CN219316963U - Double-layer multipurpose grouting platform for coal mine roadway construction - Google Patents

Double-layer multipurpose grouting platform for coal mine roadway construction Download PDF

Info

Publication number
CN219316963U
CN219316963U CN202320318090.3U CN202320318090U CN219316963U CN 219316963 U CN219316963 U CN 219316963U CN 202320318090 U CN202320318090 U CN 202320318090U CN 219316963 U CN219316963 U CN 219316963U
Authority
CN
China
Prior art keywords
square plate
support column
dumping
double
coal mine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320318090.3U
Other languages
Chinese (zh)
Inventor
陈伟
杨明
陆鹏举
程桦
杨仁树
张鲁鲁
初月朗
牛宾
张家乐
申五刚
阮杰
杨谢生
杨新文
王念涛
黎明镜
康一强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing
Anhui University of Science and Technology
China Coal No 3 Construction Group Co Ltd
Original Assignee
China University of Mining and Technology Beijing
Anhui University of Science and Technology
China Coal No 3 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing, Anhui University of Science and Technology, China Coal No 3 Construction Group Co Ltd filed Critical China University of Mining and Technology Beijing
Priority to CN202320318090.3U priority Critical patent/CN219316963U/en
Application granted granted Critical
Publication of CN219316963U publication Critical patent/CN219316963U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00—Adapting or protecting infrastructure or their operation
    • Y02A30/60—Planning or developing urban green infrastructure

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

本实用新型涉及一种煤矿井巷施工用双层多用途注浆平台,包括水平设置的第一承载方板,所述第一承载方板的底面四角处分别垂直对称连接有第一支撑柱,所述第一支撑柱的底端安装有滚轮;相邻所述第一支撑柱之间分别对称设置有防倾倒支脚,且所述防倾倒支脚沿着所述滚轮移动方向倾斜向下设置;所述第一承载方板的顶面中部周向垂直对称连接有四个第二支撑柱,所述第二支撑柱的顶面水平垂直连接有尺寸小于所述第一承载方板的第二承载方板。本实用新型采用固定式可移动平台,平台前后安装防倾倒支脚,下部设置车辆通行过道,保证井筒车辆正常运行与注浆作业时互不影响;本实用新型减少了人工及材料使用量,避免频繁拆装脚手架,提高了劳动生产效率。

Figure 202320318090

The utility model relates to a double-layer multi-purpose grouting platform for coal mine shaft construction, which comprises a horizontally arranged first bearing square plate, and first supporting columns are vertically and symmetrically connected to the four corners of the bottom surface of the first bearing square plate. Rollers are installed at the bottom of the first support column; anti-dumping feet are arranged symmetrically between adjacent first support columns, and the anti-dumping feet are arranged obliquely downward along the moving direction of the rollers; The middle part of the top surface of the first bearing square plate is connected vertically and symmetrically with four second support columns, and the top surface of the second support column is horizontally and vertically connected with a second bearing square with a size smaller than the first bearing square plate. plate. The utility model adopts a fixed movable platform. Anti-dumping feet are installed at the front and rear of the platform, and a vehicle passageway is arranged at the lower part to ensure that the normal operation of the shaft vehicle and the grouting operation do not affect each other; the utility model reduces the amount of labor and materials used, and avoids frequent Disassembly and assembly of scaffolding improves labor productivity.

Figure 202320318090

Description

一种煤矿井巷施工用双层多用途注浆平台A double-layer multi-purpose grouting platform for coal mine shaft construction

技术领域technical field

本实用新型属于煤矿井巷施工设备技术领域,特别涉及一种煤矿井巷施工用双层多用途注浆平台。The utility model belongs to the technical field of coal mine shaft construction equipment, in particular to a double-layer multi-purpose grouting platform for coal mine shaft construction.

背景技术Background technique

在煤矿井巷施工过程中,为确保井筒水害治理,对斜井井筒破碎部位及渗水点壁后注浆以封堵水源达到井筒减水的目的,由于注浆孔基本处于巷道顶板处,登高作业每次需搭设脚手架平台;但是,由于高处作业的不便,频繁安拆脚手架平台,致使作业效率降低,安全风险增加,亟待解决。In the construction process of coal mine shafts, in order to ensure the control of shaft water hazards, grouting is performed on the broken parts of the shafts of inclined shafts and the walls of seepage points to block the water source and achieve the purpose of reducing water in the shafts. Scaffolding platforms need to be erected every time; however, due to the inconvenience of high-altitude operations, frequent installation and dismantling of scaffolding platforms will reduce operating efficiency and increase safety risks, which need to be resolved urgently.

实用新型内容Utility model content

本实用新型针对现有技术存在的不足,提供了一种煤矿井巷施工用双层多用途注浆平台,具体技术方案如下:Aiming at the deficiencies in the prior art, the utility model provides a double-layer multi-purpose grouting platform for coal mine shaft construction. The specific technical scheme is as follows:

本实用新型提供一种煤矿井巷施工用双层多用途注浆平台,包括水平设置的第一承载方板,所述第一承载方板的底面四角处分别垂直对称连接有第一支撑柱,所述第一支撑柱的底端安装有滚轮;相邻所述第一支撑柱之间分别对称设置有防倾倒支脚,且所述防倾倒支脚沿着所述滚轮移动方向倾斜向下设置;所述第一承载方板的顶面中部周向垂直对称连接有四个第二支撑柱,所述第二支撑柱的顶面水平垂直连接有尺寸小于所述第一承载方板的第二承载方板。The utility model provides a double-layer multi-purpose grouting platform for coal mine roadway construction, which includes a horizontally arranged first bearing square plate, and the four corners of the bottom surface of the first bearing square plate are respectively vertically and symmetrically connected with first support columns, Rollers are installed at the bottom of the first support column; anti-dumping feet are arranged symmetrically between adjacent first support columns, and the anti-dumping feet are arranged obliquely downward along the moving direction of the rollers; The middle part of the top surface of the first bearing square plate is vertically and symmetrically connected with four second support columns, and the top surface of the second support column is horizontally and vertically connected with a second bearing square with a size smaller than the first bearing square plate. plate.

作为本实用新型一种优选技术方案,相邻所述第一支撑柱的上下部之间分别水平垂直连接有第一横杆和第二横杆,且所述第一横杆和第二横杆与所述防倾倒支脚处于同一竖直面内。As a preferred technical solution of the present invention, a first horizontal bar and a second horizontal bar are respectively connected horizontally and vertically between the upper and lower parts of the adjacent first support column, and the first horizontal bar and the second horizontal bar It is in the same vertical plane as the anti-dumping foot.

作为本实用新型一种优选技术方案,所述第一横杆与第二横杆之间设置有用于带动左右两侧所述防倾倒支脚同步升降位移的定位机构;As a preferred technical solution of the utility model, a positioning mechanism for driving the anti-dumping feet on the left and right sides to move up and down synchronously is arranged between the first crossbar and the second crossbar;

所述定位机构包括水平设置的联动板,所述联动板的端面分别垂直对称连接有套筒,所述套筒与对应所述第一支撑柱轴向滑动穿接,所述套筒的外侧面与对应所述防倾倒支脚的顶部固定连接;所述联动板的中部纵向间隙穿接有支撑螺柱,且所述支撑螺柱的上下端面分别与所述第一横杆和第二横杆垂直连接,所述支撑螺柱通过其上螺接配合的两个定位螺母保持与所述联动板定位夹持连接。The positioning mechanism includes a horizontally arranged linkage plate, and the end surfaces of the linkage plate are respectively vertically and symmetrically connected with sleeves, and the sleeves are axially slid through and connected with the corresponding first support columns, and the outer surfaces of the sleeves are It is fixedly connected to the top of the corresponding anti-dumping foot; the middle longitudinal gap of the linkage plate is pierced with support studs, and the upper and lower end surfaces of the support studs are respectively perpendicular to the first cross bar and the second cross bar The support stud is connected with the linkage plate by two positioning nuts screwed on it for positioning and clamping connection.

作为本实用新型一种优选技术方案,所述第一支撑柱的上部与所述第一承载方板的底面之间倾斜设置有加强杆,且所述加强杆与所述第一横杆在空间上分别处于相互垂直的平面上。As a preferred technical solution of the present invention, a reinforcement bar is obliquely arranged between the upper part of the first support column and the bottom surface of the first load-bearing square plate, and the space between the reinforcement bar and the first cross bar is are on mutually perpendicular planes.

作为本实用新型一种优选技术方案,所述第一承载方板沿其顶面边沿周向设置有三面围合的第一围栏,且所述第一围栏的开口侧所述第一横杆一侧。As a preferred technical solution of the present invention, the first bearing square plate is provided with a first fence surrounded by three sides along the edge of its top surface, and the first crossbar on the opening side of the first fence is a side.

作为本实用新型一种优选技术方案,所述防倾倒支脚的底端水平设置有防滑面,且所述防滑面上设有波浪形条纹。As a preferred technical solution of the present invention, the bottom end of the anti-dumping leg is horizontally provided with an anti-slip surface, and the anti-slip surface is provided with wavy stripes.

作为本实用新型一种优选技术方案,相邻所述第二支撑柱中部之间分别水平垂直连接有第三横杆。As a preferred technical solution of the present invention, third horizontal bars are respectively connected horizontally and vertically between the middle parts of the adjacent second support columns.

作为本实用新型一种优选技术方案,所述第二承载方板沿其顶面边沿周向设置有三面围合的第二围栏。As a preferred technical solution of the present invention, the second carrying square plate is provided with a second fence surrounded by three sides along the circumference of its top surface.

本实用新型的有益效果是:The beneficial effects of the utility model are:

本实用新型采用第一承载方板、第一支撑柱以及滚轮构成的固定式可移动平台,平台前后安装防倾倒支脚,更加稳固,下部设置车辆通行过道,保证井筒车辆正常运行与注浆作业时互不影响,实现安全生产;在第一承载方板的顶面上采用第二承载方板和第二支撑柱构成第二层平台,这样便于更高处的注浆作业;本实用新型减少了人工及材料使用量,避免频繁拆装脚手架,提高了劳动生产效率。The utility model adopts a fixed movable platform composed of the first load-bearing square plate, the first support column and the rollers. Anti-dumping feet are installed on the front and back of the platform, which is more stable. They do not affect each other and realize safe production; on the top surface of the first load-bearing square plate, the second load-bearing square plate and the second support column are used to form the second-floor platform, which is convenient for grouting operations at higher places; the utility model reduces the Reduce the amount of labor and materials used, avoid frequent disassembly and assembly of scaffolding, and improve labor production efficiency.

附图说明Description of drawings

图1示出了本实用新型的整体结构示意图;Fig. 1 shows the overall structural representation of the utility model;

图2示出了本实用新型中定位机构的结构示意图;Fig. 2 shows the structural representation of positioning mechanism in the utility model;

图3示出了本实用新型中防倾倒支脚的结构示意图;Fig. 3 shows the structure diagram of the anti-dumping support foot in the utility model;

图4示出了本实用新型中防倾倒支脚底端防滑面的结构示意图。Fig. 4 shows a schematic structural view of the anti-skid surface at the bottom of the anti-dumping foot in the present invention.

图中所示:1、第一承载方板;11、第一围栏;2、第一支撑柱;21、第一横杆;22、第二横杆;23、加强杆;3、滚轮;4、防倾倒支脚;41、防滑面;5、定位机构;51、联动板;52、套筒;53、支撑螺柱;54、定位螺母;6、第二承载方板;61、第二围栏;7、第二支撑柱;71、第三横杆。As shown in the figure: 1. The first load-bearing square plate; 11. The first fence; 2. The first support column; 21. The first crossbar; 22. The second crossbar; , anti-dumping feet; 41, anti-skid surface; 5, positioning mechanism; 51, linkage plate; 52, sleeve; 53, support stud; 54, positioning nut; 6, the second bearing square plate; 61, the second fence; 7, the second support column; 71, the third cross bar.

具体实施方式Detailed ways

为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅用以解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model will be further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model, and are not intended to limit the utility model.

如图1所示,一种煤矿井巷施工用双层多用途注浆平台,包括水平设置的第一承载方板1,所述第一承载方板1的底面四角处分别垂直对称连接有第一支撑柱2,所述第一支撑柱2的底端安装有滚轮3;相邻所述第一支撑柱2之间分别对称设置有防倾倒支脚4,且所述防倾倒支脚4沿着所述滚轮3移动方向倾斜向下设置;所述第一承载方板1的顶面中部周向垂直对称连接有四个第二支撑柱7,所述第二支撑柱7的顶面水平垂直连接有尺寸小于所述第一承载方板1的第二承载方板6。As shown in Figure 1, a double-layer multi-purpose grouting platform for coal mine roadway construction includes a first bearing square plate 1 arranged horizontally, and the four corners of the bottom surface of the first bearing square plate 1 are respectively vertically and symmetrically connected with the second A support column 2, the bottom end of the first support column 2 is equipped with a roller 3; the adjacent first support column 2 is respectively symmetrically provided with anti-dumping feet 4, and the anti-dumping feet 4 are arranged along the The moving direction of the roller 3 is arranged obliquely downward; the middle part of the top surface of the first bearing square plate 1 is vertically and symmetrically connected with four second support columns 7, and the top surface of the second support column 7 is horizontally and vertically connected with A second carrying square plate 6 smaller in size than the first carrying square plate 1 .

通过采用上述技术方案,该注浆平台采用第一承载方板1、第一支撑柱2以及滚轮3构成的固定式可移动平台,平台前后安装防倾倒支脚4,更加稳固,下部设置车辆通行过道,保证井筒车辆正常运行与注浆作业时互不影响,实现安全生产;在第一承载方板1的顶面上采用第二承载方板6和第二支撑柱7构成第二层平台,这样便于更高处的注浆作业;该注浆平台减少了人工及材料使用量,避免频繁拆装脚手架,提高了劳动生产效率。By adopting the above technical solution, the grouting platform adopts a fixed movable platform composed of the first load-bearing square plate 1, the first support column 2 and the rollers 3. The anti-dumping feet 4 are installed on the front and rear of the platform, which is more stable, and the vehicle passageway is arranged at the lower part , to ensure that the normal operation of the shaft vehicle and the grouting operation do not affect each other, and realize safe production; on the top surface of the first bearing square plate 1, the second bearing square plate 6 and the second support column 7 are used to form the second floor platform, so that It is convenient for grouting operations at higher places; the grouting platform reduces labor and material usage, avoids frequent disassembly and assembly of scaffolding, and improves labor production efficiency.

如图1所示,相邻所述第一支撑柱2的上下部之间分别水平垂直连接有第一横杆21和第二横杆22,且所述第一横杆21和第二横杆22与所述防倾倒支脚4处于同一竖直面内。As shown in Figure 1, a first cross bar 21 and a second cross bar 22 are respectively connected horizontally and vertically between the upper and lower parts of the adjacent first support column 2, and the first cross bar 21 and the second cross bar 22 and the anti-dumping foot 4 are in the same vertical plane.

通过采用上述技术方案,设置的第一横杆21和第二横杆22既可以增加平台的结构支撑强度,又可以充当第一层平台的注浆工人临时攀登的阶梯。By adopting the above-mentioned technical solution, the first crossbar 21 and the second crossbar 22 can not only increase the structural support strength of the platform, but also serve as a temporary climbing ladder for the grouting workers of the first floor platform.

如图1和2所示,所述第一横杆21与第二横杆22之间设置有用于带动左右两侧所述防倾倒支脚4同步升降位移的定位机构5;As shown in Figures 1 and 2, a positioning mechanism 5 for driving the anti-dumping feet 4 on the left and right sides to move up and down synchronously is arranged between the first crossbar 21 and the second crossbar 22;

所述定位机构5包括水平设置的联动板51,所述联动板51的端面分别垂直对称连接有套筒52,所述套筒52与对应所述第一支撑柱2轴向滑动穿接,所述套筒52的外侧面与对应所述防倾倒支脚4的顶部固定连接;所述联动板51的中部纵向间隙穿接有支撑螺柱53,且所述支撑螺柱53的上下端面分别与所述第一横杆21和第二横杆22垂直连接,所述支撑螺柱53通过其上螺接配合的两个定位螺母54保持与所述联动板51定位夹持连接。The positioning mechanism 5 includes a horizontally arranged linkage plate 51, the end faces of the linkage plate 51 are vertically and symmetrically connected with a sleeve 52, and the sleeve 52 is axially slid through the corresponding first support column 2, so that The outer surface of the sleeve 52 is fixedly connected to the top of the corresponding anti-dumping leg 4; the middle longitudinal gap of the linkage plate 51 is pierced with a supporting stud 53, and the upper and lower end surfaces of the supporting stud 53 are connected to the upper and lower end surfaces of the supporting stud 53 respectively. The first cross bar 21 and the second cross bar 22 are vertically connected, and the support stud 53 is held in position and clamped connection with the linkage plate 51 by two positioning nuts 54 screwed on it.

通过采用上述技术方案,设置的定位机构5可以在平台工作时,使得防倾倒支脚4降至与地面形成接触支撑力;在平台移动时,可以使得防倾倒支脚4升至与地面脱离,这样就不妨碍滚轮3的移动。在操作时,只需通过旋移调节两个定位螺母54在支撑螺柱53上的位置即可带动联动板51和套筒52沿着第一支撑柱2纵向滑移,从而达到升降防倾倒支脚4的目的;设置的联动板51还可以与第一横杆21和第二横杆22相配合构成第一层平台完善的注浆工人临时攀登的阶梯。By adopting the above-mentioned technical scheme, the positioning mechanism 5 provided can lower the anti-dumping leg 4 to form a contact support force with the ground when the platform is working; when the platform moves, the anti-dumping leg 4 can be lifted to break away from the ground, so that The movement of the roller 3 is not hindered. During operation, only need to adjust the position of the two positioning nuts 54 on the support stud 53 by rotating to drive the linkage plate 51 and the sleeve 52 to slide longitudinally along the first support column 2, so as to achieve the lifting anti-dumping feet The purpose of 4: the set linkage plate 51 can also cooperate with the first cross bar 21 and the second cross bar 22 to form a ladder for the perfect grouting workers to climb temporarily on the first floor platform.

如图1所示,所述第一支撑柱2的上部与所述第一承载方板1的底面之间倾斜设置有加强杆23,且所述加强杆23与所述第一横杆21在空间上分别处于相互垂直的平面上。As shown in Figure 1, a reinforcement rod 23 is obliquely arranged between the upper part of the first support column 2 and the bottom surface of the first bearing square plate 1, and the reinforcement rod 23 and the first cross bar 21 are in the They are located on mutually perpendicular planes in space.

通过采用上述技术方案,设置的加强杆23形成三角支撑结构,既可以与第一横杆21和第二横杆22相配合进一步增强平台的结构支撑强度,又不妨碍井筒车辆的正常通行。By adopting the above-mentioned technical solution, the set reinforcing bar 23 forms a triangular support structure, which can cooperate with the first cross bar 21 and the second cross bar 22 to further enhance the structural support strength of the platform, without hindering the normal passage of shaft vehicles.

如图1所示,所述第一承载方板1沿其顶面边沿周向设置有三面围合的第一围栏11,且所述第一围栏11的开口侧所述第一横杆21一侧。As shown in Figure 1, the first bearing square plate 1 is provided with a first fence 11 surrounded by three sides along its top edge, and the first crossbar 21 on the opening side of the first fence 11 is a side.

通过采用上述技术方案,设置的第一围栏11可以更好地保证第一层平台的人员操作安全性。By adopting the above technical solution, the set first fence 11 can better ensure the safety of personnel operating on the first-floor platform.

如图3和4所示,所述防倾倒支脚4的底端水平设置有防滑面41,且所述防滑面41上设有波浪形条纹。As shown in FIGS. 3 and 4 , an anti-slip surface 41 is horizontally provided on the bottom end of the anti-dumping leg 4 , and wavy stripes are provided on the anti-slip surface 41 .

通过采用上述技术方案,采用水平设置且呈波浪形条纹的防滑面41,可以增加防倾倒支脚4与地面的接触支撑力。By adopting the above-mentioned technical solution, the anti-slip surface 41 arranged horizontally and showing wavy stripes can increase the contact support force between the anti-dumping leg 4 and the ground.

如图1所示,相邻所述第二支撑柱7中部之间分别水平垂直连接有第三横杆71。As shown in FIG. 1 , third horizontal bars 71 are connected horizontally and vertically between adjacent middle parts of the second support columns 7 .

通过采用上述技术方案,设置的第三横杆71既可以增加第二层平台的结构支撑强度,又可以充当第二层平台的注浆工人临时攀登的阶梯;其中,第二支撑柱7的长度小于或等于第一支撑柱2长度的一半,以保证整个平台的重心稳定性。By adopting the above-mentioned technical scheme, the third crossbar 71 provided can not only increase the structural support strength of the second-floor platform, but also serve as a ladder for the grouting workers of the second-floor platform to temporarily climb; wherein, the length of the second support column 7 Less than or equal to half of the length of the first support column 2, to ensure the stability of the center of gravity of the entire platform.

如图1所示,所述第二承载方板6沿其顶面边沿周向设置有三面围合的第二围栏61。As shown in FIG. 1 , the second carrying square plate 6 is provided with a second fence 61 surrounded by three sides along the periphery of its top surface.

通过采用上述技术方案,设置的第二围栏61可以更好地保证第二层平台的人员操作安全性。By adopting the above technical solution, the set second fence 61 can better ensure the safety of personnel operating on the second-floor platform.

本实用新型在实施时,首先,平台通过滚轮3移动至需要注浆的位置,然后,人工通过旋移调节两个定位螺母54在支撑螺柱53上的位置,使得防倾倒支脚4降至与地面形成接触支撑力,注浆工人便可攀爬至合适层数的平台上进行注浆操作;第一承载方板1下方的车辆通行过道,可以保证井筒车辆正常运行与注浆作业时互不影响。When the utility model is implemented, at first, the platform moves to the position that needs grouting by the roller 3, and then manually adjusts the positions of the two positioning nuts 54 on the support studs 53 through the rotation, so that the anti-dumping legs 4 are lowered to the same level as The ground forms a contact support force, and the grouting workers can climb to a platform with a suitable number of floors for grouting operations; the vehicle passageway under the first load-bearing square plate 1 can ensure that the normal operation of the wellbore vehicle and the grouting operation are not mutually exclusive. Influence.

以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present utility model shall be included in this utility model. within the scope of protection of utility models.

Claims (8)

1.一种煤矿井巷施工用双层多用途注浆平台,其特征在于:包括水平设置的第一承载方板(1),所述第一承载方板(1)的底面四角处分别垂直对称连接有第一支撑柱(2),所述第一支撑柱(2)的底端安装有滚轮(3);相邻所述第一支撑柱(2)之间分别对称设置有防倾倒支脚(4),且所述防倾倒支脚(4)沿着所述滚轮(3)移动方向倾斜向下设置;所述第一承载方板(1)的顶面中部周向垂直对称连接有四个第二支撑柱(7),所述第二支撑柱(7)的顶面水平垂直连接有尺寸小于所述第一承载方板(1)的第二承载方板(6)。1. A kind of double-deck multi-purpose grouting platform for coal mine roadway construction, is characterized in that: comprise the first load-bearing square plate (1) that is horizontally arranged, the four corners of the bottom surface of described first load-bearing square plate (1) are vertical respectively The first support column (2) is symmetrically connected, and the bottom end of the first support column (2) is equipped with a roller (3); the adjacent first support column (2) is respectively symmetrically provided with anti-dumping feet (4), and the anti-dumping leg (4) is arranged obliquely downward along the moving direction of the roller (3); the middle part of the top surface of the first bearing square plate (1) is vertically and symmetrically connected with four A second support column (7), the top surface of the second support column (7) is horizontally and vertically connected with a second load square plate (6) whose size is smaller than the first load square plate (1). 2.根据权利要求1所述的一种煤矿井巷施工用双层多用途注浆平台,其特征在于:相邻所述第一支撑柱(2)的上下部之间分别水平垂直连接有第一横杆(21)和第二横杆(22),且所述第一横杆(21)和第二横杆(22)与所述防倾倒支脚(4)处于同一竖直面内。2. The double-layer multi-purpose grouting platform for coal mine roadway construction according to claim 1, characterized in that: the upper and lower parts of the adjacent first support column (2) are respectively horizontally and vertically connected with the second A cross bar (21) and a second cross bar (22), and the first cross bar (21) and the second cross bar (22) are in the same vertical plane as the anti-dumping support feet (4). 3.根据权利要求2所述的一种煤矿井巷施工用双层多用途注浆平台,其特征在于:所述第一横杆(21)与第二横杆(22)之间设置有用于带动左右两侧所述防倾倒支脚(4)同步升降位移的定位机构(5);3. A double-layer multi-purpose grouting platform for coal mine roadway construction according to claim 2, characterized in that: between the first cross bar (21) and the second cross bar (22) is provided a The positioning mechanism (5) that drives the anti-dumping feet (4) on the left and right sides to move up and down synchronously; 所述定位机构(5)包括水平设置的联动板(51),所述联动板(51)的端面分别垂直对称连接有套筒(52),所述套筒(52)与对应所述第一支撑柱(2)轴向滑动穿接,所述套筒(52)的外侧面与对应所述防倾倒支脚(4)的顶部固定连接;所述联动板(51)的中部纵向间隙穿接有支撑螺柱(53),且所述支撑螺柱(53)的上下端面分别与所述第一横杆(21)和第二横杆(22)垂直连接,所述支撑螺柱(53)通过其上螺接配合的两个定位螺母(54)保持与所述联动板(51)定位夹持连接。The positioning mechanism (5) includes a horizontally arranged linkage plate (51), the end faces of the linkage plate (51) are vertically and symmetrically connected with sleeves (52), and the sleeves (52) correspond to the first The support column (2) is axially slid through and connected, and the outer surface of the sleeve (52) is fixedly connected with the top of the corresponding anti-dumping foot (4); the middle longitudinal gap of the linkage plate (51) is connected with Support studs (53), and the upper and lower end surfaces of the support studs (53) are vertically connected with the first crossbar (21) and the second crossbar (22) respectively, and the support studs (53) pass through Two positioning nuts (54) screwed on it are kept in positioning and clamping connection with the linkage plate (51). 4.根据权利要求2所述的一种煤矿井巷施工用双层多用途注浆平台,其特征在于:所述第一支撑柱(2)的上部与所述第一承载方板(1)的底面之间倾斜设置有加强杆(23),且所述加强杆(23)与所述第一横杆(21)在空间上分别处于相互垂直的平面上。4. A double-layer multi-purpose grouting platform for coal mine roadway construction according to claim 2, characterized in that: the upper part of the first support column (2) and the first bearing square plate (1) Reinforcing rods (23) are arranged obliquely between the bottom surfaces, and the reinforcing rods (23) and the first transverse rods (21) are respectively located on planes perpendicular to each other in space. 5.根据权利要求3所述的一种煤矿井巷施工用双层多用途注浆平台,其特征在于:所述第一承载方板(1)沿其顶面边沿周向设置有三面围合的第一围栏(11),且所述第一围栏(11)的开口侧所述第一横杆(21)一侧。5. A double-layer multi-purpose grouting platform for coal mine shaft construction according to claim 3, characterized in that: said first load-bearing square plate (1) is provided with a three-sided enclosure along its top surface and circumferential direction The first fence (11), and the opening side of the first fence (11) is on the side of the first crossbar (21). 6.根据权利要求1~5中任一项所述的一种煤矿井巷施工用双层多用途注浆平台,其特征在于:所述防倾倒支脚(4)的底端水平设置有防滑面(41),且所述防滑面(41)上设有波浪形条纹。6. A double-layer multi-purpose grouting platform for coal mine roadway construction according to any one of claims 1 to 5, characterized in that: the bottom end of the anti-dumping leg (4) is horizontally provided with an anti-slip surface (41), and the anti-slip surface (41) is provided with wavy stripes. 7.根据权利要求1所述的一种煤矿井巷施工用双层多用途注浆平台,其特征在于:相邻所述第二支撑柱(7)中部之间分别水平垂直连接有第三横杆(71)。7. The double-layer multi-purpose grouting platform for coal mine roadway construction according to claim 1, characterized in that: the middle part of the adjacent second support column (7) is respectively horizontally and vertically connected with a third horizontal Rod (71). 8.根据权利要求7所述的一种煤矿井巷施工用双层多用途注浆平台,其特征在于:所述第二承载方板(6)沿其顶面边沿周向设置有三面围合的第二围栏(61)。8. A double-layer multi-purpose grouting platform for coal mine shaft construction according to claim 7, characterized in that: said second load-bearing square plate (6) is provided with a three-sided enclosure along its top edge and circumferential direction The second fence (61).
CN202320318090.3U 2023-02-22 2023-02-22 Double-layer multipurpose grouting platform for coal mine roadway construction Active CN219316963U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320318090.3U CN219316963U (en) 2023-02-22 2023-02-22 Double-layer multipurpose grouting platform for coal mine roadway construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320318090.3U CN219316963U (en) 2023-02-22 2023-02-22 Double-layer multipurpose grouting platform for coal mine roadway construction

Publications (1)

Publication Number Publication Date
CN219316963U true CN219316963U (en) 2023-07-07

Family

ID=87030613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320318090.3U Active CN219316963U (en) 2023-02-22 2023-02-22 Double-layer multipurpose grouting platform for coal mine roadway construction

Country Status (1)

Country Link
CN (1) CN219316963U (en)

Similar Documents

Publication Publication Date Title
CN111997342B (en) A cantilever frame support structure protruding from the outside of the building and its construction method
CN210013462U (en) An elevator shaft lifting construction operation platform
CN111691655A (en) Firm type over-and-under type operation platform is used in capital construction
CN115324321A (en) Telescopic quick-release cantilever operation platform for elevator track installation and construction method
CN213626572U (en) Tool type external cantilever operation platform
CN205206284U (en) Detachable assembly type elevator shaft operating platform
CN203834370U (en) Arch ring steel formwork trolley for circular arch culvert
CN108625292B (en) A formwork assembly platform for prefabricated columns
CN107696005B (en) lifting operation platform for building construction
CN201900636U (en) Mobile elastic floating support frame
CN204940824U (en) A kind of overhanging type mobile decorative finishing operating platform
CN211114737U (en) A construction operation platform in elevator well for tower crane promotes
CN219604807U (en) Assembled turnover wallboard installation operation frame
CN217812236U (en) Assembled liftable operation platform on water
CN202627492U (en) Single-surface side wall slide mold
CN106351431A (en) Movable working platform capable of performing continuous construction and used for rail transit tunnel
CN211899524U (en) A support body platform structure for floor pouring construction for housing construction
CN205314405U (en) Assembled stair
CN111622527A (en) Building dismantling machine
CN117536334A (en) Accumulated slippage construction method for high-altitude large-span single-layer reticulated shell
CN212613656U (en) An elevator shaft bracket
CN213509519U (en) Regularization formula elevartor shaft handling frame structure
CN207553635U (en) Elevator shaft safety protection device and elevator
CN217975317U (en) Novel assembled elevartor shaft operation platform
CN222949862U (en) A simple mobile working platform for tunnel top construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant