CN219411306U - Wall connection node structure - Google Patents
Wall connection node structure Download PDFInfo
- Publication number
- CN219411306U CN219411306U CN202320867112.1U CN202320867112U CN219411306U CN 219411306 U CN219411306 U CN 219411306U CN 202320867112 U CN202320867112 U CN 202320867112U CN 219411306 U CN219411306 U CN 219411306U
- Authority
- CN
- China
- Prior art keywords
- main board
- wall
- rod
- plate
- frame column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本申请涉及一种墙体连接节点构造,涉及建筑墙体的领域,其包括主框柱、连接组件和延长板;所述连接组件位于所述主框柱外侧,所述连接组件包括主板和加强板,主板一端与所述主框柱固定连接,另一端与所述加强板固定连接,所述加强板和所述主板之间形成有夹角,所述主板两侧各设有一个所述加强板的拼接侧;所述延长板上开设有插接槽,所述插接槽用于供所述加强板的拼接侧插入;所述延长板的高度小于所述主框柱的高度,以使所述延长板和所述加强板的拼接侧之间形成连通空间,连通空间用于连通加强板靠近主框柱的一侧和远离主框柱的一侧。本申请具有简化施工步骤的效果。
The application relates to a connection node structure of a wall, and relates to the field of building walls, which includes a main frame column, a connecting assembly and an extension plate; the connecting assembly is located outside the main frame column, and the connecting assembly includes a main board and a reinforcement plate, one end of the main board is fixedly connected to the main frame column, and the other end is fixedly connected to the reinforcement board, an angle is formed between the reinforcement board and the main board, and a splicing side of the reinforcement board is provided on both sides of the main board; The height is smaller than the height of the main frame column, so that a communication space is formed between the splicing side of the extension plate and the reinforcement plate, and the communication space is used to connect the side of the reinforcement plate close to the main frame column and the side away from the main frame column. This application has the effect of simplifying construction steps.
Description
技术领域technical field
本申请涉及建筑墙体的领域,尤其是涉及一种墙体连接节点构造。The present application relates to the field of building walls, in particular to a wall connection node structure.
背景技术Background technique
在进行建筑墙体施工时,通常需要在两面墙的连接处设置钢筋笼,来提高墙体连接的稳固度,例如,申请号为的中国专利公开了一种预制夹心墙与预制夹心墙的垂直转角连接节点结构,包括于一建筑物的垂直转角处连接的第一预制夹心墙和第二预制夹心墙,第一预制夹心墙和第二预制夹心墙分别包括位于两侧的预制层和位于中间的夹心现浇层,第一、二预制夹心墙连接端的内侧预制层直接垂直连接,使第一、二预制夹心墙连接端之间形成一转角部,第一预制夹心墙的夹心现浇层内的分布筋伸入转角部,转角部内设置T型钢筋笼,该T型钢筋笼与第一预制夹心墙的分布筋连接固定,且转角部内现浇混凝土形成现浇柱而将第一预制夹心墙和第二预制夹心墙连接固定。When carrying out building wall construction, it is usually necessary to set a reinforcement cage at the junction of two walls to improve the stability of the wall connection. For example, the Chinese patent application No. discloses a vertical corner connection node structure between a prefabricated sandwich wall and a prefabricated sandwich wall, which includes a first prefabricated sandwich wall and a second prefabricated sandwich wall connected at a vertical corner of a building. The inner prefabricated layer of the connecting end of the sandwich wall is directly vertically connected, so that a corner is formed between the connecting ends of the first and second prefabricated sandwich walls. The distribution bars in the sandwich cast-in-place layer of the first prefabricated sandwich wall extend into the corner, and a T-shaped steel reinforcement cage is arranged in the corner.
针对上述中的相关技术,在施工过程中,需要进行钢筋笼的绑扎,也需将其他钢筋与钢筋笼绑扎固定,其会导致整个施工过程较为繁琐,因此,如何简化施工过程是亟待解决的问题。In view of the related technologies mentioned above, during the construction process, it is necessary to bind the steel cage, and also to bind and fix other steel bars to the steel cage, which will make the whole construction process more cumbersome. Therefore, how to simplify the construction process is an urgent problem to be solved.
实用新型内容Utility model content
为了简化施工过程,本申请提供一种墙体连接节点构造。In order to simplify the construction process, the present application provides a wall connection node structure.
本申请提供的一种墙体连接节点构造采用如下的技术方案:A wall connection node structure provided by the application adopts the following technical scheme:
一种墙体连接节点构造,包括主框柱、连接组件和延长板;A wall connection node structure, including main frame columns, connection components and extension plates;
所述连接组件位于所述主框柱外侧,所述连接组件包括主板和加强板,主板一端与所述主框柱固定连接,另一端与所述加强板固定连接,所述加强板和所述主板之间形成有夹角,所述主板两侧各设有一个所述加强板的拼接侧;The connection assembly is located outside the main frame column, and the connection assembly includes a main board and a reinforcement plate. One end of the main board is fixedly connected to the main frame column, and the other end is fixedly connected to the reinforcement board. An angle is formed between the reinforcement board and the main board, and a splicing side of the reinforcement board is provided on both sides of the main board;
所述延长板上开设有插接槽,所述插接槽用于供所述加强板的拼接侧插入;An insertion slot is opened on the extension plate, and the insertion slot is used for inserting the splicing side of the reinforcement plate;
所述延长板的高度小于所述主框柱的高度,以使所述延长板和所述加强板的拼接侧之间形成连通空间,连通空间用于连通加强板靠近主框柱的一侧和远离主框柱的一侧。The height of the extension plate is smaller than the height of the main frame column, so that a communication space is formed between the extension plate and the spliced side of the reinforcement plate, and the communication space is used to connect the side of the reinforcement plate close to the main frame column and the side away from the main frame column.
通过采用上述技术方案,在施工过程中,将主框柱固定于桩基,再将延长板插接于加强板上,随后在连接组件两侧搭建模板,便可进行混凝土浇筑,其相对于现有技术而言,无需进行钢筋的绑扎作业,只需将主板焊接于主框柱和加强板之间即可,其简化了施工步骤;再者,由于后续需要进行模板的安装,因此,采用合适型号的延长板对加强板进行延长,以使两侧的延长板相互远离的一侧之间的间距与墙体的厚度一致,后续只需将延长板夹紧于模板和加强板之间,便可确定模板的安装位置,无需对模板的安装位置进行再次定位,其进一步的简化了施工步骤;进一步的,由于本申请预留了连通空间,使得后续加强板靠近主框柱的一侧和远离主框柱的一侧是通过一体浇筑成型的混凝土连接固定,而并非是被延长板将加强板两侧隔离,其能够提高墙体的稳固度。By adopting the above technical solution, during the construction process, the main frame column is fixed to the pile foundation, and the extension plate is inserted into the reinforcement plate, and then the formwork is built on both sides of the connection assembly, and the concrete can be poured. Compared with the prior art, there is no need to carry out the binding operation of the steel bars, and only the main frame column and the reinforcement plate need to be welded, which simplifies the construction steps. The thickness is consistent, and the installation position of the formwork can be determined by clamping the extension plate between the formwork and the reinforcement plate later, without repositioning the installation position of the formwork, which further simplifies the construction steps; further, because the application reserves a connecting space, the side of the subsequent reinforcement plate close to the main frame column and the side away from the main frame column are connected and fixed by integrally poured concrete instead of being isolated by the extension plate on both sides of the reinforcement plate, which can improve the stability of the wall.
可选的,还包括调节组件,所述调节组件包括转动杆和紧固件;Optionally, an adjustment assembly is also included, and the adjustment assembly includes a rotating rod and a fastener;
所述转动杆通过所述紧固件可拆卸连接于所述延长板,所述转动杆端部位于所述插接槽靠近连通空间的一侧时,所述转动杆端部能够与所述加强板的拼接侧接触。The rotating rod is detachably connected to the extension plate through the fastener, and when the end of the rotating rod is located on the side of the insertion groove close to the communication space, the end of the rotating rod can contact the splicing side of the reinforcing plate.
通过采用上述技术方案,对于型号不符合墙体厚度需求的延长板而言,通过紧固件将转动杆固定在延长板上,并使得转动杆端部与加强板的拼接侧抵接,从而能够通过转动杆来使得延长板移动至所需的墙体厚度处,其能够提高延长板的通用性。By adopting the above technical solution, for the extension board whose model does not meet the wall thickness requirements, the rotating rod is fixed on the extension board through the fastener, and the end of the rotating rod is abutted against the splicing side of the reinforcement board, so that the extension board can be moved to the required wall thickness by rotating the rod, which can improve the versatility of the extension board.
可选的,所述主板上开设有连通孔。Optionally, communicating holes are opened on the main board.
通过采用上述技术方案,浇筑混凝土的过程中,混凝土进入连通孔内,浇筑于连通孔内的混凝土能够将主板两侧的混凝土连接,其能够提高主板与混凝土墙体之间的锚固度。By adopting the above technical solution, during the process of pouring concrete, the concrete enters the communication hole, and the concrete poured in the communication hole can connect the concrete on both sides of the main board, which can improve the anchorage between the main board and the concrete wall.
可选的,还包括辅助装置,所述辅助装置包括拉杆,所述主板两侧均设有所述拉杆;Optionally, an auxiliary device is also included, the auxiliary device includes a pull rod, and the pull rods are provided on both sides of the main board;
所述拉杆一端与主板连接,另一端可拆卸连接有限位板。One end of the pull rod is connected to the main board, and the other end is detachably connected to the limiting plate.
通过采用上述技术方案,采用辅助组件将模板与主板固定,作业时,将拉杆一端连接于主板,并通过延长板和限位板将模板夹持,其相对于传统的对拉螺杆而言,无需将对拉螺杆中位于浇筑模腔内的螺母调整至合适位置,只需使得位于模板外侧的限位板对模板进行限位,其进一步的方便了人员进行施工作业。By adopting the above-mentioned technical scheme, the formwork and the main board are fixed by using auxiliary components. During operation, one end of the pull rod is connected to the main board, and the formwork is clamped by the extension plate and the limiting plate. Compared with the traditional pulling screw, there is no need to adjust the nuts in the casting mold cavity in the pulling screw to a suitable position. It is only necessary to make the limit plate located outside the formwork to limit the formwork, which further facilitates the construction work of personnel.
可选的,所述拉杆与所述主板可拆连接,所述拉杆外套设有套筒。Optionally, the pull rod is detachably connected to the main board, and a sleeve is provided outside the pull rod.
通过采用上述技术方案,若是无需拆除拉杆,则只需在混凝土凝固后,将拉杆延伸至墙体外的部分切割即可,其保留了拉杆,当拉杆的材质为钢材时,其能够提高墙体的稳固度;若是需要拆除拉杆,则在浇筑混凝土前,使套筒一端与主板接触,另一端与模板接触,后续拆除拉杆的过程中,由于套筒的存在,会将拉杆和混凝土隔离,其能够便于后续拆除拉杆。By adopting the above technical solution, if there is no need to remove the tie rods, it is only necessary to cut the part of the tie rods extending to the outside of the wall after the concrete has solidified, which retains the tie rods. When the tie rods are made of steel, it can improve the stability of the wall; if the tie rods need to be removed, one end of the sleeve is in contact with the main board and the other end is in contact with the formwork before pouring concrete.
可选的,所述辅助装置还包括对接组件,所述对接组件包括第一连接杆和第二连接杆;Optionally, the auxiliary device further includes a docking assembly, and the docking assembly includes a first connecting rod and a second connecting rod;
所述第一连接杆固定连接于其中一个所述拉杆端壁,第二连接杆固定连接于另一所述拉杆端壁;The first connecting rod is fixedly connected to one of the end walls of the tie rods, and the second connecting rod is fixedly connected to the other end wall of the tie rods;
所述第一连接杆端壁开设有螺纹孔,所述第二连接杆在所述螺纹孔内与所述第一连接杆螺纹配合连接;The end wall of the first connecting rod is provided with a threaded hole, and the second connecting rod is threadedly connected with the first connecting rod in the threaded hole;
所述主板上开设有连接孔,所述第一连接杆位于所述连接孔内。A connecting hole is opened on the main board, and the first connecting rod is located in the connecting hole.
通过采用上述技术方案,需要将两个拉杆拆卸时,只需拧动拉杆以使得第一连接杆和第二连接杆分离,便可将两个拉杆分离,其便于人员进行拆除作业。By adopting the above technical solution, when the two pull rods need to be disassembled, the two pull rods can be separated only by twisting the pull rods to separate the first connecting rod and the second connecting rod, which is convenient for personnel to carry out the dismantling operation.
可选的,所述对接组件位于所述连接孔内时,所述拉杆靠近所述对接组件的一端壁与所述主板侧壁接触。Optionally, when the docking assembly is located in the connection hole, an end wall of the tie rod close to the docking assembly is in contact with the side wall of the main board.
通过采用上述技术方案,通过将拉杆端壁与主板接触,能够减少混凝土进入连接孔内,从而能够防止混凝土将连接孔内壁和第一连接杆固定,其便于后续对拉杆进行拆除作业。By adopting the above technical solution, by contacting the end wall of the tie rod with the main board, the concrete can be reduced from entering the connecting hole, thereby preventing the concrete from fixing the inner wall of the connecting hole and the first connecting rod, which facilitates subsequent removal of the tie rod.
可选的,所述拉杆靠近所述主板的一端外周壁开设有环槽,所述套筒端部固定连接有止挡环,所述止挡环套设于所述环槽内,且所述止挡环被夹持于环槽的槽壁和主板之间。Optionally, a ring groove is formed on the outer peripheral wall of one end of the pull rod close to the main board, a stop ring is fixedly connected to the end of the sleeve, the stop ring is sleeved in the ring groove, and the stop ring is clamped between the groove wall of the ring groove and the main board.
通过采用上述技术方案,通过在环槽内设置止挡环,可以由止挡环阻止混凝土进入拉杆端壁和主板之间,能够减少拉杆和主板之间被混凝土连接固定,其便于后续对拉杆的拆除。By adopting the above technical scheme, by setting the stop ring in the ring groove, the stop ring can prevent concrete from entering between the end wall of the tie rod and the main board, which can reduce the connection and fixation between the tie rod and the main board by concrete, which facilitates the subsequent removal of the tie rod.
可选的,所述环槽内还设有柔性环,所述柔性环夹持于所述止挡环和所述主板之间,且所述拉杆和所述主板接触时,所述柔性环处于被所述止挡环和所述主板挤压的压缩状态。Optionally, a flexible ring is further provided in the ring groove, the flexible ring is clamped between the stop ring and the main board, and when the pull rod contacts the main board, the flexible ring is in a compressed state squeezed by the stop ring and the main board.
通过采用上述技术方案,通过对柔性环挤压,使得柔性环紧贴主板侧壁,其能够进一步减少混凝土进入拉杆和主板的接触处。By adopting the above technical solution, the flexible ring is squeezed so that the flexible ring is close to the side wall of the main board, which can further reduce the concrete from entering the contact between the tie rod and the main board.
综上所述,本申请包括以下至少一种有益技术效果:In summary, the present application includes at least one of the following beneficial technical effects:
1.通过设置主框柱、连接组件和延长板,无需进行钢筋的绑扎作业,只需将主板焊接于主框柱和加强板之间即可,其简化了施工步骤;1. By setting the main frame columns, connecting components and extension plates, there is no need to carry out the binding work of the steel bars, and only the main plate needs to be welded between the main frame columns and the reinforcement plates, which simplifies the construction steps;
2.通过设置调节组件能够提高延长板的通用性;2. The versatility of the extension board can be improved by setting the adjustment components;
3.通过设置辅助组件将模板与主板固定,能够进一步便于人员进行施工作业。3. The template and the main board are fixed by setting auxiliary components, which can further facilitate the construction work of personnel.
附图说明Description of drawings
图1是本申请实施例的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the embodiment of the present application;
图2是图1中A部分的放大示意图;Fig. 2 is the enlarged schematic diagram of part A in Fig. 1;
图3是本申请实施例中辅助装置和模板在连接状态下的结构示意图;Fig. 3 is a schematic diagram of the structure of the auxiliary device and the template in the connected state in the embodiment of the present application;
图4是本申请实施例中辅助装置的结构示意图;Fig. 4 is a schematic structural diagram of an auxiliary device in an embodiment of the present application;
图5是本申请实施例中辅助装置的剖面结构示意图;Fig. 5 is a schematic cross-sectional structure diagram of an auxiliary device in an embodiment of the present application;
图6是图5中B部分的放大示意图。FIG. 6 is an enlarged schematic view of part B in FIG. 5 .
附图标记说明:1、主框柱;2、连接组件;21、主板;211、连通孔;212、连接孔;22、加强板;221、拼接侧;3、延长板;31、插接槽;4、调节组件;41、转动杆;42、紧固件;5、模板;6、辅助装置;61、拉杆;611、限位板;612、环槽;62、对接组件;621、第一连接杆;6211、螺纹孔;622、第二连接杆;7、套筒;71、止挡环;72、柔性环。Description of reference signs: 1, main frame column; 2, connection assembly; 21, main board; 211, communication hole; 212, connection hole; 22, reinforcement plate; 221, splicing side; 3, extension plate; 31, insertion slot; 4, adjustment assembly; 41, rotation rod; 42, fastener; 5, template; 6, auxiliary device; 61, pull rod; ; 6211, threaded hole; 622, second connecting rod; 7, sleeve; 71, stop ring; 72, flexible ring.
具体实施方式Detailed ways
以下结合附图1-6对本申请作进一步详细说明。The present application will be described in further detail below in conjunction with accompanying drawings 1-6.
本申请实施例公开一种墙体连接节点构造。参照图1,墙体连接节点构造包括主框柱1、连接组件2和延长板3。The embodiment of the present application discloses a wall connection node structure. Referring to FIG. 1 , the wall connection node structure includes a main frame column 1 , a connection assembly 2 and an extension plate 3 .
参照图1,主框柱1竖直放置,且主框柱1的水平横截面呈正方形框状,连接组件2位于主框柱1外侧,连接组件2的个数根据实际需要确定,若是需要一字形墙,则在主框柱1正对的两侧各设一个连接组件2,若是需要T字形墙,则在主框柱1的三个侧壁均安装连接组件2,以供后续混凝土浇筑完成后形成T形墙体,本实施例优选为T形墙体。Referring to Fig. 1 , the main frame column 1 is placed vertically, and the horizontal cross section of the main frame column 1 is in the shape of a square frame. The connecting components 2 are located outside the main frame column 1. The number of connecting components 2 is determined according to actual needs.
参照图1,连接组件2包括主板21和加强板22,主板21和加强板22均竖直放置,主板21一侧与主框柱1外壁焊接,另一端加强板22焊接,主板21垂直于与其自身连接的主框柱1侧壁设置,且主板21与加强板22之间形成有夹角,本实施例优选为主板21垂直于加强板22设置,主板21两侧各有一个加强板22的拼接侧221。为了增大主板21与后续浇筑混凝土之间的锚固度,主板21上贯穿开设有连通孔211。Referring to Fig. 1 , the connection assembly 2 includes a main board 21 and a reinforcing board 22, both of which are placed vertically, one side of the main board 21 is welded to the outer wall of the main frame column 1, and the other end is welded to the reinforcing board 22, the main board 21 is arranged perpendicular to the side wall of the main frame column 1 connected to itself, and an angle is formed between the main board 21 and the reinforcing board 22, and in this embodiment, the main board 21 is preferably arranged perpendicular to the reinforcing board 22, and there is a splicing side 221 of a reinforcing board 22 on both sides of the main board 21. In order to increase the anchorage between the main board 21 and the subsequent concrete pouring, the main board 21 is provided with a communication hole 211 through it.
参照图1、图2和图3,由于在后续浇筑混凝土前,需要先进行模板5的搭建,两个模板5之间的厚度为后续浇筑的墙体厚度,为此,为了便于确定两个模板5之间的间距,在加强板22的两个拼接侧221各设置一个延长板3,以使得延长板3能够与模板5接触,后续只需将模板5与延长板3远离主板21的一端接触便可确定模板5的安装位置。Referring to Fig. 1, Fig. 2 and Fig. 3, since the formwork 5 needs to be constructed before the subsequent pouring of concrete, the thickness between the two formworks 5 is the wall thickness of the subsequent pouring. For this reason, in order to facilitate the determination of the distance between the two formworks 5, an extension plate 3 is provided on each of the two splicing sides 221 of the reinforcing plate 22, so that the extension plate 3 can be in contact with the formwork 5, and the installation position of the formwork 5 can be determined only by contacting the end of the formwork 5 and the end of the extension plate 3 away from the main board 21.
参照图1和图2,延长板3竖直放置,延长板3侧壁开设有插接槽31,且插接槽31贯穿延长板3的顶壁和底壁,插接槽31用于供加强板22的拼接侧221插入;延长板3的底壁与加强板22的底壁平齐,且延长板3的高度小于加强板22的高度,使得延长板3上方和加强板22侧方形成连通空间,来连通加强板22靠近主板21一侧和远离主板21的一侧,使得后续加强板22靠近主板21的一侧和远离主板21的一侧是通过一体浇筑成型的混凝土连接固定,而并非是被延长板3将加强板22两侧隔离,其能够提高墙体的稳固度。Referring to Fig. 1 and Fig. 2, the extension board 3 is placed vertically, and the side wall of the extension board 3 is provided with an insertion groove 31, and the insertion groove 31 runs through the top wall and the bottom wall of the extension board 3, and the insertion groove 31 is used for inserting the splicing side 221 of the reinforcement board 22; One side and the side away from the main board 21, so that the side of the subsequent reinforcement board 22 close to the main board 21 and the side away from the main board 21 are connected and fixed by integrally poured concrete, rather than being isolated by the extension board 3 on both sides of the reinforcement board 22, which can improve the stability of the wall.
参照图2,本实施例中,为了适应不同厚度的墙体,通过改变加强板22的拼接侧221插入插接槽31的深度来调整延长板3距离主板21的间距;为了提高加强板22和延长板3连接的稳定度,插接槽31的槽宽和加强板22的厚度一致,从而能够使加强板22插入插接槽31时,加强板22正对的两侧壁与插接槽31正对的两内侧壁接触。Referring to Fig. 2, in the present embodiment, in order to adapt to walls of different thicknesses, the distance between the extension board 3 and the main board 21 is adjusted by changing the depth at which the splicing side 221 of the reinforcement board 22 is inserted into the insertion groove 31;
参照图2,连接节点构造还包括有调节组件4,调节组件4包括转动杆41和紧固件42;本实施例中转动杆41位于延长板3顶壁上方,紧固件42连接于延长板3远离主板21的一侧顶部,紧固件42为蝶形螺丝,紧固件42的螺纹段穿过转动杆41后螺纹连接于延长板3,转动杆41水平设置,且转动杆41能够沿紧固件42转动。需要将转动杆41固定于延长板3时,只需通过转动紧固件42的蝶形把手部分来拧动紧固件42转动,便可将转动杆41夹紧于紧固件42的蝶形把手部分和延长板3之间;需要将转动杆41沿延长板3转动时,只需反向转动紧固件42,随后便可对转动杆41进行转动。Referring to Fig. 2, the connection node structure also includes an adjustment assembly 4, and the adjustment assembly 4 includes a rotating rod 41 and a fastener 42; When the rotating rod 41 needs to be fixed on the extension plate 3, only the butterfly handle part of the fastener 42 needs to be twisted to rotate the fastener 42, and the rotating rod 41 can be clamped between the butterfly handle part of the fastener 42 and the extension plate 3;
参照图2和图3,在安装模板5前,先将延长板3沿加强板22移动至所需位置,然后将转动杆41进行转动,直至转动杆41远离紧固件42的一端与加强板22接触,随后通过紧固件42将转动杆41固定至延长板3,以阻止加强板22更深入的插入至插接槽31内。后续在安装模板5的过程中,只需移动延长板3以使紧固件42与加强板22接触,再移动模板5以使模板5与延长板3接触即可。2 and 3, before installing the template 5, first move the extension plate 3 to the desired position along the reinforcing plate 22, then rotate the rotating rod 41 until the end of the rotating rod 41 away from the fastener 42 is in contact with the reinforcing plate 22, and then the rotating rod 41 is fixed to the extending plate 3 by the fastener 42, so as to prevent the reinforcing plate 22 from being inserted deeper into the insertion groove 31. In the subsequent process of installing the formwork 5 , it is only necessary to move the extension plate 3 so that the fastener 42 contacts the reinforcing plate 22 , and then move the formwork 5 so that the formwork 5 contacts the extension plate 3 .
参照图4、图5和图6,连接节点构造还包括辅助装置6,辅助装置6包括拉杆61和对接组件62,拉杆61设有两个,且拉杆外周壁车有外螺纹,对接组件62用于将两个拉杆61可拆卸连接;对接组件62包括第一连接杆621和第二连接杆622;第一连接杆621一端同轴焊接于其中一个拉杆61端壁,另一端同轴开设有螺纹孔6211;第二连接杆622一端焊接于另一个拉杆61端壁,另一端外周壁车有外螺纹,第二连接杆622在螺纹孔6211内与第一连接杆621螺纹配合连接,以实现两个拉杆61之间的可拆卸连接。Referring to Fig. 4, Fig. 5 and Fig. 6, the connection node structure also includes an auxiliary device 6. The auxiliary device 6 includes a pull rod 61 and a docking assembly 62. There are two pull rods 61, and the outer peripheral wall of the pull rods has external threads. The docking assembly 62 is used to detachably connect the two pull rods 61; the docking assembly 62 includes a first connecting rod 621 and a second connecting rod 622; one end of the first connecting rod 621 is coaxially welded to the end wall of one of the pull rods 61, and the other end is coaxially provided with a threaded hole 6211 One end of the second connecting rod 622 is welded to another pull rod 61 end wall, and the outer peripheral wall of the other end has external threads, and the second connecting rod 622 is threadedly connected with the first connecting rod 621 in the threaded hole 6211 to realize the detachable connection between the two pull rods 61.
参照图6,为了将辅助装置6与主板21连接,主板21上开设有连接孔212,第一连接杆621穿设于连接孔212内,第一连接杆621和第二连接杆622在连接孔212内螺纹配合时,两个拉杆61相互靠近的一端壁均与主板21接触,以由两个拉杆61对主板21进行夹持。6, in order to connect the auxiliary device 6 with the main board 21, the main board 21 is provided with a connecting hole 212, and the first connecting rod 621 is passed through the connecting hole 212.
参照图6,为了便于后续将拉杆61从浇筑完成的混凝土中分离,拉杆61外同轴套接有套筒7,套筒7为PVC材质,套筒7靠近主板21的一端内圈同轴固接有止挡环71,本实施例中止挡环71和套筒7一体连接;拉杆61靠近主板21的一端外周壁同轴开设有环槽612,止挡环71同轴位于环槽612内,环槽612内还同轴设有柔性环72,柔性环72的材质为柔性橡胶,柔性环72夹设于止挡环71和主板21之间,且当拉杆61端壁与主板21接触时,柔性环72处于被止挡环71和主板21挤压的状态。Referring to Fig. 6 , in order to facilitate the subsequent separation of the pull rod 61 from the poured concrete, the pull rod 61 is coaxially sleeved with a sleeve 7. The sleeve 7 is made of PVC. A stop ring 71 is coaxially fixed on the inner ring of the end of the sleeve 7 close to the main board 21. In this embodiment, the stop ring 71 and the sleeve 7 are integrally connected; A flexible ring 72 is coaxially arranged in the groove 612. The material of the flexible ring 72 is flexible rubber. The flexible ring 72 is sandwiched between the stop ring 71 and the main board 21.
参照图4和图5,为了便于将拉杆61固定于模板5,拉杆61穿设于模板5,且拉杆61位于模板5远离主板21的一端螺纹连接有限位板611,模板5被夹紧于限位板611和延长板3之间;另外,为了减少拉杆61与混凝土接触,套筒7远离主板21的一端与模板5接触。Referring to Fig. 4 and Fig. 5, in order to facilitate fixing the tie rod 61 to the formwork 5, the tie rod 61 is passed through the formwork 5, and the end of the tie rod 61 located at the end of the formwork 5 away from the main board 21 is screwed to the limit plate 611, and the formwork 5 is clamped between the limit plate 611 and the extension plate 3;
本申请实施例一种墙体连接节点构造的实施原理为:施工过程中,将主框柱1竖直放置,再通过移动延长板3以使得加强板22的拼接侧221插入插接槽31内,随后将延长板3移动至安装位置,延长板3处于安装位置时,主板21两侧的延长板3相互远离的一端侧壁之间的间距与墙体的厚度一致,将延长板3移动至安装位置后,通过对转动杆41进行转动以使得转动杆41端部与延长板3接触,再用紧固件42将转动杆41固定至延长板3即可,之后,通过上述方式将所有的延长板3安装就位。The implementation principle of a wall connection node structure in the embodiment of the present application is: during the construction process, place the main frame column 1 vertically, and then move the extension plate 3 so that the splicing side 221 of the reinforcement plate 22 is inserted into the insertion groove 31, and then move the extension plate 3 to the installation position. The end part is in contact with the extension board 3 , and then the rotating rod 41 is fixed to the extension board 3 with the fastener 42 , and then all the extension boards 3 are installed in place through the above-mentioned method.
将延长板3安装完成后,通过对接组件62将辅助装置6安装于主板21上,若是后续无需将拉杆61摘除,则无需在拉杆61上套接套筒7和柔性环72,若是后续需要将拉杆61摘除,则需要在拉杆61上套接套筒7和柔性环72,将辅助装置6安装完成后,将模板5套接于拉杆61上,并将限位板611与拉杆61螺纹连接以将模板5夹持于限位板611和延长板3之间;待模板5就位后,便可进行混凝土浇筑作业。After the extension plate 3 is installed, the auxiliary device 6 is installed on the main board 21 through the docking assembly 62. If the pull rod 61 does not need to be removed later, the sleeve 7 and the flexible ring 72 do not need to be inserted on the pull rod 61. If the pull rod 61 needs to be removed later, the sleeve 7 and the flexible ring 72 need to be connected to the pull rod 61. The formwork 5 is clamped between the limiting plate 611 and the extension plate 3; after the formwork 5 is in place, the concrete pouring operation can be performed.
后续需要对拉杆61进行拆除时,依次拆除限位板611、模板5和辅助装置6,将辅助装置6拆除后,对混凝土形成的孔进行封堵即可。When the tie rod 61 needs to be removed later, the limiting plate 611, the template 5 and the auxiliary device 6 are removed in sequence, and after the auxiliary device 6 is removed, the hole formed by the concrete can be blocked.
以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。All of the above are preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore, all equivalent changes made according to the structure, shape, and principle of the present application should be covered within the protection scope of the present application.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320867112.1U CN219411306U (en) | 2023-04-17 | 2023-04-17 | Wall connection node structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320867112.1U CN219411306U (en) | 2023-04-17 | 2023-04-17 | Wall connection node structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219411306U true CN219411306U (en) | 2023-07-25 |
Family
ID=87231275
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320867112.1U Expired - Fee Related CN219411306U (en) | 2023-04-17 | 2023-04-17 | Wall connection node structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219411306U (en) |
-
2023
- 2023-04-17 CN CN202320867112.1U patent/CN219411306U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN211923525U (en) | A composite formwork of structural columns at right-angle corners of walls and the intersections of walls | |
| CN106150087B (en) | A kind of combined frame column template and its construction method | |
| CN110145124A (en) | A reinforcement tool and its construction method for controlling the quality of horizontal stubble of shear walls | |
| CN105965672A (en) | Integrated formwork for assembly type shear wall form structure | |
| CN212405468U (en) | Stiff concrete structure beam column core area structure | |
| CN110748159B (en) | Building beam column construction pouring construction steel template | |
| CN115354846A (en) | Auxiliary post-pouring device for assembled type superimposed shear wall structure and using method thereof | |
| CN219080981U (en) | Non-support fixing device for post-pouring strip of superimposed sheet | |
| CN202509764U (en) | Template bracing structure for constructional column | |
| CN202831624U (en) | Template for deformation joint of shear wall | |
| CN206942138U (en) | Cast template splices bridge plate | |
| CN219235618U (en) | Concrete mold for easy demoulding of concrete | |
| CN210025768U (en) | A operation platform system for caisson template installation | |
| CN211682683U (en) | Pouring template convenient to enter mold | |
| CN207063499U (en) | A kind of detachable lossless template climbing frame is encorbelmented channel-section steel fixing device | |
| CN218815207U (en) | Corner structure column template structure | |
| CN217557650U (en) | Detachable superimposed sheet post-cast strip hangs mould instrument | |
| CN212176097U (en) | Temporary fixing system for embedded steel plates on surface of wall | |
| CN210828346U (en) | Anti-bank reinforcing apparatus | |
| CN115822241A (en) | Formwork support without chiseling and its construction method | |
| CN211250580U (en) | A reinforced floor slab pouring formwork for easy demoulding | |
| CN115324331A (en) | Mould lifting tool for horizontal post-cast strip construction | |
| CN215484618U (en) | A pouring formwork structure for prefabricated shear walls and columns | |
| CN224173728U (en) | A permanent side beam reinforcement device | |
| CN214462514U (en) | Sewage treatment plant's construction connection structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230725 |