CN219410833U CN202320873544.3U CN202320873544U CN219410833U CN 219410833 U CN219410833 U CN 219410833U CN 202320873544 U CN202320873544 U CN 202320873544U CN 219410833 U CN219410833 U CN 219410833U
Authority
CN
China
Prior art keywords
photovoltaic
block
fixedly connected
reinforced concrete
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320873544.3U
Other languages
Chinese (zh)
Inventor
周成贤
赵敏
赵立峰
赵长江
李尚义
刘新雨
赵鹏
唐亮亮
朱成林
刘银霞
段雪娇
何登武
包泽龙
高崇明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN202320873544.3U priority Critical patent/CN219410833U/en
Application granted granted Critical
Publication of CN219410833U publication Critical patent/CN219410833U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to the technical field of cage clamping devices, and discloses a foundation cage clamping device for a photovoltaic reinforced concrete bored concrete pile. The utility model discloses a setting of first knob, thread groove, stirrup and nut has realized the installation time that can accelerate card cage device, has reduced the effect of management cost, has improved work efficiency, has solved card cage device in the in-process of using, needs to adjust the location of card cage, but current card cage device overall structure complicacy, installation and dismantlement not enough convenient and fast's problem.

Description

Cage clamping device for foundation of photovoltaic reinforced concrete bored concrete pile
Technical Field
The utility model relates to the technical field of cage clamping devices, in particular to a cage clamping device for a foundation of a photovoltaic reinforced concrete bored concrete pile.
Background
In the application process of the photovoltaic support pile foundation, the bored pile is most widely applied, the stirrup in the pile foundation acts as a whole to make the stud and concrete atress, if the wrapping effect of the stirrup is not available, the inserted stud will lose meaning, and the pile foundation can be toppled over due to reasons such as weather, thereby influencing the construction period, and the cage clamping device is required to stabilize the pile foundation, but some problems still occur in the actual use process of the existing cage clamping device.
The utility model discloses a pile foundation steel reinforcement cage accurate positioning clamping frame device, including a pile casing and locator, the upper end outer wall of a pile casing is fixed with the retainer, and the top of retainer is provided with the locating rack, the inboard at a pile casing is installed to the locator, and the locator comprises direction location steel pipe, rings and location steel sheet, the top terminal surface welding of direction location steel pipe has rings, and the top outer wall of direction location steel pipe is fixed with the location steel sheet, has accelerated pile foundation steel reinforcement cage installation time greatly, has shortened the project time limit for a project, has reduced project management cost's characteristics, and the card cage device is in the in-process of using need adjust the location of card cage, but current card cage device overall structure is complicated, installation and dismantlement are convenient and fast inadequately, and card cage device probably receives the influence of ground unevenness and then influences the pouring precision of pile foundation when using, leads to the condition that appears the dew after pouring is accomplished, influences the result in using effect.
The problems described above are addressed. Therefore, a clamping cage device for a foundation of a photovoltaic reinforced concrete bored concrete pile is provided.
Disclosure of Invention
The utility model aims to provide a foundation clamping cage device for a photovoltaic reinforced concrete bored concrete pile, which adopts the device to work, so that the problems that the positioning of a clamping cage needs to be adjusted in the use process of the clamping cage device, the whole structure of the existing clamping cage device is complex, the installation and the disassembly are not convenient and quick enough, the clamping cage device can be influenced by uneven ground during the use, the pouring precision of a pile foundation is influenced, exposed ribs appear after the pouring is finished, and the use effect is influenced are solved.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a photovoltaic reinforced concrete bored concrete pile basis card cage device, includes the support foot rest, at the support steel pipe at support foot rest top, and support foot rest is provided with two sets of, the top of support foot rest rotates and is connected with the support bar, and the support bar is provided with two sets of, two sets of the other end of support bar all set up in the one end of support steel pipe, a set of one side of support bar rotate and be connected with a fixed section of thick bamboo, and a fixed section of thick bamboo runs through in two sets of support bar, the left and right sides of support steel pipe still is provided with the stirrup, a set of the inboard fixedly connected with connecting strip of stirrup, and the connecting strip is provided with the multiunit, one side rotation of connecting strip is connected with the nut.
Preferably, the inner side of the nut is in threaded connection with a main rib, the outer side of the main rib is fixedly connected with a binding wire, and the other end of the main rib extends to the inner side of the other group of connecting strips.
By adopting the design of the structure, the working efficiency of an operator in the process of installing the main rib can be effectively improved through the arrangement of the nuts, and the convenience in use is improved.
Preferably, a clamping groove is formed in one side of the supporting steel pipe, a thread groove is further formed in the inner side of the clamping groove, a first knob is rotatably connected to one side of the fixed cylinder, and the other end of the first knob extends to the inside of the fixed cylinder and is fixedly connected with a screw rod.
By adopting the design of the structure, the transmission direction of the first knob is changed through the arrangement of the screw rod, and the working flow is advanced.
Preferably, the outside threaded connection of lead screw has the movable block, and movable block sliding connection is in the inside of fixed cylinder, and the other end fixedly connected with transmission piece of movable block, transmission piece and thread groove phase-match.
By adopting the design of the structure, the support bars can be stably arranged on the two sides of the support steel pipe through the arrangement of the transmission block and the thread groove, and meanwhile, the support bars are convenient to detach.
Preferably, the bottom of the supporting foot rest is fixedly connected with an adjusting seat, two groups of adjusting seats are arranged, one side of each adjusting seat is rotationally connected with a second knob, and the other end of each second knob extends to the inside of each adjusting seat and is fixedly connected with a positive and negative tooth screw rod.
By adopting the design of the structure, the device can adapt to various terrains for pouring construction through the arrangement of the adjusting seat, and the condition of exposed ribs is effectively prevented.
Preferably, the left end and the right end of the positive and negative tooth screw rod are both in threaded connection with threaded blocks, the inside of the adjusting seat is also in sliding connection with a connecting block, the other end of the connecting block is fixedly connected with the bottom end of the supporting foot stool, the bottom of the connecting block is fixedly connected with a jacking block, and the inside of the adjusting seat is also fixedly connected with a fixing block.
By adopting the design of the structure, through the arrangement of the connecting block, an operator can adjust the height of the supporting foot rest only by rotating the second knob, and the working efficiency is improved.
Preferably, the left end and the right end of the threaded block are both rotationally connected with rotating bars, two groups of corresponding rotating bar rotating wheels are connected to two sides of the fixed block, and the other two groups of rotating bars are rotationally connected to two sides of the top block.
By adopting the design of the structure, the transmission direction of the second knob is changed through the arrangement of the rotating strip, so that the convenience in use is improved.
Compared with the prior art, the utility model has the following beneficial effects:
1. this application has realized the installation time that can accelerate card cage device through the setting of first knob, thread groove, stirrup and nut, has reduced the effect of management cost, has improved work efficiency, has solved card cage device in the in-process of using, needs to adjust the location of card cage, but current card cage device overall structure complicacy, installation and dismantlement not enough convenient and fast's problem.
2. This application passes through the setting of second knob, rotation strip, kicking block and connecting block, has realized that the device can accomplish under complicated topography and pour the operation and has avoided the effect that appears the condition of muscle, has solved card cage device and probably receives the influence of ground unevenness and then influences the pouring precision of pile foundation when using, leads to pouring the condition that appears the muscle after accomplishing, influences the problem of result of use.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is an enlarged block diagram of the portion A of FIG. 1 in accordance with the present utility model;
FIG. 3 is a block diagram of a fixture cartridge and a clamping slot of the present utility model;
FIG. 4 is a first knob and moving block configuration of the present utility model;
fig. 5 is a structural view of a second knob and a connection block of the present utility model.
In the figure: 1. a support foot rest; 11. a support bar; 12. a fixed cylinder; 121. a first knob; 122. a screw rod; 123. a moving block; 124. a transmission block; 13. a clamping groove; 131. a thread groove; 14. an adjusting seat; 141. a second knob; 142. positive and negative tooth screw rods; 143. a screw block; 144. a fixed block; 145. a top block; 146. rotating the strip; 147. a connecting block; 2. supporting the steel pipe; 21. stirrups; 211. a connecting strip; 212. a nut; 22. a main rib; 221. and (5) binding wires.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
For a further understanding of the present utility model, the present utility model will be described in detail with reference to the drawings.
Referring to fig. 1-3, a foundation clamping cage device for a photovoltaic reinforced concrete bored concrete pile comprises a support foot rest 1, a support steel pipe 2 at the top of the support foot rest 1, wherein the support foot rest 1 is provided with two groups, the top of the support foot rest 1 is rotationally connected with support bars 11, the support bars 11 are provided with two groups, the other ends of the support bars 11 of the two groups are all arranged at one ends of the support steel pipe 2, one side of the support bar 11 of the one group is rotationally connected with a fixed cylinder 12, the fixed cylinder 12 penetrates through the support bars 11 of the two groups, stirrups 21 are further arranged at the left end and the right end of the support steel pipe 2, connecting bars 211 are fixedly connected with the inner sides of the stirrups 21 of the one group, the connecting bars 211 are provided with a plurality of groups, and one side of the connecting bars 211 is rotationally connected with nuts 212.
The utility model is further described below with reference to examples.
Example 1
Referring to fig. 2-4, the inside threaded connection of nut 212 has main muscle 22, the outside fixedly connected with of main muscle 22 binds silk 221, and the other end of main muscle 22 extends to another group the inboard of connecting strip 211, draw-in groove 13 has been seted up to one side of supporting steel pipe 2, screw thread groove 131 has still been seted up to the inboard of draw-in groove 13, one side of fixed cylinder 12 rotates and is connected with first knob 121, the other end of first knob 121 extends to the inside of fixed cylinder 12 and fixedly connected with lead screw 122, the outside threaded connection of lead screw 122 has movable block 123, movable block 123 sliding connection is in the inside of fixed cylinder 12, the other end fixedly connected with transmission piece 124 of movable block 123, transmission piece 124 and screw thread groove 131 phase-match, the card cage device is in the in-process of using, need adjust the location of card cage, but current card cage device overall structure is complicated, install and dismantle convenient and fast inadequately, when using, put into the position of waiting to pour supporting steel pipe 2 at first, the outside of supporting steel pipe 22, when the other end of first knob 121 extends to the inside of fixed cylinder 12 and fixedly connected with lead screw 122, the outside threaded connection of lead screw 122 has movable block 123, movable block 123 sliding connection is in the inside fixed block 21, the inside of fixed block 21 is fixed at the inside of the fixed connection of main muscle 21 and the inside of the support piece 21 is installed at the inside of the support piece 22, the inside of the support piece 122 is driven at the time of the screw thread groove 122, the time of the support piece is adjusted to be in the time of the support piece 2, and the inside of the support piece is driven by the rotary device is driven to have the movable block 21, and the movable block is realized, and the movable block is in the inside of the support piece is in the time, and the end is driven and the support piece is in the main frame is in the main, and is in the device, and is in the time, and the cost is in the device.
Example 2
Referring to fig. 5, the bottom fixedly connected with adjustment seat 14 of support foot rest 1, and adjustment seat 14 is provided with two sets of, one side of adjustment seat 14 rotates and is connected with second knob 141, the other end of second knob 141 extends to the inside of adjustment seat 14 and fixedly connected with positive and negative tooth screw 142, the equal threaded connection in both ends has screw thread piece 143 about positive and negative tooth screw 142, the inside of adjustment seat 14 still sliding connection has connecting block 147, and the other end of connecting block 147 and the bottom fixed connection of support foot rest 1, the bottom fixedly connected with kicking block 145 of connecting block 147, the inside of adjustment seat 14 still fixedly connected with fixed block 144, the left and right sides of screw thread piece 143 all rotates and is connected with rotation strip 146, two sets of corresponding rotation strip 146 rotation wheels are connected in the both sides of fixed block 144, rotation strip 146 in other two sets of rotation connection in the both sides of kicking block 145, the card cage device is probably influenced by the surface unevenness and then influences the pouring precision of pile foundation, the condition of dew appears after leading to the appearance of dog to influence in use effect, when the road surface unevenness, when the bottom adjustment seat 14 of support foot rest 1 is rotated, the second lug 146 has been driven by rotation strip 146 and can drive the rotation strip 146 and can be located in the both sides of the screw thread piece 143 when the complex screw thread is located in the rotation of the rotation strip 146, and the tie-down device is accomplished, and the screw thread of the screw is located in the position of the rotation strip is located in the opposite sides of the position of the rotation of the screw piece 143.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a photovoltaic reinforced concrete bored concrete pile basis card cage device, includes support foot rest (1), at support steel pipe (2) at support foot rest (1) top, and support foot rest (1) are provided with two sets of, its characterized in that: the top of support foot rest (1) rotates and is connected with support bar (11), and support bar (11) are provided with two sets of, two sets of the other end of support bar (11) all set up the one end at support steel pipe (2), a set of one side of support bar (11) rotate and be connected with fixed section of thick bamboo (12), and fixed section of thick bamboo (12) run through in two sets of support bar (11), support steel pipe (2) control both ends and still be provided with stirrup (21), a set of the inboard fixedly connected with connecting strip (211) of stirrup (21), and connecting strip (211) are provided with the multiunit, one side rotation of connecting strip (211) is connected with nut (212).
2. The photovoltaic reinforced concrete bored concrete pile foundation clamping cage device according to claim 1, wherein: the inner side of the nut (212) is in threaded connection with a main rib (22), the outer side of the main rib (22) is fixedly connected with a binding wire (221), and the other end of the main rib (22) extends to the inner side of the other group of connecting strips (211).
3. The photovoltaic reinforced concrete bored concrete pile foundation clamping cage device according to claim 1, wherein: clamping grooves (13) are formed in one side of the supporting steel pipe (2), threaded grooves (131) are formed in the inner sides of the clamping grooves (13), a first knob (121) is connected to one side of the fixing barrel (12) in a rotating mode, and the other end of the first knob (121) extends to the inside of the fixing barrel (12) and is fixedly connected with a screw rod (122).
4. A photovoltaic reinforced concrete bored concrete pile foundation clamping cage device according to claim 3, wherein: the outside threaded connection of lead screw (122) has movable block (123), and movable block (123) sliding connection is in the inside of fixed section of thick bamboo (12), and the other end fixedly connected with transmission piece (124) of movable block (123), transmission piece (124) and thread groove (131) assorted.
5. The photovoltaic reinforced concrete bored concrete pile foundation clamping cage device according to claim 1, wherein: the bottom of the supporting foot rest (1) is fixedly connected with an adjusting seat (14), two groups of adjusting seats (14) are arranged, one side of each adjusting seat (14) is rotatably connected with a second knob (141), and the other end of each second knob (141) extends to the inside of each adjusting seat (14) and is fixedly connected with a positive and negative tooth screw rod (142).
6. The photovoltaic reinforced concrete bored concrete pile foundation clamping cage device according to claim 5, wherein: both ends all threaded connection has screw thread piece (143) about positive and negative tooth screw rod (142), and the inside of adjustment seat (14) still sliding connection has connecting block (147), and the bottom fixed connection of the other end of connecting block (147) and supporting foot rest (1), the bottom fixedly connected with kicking block (145) of connecting block (147), the inside of adjustment seat (14) still fixedly connected with fixed block (144).
7. The photovoltaic reinforced concrete bored concrete pile foundation clamping cage device according to claim 6, wherein: the left end and the right end of the threaded block (143) are respectively connected with a rotating strip (146) in a rotating way, two groups of corresponding rotating strips (146) are connected to two sides of the fixed block (144) in a rotating way, and the other two groups of rotating strips (146) are connected to two sides of the jacking block (145) in a rotating way.
CN202320873544.3U 2023-04-19 2023-04-19 Cage clamping device for foundation of photovoltaic reinforced concrete bored concrete pile Active CN219410833U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320873544.3U CN219410833U (en) 2023-04-19 2023-04-19 Cage clamping device for foundation of photovoltaic reinforced concrete bored concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320873544.3U CN219410833U (en) 2023-04-19 2023-04-19 Cage clamping device for foundation of photovoltaic reinforced concrete bored concrete pile

Publications (1)

Publication Number Publication Date
CN219410833U true CN219410833U (en) 2023-07-25

Family

ID=87240020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320873544.3U Active CN219410833U (en) 2023-04-19 2023-04-19 Cage clamping device for foundation of photovoltaic reinforced concrete bored concrete pile

Country Status (1)

Country Link
CN (1) CN219410833U (en)

Similar Documents

Publication Publication Date Title
CN116984818A (en) Steel reinforcement cage seam welder
CN219410833U (en) Cage clamping device for foundation of photovoltaic reinforced concrete bored concrete pile
CN210614703U (en) Nonrust steel pipe body straightener
CN110847033A (en) Bridge guardrail steel bar positioning device
CN218983352U (en) Cable protection tube cutting machine
CN221567115U (en) Steel reinforcement cage positioner
CN111119064B (en) Prefabricated supporting device for reinforcement cage of pier body of cross-sea bridge and supervision method of prefabricated supporting device
CN221109401U (en) Reinforcing bar drawing mechanism
CN219432632U (en) Pipeline laying positioning structure
CN220377659U (en) Adjustable pier stud protective layer adjusting device
CN221168943U (en) Spliced cement telegraph pole
CN220782070U (en) Integrated device for processing reinforcing steel bars
CN219491742U (en) Concrete inner pipe line pre-positioning supporting device
CN216999780U (en) Prefabricated section location installation auxiliary device
CN209753868U (en) steel bar bending machine for building engineering
CN220622984U (en) Fixing device of antidetonation gallows
CN219926349U (en) Automatic trowelling device
CN214977336U (en) Reinforcing bar bending device for construction
CN219773663U (en) Building engineering cement mortar trowelling device
CN220445556U (en) Fixing frame with positioning mechanism
CN219471203U (en) Quick connector for building structural design wall post base
CN221482864U (en) Municipal construction pipeline support
CN111545972B (en) Welding machine for producing steel heating radiator
CN220261414U (en) Reinforcing steel bar binding jig frame for producing prefabricated plate girder
CN220880362U (en) Support arrangement for steel reinforcement cage for construction

Legal Events

Date Code Title Description
GR01 Patent grant