and the use of a plurality of expansion bolts 11 is used to fix the device more closely, and the bolt 9 through-type connection structure makes the overall connection tighter and firmer. Furthermore, the setting of connecting the first connector 4 and the bolt 9 tightly and then hoisting and connecting to the first hanger 2 is adopted, and the nut 10 is arranged inside the first connector 4 so that the top surface of the overall structure is smooth and beautiful without affecting the load-bearing structure and life of the first hyperboloid aluminum plate 6. After the first connecting piece 4 and the first double-curved aluminum plate 6 are installed, the second hanger 3 and the first double-curved aluminum plate 7 are installed in sequence. The installation steps are simple and the same, and the required labor force is small and the construction is simple.
参照附图3,第一吊件2的顶端开设有等间距的多个第一固定腔201,第一吊件2的底部开设有等间距的多个第二固定腔202,第一吊件2的两侧开设有第一凹槽203,第一吊件2和第二吊件3设置相同且尺寸不同,根据上述多个等间距第一固定腔201的设置,使第一吊件 2能更牢固的固定在墙体1的底面,第一凹槽203的设置使横架8能更好的帮助第一吊件2和第二吊件3固定在墙体1上。Referring to accompanying drawing 3, the top of the first hanger 2 is provided with a plurality of first fixed cavities 201 at equal intervals, the bottom of the first hanger 2 is provided with a plurality of second fixed cavities 202 at equal intervals, and both sides of the first hanger 2 are provided with first grooves 203, the first hanger 2 and the second hanger 3 are set the same and have different sizes, according to the setting of the above-mentioned multiple first fixed cavities 201 at equal intervals, the first hanger 2 can be more firmly fixed on the bottom surface of the wall 1, and the setting of the first groove 203 enables the horizontal frame 8 to better help the first hanger. Part 2 and the second hanging part 3 are fixed on the wall body 1 .
参照附图4,第一连接件4的顶部对应第二固定腔202开设有第一连接腔401,第一连接件4的底部对应第二固定腔202开设有第二连接腔402,第一连接件4和第二连接件5设置相同且尺寸不同,进一步的第一连接件4的设置使第一双曲面铝板6能更紧密的固定连接在第一吊件2的底部。Referring to accompanying drawing 4, the top of the first connecting piece 4 is provided with the first connecting chamber 401 corresponding to the second fixing chamber 202, and the bottom of the first connecting piece 4 is provided with the second connecting chamber 402 corresponding to the second fixing chamber 202. The first connecting piece 4 and the second connecting piece 5 are arranged the same and have different sizes. Further setting of the first connecting piece 4 enables the first double-curved aluminum plate 6 to be fixedly connected to the bottom of the first hanging piece 2 more closely.
参照附图5,第一双曲面铝板6对应第二连接腔402开设有第一腔室601,第一双曲面铝板6设置为顶部相对水平延伸且两侧相对弯曲向内延伸至底部重合的劣弧状,进一步的第一双曲面铝板6的形状设置使吊顶空间延伸感更好,且更加美观大方。Referring to Figure 5, the first double-curved aluminum plate 6 is provided with a first chamber 601 corresponding to the second connecting cavity 402. The first double-curved aluminum plate 6 is set to extend relatively horizontally at the top, and the two sides are relatively curved and extend inward to overlap at the bottom.
参照附图6,第一双曲面铝板7对应第四连接腔502开设有第二腔室701,第一双曲面铝板7设置为顶部相对水平延伸且两侧相背离向外弯曲延伸,第一双曲面铝板7的两侧底部相对弯曲延伸呈劣弧状,更进一步的第一双曲面铝板7的两侧向外弯曲延伸对应第一双曲面铝板6两侧向内弯曲延伸使视觉空间延伸感更佳,且第一双曲面铝板7高度设置为比第一双曲面铝板6更高,高低错落使吊顶空间延伸感极佳,美观度更好。Referring to accompanying drawing 6, the first double-curved aluminum plate 7 is provided with a second chamber 701 corresponding to the fourth connecting cavity 502. The first double-curved aluminum plate 7 is set so that the top extends relatively horizontally and both sides face away from each other and bends outward. The aluminum plate 6 is taller, and the height is staggered so that the ceiling space has an excellent sense of extension, and the aesthetics is better.
本实用新型的工作原理为:将两个横架8卡接在多个第一吊件2和多个第二吊件3的两侧,再用膨胀螺栓11通过第一固定腔201将第一吊件2和第二吊件3固定在墙体1的底部,接着用膨胀螺栓11通过螺孔801将横架8固定在墙体1的下方,即安装好骨架结构,上述结构采用多个膨胀螺栓11的使用其装置固定更加紧密,第一吊件2、第二吊件3和横架8的纵横交错分布使安装结构更加稳固,提前预制好材料使安装更加简单,效率更高且环保,对劳动力要求更小。The working principle of the utility model is: two horizontal frames 8 are clamped on both sides of multiple first hanging parts 2 and multiple second hanging parts 3, and then the first hanging parts 2 and the second hanging parts 3 are fixed on the bottom of the wall body 1 through the first fixing cavity 201 with expansion bolts 11, and then the horizontal frame 8 is fixed below the wall body 1 through screw holes 801 with expansion bolts 11, that is, the skeleton structure is installed. The criss-cross distribution makes the installation structure more stable, and the prefabricated materials make the installation easier, more efficient and environmentally friendly, and require less labor.
从第一双曲面铝板6顶部的开口处将两个相背离的第一连接件4对应卡接在第一双曲面铝板6顶部凸出延伸处,再将螺栓9依次穿过第二连接腔402、第一腔室601和第一连接腔 401,接着用螺母10螺纹连接螺栓9且旋进第一连接腔401内部,然后将第一连接件4的顶面吊接第一吊件2的底面,且螺栓9穿过第二固定腔202螺纹连接螺母10,上述安装结构采用先将第一连接件4和螺栓9连接紧密再吊起连接在第一吊件2上,且将螺母10设置在第一连接件4内部使整体结构顶面平整美观且不影响第一双曲面铝板6的承重结构和寿命,安装好第一连接件4和第一双曲面铝板6之后,再依次安装第二吊件3和第一双曲面铝板7,安装步骤相同,接着重复上述安装步骤即可,第一双曲面铝板6和第一双曲面铝板7的形状设置美观大方,且安装设置高低错落有空间感,分布间距空间和弧形设计使视线无限延伸,安装方式施工简单,结构稳固。From the opening at the top of the first hyperboloid aluminum plate 6, two first connectors 4 facing away from each other are clamped correspondingly at the protruding extension of the top of the first hyperboloid aluminum plate 6, and then the bolts 9 are passed through the second connection cavity 402, the first cavity 601 and the first connection cavity 401 in sequence, and then the bolts 9 are threaded with the nuts 10 and screwed into the first connection cavity 401, then the top surface of the first connector 4 is suspended from the bottom surface of the first hanger 2, and the bolt 9 passes through the second fixing cavity 202 to thread the nut 10, The above-mentioned installation structure first connects the first connecting piece 4 and the bolt 9 tightly and then hoists them on the first hanging piece 2, and sets the nut 10 inside the first connecting piece 4 so that the top surface of the overall structure is flat and beautiful without affecting the load-bearing structure and life of the first hyperboloid aluminum plate 6. After installing the first connecting piece 4 and the first hyperbolic aluminum plate 6, install the second hanging piece 3 and the first double-curved aluminum plate 7 in sequence. The installation steps are the same, and then repeat the above installation steps. The installation is beautiful and elegant, and the height of the installation is scattered to have a sense of space. The distribution spacing space and the arc design make the line of sight extend infinitely. The installation method is simple and the construction is stable.
以上仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以作出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。本实用新型中未具体描述和解释说明的结构、装置以及操作方法,如无特别说明和限定,均按照本领域的常规手段进行实施。The above are only preferred embodiments of the present utility model, and it should be pointed out that for those of ordinary skill in the art, without departing from the principle of the present utility model, some improvements and modifications can also be made, and these improvements and modifications should also be regarded as the protection scope of the present utility model. The structures, devices and operation methods that are not specifically described and explained in the utility model, unless otherwise specified and limited, are implemented according to conventional means in the art.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202221207684.9U CN219411467U (en) | 2022-05-18 | 2022-05-18 | Assembled hyperboloid aluminum plate furred ceiling structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202221207684.9U CN219411467U (en) | 2022-05-18 | 2022-05-18 | Assembled hyperboloid aluminum plate furred ceiling structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219411467U true CN219411467U (en) | 2023-07-25 |
Family
ID=87238404
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202221207684.9U Expired - Fee Related CN219411467U (en) | 2022-05-18 | 2022-05-18 | Assembled hyperboloid aluminum plate furred ceiling structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219411467U (en) |
-
2022
- 2022-05-18 CN CN202221207684.9U patent/CN219411467U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205913226U (en) | Pelmet light gauge steel framework | |
| CN214785225U (en) | Aluminum alloy suspended ceiling assembly convenient to overhaul | |
| CN111424864A (en) | Energy-saving curtain wall system with externally attached louver aluminum grille and installation method thereof | |
| CN219411467U (en) | Assembled hyperboloid aluminum plate furred ceiling structure | |
| CN108385895A (en) | A kind of fast-assembling walling system | |
| CN108222338A (en) | A kind of curtain wall-connecting structure | |
| CN202990329U (en) | Connection structure for interior decoration top surface expansion joints | |
| CN222478133U (en) | Suspended floor template | |
| CN204715603U (en) | A kind of parallel wide keel smallpox | |
| CN220014155U (en) | Unit curtain wall large ribbon aluminum plastic panel system | |
| CN218060932U (en) | Energy-conserving curtain for building convenient to installation | |
| CN216713553U (en) | A fireproof and environmentally friendly curtain box | |
| CN216276407U (en) | Lamp air port integrated mounting structure | |
| CN116971522A (en) | Light steel joist frame and suspension type glass curtain wall | |
| CN212026801U (en) | Composite suspended ceiling of lighting lamp and soft film ceiling | |
| CN115874751A (en) | A building interior decoration installation structure and construction method | |
| CN222333167U (en) | Single board back of body muscle of veneer is hung structure futilely | |
| CN224134036U (en) | Section bar frame combination furred ceiling | |
| CN222375771U (en) | A kind of indoor long distance ceiling structure | |
| CN112144712A (en) | Dry hanging design structure of assembled aluminum plate curtain wall and mounting method thereof | |
| CN216239222U (en) | Dry hanging structure of stone curtain wall | |
| CN214784748U (en) | Floor double-inclined keel | |
| CN219033757U (en) | Adjustable suspended ceiling structure | |
| CN217998552U (en) | Aluminum alloy curtain wall structure | |
| CN217679935U (en) | Multi-point location modularization furred ceiling mounting structure of resistance to deformation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230725 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |