CN219327547U - A positioning and reinforcing device for long lateral catheters - Google Patents

A positioning and reinforcing device for long lateral catheters Download PDF

Info

Publication number
CN219327547U
CN219327547U CN202320485187.3U CN202320485187U CN219327547U CN 219327547 U CN219327547 U CN 219327547U CN 202320485187 U CN202320485187 U CN 202320485187U CN 219327547 U CN219327547 U CN 219327547U
Authority
CN
China
Prior art keywords
plate
positioning
adjusting
positioning sleeve
adjusting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202320485187.3U
Other languages
Chinese (zh)
Inventor
邢浩
李瀚�
苏顺
吴佳琪
张明亮
温建宇
盛帅兵
郭冬冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202320485187.3U priority Critical patent/CN219327547U/en
Application granted granted Critical
Publication of CN219327547U publication Critical patent/CN219327547U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to the technical field of engineering guide pipes and discloses a transverse long guide pipe positioning and reinforcing device which comprises a fixed plate, wherein mounting plates are arranged at two corners of two side walls of the fixed plate, a connecting seat is arranged in the middle of the upper end of the fixed plate, a connecting bearing is arranged in the middle of the connecting seat, a connecting column is arranged in an inner ring of the connecting bearing, an adjusting plate is arranged at the upper end of the connecting column, a positioning sleeve is arranged in the middle of the upper end of the adjusting plate, connecting wing plates are arranged at the lower parts of two side walls of the positioning sleeve, and fastening bolts are arranged at two sides of the middle of the connecting wing plates. The setting of fixed plate, connecting seat, connecting bearing, spliced pole, regulating plate and adjusting bolt makes the device when the fixed horizontal long pipe of location, and location reinforced structure can deflect according to the location demand of long pipe and adjust, makes the use flexibility of device higher, also is the device can satisfy more user demands.

Description

一种横向长导管定位加固装置A positioning and reinforcing device for long lateral catheters

技术领域technical field

本实用新型属于工程用导管技术领域,具体为一种横向长导管定位加固装置。The utility model belongs to the technical field of engineering conduits, in particular to a positioning and reinforcing device for long horizontal conduits.

背景技术Background technique

工程导管主要用于工程桥梁、高层建筑基础施工,主要用途是用作铁路桥、公路桥、电厂基础、地铁开挖等基础建设混凝土灌注基础导管,在隧道施工等工程建设中,隧道拱顶等结构在加固时会使用长导管与小导管在结构中纵向加固的方法,小导管加固与开挖施工存在一定干扰,同时由于存在开挖临空面,纵向注浆加固地层效果变差;若设置洞身长导管加固方式,为保证施工精度常需采取扩挖方式形成长导管工作室,并对长导管进行定位加固,以保证施工精度。Engineering conduits are mainly used in the foundation construction of engineering bridges and high-rise buildings. The main purpose is to be used as concrete pouring foundation conduits for infrastructure construction such as railway bridges, highway bridges, power plant foundations, and subway excavations. In engineering construction such as tunnel construction, tunnel vaults, etc. When the structure is reinforced, the method of longitudinal reinforcement of long conduits and small conduits in the structure will be used. There will be some interference between the reinforcement of small conduits and the excavation construction. In order to ensure the construction accuracy, it is often necessary to expand and excavate the long conduit to form a long conduit working room, and to strengthen the positioning of the long conduit to ensure the construction accuracy.

在公开号为CN208934712U的专利一种无中墙连拱隧道横向长导管定位加固装置中,其定位加固结构直接将导管固定,固定后无法根据导管搭设需求进行调节,使用灵活性差,为此这里提出了一种横向长导管定位加固装置。In the patent of CN208934712U, a positioning and reinforcing device for horizontally long conduits in multi-arch tunnels without middle walls, the positioning and reinforcing structure directly fixes the conduits, which cannot be adjusted according to the requirements of conduit erection after fixing, and the flexibility of use is poor. Therefore, it is proposed here A positioning reinforcement device for long lateral catheters is proposed.

发明内容Contents of the invention

针对上述情况,为克服现有技术的缺陷,本实用新型提供一种横向长导管定位加固装置,有效的解决了现有的横向长导管定位加固装置存在的问题。In view of the above situation, in order to overcome the defects of the prior art, the utility model provides a positioning and strengthening device for a long transverse conduit, which effectively solves the problems existing in the existing positioning and strengthening device for a long transverse conduit.

为实现上述目的,本实用新型提供如下技术方案:一种横向长导管定位加固装置,包括固定板,所述固定板两侧壁两角处均设置有安装片,所述固定板上端中部设置有连接座,所述连接座中部设置有连接轴承,所述连接轴承内圈内设置有连接柱,所述连接柱上端设置有调节板,所述调节板上端中部设置有定位套,所述定位套两侧壁下部均设置有连接翼板,所述连接翼板中部两侧均设置有紧固螺栓,位于所述连接翼板远离所述定位套一侧的所述调节板上设置有调节螺栓。In order to achieve the above purpose, the utility model provides the following technical solutions: a positioning and reinforcing device for long transverse conduits, including a fixing plate, mounting pieces are provided at the two corners of the two side walls of the fixing plate, and the middle part of the upper end of the fixing plate is provided with Connecting seat, the middle part of the connecting seat is provided with a connecting bearing, the inner ring of the connecting bearing is provided with a connecting column, the upper end of the connecting column is provided with an adjusting plate, the middle part of the upper end of the adjusting plate is provided with a positioning sleeve, and the positioning sleeve The lower parts of the two sidewalls are provided with connecting flaps, both sides of the middle part of the connecting flaps are provided with fastening bolts, and the adjusting plate located on the side of the connecting flaps away from the positioning sleeve is provided with adjusting bolts.

优选的,所述安装片与所述固定板侧壁焊接,所述安装片中部成型有通孔,所述连接座成型于所述固定板上端中部。Preferably, the mounting piece is welded to the side wall of the fixing plate, a through hole is formed in the middle of the mounting piece, and the connecting seat is formed in the middle of the upper end of the fixing plate.

优选的,所述连接轴承外圈与所述连接座内壁过盈连接,所述连接柱下端与所述连接轴承内圈过盈连接。Preferably, the outer ring of the connection bearing is in interference connection with the inner wall of the connection seat, and the lower end of the connection column is in interference connection with the inner ring of the connection bearing.

优选的,所述连接柱上端与所述调节板下端中部焊接,所述连接翼板成型于所述定位套上,所述定位套下端以及所述连接翼板下端均与所述调节板上端搭接。Preferably, the upper end of the connecting column is welded to the middle part of the lower end of the adjusting plate, the connecting wing is formed on the positioning sleeve, and the lower end of the positioning sleeve and the lower end of the connecting wing overlap with the upper end of the adjusting plate catch.

优选的,所述紧固螺栓贯穿所述连接翼板和所述调节板,所述紧固螺栓伸出所述连接翼板和所述调节板一端通过螺母固定。Preferably, the fastening bolt runs through the connecting wing plate and the adjusting plate, and one end of the fastening bolt protruding from the connecting wing plate and the adjusting plate is fixed by a nut.

优选的,所述调节螺栓与所述调节板通过螺纹连接,所述调节螺栓贯穿所述调节板一端与所述固定板上端通过卡压的方式进行连接。Preferably, the adjusting bolt is threadedly connected to the adjusting plate, and one end of the adjusting bolt penetrates through the adjusting plate and is connected to the upper end of the fixing plate by pressing.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

在该横向长导管定位加固装置中,固定板、连接座、连接轴承、连接柱、调节板和调节螺栓的设置,使装置在定位固定横向长导管时,定位加固结构可根据长导管的定位需求进行偏转调节,使装置的使用灵活性更高,也是装置能够满足更多的使用需求;长导管通过在装置上穿插进行定位加固,具有很高的施工便捷性,可有效降低施工难度。In the positioning and strengthening device for long horizontal conduits, the fixing plate, connecting seat, connecting bearing, connecting column, adjusting plate and adjusting bolts are arranged so that when the device is positioning and fixing the long horizontal conduit, the positioning and strengthening structure can be adjusted according to the positioning requirements of the long conduit. The deflection adjustment makes the use of the device more flexible, and the device can meet more needs for use; the long conduit is inserted through the device for positioning and reinforcement, which has high construction convenience and can effectively reduce construction difficulty.

附图说明Description of drawings

附图用来提供对本实用新型的进一步理解,并且构成说明书的一部分,与本实用新型的实施例一起用于解释本实用新型,并不构成对本实用新型的限制。在附图中:The accompanying drawings are used to provide a further understanding of the utility model, and constitute a part of the description, and are used to explain the utility model together with the embodiments of the utility model, and do not constitute a limitation to the utility model. In the attached picture:

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型中固定板、连接座、连接轴承和连接柱的连接结构示意图;Fig. 2 is the schematic diagram of the connection structure of the fixed plate, the connection seat, the connection bearing and the connection column in the utility model;

图3为本实用新型中定位套和连接翼板的结构示意图;Fig. 3 is the structural representation of positioning sleeve and connecting wing plate in the utility model;

图中:1、固定板;2、安装片;3、连接座;4、连接轴承;5、连接柱;6、调节板;7、定位套;8、连接翼板;9、紧固螺栓;10、调节螺栓。In the figure: 1. Fixed plate; 2. Mounting plate; 3. Connecting seat; 4. Connecting bearing; 5. Connecting column; 6. Adjusting plate; 7. Positioning sleeve; 8. Connecting wing plate; 9. Fastening bolt 10. Adjust the bolt.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例;基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Example: Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present utility model.

本实施例,由图1-3给出,本实用新型包括固定板1,固定板1两侧壁两角处均设置有安装片2,固定板1上端中部设置有连接座3,连接座3中部设置有连接轴承4,连接轴承4内圈内设置有连接柱5,连接柱5上端设置有调节板6,调节板6上端中部设置有定位套7,定位套7两侧壁下部均设置有连接翼板8,连接翼板8中部两侧均设置有紧固螺栓9,位于连接翼板8远离定位套7一侧的调节板6上设置有调节螺栓10。The present embodiment is given by Figures 1-3. The utility model includes a fixed plate 1, and the two corners of the two side walls of the fixed plate 1 are provided with mounting pieces 2, and the middle part of the upper end of the fixed plate 1 is provided with a connecting seat 3. The middle part is provided with a connecting bearing 4, the inner ring of the connecting bearing 4 is provided with a connecting column 5, the upper end of the connecting column 5 is provided with an adjusting plate 6, the middle part of the upper end of the adjusting plate 6 is provided with a positioning sleeve 7, and the lower part of the two side walls of the positioning sleeve 7 is provided with The connecting wing plate 8 is provided with fastening bolts 9 on both sides of the middle part of the connecting wing plate 8 , and an adjusting bolt 10 is arranged on the adjusting plate 6 on the side away from the positioning sleeve 7 of the connecting wing plate 8 .

其中,安装片2与固定板1侧壁焊接,安装片2中部成型有通孔,连接座3成型于固定板1上端中部,使用螺栓或其他固定件通过安装片2可将固定板1安装至墙体等结构上。Wherein, the mounting piece 2 is welded to the side wall of the fixing plate 1, the middle part of the mounting piece 2 is formed with a through hole, the connecting seat 3 is formed in the middle of the upper end of the fixing plate 1, and the fixing plate 1 can be installed to the structural walls etc.

其中,连接轴承4外圈与连接座3内壁过盈连接,连接柱5下端与连接轴承4内圈过盈连接,连接柱5上端与调节板6下端中部焊接,调节板6在连接柱5和连接轴承4的辅助下可在固定板1上端进行转动。Among them, the outer ring of the connecting bearing 4 is in interference connection with the inner wall of the connecting seat 3, the lower end of the connecting column 5 is in an interference connection with the inner ring of the connecting bearing 4, the upper end of the connecting column 5 is welded to the middle part of the lower end of the adjusting plate 6, and the adjusting plate 6 is connected between the connecting column 5 and the inner ring of the connecting bearing 4. With the help of the connecting bearing 4, the upper end of the fixed plate 1 can be rotated.

其中,连接翼板8成型于定位套7上,定位套7下端以及连接翼板8下端均与调节板6上端搭接,紧固螺栓9贯穿连接翼板8和调节板6,紧固螺栓9伸出连接翼板8和调节板6一端通过螺母固定,需要定位加固的横向长导管可通过定位套7配合调节板6进行定位固定,横向长导管从定位套7与调节板6之间穿过,紧固螺栓9将定位套7与调节板6固定在一起。Wherein, the connecting wing plate 8 is formed on the positioning sleeve 7, the lower end of the positioning sleeve 7 and the lower end of the connecting wing plate 8 are overlapped with the upper end of the adjusting plate 6, the fastening bolt 9 runs through the connecting wing plate 8 and the adjusting plate 6, and the fastening bolt 9 One end protruding from the connecting wing plate 8 and the adjustment plate 6 is fixed by a nut, and the horizontal long conduit that needs to be positioned and reinforced can be positioned and fixed through the positioning sleeve 7 and the adjustment plate 6, and the horizontal long conduit passes between the positioning sleeve 7 and the adjustment plate 6 , the fastening bolt 9 fixes the positioning sleeve 7 and the adjusting plate 6 together.

其中,调节螺栓10与调节板6通过螺纹连接,调节螺栓10贯穿调节板6一端与固定板1上端通过卡压的方式进行连接,调节螺栓10在旋松时,调节板6可便捷转动,调节螺栓10再旋紧时,调节螺栓10的下端会将固定板1上端抵紧,则调节板6会被锁止固定。Wherein, the adjusting bolt 10 is threadedly connected with the adjusting plate 6, and one end of the adjusting bolt 10 penetrates through the adjusting plate 6 and is connected with the upper end of the fixing plate 1 by clamping. When the adjusting bolt 10 is unscrewed, the adjusting plate 6 can be easily rotated and adjusted When the bolt 10 is tightened again, the lower end of the adjusting bolt 10 will push against the upper end of the fixing plate 1, and then the adjusting plate 6 will be locked and fixed.

工作原理:在使用装置对横向长导管定位固定时,使用螺栓或其他固定件通过安装片2将固定板1固定安装至隧道内壁或墙体等结构上需要固定横向长导管的位置处,横向长导管从调节板6远离固定板1一侧的中部经过,使定位套7配合调节板6将横向长导管夹持固定,使用紧固螺栓9将定位套7和调节板6连接固定,即对横向长导管进行定位固定,调节螺栓10在旋松时,调节板6可便捷转动,调节螺栓10再旋紧时,调节螺栓10的下端会将固定板1上端抵紧,则调节板6会被锁止固定,这样在长导管安装的过程中,若长导管需要进行一些偏转微调,则可将调节螺栓10旋松,使调节板6和定位套7转动,以满足横向长导管的定位需求,然后再将调节螺栓10旋紧即可。Working principle: When using the device to position and fix the long horizontal conduit, use bolts or other fixing parts to fix the fixed plate 1 through the mounting piece 2 to the position where the long horizontal conduit needs to be fixed on the inner wall of the tunnel or the wall. The conduit passes through the middle of the side of the adjustment plate 6 away from the fixed plate 1, and the positioning sleeve 7 cooperates with the adjustment plate 6 to clamp and fix the horizontal long conduit, and the fastening bolt 9 is used to connect and fix the positioning sleeve 7 and the adjustment plate 6, that is, to The long conduit is positioned and fixed. When the adjusting bolt 10 is loosened, the adjusting plate 6 can be rotated conveniently. When the adjusting bolt 10 is tightened again, the lower end of the adjusting bolt 10 will press the upper end of the fixing plate 1 tightly, and the adjusting plate 6 will be locked. In this way, during the installation of the long conduit, if the deflection of the long conduit needs to be fine-tuned, the adjusting bolt 10 can be loosened to rotate the adjusting plate 6 and the positioning sleeve 7 to meet the positioning requirements of the horizontal long conduit, and then Adjusting bolt 10 is tightened again and gets final product.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is a relationship between these entities or operations. There is no such actual relationship or order between them. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or device.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.

Claims (6)

1.一种横向长导管定位加固装置,包括固定板(1),其特征在于:所述固定板(1)两侧壁两角处均设置有安装片(2),所述固定板(1)上端中部设置有连接座(3),所述连接座(3)中部设置有连接轴承(4),所述连接轴承(4)内圈内设置有连接柱(5),所述连接柱(5)上端设置有调节板(6),所述调节板(6)上端中部设置有定位套(7),所述定位套(7)两侧壁下部均设置有连接翼板(8),所述连接翼板(8)中部两侧均设置有紧固螺栓(9),位于所述连接翼板(8)远离所述定位套(7)一侧的所述调节板(6)上设置有调节螺栓(10)。1. A positioning and reinforcing device for a long horizontal conduit, comprising a fixed plate (1), characterized in that: the two corners of the two side walls of the fixed plate (1) are provided with mounting pieces (2), and the fixed plate (1) ) is provided with a connection seat (3) in the middle of the upper end, a connection bearing (4) is provided in the middle of the connection seat (3), a connection column (5) is provided in the inner ring of the connection bearing (4), and the connection column ( 5) An adjustment plate (6) is provided at the upper end, a positioning sleeve (7) is provided at the middle of the upper end of the adjustment plate (6), and a connecting wing plate (8) is provided at the lower part of both side walls of the positioning sleeve (7). Fastening bolts (9) are provided on both sides of the middle part of the connecting wing (8), and the adjusting plate (6) on the side of the connecting wing (8) away from the positioning sleeve (7) is provided with Adjustment bolt (10). 2.根据权利要求1所述的一种横向长导管定位加固装置,其特征在于:所述安装片(2)与所述固定板(1)侧壁焊接,所述安装片(2)中部成型有通孔,所述连接座(3)成型于所述固定板(1)上端中部。2. A positioning and strengthening device for long transverse conduits according to claim 1, characterized in that: the mounting piece (2) is welded to the side wall of the fixing plate (1), and the middle part of the mounting piece (2) is shaped There is a through hole, and the connecting seat (3) is formed in the middle part of the upper end of the fixing plate (1). 3.根据权利要求1所述的一种横向长导管定位加固装置,其特征在于:所述连接轴承(4)外圈与所述连接座(3)内壁过盈连接,所述连接柱(5)下端与所述连接轴承(4)内圈过盈连接。3. A positioning and strengthening device for long transverse conduits according to claim 1, characterized in that: the outer ring of the connecting bearing (4) is in interference connection with the inner wall of the connecting seat (3), and the connecting column (5 ) lower end is in interference connection with the inner ring of the connecting bearing (4). 4.根据权利要求1所述的一种横向长导管定位加固装置,其特征在于:所述连接柱(5)上端与所述调节板(6)下端中部焊接,所述连接翼板(8)成型于所述定位套(7)上,所述定位套(7)下端以及所述连接翼板(8)下端均与所述调节板(6)上端搭接。4. A positioning and reinforcing device for long transverse conduits according to claim 1, characterized in that: the upper end of the connecting column (5) is welded to the middle of the lower end of the adjusting plate (6), and the connecting wing (8) Formed on the positioning sleeve (7), the lower end of the positioning sleeve (7) and the lower end of the connecting wing (8) overlap with the upper end of the adjusting plate (6). 5.根据权利要求1所述的一种横向长导管定位加固装置,其特征在于:所述紧固螺栓(9)贯穿所述连接翼板(8)和所述调节板(6),所述紧固螺栓(9)伸出所述连接翼板(8)和所述调节板(6)一端通过螺母固定。5. A positioning and reinforcing device for long transverse conduits according to claim 1, characterized in that: the fastening bolt (9) runs through the connecting wing (8) and the adjusting plate (6), the Fastening bolts (9) protrude from the connecting wing plate (8) and one end of the adjusting plate (6) is fixed by a nut. 6.根据权利要求1所述的一种横向长导管定位加固装置,其特征在于:所述调节螺栓(10)与所述调节板(6)通过螺纹连接,所述调节螺栓(10)贯穿所述调节板(6)一端与所述固定板(1)上端通过卡压的方式进行连接。6. A positioning and reinforcing device for long transverse conduits according to claim 1, characterized in that: the adjusting bolt (10) is threadedly connected to the adjusting plate (6), and the adjusting bolt (10) runs through the One end of the adjusting plate (6) is connected to the upper end of the fixing plate (1) by pressing.
CN202320485187.3U 2023-03-14 2023-03-14 A positioning and reinforcing device for long lateral catheters Expired - Fee Related CN219327547U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320485187.3U CN219327547U (en) 2023-03-14 2023-03-14 A positioning and reinforcing device for long lateral catheters

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320485187.3U CN219327547U (en) 2023-03-14 2023-03-14 A positioning and reinforcing device for long lateral catheters

Publications (1)

Publication Number Publication Date
CN219327547U true CN219327547U (en) 2023-07-11

Family

ID=87064481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320485187.3U Expired - Fee Related CN219327547U (en) 2023-03-14 2023-03-14 A positioning and reinforcing device for long lateral catheters

Country Status (1)

Country Link
CN (1) CN219327547U (en)

Similar Documents

Publication Publication Date Title
CN101713168A (en) Process for mounting template for manufacturing sectional box girders
CN205479706U (en) Push pipe work jing ding advances structure
CN104711996B (en) An end steel shell installation position adjustment device and operation method
CN211340448U (en) Steel pipe concrete arch bridge installation system
CN111764420A (en) Plugging construction method for deep foundation pit self-waterproof floor-penetrating steel pipe downcast pipe well
CN219327547U (en) A positioning and reinforcing device for long lateral catheters
CN210563429U (en) Shear wall template reinforcing member
CN111173255A (en) Single-layer overhanging protection platform foundation device
CN207813019U (en) A kind of UHPC non-dismantling formworks of casting concrete column
CN110080285A (en) A kind of prefabricated side wall positioning connection structure of underground structure and connection method
CN217028931U (en) Steel pipe concrete support assembly
CN217583409U (en) Pipe jacking back structure
CN206338075U (en) A kind of anti-internal water pressure composite shield section of jurisdiction
CN213661165U (en) A kind of reinforced composite mode-free cable trench
CN115853543A (en) Prefabricated assembly type pipe shed guide wall and construction method thereof
CN211448694U (en) Prefabricated cushion block connecting beam structure erected in tunnel with soft soil layer
CN222822830U (en) A telescopic steel ring template device for reserved pipe holes in cast-in-place inspection wells
CN220451903U (en) Temporary support reinforcing device for shield construction of overlapping tunnel
CN111926857A (en) Template for construction joint of pipe gallery wall and construction method
CN114439219A (en) A retractable floor support truss
CN219654700U (en) Modularized shield segment reinforcing structure
CN213329403U (en) An assembled large-scale electromechanical integrated pipeline combined bridge device
CN218265916U (en) A Prestressed Supporting Device for Segment Segment by Freezing Method in Communication Channel
CN112900366A (en) Geomembrane connecting structure and construction method thereof
CN111395593A (en) An integrated T-shaped member of assembled welded steel formwork and its production method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230711