Prior art keywords
bolt
foundation
positioning
steel column
derrick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202320425007.2U
Other languages
Chinese (zh)
Inventor
吴金池
何冲
孙敏
肖锐
杨威
吴鹏飞
黄紫茵
王大庆
郑晗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Industrial Construction Group No3 Building Engineering Co ltd
Original Assignee
Hubei Industrial Construction Group No3 Building Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Industrial Construction Group No3 Building Engineering Co ltd filed Critical Hubei Industrial Construction Group No3 Building Engineering Co ltd
Priority to CN202320425007.2U priority Critical patent/CN219365493U/en
Application granted granted Critical
Publication of CN219365493U publication Critical patent/CN219365493U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model belongs to the technical field of steel structure construction, and provides an anchor bolt positioning device for an exposed steel column foot, which is arranged on a foundation reinforcement cage in a foundation pit before concrete pouring. The utility model can achieve the purposes of convenient installation and accurate positioning of the foundation bolt.

Description

一种外露式钢柱柱脚的地脚螺栓定位装置An anchor bolt positioning device for an exposed steel column foot

技术领域technical field

本实用新型属于钢结构施工技术领域,具体涉及一种外露式钢柱柱脚的地脚螺栓定位装置。The utility model belongs to the technical field of steel structure construction, in particular to an anchor bolt positioning device for an exposed steel column foot.

背景技术Background technique

钢柱柱脚是钢结构中的重要节点,其作用是将钢柱下端轴力、剪力、弯矩传递给基础,使钢柱与基础有效地连接在一起,确保上部结构承受各种外力作用。钢柱柱脚类型按柱脚位置分外露式、外包式、埋入式和插入式。轻型钢结构房屋和重工业厂房中通常采用外露式钢柱柱脚,抗震设防烈度为6、7度且高度不超过50m的多层和高层钢框架也可采用外露式钢柱柱脚。The steel column foot is an important node in the steel structure. Its function is to transmit the axial force, shear force and bending moment at the lower end of the steel column to the foundation, so that the steel column and the foundation are effectively connected together to ensure that the upper structure can withstand various external forces. . The type of steel column foot is divided into exposed type, outsourcing type, embedded type and plug-in type according to the position of the column foot. Exposed steel column feet are usually used in light steel structure houses and heavy industrial workshops, and exposed steel column feet can also be used for multi-storey and high-rise steel frames with seismic fortification intensity of 6 or 7 degrees and a height of no more than 50m.

外露式钢柱柱脚施工时一般采用地脚螺栓将钢柱与基础进行连接固定,地脚螺栓通常预埋于基础内。目前,安装地脚螺栓时一般是基础混凝土浇筑前在其上方采用定位钢板、经纬仪、钢卷尺、水准仪等逐个调整悬空地脚螺栓的水平定位及竖向标高,同时采用短钢筋将调整好的悬空地脚螺栓与基础钢筋笼进行临时固定,待基础混凝土初凝前再次采用经纬仪、钢卷尺、水准仪等逐个复核经短钢筋临时固定的悬空地脚螺栓的水平定位及竖向标高。During the construction of the exposed steel column foot, the steel column and the foundation are generally connected and fixed by anchor bolts, and the anchor bolts are usually pre-buried in the foundation. At present, when installing anchor bolts, the horizontal positioning and vertical elevation of the suspended anchor bolts are adjusted one by one by using positioning steel plates, theodolites, steel tapes, level gauges, etc. before the foundation concrete is poured. The anchor bolts and the foundation reinforcement cage are temporarily fixed, and the horizontal positioning and vertical elevation of the suspended anchor bolts temporarily fixed by short steel bars are checked one by one by using theodolite, steel tape measure, level gauge, etc. before the foundation concrete is initially set.

现有外露式钢柱柱脚在安装地脚螺栓时使用设备多、步骤复杂,而且定位不准确,这是因为:1、由于地脚螺栓在基础混凝土浇筑前处于悬空布置,容易晃动,导致地脚螺栓的水平定位及竖向标高调整比较困难,且采用短钢筋进行临时固定时容易使地脚螺栓发生偏移,另外在基础混凝土浇筑时因振动棒震动,容易使地脚螺栓发生水平及竖向移位,进而导致地脚螺栓定位不准确;2、地脚螺栓在基础内的锚固长度过长(根据但泽义主编的《钢结构设计手册》第四版(中国建筑工业出版社,2019年2月)第1153页和第1164页的相关规定,地脚螺栓在基础内的锚固长度一般不宜小于25d,d为地脚螺栓直径),且地脚螺栓悬空布置,当地脚螺栓垂直度稍有偏差,就会导致地脚螺栓的水平偏差过大。The existing exposed steel column feet use a lot of equipment when installing the anchor bolts, the steps are complicated, and the positioning is not accurate. The horizontal positioning and vertical elevation adjustment of the anchor bolts are relatively difficult, and the anchor bolts are likely to shift when short steel bars are used for temporary fixation. In addition, when the foundation concrete is poured, the anchor bolts are likely to be horizontal and vertical due to the vibration of the vibrating rod. 2. The anchorage length of the anchor bolts in the foundation is too long (according to the fourth edition of "Steel Structure Design Manual" edited by Dan Ziyi (China Architecture and Building Press, 2019 According to the relevant regulations on pages 1153 and 1164 of February 2019, the anchorage length of the anchor bolts in the foundation should generally not be less than 25d, where d is the diameter of the anchor bolts), and the anchor bolts are suspended in the air, and the verticality of the anchor bolts is slightly If there is a deviation, the horizontal deviation of the anchor bolts will be too large.

实用新型内容Utility model content

为解决上述问题,本实用新型提供一种外露式钢柱柱脚的地脚螺栓定位装置,它既能解决地脚螺栓水平定位及竖向标高调整困难的问题,又能大大提高地脚螺栓的抗拔能力,达到地脚螺栓安装方便、定位准确的目的。In order to solve the above problems, the utility model provides an anchor bolt positioning device for exposed steel column feet, which can not only solve the problems of difficult horizontal positioning and vertical elevation adjustment of the anchor bolts, but also greatly improve the anchor bolt positioning. The anti-pullout ability achieves the purpose of convenient installation and accurate positioning of anchor bolts.

本实用新型解决其技术问题所采用的技术方案是:The technical scheme that the utility model solves its technical problem adopts is:

一种外露式钢柱柱脚的地脚螺栓定位装置,该装置在混凝土浇筑前安装于基坑内的基础钢筋笼上,该装置包括连接件、定位井架、地脚螺栓和底部固定螺母,所述连接件安装于定位井架的外周并将定位井架与基础钢筋笼固定连接成一体,所述定位井架上设有与地脚螺栓预埋数量和位置相对应的通孔,所述地脚螺栓通过对应的通孔穿过定位井架,所述底部固定螺母螺纹连接于地脚螺栓的底部并将地脚螺栓和定位井架固定连接成一体。An anchor bolt positioning device for an exposed steel column foot, the device is installed on the foundation reinforcement cage in the foundation pit before concrete pouring, and the device includes a connecting piece, a positioning derrick, an anchor bolt and a bottom fixing nut. The connecting piece is installed on the outer periphery of the positioning derrick and fixedly connects the positioning derrick and the basic steel cage into one body. The positioning derrick is provided with through holes corresponding to the pre-embedded number and positions of the anchor bolts. The anchor bolts pass through the corresponding The through hole passes through the positioning derrick, and the bottom fixing nut is threadedly connected to the bottom of the anchor bolt and the anchor bolt and the positioning derrick are fixedly connected into one.

可选的,所述定位井架包括上下间隔一定距离水平设置的两个水平框架以及将两个水平框架固定连接成一体的若干个立柱,所述通孔开设于每个水平框架上,所述连接件固定安装于每个水平框架的外周。Optionally, the positioning derrick includes two horizontal frames arranged horizontally at a certain distance up and down and several uprights fixedly connecting the two horizontal frames into one, the through holes are opened on each horizontal frame, and the connection Parts are fixedly installed on the outer periphery of each horizontal frame.

可选的,所述水平框架包括横向定位板、纵向定位板和斜撑板,至少2个横向定位板和至少2个纵向定位板呈井字状固定连接在一起,所述斜撑板倾斜设置于两个横向定位板之间,所述通孔开设于横向定位板与纵向定位板的相交处,所述连接件安装于横向定位板的两端。Optionally, the horizontal frame includes a transverse positioning plate, a longitudinal positioning plate and a slanting bracing plate, at least 2 transverse locating plates and at least 2 longitudinal locating plates are fixedly connected together in a well-shaped shape, and the slanting bracing plates are arranged obliquely Between the two transverse positioning plates, the through hole is opened at the intersection of the transverse positioning plate and the longitudinal positioning plate, and the connectors are installed at both ends of the transverse positioning plate.

可选的,所述横向定位板、纵向定位板、斜撑板、立柱和连接件均采用角钢制作。Optionally, the horizontal positioning plate, the longitudinal positioning plate, the diagonal bracing plate, the column and the connecting piece are all made of angle steel.

可选的,所述通孔的孔径为d+2mm,d为地脚螺栓的直径。Optionally, the diameter of the through hole is d+2mm, where d is the diameter of the anchor bolt.

可选的,所述地脚螺栓在基坑内的预埋深度为10d~20d,大幅度减少地脚螺栓在基础内的锚固深度。Optionally, the pre-embedded depth of the anchor bolts in the foundation pit is 10d-20d, which greatly reduces the anchorage depth of the anchor bolts in the foundation.

可选的,当地脚螺栓的材质为Q235时,地脚螺栓的预埋深度为10d~15d;当地脚螺栓的材质为Q345时,地脚螺栓的预埋深度为15d~20d。Optionally, when the material of the anchor bolts is Q235, the embedded depth of the anchor bolts is 10d to 15d; when the material of the anchor bolts is Q345, the embedded depth of the anchor bolts is 15d to 20d.

可选的,所述地脚螺栓包括螺栓本体以及螺纹连接于螺栓本体顶部的顶部固定螺母和调节螺母,所述调节螺母位于顶部固定螺母的下方。Optionally, the anchor bolt includes a bolt body, a top fixing nut and an adjusting nut threadedly connected to the top of the bolt body, and the adjusting nut is located below the top fixing nut.

可选的,所述地脚螺栓还包括套设于螺栓本体上的两个垫板,两个垫板位于顶部固定螺母与调节螺母之间。Optionally, the anchor bolt further includes two backing plates sheathed on the bolt body, and the two backing plates are located between the top fixing nut and the adjusting nut.

可选的,所述垫板的宽度为3d,当地脚螺栓的直径不大于48mm时,所述垫板的厚度为20mm,当地脚螺栓的直径大于48mm时,所述垫板的厚度为30mm。Optionally, the width of the backing plate is 3d, the thickness of the backing plate is 20mm when the diameter of the anchor bolt is not greater than 48mm, and the thickness of the backing plate is 30mm when the diameter of the anchor bolt is greater than 48mm.

本实用新型产生的有益效果是:本实用新型提供的一种外露式钢柱柱脚的地脚螺栓定位装置,该装置通过连接件与基坑钢筋笼固定连接成一体,再将定位井架固定安装在连接件上,最后将地脚螺栓通过螺母固定安装于定位井架上上,可以将该装置与基础钢筋笼连接成一体形成可靠的稳定的支撑体系,最终达到地脚螺栓安装方便、定位准确的目的。The beneficial effects produced by the utility model are: the utility model provides an exposed steel column base anchor bolt positioning device, the device is fixedly connected with the reinforcement cage of the foundation pit through the connecting piece, and then the positioning derrick is fixed and installed On the connecting parts, the anchor bolts are finally fixed and installed on the positioning derrick through nuts, and the device can be connected with the basic steel cage to form a reliable and stable support system, and finally the anchor bolts can be easily installed and positioned accurately. Purpose.

首先,本实用新型调节好定位井架安装高度并使所有通孔与地脚螺栓的预埋位置一一对应,地脚螺栓安装时只需从对应的通孔穿过定位井架再通过底部固定螺母固定于定位机构上即可,安装简单可靠,还可避免现有技术中因地脚螺栓悬空布置容易晃动导致地脚螺栓的水平定位及竖向标高调整困难的问题,保证地脚螺栓的定位准确性;First of all, the utility model adjusts the installation height of the positioning derrick and makes all the through holes correspond to the pre-embedded positions of the anchor bolts one by one. When the anchor bolts are installed, they only need to pass through the positioning derrick from the corresponding through holes and then fix them with the fixing nuts at the bottom. It can be installed on the positioning mechanism, the installation is simple and reliable, and it can also avoid the problems in the prior art that the horizontal positioning of the anchor bolts and the adjustment of the vertical elevation are difficult due to the easy shaking of the suspension arrangement of the anchor bolts, so as to ensure the positioning accuracy of the anchor bolts ;

其次,相比于现有技术采用短钢筋进行临时固定易使地脚螺栓发生偏移,本实用新型的地脚螺栓通过定位井架、连接件与基础钢筋笼形成一体的稳固连接体系,使得地脚螺栓不易发生偏移,进一步保证地脚螺栓的定位准确性;Secondly, compared with the prior art that uses short steel bars for temporary fixation, the anchor bolts are likely to shift. The anchor bolts of the utility model form a solid connection system integrated with the positioning derrick, the connectors and the basic steel cage, so that the anchor bolts The bolts are not easy to shift, which further ensures the positioning accuracy of the anchor bolts;

再次,本实用新型通过设置定位井架和连接件将地脚螺栓与基础钢筋笼形成一体的稳固连接体系,在基础混凝土的浇筑过程中可以避免因震动棒震动引起地脚螺栓发生水平及竖向移位的问题,进一步保证地脚螺栓的定位准确性;Thirdly, the utility model forms a solid connection system integrating the anchor bolts and the foundation steel cage by setting the positioning derrick and connecting pieces, which can avoid the horizontal and vertical displacement of the anchor bolts caused by the vibration of the vibrating rod during the pouring of the foundation concrete. Positioning problem, to further ensure the positioning accuracy of the anchor bolts;

最后,本实用新型通过设置定位井架和连接件将地脚螺栓与基础钢筋笼形成一体的稳固连接体系,大大提高了地脚螺栓的抗拔能力,保证地脚螺栓的安全可靠性。Finally, the utility model forms a stable connection system integrating the anchor bolts and the foundation steel cage by setting the positioning derrick and connecting pieces, which greatly improves the pull-out resistance of the anchor bolts and ensures the safety and reliability of the anchor bolts.

附图说明Description of drawings

下面将结合附图及实施例对本实用新型作进一步说明,附图中:The utility model will be further described below in conjunction with accompanying drawing and embodiment, in the accompanying drawing:

图1是本实用新型实施例中外露式钢柱柱脚的地脚螺栓定位装置的立面图;Fig. 1 is the elevation view of the anchor bolt positioning device of the exposed steel column foot in the utility model embodiment;

图2是本实用新型实施例中外露式钢柱柱脚的地脚螺栓定位装置的平面图;Fig. 2 is a plan view of the anchor bolt positioning device of the exposed steel column foot in the embodiment of the present invention;

图3是本实用新型实施例中地脚螺栓的结构示意图。Fig. 3 is a schematic diagram of the structure of the anchor bolts in the embodiment of the utility model.

图中:1-横向定位板、2-纵向定位板、3-斜撑板、4-连接件、5-立柱、6-地脚螺栓、61-底部固定螺母、62-顶部固定螺母、63-调节螺母、64-垫板、65-螺栓本体、7-通孔。In the figure: 1-horizontal positioning plate, 2-longitudinal positioning plate, 3-diagonal bracing plate, 4-connector, 5-column, 6-anchor bolt, 61-bottom fixing nut, 62-top fixing nut, 63- Adjusting nut, 64-backing plate, 65-bolt body, 7-through hole.

具体实施方式Detailed ways

为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型的一部分实施例,而不是全部的实施例。应当理解,此处所描述的具体实施例仅用以解释本实用新型,并不用于限定本实用新型。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动的前提下所获得的所有其他实施例,都属于本实用新型保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the utility model more clear, the technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the utility model. Obviously, the described The embodiments are some embodiments of the present utility model, but not all embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model, and are not intended to limit the utility model. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

下面结合图1-图3描述本实用新型的外露式钢柱柱脚的地脚螺栓定位装置。The anchor bolt positioning device of the exposed steel column foot of the utility model is described below with reference to FIGS. 1-3 .

如图1、图2所示,本实用新型提供一种外露式钢柱柱脚的地脚螺栓定位装置,该装置在混凝土浇筑前安装于基坑内的基础钢筋笼上(图中未示意基坑和基础钢筋笼),该装置包括连接件4、定位井架(本实施例中由横向定位板1、纵向定位板2、斜撑板3、立柱5按照图示要求连接而成)、地脚螺栓6和底部固定螺母61,连接件4安装于定位井架的外周并将定位井架与基础钢筋笼固定连接成一体,定位井架上设有与地脚螺栓预埋数量和位置相对应的通孔7,地脚螺栓6通过对应的通孔7穿过定位井架,底部固定螺母61螺纹连接于地脚螺栓的底部并将地脚螺栓6和定位井架固定连接成一体。As shown in Figure 1 and Figure 2, the utility model provides an anchor bolt positioning device for exposed steel column feet, which is installed on the foundation reinforcement cage in the foundation pit before concrete pouring (the foundation pit is not shown in the figure and basic reinforcement cage), the device includes connecting piece 4, positioning derrick (in this embodiment, the horizontal positioning plate 1, the longitudinal positioning plate 2, the slanting plate 3, and the column 5 are connected according to the requirements of the diagram), anchor bolts 6 and the bottom fixing nut 61, the connecting piece 4 is installed on the outer periphery of the positioning derrick and the positioning derrick is fixedly connected with the basic steel cage into one body, and the positioning derrick is provided with through holes 7 corresponding to the pre-embedded quantity and positions of the anchor bolts, The anchor bolt 6 passes through the positioning derrick through the corresponding through hole 7, and the bottom fixing nut 61 is threadedly connected to the bottom of the anchor bolt and the anchor bolt 6 and the positioning derrick are fixedly connected as one.

在本实用新型的一个实施例中,如图1、图2所示,定位井架包括上下间隔一定距离水平设置的两个水平框架以及将两个水平框架固定连接成一体的若干个立柱5,通孔7开设于每个水平框架上,连接件4固定安装于每个水平框架的外周。本实用新型采用两层水平框架,可以使地脚螺栓固定更牢固,进一步提高其定位准确性。In one embodiment of the present utility model, as shown in Fig. 1 and Fig. 2, the positioning derrick includes two horizontal frames arranged horizontally at a certain distance up and down and several upright columns 5 fixedly connecting the two horizontal frames into one body. The holes 7 are opened on each horizontal frame, and the connecting piece 4 is fixedly installed on the outer periphery of each horizontal frame. The utility model adopts a two-layer horizontal frame, which can make the anchor bolts fixed more firmly and further improve the positioning accuracy.

在本实用新型的一个实施例中,如图1、图2所示,水平框架包括横向定位板1、纵向定位板2和斜撑板3,至少2个横向定位板1和至少2个纵向定位板2呈井字状固定连接在一起,斜撑板3倾斜设置于两个横向定位板1之间,通孔7开设于横向定位板1与纵向定位板2的相交处,连接件4安装于横向定位板的两端。本实用新型采用井字结构的水平框架,并通过斜撑板进行加固连接,可以保证定位井架不易变形,提高其稳固性,从而进一步保证地脚螺栓定位的准确性。In one embodiment of the present utility model, as shown in Fig. 1 and Fig. 2, the horizontal frame includes a transverse positioning plate 1, a longitudinal positioning plate 2 and a brace plate 3, at least two transverse positioning plates 1 and at least two longitudinal positioning plates The plates 2 are fixedly connected together in a well-shaped shape, the slanting braces 3 are arranged obliquely between the two transverse positioning plates 1, the through holes 7 are opened at the intersection of the transverse positioning plate 1 and the longitudinal positioning plate 2, and the connecting piece 4 is installed on the Position the ends of the board laterally. The utility model adopts a horizontal frame with a well-shaped structure, and is reinforced and connected by slanting braces, which can ensure that the positioning derrick is not easy to deform and improve its stability, thereby further ensuring the accuracy of the positioning of the anchor bolts.

在本实用新型的一个实施例中,如图1、图2所示,横向定位板1、纵向定位板2、斜撑板3、立柱5和连接件4均采用角钢制作。本实用新型的定位井架和连接件采用常用材料角钢制作,具有取材方便制作容易成本低的优点,而且采用角钢制作连接件,横向定位板的两端搭设在连接件水平设置的肢上,横向定位板的安装位置可以在肢宽度范围内进行调节,以适应基础钢筋笼安装偏差(基础钢筋笼在安装时与基坑边缘的定位存在偏差)。In one embodiment of the present utility model, as shown in Fig. 1 and Fig. 2, the transverse positioning plate 1, the longitudinal positioning plate 2, the diagonal bracing plate 3, the column 5 and the connector 4 are all made of angle steel. The positioning derrick and connecting parts of the utility model are made of commonly used material angle steel, which has the advantages of convenient material acquisition, easy manufacture and low cost, and the connecting part is made of angle steel. The installation position of the plate can be adjusted within the range of the limb width to adapt to the installation deviation of the foundation reinforcement cage (there is a deviation between the foundation reinforcement cage and the edge of the foundation pit during installation).

实施时,该装置各角钢部件的选型视地脚螺栓的型号而定,本实用新型经过优化计算得出如表1所示的各角钢部件优化选型表。During implementation, the selection of each angle steel part of the device depends on the model of the anchor bolts. The utility model obtains the optimal selection table of each angle steel part as shown in Table 1 through optimization calculation.

表1各角钢部件优化选型表Table 1 Optimum selection table for each angle steel component

地脚螺栓型号Anchor bolt model 横向定位板lateral positioning plate 纵向定位板Longitudinal positioning plate 斜撑板Bracing plate 连接件connector 立柱column s(mm)s(mm) M24×3M24×3 L56×5L56×5 L56×5L56×5 L50×4L50×4 L56×5L56×5 L50×4L50×4 1515 M30×3.5M30×3.5 L63×5L63×5 L63×5L63×5 L56×4L56×4 L63×5L63×5 L56×4L56×4 2020 M56×4M56×4 L75×5L75×5 L75×5L75×5 L63×4L63×4 L75×5L75×5 L63×4L63×4 2525 M42×4.5M42×4.5 L90×6L90×6 L90×6L90×6 L75×5L75×5 L90×6L90×6 L75×5L75×5 3030 M48×5M48×5 L100×7L100×7 L100×7L100×7 L90×6L90×6 L100×7L100×7 L90×6L90×6 3535 M56×5.5M56×5.5 L125×8L125×8 L125×8L125×8 L100×7L100×7 L125×8L125×8 L100×7L100×7 4040 M64×6M64×6 L140×10L140×10 L140×10L140×10 L125×8L125×8 L140×10L140×10 L125×8L125×8 5050 M72×6M72×6 L160×12L160×12 L160×12L160×12 L140×10L140×10 L160×12L160×12 L140×10L140×10 6060

注:s为横向定位板端部与连接件边缘的距离。Note: s is the distance between the end of the lateral positioning plate and the edge of the connector.

因为本实用新型可对地脚螺栓进行快速准确安装,因此对地脚螺栓经过的孔可设计成比其直径略大一点即可,横向定位板51、纵向定位板52上通孔的孔径可为d+2mm。Because the utility model can quickly and accurately install the anchor bolts, the holes through which the anchor bolts pass can be designed to be slightly larger than its diameter, and the apertures of the through holes on the lateral positioning plate 51 and the longitudinal positioning plate 52 can be d+2mm.

本实用新型通过将地脚螺栓与基础钢筋笼进行可靠连接,可以大大提高地脚螺栓的抗拔力,而地脚螺栓的抗拔力还与其锚固深度有关,因此在满足设计抗拔力的情况下,本实用新型可以减少地脚螺栓的锚固深度,优选的地脚螺栓在基坑内的预埋深度为10d~20d,d为地脚螺栓的直径。本实用新型可以减小地脚螺栓的锚固深度至少5d,地脚螺栓在基础内的锚固深度大大减少,可以降低因地脚螺栓垂直度稍有偏差导致地脚螺栓的水平偏差过大的情况发生,进一步提供地脚螺栓的定位准确性。The utility model can greatly improve the pull-out force of the anchor bolts by reliably connecting the anchor bolts with the foundation steel cage, and the pull-out force of the anchor bolts is also related to its anchorage depth, so when the design pull-out force is met Next, the utility model can reduce the anchoring depth of the anchor bolts. The preferred embedded depth of the anchor bolts in the foundation pit is 10d-20d, where d is the diameter of the anchor bolts. The utility model can reduce the anchoring depth of the anchor bolts by at least 5d, greatly reduce the anchoring depth of the anchor bolts in the foundation, and reduce the occurrence of excessive horizontal deviation of the anchor bolts due to slight deviations in the verticality of the anchor bolts , to further provide the positioning accuracy of the anchor bolts.

考虑到地脚螺栓在基础内的锚固深度还与其材质有关,本实用新型经过优化计算得到,当地脚螺栓的材质为Q235时,地脚螺栓的预埋深度为10d~15d;当地脚螺栓的材质为Q345时,地脚螺栓3的预埋深度为15d~20d。Considering that the anchorage depth of the anchor bolts in the foundation is also related to its material, the utility model is obtained through optimization calculation. When the material of the anchor bolts is Q235, the pre-embedded depth of the anchor bolts is 10d-15d; the material of the anchor bolts When it is Q345, the pre-embedded depth of anchor bolt 3 is 15d~20d.

本实用新型在安装地脚螺栓后,向基坑内浇筑混凝土并进行养护,然后将装有柱脚底板的钢柱吊装至地脚螺栓上,将柱脚底板的水平定位及竖向标高调节到位后,向柱脚底板与基础混凝土之间额间隙内填充灌浆料,实现柱脚底板与混凝土基础之间的固定连接。现有技术采用向间隙内垫楔块的方式调节柱脚底板的水平标高,然而垫楔块的方式存在需要反复操作的困难,因此在本实用新型的一个实施例中,如图3所示,地脚螺栓6包括螺栓本体65以及螺纹连接于螺栓本体顶部的顶部固定螺母62和调节螺母63,调节螺母位于顶部固定螺母的下方,在安装时先将调节螺母安装于螺栓本体上,再将柱脚底板安装在地脚螺栓上并支撑于调节螺母上,通过选择调节螺母可以控制柱脚底板的竖向标高,操作简单方便,调节精度好,然后通过顶部固定螺母对柱脚底板进行固定,顶部固定螺母可采用双螺母。In the utility model, after the anchor bolts are installed, concrete is poured into the foundation pit and maintained, and then the steel column equipped with the base plate is hoisted to the anchor bolts, and the horizontal positioning and vertical elevation of the base plate are adjusted in place. , filling the gap between the column base plate and the foundation concrete with grouting material, so as to realize the fixed connection between the column base plate and the concrete foundation. The prior art adopts the method of padding wedges into the gap to adjust the horizontal elevation of the base plate of the column base. However, the method of padding wedges has the difficulty of requiring repeated operations. Therefore, in one embodiment of the present invention, as shown in Figure 3, The anchor bolt 6 includes a bolt body 65 and a top fixing nut 62 and an adjusting nut 63 that are threadedly connected to the top of the bolt body. The foot plate is installed on the anchor bolt and supported on the adjusting nut. By selecting the adjusting nut, the vertical elevation of the column foot plate can be controlled. The operation is simple and convenient, and the adjustment accuracy is good. Then the column foot plate is fixed by the top fixing nut, and the top Fixed nut can adopt double nut.

在实施时,螺母与柱脚底板之间设有垫板以防止松动,因此,在一个实施例中,如图1-图3所示,地脚螺栓6还包括套设于螺栓本体65上的两个垫板64,两个垫板位于顶部固定螺母与调节螺母之间。垫板上穿孔的孔径为d+2mm。During implementation, a backing plate is provided between the nut and the bottom plate of the column to prevent loosening. Therefore, in one embodiment, as shown in FIGS. Two backing plates 64 are located between the top fixing nut and the adjusting nut. The hole diameter of the hole on the backing plate is d+2mm.

垫板的规格与地脚螺栓的规格有关,优选的,垫板34的宽度为3d,当地脚螺栓的直径不大于48mm时,垫板的厚度为20mm,当地脚螺栓的直径大于48mm时,垫板的厚度为30mm。The specifications of the backing plate are related to the specifications of the anchor bolts. Preferably, the width of the backing plate 34 is 3d. When the diameter of the anchor bolts is not greater than 48mm, the thickness of the backing plate is 20mm. When the diameter of the anchor bolts is greater than 48mm, the thickness of the backing plate is 20mm. The thickness of the plate is 30 mm.

采用本实用新型提供的定位装置安装钢柱柱脚时,钢柱柱脚的施工方法包括以下步骤:When the positioning device provided by the utility model is used to install the steel column foot, the construction method of the steel column foot includes the following steps:

S1、开挖基坑,并按施工图的要求在基础垫层上铺设并绑扎基础底板钢筋、竖向纵筋及箍筋使其形成基础钢筋笼;S1. Excavate the foundation pit, and lay and tie the foundation bottom plate reinforcement, vertical longitudinal reinforcement and stirrup on the foundation cushion according to the requirements of the construction drawing to form a foundation reinforcement cage;

S2、在地脚螺栓的预埋深度范围内通过连接件将定位井架与基础钢筋笼固定连接成一体,定位井架安装后各个通孔的位置与对应的地脚螺栓的预埋位置一致,将螺栓本体从定位井架的通孔穿过,并通过一对底部固定螺母将螺栓本体与定位井架固定连接成一体;S2. Within the pre-embedded depth range of the anchor bolts, the positioning derrick and the basic steel cage are fixedly connected into one body through the connecting piece. After the positioning derrick is installed, the positions of each through hole are consistent with the pre-embedded positions of the corresponding anchor bolts. The body passes through the through hole of the positioning derrick, and the bolt body is fixedly connected with the positioning derrick through a pair of bottom fixing nuts;

当定位井架和连接件采用角钢制作时,步骤S2具体包括:When the positioning derrick and connecting parts are made of angle steel, step S2 specifically includes:

S21、安装连接件:在地脚螺栓的预埋深度范围内将由角钢制作的连接件水平安装在基坑内相对两侧的基础钢筋笼上,每侧基础钢筋笼上各安装2个连接件,每个连接件的一个肢竖直安装在基础钢筋笼上,其另一个肢朝内水平设置,位于上方的两个连接件的另一个肢等高设置,位于下方的两个连接件的另一个肢等高设置,连接件与基础钢筋笼之间可通过焊接进行牢固连接;S21. Install connectors: within the pre-embedded depth of the anchor bolts, install the connectors made of angle steel horizontally on the foundation reinforcement cages on opposite sides of the foundation pit, and install 2 connectors on each side of the foundation reinforcement cages. One leg of each connecting piece is installed vertically on the foundation reinforcement cage, the other leg is set horizontally inward, the other limbs of the upper two connecting pieces are set at the same height, and the other limbs of the two lower connecting pieces are arranged at the same height Equal height setting, the connecting piece and the basic reinforcement cage can be firmly connected by welding;

S22、安装横向定位板:将由角钢制作的横向定位板放置于连接件的另一个肢上,每个横向定位板上设有2个通孔,位于上方的两个连接件上放置2个横向定位板,位于下方的两个连接件上放置2个横向定位板,将所有通孔位置调节至与对应的地脚螺栓的预埋位置一致,然后将横向定位板与连接件固定连接,可通过焊接进行牢固连接;S22. Install the lateral positioning plate: place the lateral positioning plate made of angle steel on the other limb of the connector, each lateral positioning plate is provided with 2 through holes, and place 2 lateral positioning plates on the two upper connectors Two horizontal positioning plates are placed on the two connecting parts below, and the positions of all through holes are adjusted to be consistent with the pre-embedded positions of the corresponding anchor bolts, and then the horizontal positioning plate is fixedly connected to the connecting parts, which can be welded make a firm connection;

S23、安装纵向定位板:准备4个由角钢制作的纵向定位板,每个纵向定位板上设有2个通孔,将2个纵向定位板呈井字状固定安装在位于上方的横向定位板上,将2个纵向定位板呈井字状固定安装在位于下方的横向定位板上,并使所有通孔位置调节至与对应的地脚螺栓的预埋位置一致,纵向定位板与横向定位板之间可通过焊接进行牢固连接;S23. Install the longitudinal positioning plate: prepare 4 longitudinal positioning plates made of angle steel, each longitudinal positioning plate is provided with 2 through holes, and fix the 2 longitudinal positioning plates on the upper horizontal positioning plate in the shape of a well , fix and install the two longitudinal positioning plates on the lower horizontal positioning plate in the shape of a well, and adjust the positions of all through holes to be consistent with the pre-embedded positions of the corresponding anchor bolts. The vertical positioning plate and the horizontal positioning plate Can be firmly connected by welding;

S24、安装立柱:将由角钢制作的4个立柱分别竖直在横向定位板与纵向定位板相交形成的4个交叉处,每个立柱的一个肢与上下两个横向定位板固定连接,其另一个肢与上下两个纵向定位板固定连接,可采用焊接进行牢固连接;S24. Installing columns: vertically place the 4 columns made of angle steel at the 4 intersections formed by the intersection of the horizontal positioning plate and the longitudinal positioning plate, one leg of each column is fixedly connected with the upper and lower horizontal positioning plates, and the other The limbs are fixedly connected with the upper and lower longitudinal positioning plates, which can be firmly connected by welding;

S25、安装斜撑板:准备由角钢制作的2个斜撑板,其中一个斜撑板倾斜设置于上方两个横向定位板之间,另一个斜撑板倾斜设置于下方两个横向定位板之间,斜撑板与横向定位板之间可采用焊接进行牢固连接,步骤S25与S24安装顺序可调换,即可以安装立柱再安装斜撑板,也可以先安装斜撑板再安装立柱,安装完斜撑板和立柱后即完成定位井架的安装;S25. Install slanting braces: Prepare 2 slanting braces made of angle steel, one of which is obliquely set between the upper two horizontal positioning plates, and the other slanting bracing is obliquely set between the lower two horizontal positioning plates In between, the diagonal bracing plate and the lateral positioning plate can be firmly connected by welding. The installation sequence of steps S25 and S24 can be reversed, that is, the uprights can be installed before the diagonal bracing plate, or the diagonal bracing plate can be installed first and then the upright column. The installation of the positioning derrick is completed after the slanting braces and columns are installed;

S26、将4个地脚螺栓从对应的通孔穿过定位井架,并通过一对底部固定螺母将螺栓本体与定位井架连接成一体;S26. Pass 4 anchor bolts through the positioning derrick through the corresponding through holes, and connect the bolt body and the positioning derrick into one body through a pair of bottom fixing nuts;

S3、向基坑内浇筑混凝土并进行养护,具体的,安装基础模板并在基础内预留抗剪槽,按规范要求浇筑基础混凝土,在混凝土浇筑完成后及时覆盖薄膜对其进行养护;S3. Pour concrete into the foundation pit and perform maintenance. Specifically, install the foundation formwork and reserve shear grooves in the foundation, pour the foundation concrete according to the specifications, and cover it with a film in time for maintenance after the concrete pouring is completed;

S4、将钢柱通过固定于其底部的柱脚底板套设于螺栓本体上,通过调节螺母调整好柱脚底板的水平定位及竖向标高后,将顶部固定螺母螺纹连接于螺栓本体的顶部,完成柱脚底板与混凝土基础的连接;S4. Set the steel column on the bolt body through the column base plate fixed at the bottom. After adjusting the horizontal positioning and vertical elevation of the column base plate through the adjusting nut, screw the top fixing nut to the top of the bolt body. Complete the connection between the column base plate and the concrete foundation;

步骤S4具体包括以下步骤:Step S4 specifically includes the following steps:

S41、在钢结构加工车间依次将抗剪键4焊接在柱脚底板的下方、柱脚底板焊接在钢柱的底部;S41. In the steel structure processing workshop, the shear key 4 is sequentially welded below the base plate of the column foot, and the base plate of the column base is welded to the bottom of the steel column;

S42、在螺栓本体上依次安装调节螺母、垫板,采用吊车将钢柱(含柱脚底板、抗剪键)吊装至对应位置,同时将地脚螺栓穿过柱脚底板的螺栓孔;S42. Install adjusting nuts and backing plates in turn on the bolt body, use a crane to hoist the steel column (including the column base plate and the shear key) to the corresponding position, and at the same time pass the anchor bolts through the bolt holes of the column base plate;

S43、依次调整调节螺母来控制柱脚底板的水平定位及竖向标高,待调整好后在地脚螺栓上依次安装垫板、顶部固定螺母,此时钢柱(含柱脚底板、抗剪键)即安装就位;S43. Adjust the adjusting nuts in sequence to control the horizontal positioning and vertical elevation of the column base plate. ) means installed in place;

S5:灌浆料填充,配制高强无收缩灌浆料,对柱脚底板、抗剪键与混凝土基础之间的缝隙采用灌浆料填充密实。S5: Filling with grouting material, prepare high-strength non-shrinking grouting material, and use grouting material to fill the gaps between the base plate of the column foot, the shear key and the concrete foundation.

本实用新型在安装时应先根据地脚螺栓的预埋深度确定其在基坑内的相应标高,定位井架和连接件应位于地脚螺栓的预埋深度范围内。本实用新型通过采用角钢制作定位井架和连接件,先确定好其安装标高,再依次安装连接件、横向定位板、纵向定位板、立柱、斜撑板,可以根据现场实际工况取材制作,并进入基坑内安装,不受基坑顶部开口钢筋网的限制,而且通过角钢整个肢的长距离连接,可以保证各部件之间、连接件与基础钢筋笼之间可靠连接,使定位机构与基础钢筋笼之间形成牢固的支撑体系,提高地脚螺栓的定位准确性。When the utility model is installed, the corresponding elevation in the foundation pit should be determined according to the pre-embedded depth of the anchor bolts, and the positioning derrick and connectors should be located within the pre-embedded depth range of the anchor bolts. The utility model adopts angle steel to make the positioning derrick and connecting parts, firstly determine its installation elevation, and then install the connecting parts, horizontal positioning plate, longitudinal positioning plate, column, and diagonal bracing plate in sequence, which can be made according to the actual working conditions on site, and Installed in the foundation pit, it is not limited by the steel mesh at the top of the foundation pit, and through the long-distance connection of the entire limb of the angle steel, it can ensure reliable connection between the components, the connector and the foundation reinforcement cage, so that the positioning mechanism and the foundation reinforcement cage A solid support system is formed between the cages to improve the positioning accuracy of the anchor bolts.

应当理解的是,对本领域普通技术人员来说,可以根据上述说明加以改进或变换,而所有这些改进和变换都应属于本实用新型所附权利要求的保护范围。It should be understood that those skilled in the art can make improvements or changes based on the above description, and all these improvements and changes should belong to the protection scope of the appended claims of the present utility model.

Claims (10)

1. The utility model provides an rag bolt positioner of exposed steel column foot, its characterized in that, the device is installed on the foundation reinforcement cage in the foundation ditch before concrete placement, and the device includes connecting piece, location derrick, rag bolt and bottom fixation nut, the connecting piece is installed in the periphery of location derrick and is become integrative with location derrick and foundation reinforcement cage fixed connection, be equipped with the through-hole corresponding with rag bolt pre-buried quantity and position on the location derrick, rag bolt passes the location derrick through the through-hole that corresponds, bottom fixation nut threaded connection is in rag bolt's bottom and is become integrative with rag bolt and location derrick fixed connection.
2. The foundation bolt positioning device for the exposed steel column base of claim 1, wherein the positioning derrick comprises two horizontal frames horizontally arranged at a certain distance from top to bottom and a plurality of upright posts fixedly connecting the two horizontal frames into a whole, the through holes are formed in each horizontal frame, and the connecting pieces are fixedly arranged on the periphery of each horizontal frame.
3. The foundation bolt positioning device for the exposed steel column base of claim 2, wherein the horizontal frame comprises transverse positioning plates, longitudinal positioning plates and inclined supporting plates, at least 2 transverse positioning plates and at least 2 longitudinal positioning plates are fixedly connected together in a cross shape, the inclined supporting plates are obliquely arranged between the two transverse positioning plates, through holes are formed in the intersection of the transverse positioning plates and the longitudinal positioning plates, and the connecting pieces are arranged at two ends of the transverse positioning plates.
4. An exposed steel column foot anchor bolt locating device according to claim 3, wherein the transverse locating plate, the longitudinal locating plate, the diagonal bracing plate, the upright column and the connecting piece are all made of angle steel.
5. An exposed steel column foot anchor bolt positioning device according to claim 1, wherein the aperture of the through hole is d+2mm, d being the diameter of the anchor bolt.
6. The foundation bolt positioning device for the exposed steel column base of claim 1, wherein the depth of the foundation bolts embedded in the foundation pit is 10 d-20 d.
7. An anchor bolt positioning device for an exposed steel column foot according to claim 1 or 6, wherein when the anchor bolt is made of Q235, the embedded depth of the anchor bolt is 10 d-15 d; when the foundation bolt is made of Q345, the embedded depth of the foundation bolt is 15 d-20 d.
8. An anchor bolt positioning device for an exposed steel column foot according to claim 1, wherein the anchor bolt comprises a bolt body, and a top fixing nut and an adjusting nut which are screwed on the top of the bolt body, and the adjusting nut is located below the top fixing nut.
9. The foundation bolt positioning device of claim 8, wherein said foundation bolt further comprises two pads sleeved on said bolt body, said two pads being located between said top fixing nut and said adjusting nut.
10. An exposed steel column foot anchor bolt positioning device according to claim 9, wherein the width of the shim plate is 3d, the thickness of the shim plate is 20mm when the diameter of the anchor bolt is not more than 48mm, and the thickness of the shim plate is 30mm when the diameter of the anchor bolt is more than 48 mm.
CN202320425007.2U 2023-03-08 2023-03-08 Rag bolt positioner of exposed steel column foot Expired - Fee Related CN219365493U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320425007.2U CN219365493U (en) 2023-03-08 2023-03-08 Rag bolt positioner of exposed steel column foot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320425007.2U CN219365493U (en) 2023-03-08 2023-03-08 Rag bolt positioner of exposed steel column foot

Publications (1)

Publication Number Publication Date
CN219365493U true CN219365493U (en) 2023-07-18

Family

ID=87140873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320425007.2U Expired - Fee Related CN219365493U (en) 2023-03-08 2023-03-08 Rag bolt positioner of exposed steel column foot

Country Status (1)

Country Link
CN (1) CN219365493U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119508650A (en) * 2024-11-14 2025-02-25 武汉大学 A field open temperature increase test device and installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119508650A (en) * 2024-11-14 2025-02-25 武汉大学 A field open temperature increase test device and installation method
CN119508650B (en) * 2024-11-14 2025-09-23 武汉大学 Open field heating test device and installation method

Similar Documents

Publication Publication Date Title
CN205296874U (en) Information -based construction monitor positioning device of stake integration
CN112049146A (en) Steel structure foundation embedded part and technological process thereof
CN108035554B (en) Construction method of section steel column support frame of super high-rise building frame column
CN105887811A (en) Ultra-deep soft soil pile integral construction method based on high-precision information monitoring
CN106193330B (en) A kind of steel building construction land tenure foot bolt pre-embedded construction method
CN109457965A (en) The Efficient installation method and its device of precast concrete wall panel
CN219365493U (en) Rag bolt positioner of exposed steel column foot
CN118774266A (en) High-precision control device and control method for horizontal heavy embedded parts
CN220432162U (en) Leveling and supporting device for embedded supporting leg of heavy tower crane
CN213174260U (en) Laminated rubber shock insulation support mounting structure
CN105735228B (en) High-lift tooth climbs formula ship lift rack system construction method and installation accuracy control method
CN102953344B (en) Climbing cone type triangular cantilever bracket
CN205894490U (en) Steel core concrete column and pile foundation connection structure
CN109179222B (en) Construction method for controlling inclination and levelness of embedded joint of tower crane
CN215168216U (en) A prefabricated post temporary fixation device and system for on backfill foundation
CN206189607U (en) Rag bolt location structure
CN204690776U (en) A kind of reinforced concrete composite structure huge plug-in type suspension column structure
CN219033277U (en) Auxiliary steel structure column foot vertical fixing device
CN202338107U (en) Flexible sliding mold torsion-resisting construction device of silo
CN207211221U (en) Miniature anti-floating pile resistance to plucking bearing capacity testing arrangement of fibre muscle
CN215055273U (en) A assembled template for installing support bracket embedded box
CN209308063U (en) The cast iron platform of horizontal adjustable and large-scale cast iron platform
CN110258610B (en) Column foot node for modular building
CN212375847U (en) Positioning platform of foundation pit reverse construction method steel structure column
CN211547694U (en) A cast-in-place pile reinforcement cage positioning and centering device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230718

CF01 Termination of patent right due to non-payment of annual fee