CN219316568U CN202223400099.3U CN202223400099U CN219316568U CN 219316568 U CN219316568 U CN 219316568U CN 202223400099 U CN202223400099 U CN 202223400099U CN 219316568 U CN219316568 U CN 219316568U
Authority
CN
China
Prior art keywords
blocks
base
block
threaded rod
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202223400099.3U
Other languages
Chinese (zh)
Inventor
张力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Kajian Construction Engineering Co ltd
Original Assignee
Xinjiang Kajian Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Kajian Construction Engineering Co ltd filed Critical Xinjiang Kajian Construction Engineering Co ltd
Priority to CN202223400099.3U priority Critical patent/CN219316568U/en
Application granted granted Critical
Publication of CN219316568U publication Critical patent/CN219316568U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00—Energy generation through renewable energy sources
    • Y02E10/70—Wind energy
    • Y02E10/72—Wind turbines with rotation axis in wind direction

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型公开了高强度抗风性电力铁塔,包括底座,所述底座下表面固定安装有定位箱,所述定位箱两侧面均开设有条形口,所述底座表面开设有与定位箱相连通的转动孔,所述转动孔内转动安装有螺纹杆,所述螺纹杆上螺纹套接有固定块,所述螺纹杆上转动套接有连接块,所述连接块表面对称转动安装有支杆,两个所述条形口内均滑动安装有卡块,两根所述支杆分别与两个卡块转动连接,所述螺纹杆上固定套接有挡块,所述挡块与连接块转动连接。本实用新型通过螺纹杆、固定块、支杆、连接块、卡块、挡块的相互配合,在安装底座时,利用两个卡块插入到土壤内,进而进一步提高底座的稳定性,防止当遇到强风天气时,底座出现倾覆的情况。

Figure 202223400099

The utility model discloses a high-strength wind-resistant electric power tower, which comprises a base, a positioning box is fixedly installed on the lower surface of the base, strip-shaped openings are opened on both sides of the positioning box, and a positioning box is connected to the positioning box on the surface of the base. A threaded rod is rotated in the rotating hole, a fixed block is threaded on the threaded rod, a connecting block is rotated on the threaded rod, and a support is installed on the surface of the connecting block for symmetrical rotation. The two rods are slidably installed with clamping blocks in the two strip openings, and the two support rods are respectively connected to the two clamping blocks in rotation. The threaded rods are fixedly sleeved with stoppers, and the stoppers and the connecting blocks Turn to connect. The utility model uses the mutual cooperation of the threaded rod, the fixed block, the support rod, the connecting block, the clamping block and the blocking block. When the base is installed, the two clamping blocks are inserted into the soil, thereby further improving the stability of the base and preventing the When encountering strong wind weather, the base will overturn.

Figure 202223400099

Description

高强度抗风性电力铁塔High-strength wind-resistant power tower

技术领域technical field

本实用新型涉及电力铁搭技术领域,尤其涉及高强度抗风性电力铁塔。The utility model relates to the technical field of electric iron towers, in particular to high-strength wind-resistant electric iron towers.

背景技术Background technique

近年来,随着国民经济的快速增长,电力行业发展迅速,推动了输电线路铁塔行业的快速发展,整个铁塔主要由塔头、塔身和塔腿三大部分组成,目前的铁塔大部分都是将铁塔主体安装在固定底座上。In recent years, with the rapid growth of the national economy, the rapid development of the power industry has promoted the rapid development of the transmission line tower industry. The entire tower is mainly composed of three parts: the tower head, the tower body and the tower legs. Most of the current towers are Install the main body of the iron tower on the fixed base.

尽管底座的重量一般较大,具有一定的稳定性和抗风性,但是在遇到强风天气时,由于塔身的高度较高,底座受到更大的外力,很容易出现倾覆的情况,影响电力的正常供应。Although the weight of the base is generally large and has a certain degree of stability and wind resistance, when encountering strong winds, due to the high height of the tower body, the base is subject to greater external force, which is prone to overturning and affects the power supply. normal supply.

实用新型内容Utility model content

本实用新型的目的是为了解决现有技术中存在的缺点,在遇到强风天气时,由于塔身的高度较高,底座受到更大的外力,很容易出现倾覆的情况,影响电力的正常供应,而提出的高强度抗风性电力铁塔。The purpose of this utility model is to solve the shortcomings in the prior art. When encountering strong winds, due to the high height of the tower body, the base is subject to greater external force, which is prone to overturning and affects the normal supply of electricity. , and the proposed high-strength wind-resistant power tower.

为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:

高强度抗风性电力铁塔,包括底座,所述底座下表面固定安装有定位箱,所述定位箱两侧面均开设有条形口,所述底座表面开设有与定位箱相连通的转动孔;The high-strength wind-resistant electric tower includes a base, a positioning box is fixedly installed on the lower surface of the base, strip-shaped openings are opened on both sides of the positioning box, and a rotating hole communicating with the positioning box is opened on the surface of the base;

所述转动孔内转动安装有螺纹杆,所述螺纹杆一端固定安装有调节块,所述螺纹杆上螺纹套接有固定块,所述固定块固定安装在底座表面,所述螺纹杆上转动套接有连接块,所述连接块表面对称转动安装有支杆,两个所述条形口内均滑动安装有卡块,两根所述支杆远离连接块一端分别与两个卡块转动连接,所述螺纹杆上固定套接有挡块,所述挡块与连接块转动连接。A threaded rod is installed in the rotation hole, one end of the threaded rod is fixedly mounted with an adjustment block, and a fixed block is threaded on the threaded rod, and the fixed block is fixedly installed on the surface of the base, and the threaded rod rotates A connecting block is sleeved, and the surface of the connecting block is symmetrically rotated to install a support rod, and a clamping block is slidingly installed in the two strip-shaped openings, and the ends of the two supporting rods away from the connecting block are respectively connected to the two clamping blocks in rotation , the threaded rod is fixedly sleeved with a block, and the block is rotatably connected with the connecting block.

优选地,所述定位箱下表面开设有通孔,所述螺纹杆一端固定安装有定位销,所述定位销位于通孔正上方。Preferably, a through hole is opened on the lower surface of the positioning box, a positioning pin is fixedly installed at one end of the threaded rod, and the positioning pin is located directly above the through hole.

优选地,所述定位箱内固定安装有多个支撑块,多个所述支撑块分别与两个卡块滑动接触。Preferably, a plurality of support blocks are fixedly installed in the positioning box, and the plurality of support blocks are respectively in sliding contact with the two clamping blocks.

优选地,多个所述支撑块表面均开设有多个圆柱槽,多个所述圆柱槽内均滚动安装有滚动柱,多个所述滚动柱分别与两个卡块滚动接触。Preferably, a plurality of cylindrical grooves are opened on the surfaces of the plurality of support blocks, rolling columns are installed in each of the plurality of cylindrical grooves, and the plurality of rolling columns are respectively in rolling contact with the two clamping blocks.

优选地,所述底座上表面固定安装有多个定位块,多个所述定位块侧面均固定安装有L形的挡板,多个所述定位块表面均通过多个螺钉螺母固定件固定安装有安装块,多个所述安装块分别与多个挡板接触,多个所述安装块表面均固定连接有塔脚。Preferably, a plurality of positioning blocks are fixedly installed on the upper surface of the base, L-shaped baffles are fixedly installed on the sides of the plurality of positioning blocks, and the surfaces of the plurality of positioning blocks are fixed and installed by a plurality of screw nut fixing parts There are mounting blocks, a plurality of the mounting blocks are respectively in contact with a plurality of baffles, and tower feet are fixedly connected to the surfaces of the multiple mounting blocks.

优选地,多个所述挡板表面均开设有L形的限位槽,多个所述限位槽内均插设有L形的限位块,多个所述限位块分别与多个安装块固定连接。Preferably, L-shaped limiting grooves are provided on the surfaces of the plurality of baffle plates, and L-shaped limiting blocks are inserted in the plurality of the limiting grooves, and the plurality of the limiting blocks are respectively connected with the plurality of The mounting block is fixedly connected.

本实用新型中,有益效果为:In the utility model, beneficial effect is:

通过螺纹杆、固定块、支杆、连接块、卡块、挡块的相互配合,在安装底座时,利用两个卡块插入到土壤内,进而进一步提高底座的稳定性,防止当遇到强风天气时,底座出现倾覆的情况。Through the mutual cooperation of threaded rods, fixed blocks, support rods, connecting blocks, clamping blocks, and stoppers, when installing the base, use two clamping blocks to insert into the soil, thereby further improving the stability of the base and preventing strong winds. In weather, the base may overturn.

附图说明Description of drawings

图1为本实用新型提出的高强度抗风性电力铁塔其中一个视角的立体局部截面结构示意图;Fig. 1 is the three-dimensional local cross-sectional structure schematic diagram of one of the viewing angles of the high-strength wind-resistant electric power tower proposed by the utility model;

图2为本实用新型提出的高强度抗风性电力铁塔另一个视角的立体局部截面结构示意图;Fig. 2 is the three-dimensional partial cross-sectional structure schematic diagram of another perspective of the high-strength wind-resistant electric power tower proposed by the utility model;

图3为图1中A处结构放大图;Figure 3 is an enlarged view of the structure at A in Figure 1;

图4为图2中B处结构放大图。FIG. 4 is an enlarged view of the structure at B in FIG. 2 .

图中:1底座、2定位箱、3螺纹杆、4固定块、5连接块、6支杆、7卡块、8挡块、9定位销、10支撑块、11滚动柱、12定位块、13挡板、14安装块、15塔脚、16限位块。In the figure: 1 base, 2 positioning box, 3 threaded rod, 4 fixed block, 5 connecting block, 6 support rod, 7 clamping block, 8 stop block, 9 positioning pin, 10 supporting block, 11 rolling column, 12 positioning block, 13 baffle plates, 14 mounting blocks, 15 tower feet, 16 limit blocks.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example.

参照图1-4,高强度抗风性电力铁塔,包括底座1,底座1下表面固定安装有定位箱2,定位箱2两侧面均开设有条形口,底座1表面开设有与定位箱2相连通的转动孔,转动孔内转动安装有螺纹杆3,螺纹杆3一端固定安装有调节块,螺纹杆3上螺纹套接有固定块4,固定块4固定安装在底座1表面,螺纹杆3上转动套接有连接块5,连接块5表面对称转动安装有支杆6,两个条形口内均滑动安装有卡块7,两根支杆6远离连接块5一端分别与两个卡块7转动连接,螺纹杆3上固定套接有挡块8,挡块8与连接块5转动连接。Referring to Figures 1-4, the high-strength wind-resistant electric tower includes a base 1, and a positioning box 2 is fixedly installed on the lower surface of the base 1. Both sides of the positioning box 2 are provided with strip openings, and the surface of the base 1 is provided with a positioning box 2. Connected to the rotating hole, the rotating hole is equipped with a threaded rod 3, one end of the threaded rod 3 is fixedly installed with an adjustment block, the threaded rod 3 is threaded with a fixed block 4, and the fixed block 4 is fixed on the surface of the base 1, and the threaded rod 3 is rotatably sleeved with a connection block 5, and the surface of the connection block 5 is symmetrically rotated to install a support rod 6, and a clamp block 7 is slidably installed in the two strip-shaped openings. The block 7 is rotatably connected, the threaded rod 3 is fixedly sleeved with a block 8, and the block 8 is rotatably connected with the connecting block 5.

在对底座1进行安装时,工作人员首先将定位箱2固定插入在土壤内,然后通过调节块带动螺纹杆3转动,进而通过固定块4带动螺纹杆3竖直向下移动,再通过螺纹杆3带动挡块8转动并竖直向下移动,从而挡块8与连接块5发生相对转动,然后再通过挡块8带动连接块5竖直向下移动,从而连接块5通过两根支杆6带动两个卡块7相互远离,进而两个卡块7分别插入到土壤内,利用两个卡块7插入到土壤内,进而进一步提高底座1的稳定性,防止当遇到强风天气时,底座1出现倾覆的情况。When installing the base 1, the staff first fixes the positioning box 2 into the soil, then drives the threaded rod 3 to rotate through the adjustment block, and then drives the threaded rod 3 to move vertically downward through the fixed block 4, and then passes the threaded rod 3 Drive the block 8 to rotate and move vertically downward, so that the block 8 and the connecting block 5 rotate relative to each other, and then the block 8 drives the connecting block 5 to move vertically downward, so that the connecting block 5 passes through two poles 6 drives the two clamping blocks 7 away from each other, and then the two clamping blocks 7 are respectively inserted into the soil, and the two clamping blocks 7 are inserted into the soil, thereby further improving the stability of the base 1 and preventing the Base 1 is overturned.

定位箱2下表面开设有通孔,螺纹杆3一端固定安装有定位销9,定位销9位于通孔正上方,螺纹杆3在竖直向下移动时,带动定位销9竖直向下移动,进而定位销9穿过通孔插入到土壤内,进一步提高底座1的稳固性。The lower surface of the positioning box 2 is provided with a through hole, and one end of the threaded rod 3 is fixedly equipped with a positioning pin 9. The positioning pin 9 is located directly above the through hole. When the threaded rod 3 moves vertically downward, it drives the positioning pin 9 to move vertically downward. , and then the positioning pin 9 is inserted into the soil through the through hole, further improving the stability of the base 1 .

定位箱2内固定安装有多个支撑块10,多个支撑块10分别与两个卡块7滑动接触,多个支撑块10表面均开设有多个圆柱槽,多个圆柱槽内均滚动安装有滚动柱11,多个滚动柱11分别与两个卡块7滚动接触,多个支撑块10分别对两个卡块7起到支撑的作用,两个卡块7在相对远离时,分别与多个滚动柱11发生滚动,进而有效的减小支撑块10与卡块7之间的摩擦力。A plurality of support blocks 10 are fixedly installed in the positioning box 2, and the plurality of support blocks 10 are respectively in sliding contact with the two clamping blocks 7. The surfaces of the plurality of support blocks 10 are all provided with a plurality of cylindrical grooves, and the plurality of cylindrical grooves are all rolled and installed. There are rolling columns 11, a plurality of rolling columns 11 are in rolling contact with the two blocks 7 respectively, and a plurality of support blocks 10 respectively play a supporting role for the two blocks 7, and when the two blocks 7 are relatively far away, they are respectively in contact with the two blocks 7. The multiple rolling columns 11 roll, thereby effectively reducing the frictional force between the supporting block 10 and the clamping block 7 .

底座1上表面固定安装有多个定位块12,多个定位块12侧面均固定安装有L形的挡板13,多个定位块12表面均通过多个螺钉螺母固定件固定安装有安装块14,多个安装块14分别与多个挡板13接触,多个安装块14表面均固定连接有塔脚15,在对塔脚15进行安装时,工作人员首先将安装块14与挡板13接触,再通过螺钉螺母固定件与定位块12固定连接,塔脚15在起到支撑时,挡板13可提高塔脚15的稳固性。A plurality of positioning blocks 12 are fixedly installed on the upper surface of the base 1, L-shaped baffles 13 are fixedly installed on the sides of the plurality of positioning blocks 12, and mounting blocks 14 are fixedly installed on the surfaces of the plurality of positioning blocks 12 through a plurality of screw and nut fixtures. , a plurality of installation blocks 14 are respectively in contact with a plurality of baffles 13, and the surfaces of the plurality of installation blocks 14 are fixedly connected with tower feet 15. When installing the tower feet 15, the staff first contacts the installation blocks 14 with the baffles 13 , and then fixedly connected with the positioning block 12 through screw and nut fixtures, when the tower foot 15 plays a supporting role, the baffle plate 13 can improve the stability of the tower foot 15.

多个挡板13表面均开设有L形的限位槽,多个限位槽内均插设有L形的限位块16,多个限位块16分别与多个安装块14固定连接,通过限位块16有效的防止塔脚15在遇到强风天气时出现松动。A plurality of baffle plates 13 are provided with L-shaped limiting grooves on the surface, and L-shaped limiting blocks 16 are inserted in the plurality of limiting grooves, and the plurality of limiting blocks 16 are respectively fixedly connected with a plurality of mounting blocks 14. The stopper 16 effectively prevents the tower foot 15 from loosening when encountering a strong wind.

本实用新型中,在对底座1进行安装时,工作人员首先将定位箱2固定插入在土壤内,然后通过转动螺纹杆3带动挡块8转动并竖直向下移动,再通过挡块8带动连接块5竖直向下移动,从而连接块5通过两根支杆6带动两个卡块7相互远离,进而两个卡块7分别插入到土壤内,进而进一步提高底座1的稳定性,防止当遇到强风天气时,底座1出现倾覆的情况。In the utility model, when installing the base 1, the staff first fixes the positioning box 2 and inserts it into the soil, and then drives the stopper 8 to rotate and move vertically downward by rotating the threaded rod 3, and then drives the stopper 8 through the stopper 8. The connecting block 5 moves vertically downward, so that the connecting block 5 drives the two clamping blocks 7 away from each other through the two poles 6, and then the two clamping blocks 7 are respectively inserted into the soil, thereby further improving the stability of the base 1 and preventing When running into strong wind weather, the situation that the base 1 overturns occurs.

总体来说,针对技术问题:在遇到强风天气时,由于塔身的高度较高,底座1受到更大的外力,很容易出现倾覆的情况,影响电力的正常供应;采用技术方案:通过螺纹杆3、固定块4、支杆6、连接块5、卡块7、挡块8的相互配合,在安装底座1时,利用两个卡块7插入到土壤内,进而进一步提高底座1的稳定性;因为技术方案的实现过程是:在对底座1进行安装时,工作人员首先将定位箱2固定插入在土壤内,然后通过转动螺纹杆3带动挡块8转动并竖直向下移动,再通过挡块8带动连接块5竖直向下移动,从而连接块5通过两根支杆6带动两个卡块7相互远离,进而两个卡块7分别插入到土壤内;所以必然能解决该技术问题,实现的技术效果就是:进一步提高底座1的稳定性,防止当遇到强风天气时,底座1出现倾覆的情况。Generally speaking, for technical problems: when encountering strong winds, due to the high height of the tower body, the base 1 is subject to greater external force, which is prone to overturning and affects the normal supply of electricity; technical solution: through the thread The mutual cooperation of the rod 3, the fixed block 4, the support rod 6, the connecting block 5, the clamping block 7, and the stopper 8, when installing the base 1, use the two clamping blocks 7 to be inserted into the soil, thereby further improving the stability of the base 1 Because the realization process of the technical solution is: when installing the base 1, the staff first fixes the positioning box 2 and inserts it into the soil, and then drives the stopper 8 to rotate and move vertically downward by rotating the threaded rod 3, and then The stopper 8 drives the connecting block 5 to move vertically downward, so that the connecting block 5 drives the two clamping blocks 7 away from each other through the two poles 6, and then the two clamping blocks 7 are respectively inserted into the soil; so the problem must be solved Technical problem, the technical effect achieved is: to further improve the stability of the base 1 and prevent the base 1 from overturning when encountering strong winds.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above is only a preferred embodiment of the utility model, but the scope of protection of the utility model is not limited thereto. The equivalent replacement or change of the new technical solution and the concept of the utility model shall be covered by the protection scope of the utility model.

Claims (6)

1.高强度抗风性电力铁塔,包括底座(1),其特征在于,所述底座(1)下表面固定安装有定位箱(2),所述定位箱(2)两侧面均开设有条形口,所述底座(1)表面开设有与定位箱(2)相连通的转动孔;1. A high-strength wind-resistant power tower, comprising a base (1), characterized in that a positioning box (2) is fixedly installed on the lower surface of the base (1), and strips are provided on both sides of the positioning box (2). shaped mouth, the surface of the base (1) is provided with a rotating hole communicating with the positioning box (2); 所述转动孔内转动安装有螺纹杆(3),所述螺纹杆(3)一端固定安装有调节块,所述螺纹杆(3)上螺纹套接有固定块(4),所述固定块(4)固定安装在底座(1)表面,所述螺纹杆(3)上转动套接有连接块(5),所述连接块(5)表面对称转动安装有支杆(6),两个所述条形口内均滑动安装有卡块(7),两根所述支杆(6)远离连接块(5)一端分别与两个卡块(7)转动连接,所述螺纹杆(3)上固定套接有挡块(8),所述挡块(8)与连接块(5)转动连接。A threaded rod (3) is installed for rotation in the rotating hole, an adjusting block is fixedly installed at one end of the threaded rod (3), and a fixed block (4) is threaded on the threaded rod (3), and the fixed block (4) Fixedly installed on the surface of the base (1), the threaded rod (3) is rotatably fitted with a connection block (5), and the surface of the connection block (5) is symmetrically rotated with a support rod (6), two Blocks (7) are slidably installed in the strip-shaped openings, and the ends of the two poles (6) away from the connecting block (5) are respectively rotatably connected with the two blocks (7), and the threaded rods (3) A block (8) is fixedly sleeved on the top, and the block (8) is rotatably connected with the connecting block (5). 2.根据权利要求1所述的高强度抗风性电力铁塔,其特征在于,所述定位箱(2)下表面开设有通孔,所述螺纹杆(3)一端固定安装有定位销(9),所述定位销(9)位于通孔正上方。2. The high-strength wind-resistant electric power tower according to claim 1, characterized in that, the lower surface of the positioning box (2) is provided with a through hole, and one end of the threaded rod (3) is fixedly installed with a positioning pin (9 ), the positioning pin (9) is located directly above the through hole. 3.根据权利要求1所述的高强度抗风性电力铁塔,其特征在于,所述定位箱(2)内固定安装有多个支撑块(10),多个所述支撑块(10)分别与两个卡块(7)滑动接触。3. The high-strength wind-resistant electric power tower according to claim 1, characterized in that, a plurality of support blocks (10) are fixedly installed in the positioning box (2), and a plurality of support blocks (10) are respectively Sliding contact with the two blocks (7). 4.根据权利要求3所述的高强度抗风性电力铁塔,其特征在于,多个所述支撑块(10)表面均开设有多个圆柱槽,多个所述圆柱槽内均滚动安装有滚动柱(11),多个所述滚动柱(11)分别与两个卡块(7)滚动接触。4. The high-strength wind-resistant electric power tower according to claim 3 is characterized in that, a plurality of said support blocks (10) surfaces are provided with a plurality of cylindrical grooves, and a plurality of cylindrical grooves are rollingly installed in a plurality of said cylindrical grooves. Rolling columns (11), a plurality of rolling columns (11) are respectively in rolling contact with the two clamping blocks (7). 5.根据权利要求1所述的高强度抗风性电力铁塔,其特征在于,所述底座(1)上表面固定安装有多个定位块(12),多个所述定位块(12)侧面均固定安装有L形的挡板(13),多个所述定位块(12)表面均通过多个螺钉螺母固定件固定安装有安装块(14),多个所述安装块(14)分别与多个挡板(13)接触,多个所述安装块(14)表面均固定连接有塔脚(15)。5. The high-strength wind-resistant electric power tower according to claim 1, characterized in that, a plurality of positioning blocks (12) are fixedly installed on the upper surface of the base (1), and the sides of the plurality of positioning blocks (12) L-shaped baffles (13) are fixedly installed, and the surfaces of a plurality of positioning blocks (12) are fixed with mounting blocks (14) through a plurality of screw and nut fixtures, and the plurality of mounting blocks (14) are respectively In contact with a plurality of baffles (13), tower feet (15) are fixedly connected to the surfaces of the plurality of installation blocks (14). 6.根据权利要求5所述的高强度抗风性电力铁塔,其特征在于,多个所述挡板(13)表面均开设有L形的限位槽,多个所述限位槽内均插设有L形的限位块(16),多个所述限位块(16)分别与多个安装块(14)固定连接。6. The high-strength wind-resistant electric power tower according to claim 5, characterized in that, a plurality of said baffle plates (13) are provided with L-shaped limiting grooves on the surface, and each of the plurality of said limiting grooves An L-shaped limiting block (16) is inserted, and a plurality of the limiting blocks (16) are respectively fixedly connected with a plurality of mounting blocks (14).
CN202223400099.3U 2022-12-18 2022-12-18 High-strength wind-resistant electric iron tower Expired - Fee Related CN219316568U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223400099.3U CN219316568U (en) 2022-12-18 2022-12-18 High-strength wind-resistant electric iron tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223400099.3U CN219316568U (en) 2022-12-18 2022-12-18 High-strength wind-resistant electric iron tower

Publications (1)

Publication Number Publication Date
CN219316568U true CN219316568U (en) 2023-07-07

Family

ID=87030291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223400099.3U Expired - Fee Related CN219316568U (en) 2022-12-18 2022-12-18 High-strength wind-resistant electric iron tower

Country Status (1)

Country Link
CN (1) CN219316568U (en)

Similar Documents

Publication Publication Date Title
CN207112095U (en) A kind of feed pipe pipe clamp
CN215055916U (en) Bending groove type cross arm
CN206283458U (en) A kind of solar photovoltaic bracket of adjustable inclination angle
CN216959757U (en) Photovoltaic power generation steel structure support
CN217307602U (en) Wind-resistant reinforced outdoor photovoltaic panel mounting bracket
CN210577392U (en) Overhead device for cable maintenance
CN214176640U (en) Fixing device is used in block terminal installation
CN214475557U (en) Traffic control is with solar signal lamp convenient to equipment
CN212224189U (en) A kind of building energy-saving can cultivate green balcony
CN212273564U (en) Data acquisition unit telescopic support frame
CN215010141U (en) Fastening device for photovoltaic solar installation
CN215275675U (en) A table tennis storage device
CN207759806U (en) A kind of modular cable actinobacillus device
CN209200408U (en) A kind of suspension type high-low pressure electrical cabinet
CN222546894U (en) A safety protection device for radio and television transmission tower
CN214576139U (en) Corrosion-resistant transmission line zinc-plated iron tower
CN222515267U (en) Photovoltaic support convenient to multi-angle adjustment
CN222125374U (en) A low voltage distribution network fault detection device
CN223991635U (en) Electric iron tower with stable tower bottom and ground connection
CN218997973U (en) Support for wind power photovoltaic
CN223125477U (en) A typhoon-proof fixing device for landscape trees in coastal areas
CN220341957U (en) Insulation stable cable support
CN217953527U (en) A kind of ecological environment monitoring equipment
CN219981219U (en) Variable supporting leg
CN221408396U (en) Power distribution net rack with lightning protection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230707