CN219351124U - Cable laying auxiliary device - Google Patents
Cable laying auxiliary device Download PDFInfo
- Publication number
- CN219351124U CN219351124U CN202223583387.7U CN202223583387U CN219351124U CN 219351124 U CN219351124 U CN 219351124U CN 202223583387 U CN202223583387 U CN 202223583387U CN 219351124 U CN219351124 U CN 219351124U
- Authority
- CN
- China
- Prior art keywords
- rectangular frame
- wire
- reinforced concrete
- cable
- rectangular
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 33
- 238000007689 inspection Methods 0.000 claims abstract description 25
- 229910000831 Steel Inorganic materials 0.000 claims description 16
- 239000010959 steel Substances 0.000 claims description 16
- 238000000034 method Methods 0.000 abstract description 6
- 238000009434 installation Methods 0.000 abstract description 5
- 238000009826 distribution Methods 0.000 abstract description 3
- 238000004804 winding Methods 0.000 abstract description 2
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 230000003044 adaptive effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model discloses a cable laying auxiliary device, which comprises a wire feeding combined frame and a connecting wire, wherein the wire feeding combined frame comprises two rectangular frames and two wire guide wheels, and each rectangular frame is provided with one wire guide wheel; one rectangular frame is arranged at the top of the inspection well, two reinforced concrete pipelines are laid on the well wall of the inspection well, and two ends of the other rectangular frame are respectively arranged in the two reinforced concrete pipelines. The using method of the device comprises the following steps: winding and protecting the end part of the cable, conveying the cable to the end part of one of the reinforced concrete pipelines, and respectively inserting two sides of a rectangular frame into the two reinforced concrete pipelines; connecting two rectangular frames; putting the connecting wire into two wire guide wheels, and pushing the connecting wire into the reinforced concrete pipeline; binding the end of the connecting wire with the end of the cable; pulling the connecting wire to enable the cable to enter and exit the well, and placing the cable to be in the distribution room; and finishing the laying of the other cable, and disassembling the wire feeding combined frame. The utility model has convenient installation and laying operation.
Description
Technical Field
The utility model belongs to the technical field of building construction, and particularly relates to a cable laying auxiliary device.
Background
The underground infrastructure is convenient to install and maintain by arranging inspection wells for power supply, water drainage, pollution discharge, communication, cable television, gas pipes, street lamp circuits and the like. When a large-section cable is laid into a well to be put into a box, conventionally, a cable head is placed in the end head of a reinforced concrete pipeline below the wall of an inspection well, and then the cable head is pushed forward to be put into well construction. The existing method for pushing and constructing the cable head at the end of the reinforced concrete pipeline of the inspection well can cause initial damage to the cable surface caused by friction scratch (heavy weight), reduce the service life, and has the disadvantages of time and labor waste, low efficiency and influence on the smooth implementation of the quality of the installation progress.
Disclosure of Invention
Aiming at the problems in the prior art, the utility model provides the cable laying auxiliary device which is simple in processing and manufacturing, convenient in installation and laying operation, detachable and movable and capable of being reused and the using method thereof.
The utility model adopts the following technical scheme:
the device comprises a wire feeding combined frame (3) and a connecting wire (7), wherein the wire feeding combined frame (3) comprises two rectangular frames and two wire guide wheels (6), one wire guide wheel (6) is arranged in the middle of each rectangular frame, the two rectangular frames are connected through a plurality of long limb bolt rods (4), and the two rectangular frames are parallel to each other; one rectangular frame is arranged at the top of the inspection well (1), two opposite reinforced concrete pipelines (2) are laid on the well wall of the inspection well (1), one end of the other rectangular frame is arranged in one reinforced concrete pipeline (2), and the other end of the other rectangular frame is arranged in the other reinforced concrete pipeline (2); the connecting wire (7) is wound into two wire guide wheels (6) in a plurality of circles.
Further, the width of the rectangular frame is smaller than the inner diameter of the reinforced concrete pipeline (2), and the length of the rectangular frame is larger than the diameter of the inspection well (1).
Further, the rectangular frame is made of one of flat steel, square steel and thick steel plates.
Further, a nut is arranged at one end of each long-limb bolt rod (4), a plurality of bolt holes (8) are formed in the rectangular frame, one end, far away from the nut, of each long-limb bolt rod (4) penetrates through two corresponding bolt holes (8) of the rectangular frame, and one end, far away from the nut, of each long-limb bolt rod (4) is provided with one nut (5).
Further, one side of the wire guide wheel (6) is connected with a wire guide wheel shaft (9), the other side of the wire guide wheel (6) is connected with another opposite wire guide wheel shaft (9), one wire guide wheel shaft (9) is connected with one side of the rectangular frame, the other wire guide wheel shaft (9) is connected with the other side of the rectangular frame, and two sides of the rectangular frame, which are connected with the two wire guide wheel shafts (9), are parallel to each other.
Further, the connecting wire (7) is a steel strand.
The beneficial technical effects of the utility model are as follows: the auxiliary cable laying device disclosed by the utility model is reasonable and ingenious in structural design, simple in processing and manufacturing, convenient in installation and laying operation, safe and stable, capable of being detached and moved, capable of being repeatedly used, saving in construction cost, avoiding initial damage of cables, ensuring smooth implementation of the quality of the cable laying and installation progress, and achieving social benefit and economic benefit of safe construction.
Drawings
FIG. 1 is a schematic diagram of the structure of the device of the present utility model;
fig. 2 is a schematic structural view of a wire feeding combination frame according to the present utility model.
Detailed Description
Referring to fig. 1-2, the auxiliary device for laying cables comprises a wire feeding combined frame 3 and a connecting wire 7, wherein the wire feeding combined frame 3 comprises two rectangular frames and two wire guide wheels 6, one wire guide wheel 6 is arranged in the middle of each rectangular frame, the two rectangular frames are connected through a plurality of long limb bolt rods 4, and the two rectangular frames are parallel to each other; one rectangular frame is arranged at the top of the inspection well 1, two reinforced concrete pipelines 2 are laid on the well wall of the inspection well 1, the two reinforced concrete pipelines 2 are laid on two opposite sides of the well wall of the inspection well 1, one end of the other rectangular frame is arranged in one reinforced concrete pipeline 2, and the other end of the other rectangular frame is arranged in the other reinforced concrete pipeline 2; the connecting wire 7 is wound into two wire guide wheels 6 in a plurality of turns. The width of the rectangular frame is smaller than the inner diameter of the reinforced concrete pipeline 2, and the length of the rectangular frame is larger than the diameter of the inspection well 1. The rectangular frame is made of one of flat steel, square steel and thick steel plates. The one end processing of long limb bolt pole 4 has the nut, rectangular frame processes has a plurality of bolt holes 8, and the one end that the nut was kept away from to every long limb bolt pole 4 passes two bolt holes 8 that rectangular frame corresponds, and a nut 5 is installed to the one end that the nut was kept away from to every long limb bolt pole 4. One side of the wire guide wheel 6 is connected with a wire guide wheel shaft 9, the other side of the wire guide wheel 6 is connected with another opposite wire guide wheel shaft 9, one wire guide wheel shaft 9 is connected with one side of the rectangular frame, the other wire guide wheel shaft 9 is connected with the other side of the rectangular frame, and two sides of the rectangular frame, which are connected with the two wire guide wheel shafts 9, are parallel to each other. The connecting wire 7 is a steel strand.
The application method based on the cable laying auxiliary device comprises the following steps:
step (1): winding and protecting the end part of the cable, and respectively inserting two sides of the short side of a rectangular frame into two reinforced concrete pipelines 2 after the cable is segmented and sent to the end part of one reinforced concrete pipeline 2;
step (II): one end of each long limb bolt rod 4 far away from the nuts passes through the bolt holes 8 of the rectangular frame inserted into the two reinforced concrete pipelines 2;
step (III): the corresponding bolt holes 8 machined by the other rectangular frame penetrate through the long-limb bolt rods 4, and nuts 5 are used for respectively fastening the long-limb bolt rods 4; the other rectangular frame is arranged on the top of the inspection well 1;
step (IV): putting the connecting wire 7 into a wire guide wheel 6 which is vertically symmetrical, paying off and pushing the connecting wire 7 into a reinforced concrete pipeline 2 which needs to be penetrated by a cable;
step (five): after the connecting wire 7 is fed out of the end part of the reinforced concrete pipeline 2 into which the cable is required to penetrate, binding the end part of the fed connecting wire 7 and the end part of the cable which is wound and protected by steel wires;
step (six): pulling the connecting wire 7 to link so as to lead the cable to enter and exit the well, and loosening the binding wire to place the cable to be placed in the distribution room;
step (seven): repeating the steps (four) to (six) until the laying of the length of the other cable is completed, discharging the cable from the well and entering the box, and disassembling the wire feeding combined frame 3.
Implementation mode of the cable laying auxiliary device:
referring to fig. 1-2, 1) welding and processing flat (square) steel or thick steel plates to manufacture two rectangular frames with the width smaller than the inner diameter of the reinforced concrete pipeline 2 and the length larger than the diameter of the inspection shaft 1, and symmetrically arranging two groups of bolt holes 8 in the area except the middle part of the length direction of the two rectangular frames;
2) Selecting a long limb bolt rod 4 with an adaptive length and an external diameter according to the height distance from the bottom end of the reinforced concrete pipeline 2 to the wellhead edge of the inspection well 1 and the internal diameter of the bolt hole 8;
3) Two groups of disc-type wire guide wheels 6 with inner arc grooves are processed and manufactured and used for placing connecting wires 7, two wire guide wheel shafts 9 are symmetrically and vertically welded and additionally arranged at the center positions of two sides of the wire guide wheels 6 respectively, and the combined width of the two wire guide wheel shafts 9 and the wire guide wheels 6 is the same as the width of two rectangular frames;
4) The bottoms of the wire wheel shafts 9 on the two sides of the two groups of wire wheels 6 are symmetrically and vertically welded and added in the middle of the two sides of the two rectangular frames respectively, and the processing and manufacturing of the cable laying device are completed.
5) The using method comprises the following steps: (1) the end part of the large-section cable is wound and protected, when the large-section cable is segmented and sent to the end part of one reinforced concrete pipeline 2 horizontally arranged below the well wall of the inspection well 1, two sides of the short side of a rectangular frame are respectively inserted into and supported on the inner pipe wall of the lower end of the reinforced concrete pipeline 2 at two sides of the well wall of the inspection well 1, and the rectangular frame can be hung by ropes: (2) the long limb bolt rods 4 are penetrated from bottom to top at the bolt holes 8 opened on the inner pipe wall of the lower end of the reinforced concrete pipe 2 which is inserted and borne at the two sides of the inspection well 1, and can also be penetrated in advance; (3) the bolt holes 8 symmetrically arranged on the other rectangular frame are aligned with the long limb bolt rods 4 which are penetrated into and bear on the rectangular frame on the inner pipe wall of the lower end of the reinforced concrete pipe 2 at the two sides of the well wall of the inspection well 1, and are inserted from top to bottom; (4) the other rectangular frame which is inserted into the long limb bolt rod 4 from top to bottom can be clamped and fixed at the upper end of the well edge of the inspection well 1, the long limb bolt rods 4 are respectively fastened by nuts 5, and two rectangular frames at different positions are symmetrically arranged on the upper part and the lower part, the long limb bolt rod 4, a wire guide wheel 6 and a wire guide wheel shaft 9 to form a wire feeding combined frame 3; (5) an operator stands at the side end of the well edge of the inspection well 1 to put a connecting wire 7 into the wire guide wheels 6 which are vertically symmetrical, the connecting wire 7 can be wound in a plurality of circles, and the connecting wire 7 is paid out and pushed into the reinforced concrete pipeline 2 which needs to be penetrated by a cable; (6) after the connecting wire 7 is fed out of the end part of the reinforced concrete pipeline 2, the end of the fed connecting wire 7 and the end of the cable with the large section which is wound and protected are bound by a steel wire for about 300 mm; (7) operators at the well edge of the inspection well 1 drag the connecting wire 7 to link so that the large-section cable enters and exits the well, and other operators can assist in lifting and conveying, so that the binding wire is loosened to place the cable to be placed in a distribution room (box); (8) repeating the operation steps (5) - (7) until the laying of the other cable with the length is completed; (9) and (3) disassembling the wire feeding combined frame 3, and installing the cable laying device at the position of the next inspection well 1 according to the operation steps (1) - (9) to finish the cable laying of the whole length of project engineering.
Claims (6)
1. The auxiliary cable laying device is characterized by comprising a wire feeding combined frame (3) and a connecting wire (7), wherein the wire feeding combined frame (3) comprises two rectangular frames and two wire guide wheels (6), one wire guide wheel (6) is arranged in the middle of each rectangular frame, the two rectangular frames are connected through a plurality of long limb bolt rods (4), and the two rectangular frames are parallel to each other; one rectangular frame is arranged at the top of the inspection well (1), two opposite reinforced concrete pipelines (2) are laid on the well wall of the inspection well (1), one end of the other rectangular frame is arranged in one reinforced concrete pipeline (2), and the other end of the other rectangular frame is arranged in the other reinforced concrete pipeline (2); the connecting wire (7) is wound into two wire guide wheels (6) in a plurality of circles.
2. Cabling aid according to claim 1, characterized in that the rectangular frame has a width smaller than the inner diameter of the reinforced concrete pipe (2) and a length larger than the diameter of the manhole (1).
3. The cabling assist apparatus of claim 2 wherein the rectangular frame is one of flat steel, square steel, and thick steel plate.
4. Cabling aid according to claim 1, characterized in that the long limb bolt bars (4) have nuts at one end, the rectangular frame is machined with a number of bolt holes (8), one end of each long limb bolt bar (4) remote from the nuts passes through two corresponding bolt holes (8) of the rectangular frame, one nut (5) is mounted at the end of each long limb bolt bar (4) remote from the nuts.
5. Cable laying aid according to claim 1, characterized in that one side of the wire wheel (6) is connected with one wire wheel axle (9), the other side of the wire wheel (6) is connected with another opposite wire wheel axle (9), one wire wheel axle (9) is connected with one side of the rectangular frame, the other wire wheel axle (9) is connected with the other side of the rectangular frame, the two sides of the rectangular frame connecting the two wire wheel axles (9) are parallel to each other.
6. Cabling aid according to claim 1, characterized in that the connection line (7) is a steel strand.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223583387.7U CN219351124U (en) | 2022-12-31 | 2022-12-31 | Cable laying auxiliary device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223583387.7U CN219351124U (en) | 2022-12-31 | 2022-12-31 | Cable laying auxiliary device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219351124U true CN219351124U (en) | 2023-07-14 |
Family
ID=87110673
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202223583387.7U Active CN219351124U (en) | 2022-12-31 | 2022-12-31 | Cable laying auxiliary device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219351124U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116014631A (en) * | 2022-12-31 | 2023-04-25 | 金川集团股份有限公司 | A cable laying auxiliary device and its use method |
-
2022
- 2022-12-31 CN CN202223583387.7U patent/CN219351124U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116014631A (en) * | 2022-12-31 | 2023-04-25 | 金川集团股份有限公司 | A cable laying auxiliary device and its use method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN114933231B (en) | Calandria bundle hoisting tool and construction method thereof | |
| CN205393933U (en) | Shield constructs dismouting device in quick -witted screw conveyer hole | |
| CN113236858B (en) | Method for laying concrete cushion layer and steel pipe in jacking pipe | |
| CN210794552U (en) | Net rack color steel plate profiling rapid conveying device | |
| CN201320727Y (en) | Assembly device for PCCP pipelines | |
| CN108975171B (en) | Segmented accurate dismounting device for water beam and upright column of heating furnace and use method | |
| CN115613461B (en) | Bottom formwork floor support plate construction process suitable for construction of cast-in-situ bridge deck of reinforced concrete composite beam | |
| CN116014631A (en) | A cable laying auxiliary device and its use method | |
| CN221939882U (en) | A U-shaped steel cage hoisting device | |
| CN209816682U (en) | Bridge steel box girder aerial working operation platform | |
| CN218118172U (en) | Hydraulic device for mounting nodular cast iron pipe | |
| CN219712564U (en) | Concrete spigot-and-socket pipe installation fastening device | |
| CN208981895U (en) | A hoisting and self-climbing combined mechanism for power transmission tower erection | |
| CN216851238U (en) | Cable support for reinforcing railway line | |
| CN215885862U (en) | Cable winder | |
| CN206616598U (en) | A combined square manhole cover | |
| CN117536446A (en) | Construction method of U-shaped steel reinforcement cage in construction of underground comprehensive pipe rack | |
| CN205934962U (en) | A system of sliding for underground pipe gallery cast -in -situ construction | |
| CN214031291U (en) | Cable conveying system for open caisson construction | |
| CN109941900B (en) | Simple installation equipment for sound barrier plugboard | |
| CN113186843A (en) | Busy trunk concrete sound barrier installation construction method | |
| CN111304981B (en) | Urban rail side passage construction support device and use method | |
| CN211470628U (en) | Water conservancy closed conduit pipe conveyor | |
| CN220336479U (en) | Concrete spreader | |
| CN108868098B (en) | Support frame used outside hoistway and mounting method thereof |