CN219341509U - A connector collection device during the disassembly and assembly of steel support and load-holding devices - Google Patents
A connector collection device during the disassembly and assembly of steel support and load-holding devices Download PDFInfo
- Publication number
- CN219341509U CN219341509U CN202320536448.XU CN202320536448U CN219341509U CN 219341509 U CN219341509 U CN 219341509U CN 202320536448 U CN202320536448 U CN 202320536448U CN 219341509 U CN219341509 U CN 219341509U
- Authority
- CN
- China
- Prior art keywords
- steel support
- fixed mounting
- collection device
- frame
- connecting rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 30
- 239000010959 steel Substances 0.000 title claims abstract description 30
- 238000000034 method Methods 0.000 claims abstract description 26
- 230000005484 gravity Effects 0.000 claims description 9
- 230000014759 maintenance of location Effects 0.000 claims 6
- 238000009434 installation Methods 0.000 abstract description 20
- 239000004744 fabric Substances 0.000 description 13
- 230000000694 effects Effects 0.000 description 8
- 238000010276 construction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及钢支撑结构技术领域,具体为一种在钢支撑保载装置拆装过程中的连接件收集装置。The utility model relates to the technical field of steel support structures, in particular to a connecting piece collection device during the disassembly and assembly process of a steel support load-holding device.
背景技术Background technique
钢支撑结构是钢结构材料制作而成的一种具有支撑功能的钢结构,在对地铁深基坑进行施工的过程中,需要使用到钢结构,钢结构可实现对地铁基坑内侧的临时支撑工作,提高了地铁基坑施工过程中的安全性。The steel support structure is a steel structure with supporting function made of steel structure materials. During the construction of the deep foundation pit of the subway, the steel structure needs to be used. The steel structure can realize the temporary support of the inner side of the foundation pit of the subway. work, which improves the safety during the construction of the subway foundation pit.
现有技术诸如公开号为CN214940208U的实用新型,该专利公开了一种地铁深基坑用的钢支撑保载装置,涉及钢支撑结构技术领域。本实用新型包括支撑板和安装筒,所述支撑板上安装有千斤顶,所述千斤顶的活塞杆活动插设在所述安装筒内且端部安装有压块,所述支撑板的顶部呈对称安装有丝杆,两个所述丝杆的自由端均活动插设在所述安装筒内,所述支撑板和所述安装筒之间安装有螺纹套设在所述丝杆外表面的螺帽。本实用新型把安装筒通过法兰与支撑钢管连接,通过千斤顶推动支撑板抵触基坑壁,再扭动螺帽转动移动并抵触安装筒,利用抵触摩擦力从而使支撑板与安装筒在对基坑支护的状态形成一个整体固定,从而使千斤顶在油压卸除后,支撑板和安装筒对基坑的内壁进行有效且稳定的支护。The prior art, such as the utility model whose publication number is CN214940208U, discloses a steel support load-holding device for subway deep foundation pits, and relates to the technical field of steel support structures. The utility model comprises a support plate and a mounting cylinder, a jack is installed on the support plate, a piston rod of the jack is movably inserted in the mounting cylinder and a pressure block is installed at the end, and the top of the support plate is symmetrical Screw rods are installed, and the free ends of the two screw rods are movably inserted in the installation tube, and a screw threaded on the outer surface of the screw rod is installed between the support plate and the installation tube. cap. The utility model connects the installation cylinder with the supporting steel pipe through the flange, pushes the support plate to touch the wall of the foundation pit through the jack, and then twists the nut to rotate and move and touch the installation cylinder, so that the support plate and the installation cylinder are aligned on the foundation by using the conflicting friction force. The state of the pit support is fixed as a whole, so that after the hydraulic jack is removed, the support plate and the installation cylinder can effectively and stably support the inner wall of the foundation pit.
针对上述及现有的相关技术,发明人认为往往存在以下缺陷:在对钢支撑保载装置进行实际拆装使用的过程中,整个装置处于横放的状态,当需要对法兰板进行拆装工作时,拆装过程中容易出现掉落螺纹连接件的情况,由于基坑的结构较大且螺纹连接件的结构较小,容易导致掉落螺纹连接件丢失的情况,从而影响了对钢支撑保载装置的正常拆装工作。For the above-mentioned and existing related technologies, the inventor believes that the following defects often exist: in the process of actually disassembling and using the steel support load-holding device, the entire device is in a horizontal state, and when it is necessary to disassemble the flange plate When working, it is easy to drop the threaded connectors during disassembly and assembly. Due to the large structure of the foundation pit and the small structure of the threaded connectors, it is easy to lead to the loss of the dropped threaded connectors, which affects the steel support. Normal disassembly and assembly of the load-holding device.
为此,我们提出一种在钢支撑保载装置拆装过程中的连接件收集装置。For this reason, we propose a connecting piece collection device during the disassembly and assembly of the steel support load-holding device.
实用新型内容Utility model content
本实用新型的目的在于提供一种在钢支撑保载装置拆装过程中的连接件收集装置,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide a connector collection device during the disassembly and assembly of the steel support load-holding device, so as to solve the problems raised in the above-mentioned background technology.
为实现上述目的,本实用新型提供如下技术方案:一种在钢支撑保载装置拆装过程中的连接件收集装置,包括支撑座,所述支撑座的上表面固定安装有千斤顶,所述千斤顶的上端固定安装有安装筒,所述安装筒的表面套有套筒,所述安装筒的上端固定安装有法兰板,所述安装筒的表面设有收集装置,所述收集装置包括转动安装在套筒表面的转环,所述转环的侧壁固定安装有连接杆,所述连接杆的表面套有圆形筒,所述圆形筒的端面固定安装有收集框,所述收集框为凹槽状结构,所述收集框的外侧套有布袋,所述收集框的表面固定安装有两个支撑杆。In order to achieve the above purpose, the utility model provides the following technical solutions: a connector collecting device in the process of disassembling and assembling the steel support load-holding device, including a support seat, a jack is fixedly installed on the upper surface of the support seat, and the jack The upper end of the installation cylinder is fixedly installed with a mounting cylinder, the surface of the installation cylinder is covered with a sleeve, the upper end of the installation cylinder is fixedly installed with a flange plate, the surface of the installation cylinder is provided with a collection device, and the collection device includes a rotating installation The swivel on the surface of the sleeve, the side wall of the swivel is fixedly equipped with a connecting rod, the surface of the connecting rod is covered with a circular cylinder, and the end surface of the circular cylinder is fixedly equipped with a collection frame, the collection frame It is a groove-shaped structure, the outside of the collection frame is covered with a cloth bag, and two support rods are fixedly installed on the surface of the collection frame.
上述部件达到的效果为:在拆卸螺纹连接件的过程中,螺纹连接件拆卸后会掉落在收集框的内侧,并且掉落在收集框内侧的螺纹连接件会滑落在布袋内侧进行收集,从而避免了拆卸过程中螺纹连接件发生丢失的情况。The effect achieved by the above components is: in the process of disassembling the threaded connector, the threaded connector will fall on the inside of the collection frame after disassembly, and the threaded connector that falls on the inside of the collection frame will slide down to the inside of the bag for collection, thereby The situation that the threaded connection piece is lost during the dismantling process is avoided.
优选的,所述连接杆的表面固定安装有连接绳,所述连接绳远离连接杆的一端固定安装有重力球。Preferably, a connecting rope is fixedly installed on the surface of the connecting rod, and a gravity ball is fixedly installed on the end of the connecting rope far away from the connecting rod.
上述部件达到的效果为:转环会受到重力球重力作用带动收集框翻转至布袋朝下的位置。The effect achieved by the above components is: the swivel will be driven by the gravity of the gravity ball to turn the collection frame over to the position where the bag faces downward.
优选的,所述连接杆和圆形筒的侧壁均固定安装有四个支块,所述连接杆上支块和圆形筒上支块彼此靠近的一侧固定安装有第一弹簧。Preferably, four support blocks are fixedly installed on the side wall of the connecting rod and the circular cylinder, and a first spring is fixedly installed on the side where the upper support blocks of the connecting rod and the upper support blocks of the circular cylinder are close to each other.
上述部件达到的效果为:通过设置第一弹簧,起到了驱动收集框移动至法兰板正下方的作用,进一步提高了对法兰板上螺纹连接件掉落时的收集效率。The effect achieved by the above components is: by setting the first spring, it plays a role in driving the collection frame to move directly under the flange plate, further improving the collection efficiency when the threaded connector on the flange plate falls.
优选的,所述收集框的表面固定安装有两个支杆,所述支杆的内部滑动穿设有锥杆,所述锥杆的侧壁固定安装有挡块,所述收集框的表面开设有针孔,所述针孔的尺寸和锥杆的尺寸相适配。Preferably, two poles are fixedly installed on the surface of the collection frame, and a tapered rod is slidably pierced inside the pole, and a stopper is fixedly installed on the side wall of the tapered rod, and the surface of the collection frame is provided with a There are pinholes, and the size of the pinholes matches the size of the tapered rod.
上述部件达到的效果为:通过设置布袋和收集框为可拆卸结构,方便了对收集后螺纹连接件的处理工作。The effect achieved by the above parts is: by setting the cloth bag and the collection frame as detachable structures, it is convenient to handle the collected threaded connectors.
优选的,所述锥杆的表面套有第二弹簧,所述第二弹簧的两端分别与支杆和挡块固定连接。Preferably, a second spring is sheathed on the surface of the tapered rod, and the two ends of the second spring are respectively fixedly connected with the support rod and the stopper.
上述部件达到的效果为:挡块会受到支杆上第二弹簧弹力作用带动锥杆插入针孔内壁,此时可实现对布袋的稳定固定工作。The effect achieved by the above components is: the stopper will be driven by the second spring force on the pole to insert the tapered rod into the inner wall of the pinhole, and at this time, the stable fixing of the cloth bag can be realized.
优选的,所述法兰板的表面设有定位装置,所述定位装置包括固定安装在法兰板表面的若干个固定杆,若干个所述固定杆的另一端均固定安装有限位框,所述限位框的内部螺纹穿设有两个螺栓,两个所述螺栓彼此靠近的一端均固定连接有圆形块。Preferably, the surface of the flange plate is provided with a positioning device, and the positioning device includes several fixed rods fixedly installed on the surface of the flange plate, and the other ends of the several fixed rods are all fixedly mounted with a limit frame, so that Two bolts are threaded through the inner thread of the limiting frame, and the ends of the two bolts close to each other are fixedly connected with a circular block.
上述部件达到的效果为:在需要对螺纹连接件进行拆卸工作时,转动两个螺栓,螺栓会挤压在螺纹连接件位置的侧壁,从而减少了螺纹连接件拆卸过程中螺纹件和螺母之间同方向转动的情况。The effect achieved by the above components is: when it is necessary to disassemble the threaded connection, turn the two bolts, and the bolts will be squeezed on the side wall of the threaded connection, thereby reducing the distance between the threaded part and the nut during the disassembly of the threaded connection. When rotating in the same direction.
优选的,所述限位框的表面转动安装有转板,所述转板的表面胶接有橡胶垫。Preferably, the surface of the limiting frame is rotatably installed with a rotating plate, and the surface of the rotating plate is glued with a rubber pad.
上述部件达到的效果为:转动转板,使转板遮盖在螺纹连接件的外表面,减少了螺纹连接件在法兰板内部滑动的情况,进一步提高了对螺纹连接件进行拆卸过程中的稳定性,橡胶垫的设置提高了对螺纹连接件遮挡过程中的稳定性。The effect achieved by the above components is: turning the rotating plate, so that the rotating plate covers the outer surface of the threaded connector, reducing the sliding of the threaded connector inside the flange plate, and further improving the stability during the disassembly process of the threaded connector The setting of the rubber pad improves the stability in the process of shielding the threaded connection.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:
1.本实用新型通过设置收集装置,方便了对拆装钢支撑保载装置过程中螺纹连接件的收集处理工作,从而降低了螺纹连接件掉落在地面上出现丢失的情况,一定程度上保证了对钢支撑保载装置的正常拆装工作。1. The utility model facilitates the collection and processing of the threaded connectors during the process of disassembling and assembling the steel support load-holding device by setting a collecting device, thereby reducing the situation of threaded connectors falling on the ground and being lost, ensuring to a certain extent This ensures the normal disassembly and assembly of the steel support load-holding device.
2.本实用新型通过设置定位装置,方便了对拆卸过程中螺纹连接件的限位遮挡工作,进一步提高了对螺纹连接件进行拆卸的稳定性。2. The utility model is provided with a positioning device, which facilitates the position-limiting and shielding work of the threaded connector during the disassembly process, and further improves the stability of disassembling the threaded connector.
附图说明Description of drawings
图1为本实用新型整体结构示意图;Fig. 1 is a schematic diagram of the overall structure of the utility model;
图2为本实用新型的另一角度结构示意图;Fig. 2 is another angle structural representation of the utility model;
图3为本实用新型中图2的局部结构示意图;Fig. 3 is the local structural representation of Fig. 2 in the utility model;
图4为本实用新型中图3的B处放大图;Fig. 4 is the enlarged view of the B place of Fig. 3 in the utility model;
图5为本实用新型中图1的A处放大图。Fig. 5 is an enlarged view of A in Fig. 1 in the present invention.
图中:1-支撑座;2-千斤顶;3-套筒;4-安装筒;5-法兰板;6-收集装置;601-收集框;602-布袋;603-支撑杆;604-转环;605-连接杆;606-连接绳;607-重力球;608-圆形筒;609-第一弹簧;610-支杆;611-锥杆;612-挡块;613-第二弹簧;614-针孔;7-定位装置;71-固定杆;72-限位框;73-圆形块;74-螺栓;75-橡胶垫;76-转板。In the figure: 1-support seat; 2-jack; 3-sleeve; 4-installation cylinder; 5-flange plate; 6-collection device; 601-collection frame; Ring; 605-connecting rod; 606-connecting rope; 607-gravity ball; 608-round cylinder; 609-first spring; 614-pinhole; 7-positioning device; 71-fixing rod; 72-limit frame; 73-round block; 74-bolt; 75-rubber pad;
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
请参阅图1-5,本实用新型提供一种技术方案:一种在钢支撑保载装置拆装过程中的连接件收集装置,包括支撑座1,支撑座1的上表面固定安装有千斤顶2,千斤顶2的上端固定安装有安装筒4,安装筒4的表面套有套筒3,安装筒4的上端固定安装有法兰板5,安装筒4的表面设有收集装置6,法兰板5的表面设有定位装置7。Please refer to Figures 1-5, the utility model provides a technical solution: a connector collection device in the process of disassembling and assembling the steel support load-holding device, including a support base 1, and a
下面具体说一下其收集装置6和定位装置7的具体设置和作用。Let's talk about the concrete setting and effect of its
如图1-图4所示,收集装置6包括转动安装在套筒3表面的转环604,转环604的侧壁固定安装有连接杆605,连接杆605的表面套有圆形筒608,圆形筒608的端面固定安装有收集框601,收集框601为凹槽状结构,收集框601的外侧套有布袋602,收集框601的表面固定安装有两个支撑杆603。在拆卸螺纹连接件的过程中,螺纹连接件拆卸后会掉落在收集框601的内侧,并且掉落在收集框601内侧的螺纹连接件会滑落在布袋602内侧进行收集,从而避免了拆卸过程中螺纹连接件发生丢失的情况。As shown in Figures 1-4, the
连接杆605的表面固定安装有连接绳606,连接绳606远离连接杆605的一端固定安装有重力球607。转环604会受到重力球607重力作用带动收集框601翻转至布袋602朝下的位置。连接杆605和圆形筒608的侧壁均固定安装有四个支块,连接杆605上支块和圆形筒608上支块彼此靠近的一侧固定安装有第一弹簧609。通过设置第一弹簧609,起到了驱动收集框601移动至法兰板5正下方的作用,进一步提高了对法兰板5上螺纹连接件掉落时的收集效率。A connecting
收集框601的表面固定安装有两个支杆610,支杆610的内部滑动穿设有锥杆611,锥杆611的侧壁固定安装有挡块612,收集框601的表面开设有针孔614,针孔614的尺寸和锥杆611的尺寸相适配。通过设置布袋602和收集框601为可拆卸结构,方便了对收集后螺纹连接件的处理工作。锥杆611的表面套有第二弹簧613,第二弹簧613的两端分别与支杆610和挡块612固定连接。挡块612会受到支杆610上第二弹簧613弹力作用带动锥杆611插入针孔614内壁,此时可实现对布袋602的稳定固定工作。Two
如图1和图2以及图5所示,定位装置7包括固定安装在法兰板5表面的若干个固定杆71,若干个固定杆71的另一端均固定安装有限位框72,限位框72的内部螺纹穿设有两个螺栓74,两个螺栓74彼此靠近的一端均固定连接有圆形块73。在需要对螺纹连接件进行拆卸工作时,转动两个螺栓74,螺栓74会挤压在螺纹连接件位置的侧壁,从而减少了螺纹连接件拆卸过程中螺纹件和螺母之间同方向转动的情况。As shown in Fig. 1 and Fig. 2 and Fig. 5,
限位框72的表面转动安装有转板76,转板76的表面胶接有橡胶垫75。转动转板76,使转板76遮盖在螺纹连接件的外表面,减少了螺纹连接件在法兰板5内部滑动的情况,进一步提高了对螺纹连接件进行拆卸过程中的稳定性,橡胶垫75的设置提高了对螺纹连接件遮挡过程中的稳定性。The surface of the limiting
工作原理:在需要对法兰板5内部连接的螺纹连接件进行拆卸工作时,转环604会受到重力球607重力作用带动收集框601翻转至布袋602朝下的位置,在拆卸螺纹连接件的过程中,螺纹连接件拆卸后会掉落在收集框601的内侧,并且掉落在收集框601内侧的螺纹连接件会滑落在布袋602内侧进行收集,从而避免了拆卸过程中螺纹连接件发生丢失的情况,通过设置连接杆605在圆形筒608的内壁滑动,方便了对收集框601的收缩工作,方便了对法兰板5在地面上的摆放工作,向彼此远离的一侧拉动两个锥杆611,将布袋602套在收集框601的下侧,松开锥杆611,挡块612会受到支杆610上第二弹簧613弹力作用带动锥杆611插入针孔614内壁,此时可实现对布袋602的稳定固定工作,通过设置布袋602和收集框601为可拆卸结构,方便了对收集后螺纹连接件的处理工作,通过设置第一弹簧609,起到了驱动收集框601移动至法兰板5正下方的作用,进一步提高了对法兰板5上螺纹连接件掉落时的收集效率,通过设置收集装置6,方便了对拆装钢支撑保载装置过程中螺纹连接件的收集处理工作,从而降低了螺纹连接件掉落在地面上出现丢失的情况,一定程度上保证了对钢支撑保载装置的正常拆装工作。Working principle: When it is necessary to disassemble the threaded connectors connected inside the
在需要对螺纹连接件进行拆卸工作时,转动两个螺栓74,螺栓74会挤压在螺纹连接件位置的侧壁,从而减少了螺纹连接件拆卸过程中螺纹件和螺母之间同方向转动的情况,转动转板76,使转板76遮盖在螺纹连接件的外表面,减少了螺纹连接件在法兰板5内部滑动的情况,进一步提高了对螺纹连接件进行拆卸过程中的稳定性,橡胶垫75的设置提高了对螺纹连接件遮挡过程中的稳定性,通过设置定位装置7,方便了对拆卸过程中螺纹连接件的限位遮挡工作,进一步提高了对螺纹连接件进行拆卸的稳定性。When it is necessary to disassemble the threaded connection, turn the two
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is a relationship between these entities or operations. There is no such actual relationship or order between them. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or device.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320536448.XU CN219341509U (en) | 2023-03-20 | 2023-03-20 | A connector collection device during the disassembly and assembly of steel support and load-holding devices |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320536448.XU CN219341509U (en) | 2023-03-20 | 2023-03-20 | A connector collection device during the disassembly and assembly of steel support and load-holding devices |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219341509U true CN219341509U (en) | 2023-07-14 |
Family
ID=87102858
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320536448.XU Active CN219341509U (en) | 2023-03-20 | 2023-03-20 | A connector collection device during the disassembly and assembly of steel support and load-holding devices |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219341509U (en) |
-
2023
- 2023-03-20 CN CN202320536448.XU patent/CN219341509U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108555825A (en) | Pin extracting apparatus | |
| CN219341509U (en) | A connector collection device during the disassembly and assembly of steel support and load-holding devices | |
| CN208716799U (en) | A ground anchor removal device for power engineering | |
| CN217727800U (en) | Bolt pre-tightening robot for wind generating set | |
| CN210879488U (en) | A hydraulic multifunctional bearing dismounting device | |
| CN211377532U (en) | Support type cable trench construction support | |
| CN204639528U (en) | A kind of 360 ° rotate freely group to stage apparatus | |
| CN210797243U (en) | A convertible bridge prefabricated steel pedestal | |
| CN209073059U (en) | A kind of labour-saving greenhouse bracket lifting structure | |
| CN209184103U (en) | A kind of portable high-pressure line steel tower ground wire lead lifting device | |
| CN215369744U (en) | Semi-automatic rod unloading device of underground drill rig | |
| CN222768296U (en) | A special tool for disassembling the pin shaft of an underground scraper | |
| CN218946832U (en) | Assembly device for a roller bearing | |
| CN215428668U (en) | Machine-made sand turning device | |
| CN215886257U (en) | Convenient jacking device | |
| CN204630835U (en) | A kind of plastic inspection well is marked time bearing test pick-up unit | |
| CN219325207U (en) | Tool for dismantling pin shaft of grab bucket of garbage crane | |
| CN217998841U (en) | Concrete pouring workbench for house construction | |
| CN219546564U (en) | Tower crane convenient to installation | |
| CN219380541U (en) | Device for disassembling main shaft of bearing body of flotation machine | |
| CN219841263U (en) | A hydrological monitoring auxiliary positioning bracket | |
| CN216449341U (en) | Building material bearing capacity detection device | |
| CN216421160U (en) | Long-arm electric hammer | |
| CN218911134U (en) | Temporary steel structure support for lower-bearing type steel truss girder dragging construction | |
| CN220550827U (en) | Transition device for adjusting overhanging scaffold |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |