CN219316128U - Prefabricated wallboard and precast beam installation connection structure - Google Patents
Prefabricated wallboard and precast beam installation connection structure Download PDFInfo
- Publication number
- CN219316128U CN219316128U CN202223340423.7U CN202223340423U CN219316128U CN 219316128 U CN219316128 U CN 219316128U CN 202223340423 U CN202223340423 U CN 202223340423U CN 219316128 U CN219316128 U CN 219316128U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- block
- connection structure
- fixedly installed
- channel steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 26
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 35
- 239000010959 steel Substances 0.000 claims abstract description 35
- 238000010276 construction Methods 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 3
- 230000000087 stabilizing effect Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑工程技术领域,具体来说,涉及一种预制墙板和预制梁安装连接结构。The utility model relates to the technical field of construction engineering, in particular to a prefabricated wall panel and prefabricated beam installation and connection structure.
背景技术Background technique
装配式建筑是指把传统建造方式中的大量现场作业工作转移到工厂进行,在工厂加工制作好建筑用构件和配件(如楼板、墙板、楼梯、阳台等),运输到建筑施工现场,通过可靠的连接方式在现场装配安装而成的建筑。预制墙板和预制梁作为装配式建筑的主要外围结构,其连接的方式和结构非常重要Prefabricated building refers to the transfer of a large number of on-site operations in the traditional construction method to the factory, where the building components and accessories (such as floors, wall panels, stairs, balconies, etc.) are processed and manufactured in the factory, and transported to the construction site. Reliable connections are assembled and installed on site. Prefabricated wall panels and prefabricated beams are the main peripheral structures of prefabricated buildings, and their connection methods and structures are very important
现有技术中,预制墙板和预制梁之间的距离不能够进行调节,从而导致了多个预制墙板在安装过后不够平整,进而大大降低了施工的质量,并且现有的连接结构不能够对预制墙板之间得到缝隙进行调整,从而导致了预制墙板之间的缝隙宽度无法保持一致,进而大大降低了预制墙面的整齐性。In the prior art, the distance between the prefabricated wall panels and the prefabricated beams cannot be adjusted, resulting in the unevenness of multiple prefabricated wall panels after installation, which greatly reduces the quality of construction, and the existing connection structure cannot The gaps between the prefabricated wall panels are adjusted, resulting in that the width of the gaps between the prefabricated wall panels cannot be kept consistent, thereby greatly reducing the orderliness of the prefabricated wall surfaces.
针对相关技术中的问题,目前尚未提出有效的解决方案。Aiming at the problems in the related technologies, no effective solution has been proposed yet.
实用新型内容Utility model content
针对相关技术中的问题,本实用新型提出一种预制墙板和预制梁安装连接结构,以克服现有相关技术所存在的上述技术问题。Aiming at the problems in the related technology, the utility model proposes a prefabricated wall board and prefabricated beam installation and connection structure to overcome the above-mentioned technical problems in the existing related technology.
为此,本实用新型采用的具体技术方案如下:For this reason, the concrete technical scheme that the utility model adopts is as follows:
一种预制墙板和预制梁安装连接结构,包括梁本体,所述梁本体的右侧设有安装板,所述安装板的右侧中间固定安装有连接块,所述连接块的内部且靠近其底部设有齿板,所述齿板的右端穿出连接块固定连接有H形槽钢,所述连接块内壁的顶部且靠近其右侧固定安装有支撑杆,所述支撑杆的内侧且靠近其底部通过转轴转动连接有连接杆,所述连接杆的顶部且靠近其左端通过铰接件活动连接有按压杆,所述按压杆的顶端穿出连接块固定连接有按压块,所述连接杆的右侧底端固定安装有卡接块,所述卡接块与齿板相互卡接且适配,所述H形槽钢的上下两侧设有墙板本体。A prefabricated wall panel and prefabricated beam installation and connection structure, including a beam body, a mounting plate is provided on the right side of the beam body, a connecting block is fixedly installed in the middle of the right side of the mounting plate, and the inside of the connecting block is close to The bottom of the tooth plate is provided with a tooth plate, and the right end of the tooth plate passes through the connecting block and is fixedly connected with an H-shaped channel steel. The top of the inner wall of the connecting block is fixedly installed near the right side of the support rod. The inner side of the support rod and A connecting rod is connected to the bottom by a rotating shaft, and a pressing rod is movably connected to the top of the connecting rod and near its left end through a hinge. The bottom end of the right side of the wall is fixedly installed with a clamping block, and the clamping block and the tooth plate are clamped and adapted to each other, and the upper and lower sides of the H-shaped channel steel are provided with a wall panel body.
作为优选,所述梁本体的右侧开设有若干个螺纹孔,安装板的内部且靠近其上下两侧螺纹连接有固定螺栓,所述固定螺栓与螺纹孔螺纹连接且适配。Preferably, several threaded holes are opened on the right side of the beam body, and fixing bolts are threaded inside the mounting plate and close to its upper and lower sides, and the fixing bolts are threaded and adapted to the threaded holes.
作为优选,所述连接杆的顶部且靠近其右端固定安装有弹簧,所述弹簧的顶端与连接块内壁的底部固定连接。Preferably, a spring is fixedly installed on the top of the connecting rod near its right end, and the top end of the spring is fixedly connected to the bottom of the inner wall of the connecting block.
作为优选,所述齿板右端的上下两侧固定安装有稳定钢板,所述稳定钢板的右侧与H形槽钢固定连接。Preferably, stable steel plates are fixedly installed on the upper and lower sides of the right end of the tooth plate, and the right side of the stable steel plate is fixedly connected with the H-shaped channel steel.
作为优选,所述连接块内壁的底壁固定安装有导向槽,所述导向槽与齿板滑动连接且适配。Preferably, a guide groove is fixedly installed on the bottom wall of the inner wall of the connecting block, and the guide groove is slidably connected and adapted to the tooth plate.
作为优选,所述H形槽钢的外侧且靠近其上下两侧设有旋钮,所述旋钮的内侧固定安装有螺杆,所述螺杆的另一端穿过H形槽钢通过轴承转动连接有固定板,所述固定板的内侧固定安装有防滑条。As a preference, knobs are provided on the outside of the H-shaped channel steel and close to its upper and lower sides, and the inner side of the knob is fixedly equipped with a screw, and the other end of the screw rod passes through the H-shaped channel steel and is connected to a fixed plate through bearing rotation. , the inner side of the fixed plate is fixedly installed with anti-slip strips.
作为优选,所述墙板本体的上下两侧固定安装有滑块,所述H形槽钢内部的上下两侧开设有滑轨,所述滑块与滑轨滑动连接且适配。Preferably, sliders are fixedly installed on the upper and lower sides of the wallboard body, and slide rails are provided on the upper and lower sides inside the H-shaped channel steel, and the sliders are slidably connected and adapted to the slide rails.
本实用新型的有益效果为:按压挤压块能够对连接杆的左端进行挤压,从而能够使得连接杆的另一端抬起,进而能够使卡接块脱离齿板,并且在齿板与导向槽的滑动作用下,实现了对预制墙板和预制梁之间距离的调节,从而能够保证多个预制墙板的平整度,提高施工的质量,同时梁本体的右侧开设有若干个螺纹孔,安装板的内部且靠近其上下两侧螺纹连接有固定螺栓,通过固定螺栓与螺纹孔的设置,实现了对预制墙板上下位置的调节,并且方便工作人员进行拆卸和安装,旋钮转动能够带动螺纹杆进行转动,螺纹杆在转动的同时能够带动固定板进行移动,固定板能够对预制墙板进行夹持固定,从而能够提高墙板的稳定性,避免墙板发生晃动。The beneficial effects of the utility model are: pressing the extruding block can squeeze the left end of the connecting rod, so that the other end of the connecting rod can be lifted, and then the clamping block can be detached from the tooth plate, and between the tooth plate and the guide groove Under the action of sliding, the distance between the prefabricated wall panels and the prefabricated beams can be adjusted, so as to ensure the flatness of multiple prefabricated wall panels and improve the quality of construction. At the same time, there are several threaded holes on the right side of the beam body. There are fixing bolts threaded on the inside of the installation plate and close to its upper and lower sides. Through the setting of fixing bolts and threaded holes, the adjustment of the upper and lower positions of the prefabricated wallboard is realized, and it is convenient for the staff to disassemble and install. The rotation of the knob can drive the thread The rod rotates, and the threaded rod can drive the fixed plate to move while rotating, and the fixed plate can clamp and fix the prefabricated wallboard, thereby improving the stability of the wallboard and preventing the wallboard from shaking.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the accompanying drawings required in the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only the present invention. For some embodiments of the present invention, those of ordinary skill in the art can also obtain other drawings based on these drawings on the premise of not paying creative efforts.
图1是根据本实用新型实施例的一种预制墙板和预制梁安装连接结构的立体结构示意图;Fig. 1 is a three-dimensional structural schematic diagram of a prefabricated wall panel and a prefabricated beam installation and connection structure according to an embodiment of the present invention;
图2是根据本实用新型实施例的一种预制墙板和预制梁安装连接结构的结构示意图;Fig. 2 is a structural schematic diagram of a prefabricated wall panel and a prefabricated beam installation and connection structure according to an embodiment of the present invention;
图3是根据本实用新型实施例的一种预制墙板和预制梁安装连接结构的A处放大图;Fig. 3 is an enlarged view at A of a prefabricated wall panel and a prefabricated beam installation and connection structure according to an embodiment of the present invention;
图4是根据本实用新型实施例的一种预制墙板和预制梁安装连接结构的B处放大图。Fig. 4 is an enlarged view at B of a prefabricated wall panel and prefabricated beam installation and connection structure according to an embodiment of the present invention.
图中:In the picture:
1、梁本体;2、安装板;3、连接块;4、齿板;5、H形槽钢;6、支撑杆;7、连接杆;8、按压块;9、卡接块;10、墙板本体;11、螺纹孔;12、固定螺栓;13、弹簧;14、稳定钢板;15、导向槽;16、旋钮;17、螺杆;18、固定板;19、滑块;20、滑轨。1. Beam body; 2. Mounting plate; 3. Connecting block; 4. Tooth plate; 5. H-shaped channel steel; 6. Support rod; 7. Connecting rod; 8. Press block; 9. Clamp block; 10. Wallboard body; 11. Threaded hole; 12. Fixing bolt; 13. Spring; 14. Stable steel plate; 15. Guide slot; 16. Knob; 17. Screw; 18. Fixed plate; 19. Slider; .
具体实施方式Detailed ways
为进一步说明各实施例,本实用新型提供有附图,这些附图为本实用新型揭露内容的一部分,其主要用以说明实施例,并可配合说明书的相关描述来解释实施例的运作原理,配合参考这些内容,本领域普通技术人员应能理解其他可能的实施方式以及本实用新型的优点,图中的组件并未按比例绘制,而类似的组件符号通常用来表示类似的组件。In order to further illustrate the various embodiments, the utility model provides accompanying drawings, which are a part of the disclosure content of the utility model, which are mainly used to illustrate the embodiments, and can cooperate with the relevant descriptions in the manual to explain the operating principles of the embodiments. With reference to these contents, those skilled in the art should be able to understand other possible implementations and advantages of the present invention. The components in the figures are not drawn to scale, and similar component symbols are generally used to represent similar components.
根据本实用新型的实施例,提供了一种预制墙板和预制梁安装连接结构。According to an embodiment of the utility model, a prefabricated wall panel and a prefabricated beam installation and connection structure are provided.
实施例一Embodiment one
如图1- 4所示,根据本实用新型实施例的一种预制墙板和预制梁安装连接结构,包括梁本体1,梁本体1的右侧设有安装板2,安装板2的右侧中间固定安装有连接块3,连接块3的内部且靠近其底部设有齿板4,齿板4的右端穿出连接块3固定连接有H形槽钢5,连接块3内壁的顶部且靠近其右侧固定安装有支撑杆6,支撑杆6的内侧且靠近其底部通过转轴转动连接有连接杆7,连接杆7的顶部且靠近其左端通过铰接件活动连接有按压杆,按压杆的顶端穿出连接块3固定连接有按压块8,连接杆7的右侧底端固定安装有卡接块9,卡接块9与齿板4相互卡接且适配,H形槽钢5的上下两侧设有墙板本体10。梁本体1的右侧开设有若干个螺纹孔11,安装板2的内部且靠近其上下两侧螺纹连接有固定螺栓12,固定螺栓12与螺纹孔11螺纹连接且适配,通过固定螺栓12与螺纹孔11的设置,实现了对预制墙板上下位置的调节,并且方便工作人员进行拆卸和安装,连接杆7的顶部且靠近其右端固定安装有弹簧13,弹簧13的顶端与连接块3内壁的底部固定连接,在弹簧13的弹性作用下,使得卡接块9能够对齿板4相互卡接。As shown in Figures 1-4, a prefabricated wallboard and prefabricated beam installation and connection structure according to an embodiment of the present invention includes a
实施例二Embodiment two
如图1- 4所示,根据本实用新型实施例的一种预制墙板和预制梁安装连接结构,包括梁本体1,梁本体1的右侧设有安装板2,安装板2的右侧中间固定安装有连接块3,连接块3的内部且靠近其底部设有齿板4,齿板4的右端穿出连接块3固定连接有H形槽钢5,连接块3内壁的顶部且靠近其右侧固定安装有支撑杆6,支撑杆6的内侧且靠近其底部通过转轴转动连接有连接杆7,连接杆7的顶部且靠近其左端通过铰接件活动连接有按压杆,按压杆的顶端穿出连接块3固定连接有按压块8,连接杆7的右侧底端固定安装有卡接块9,卡接块9与齿板4相互卡接且适配,H形槽钢5的上下两侧设有墙板本体10。齿板4右端的上下两侧固定安装有稳定钢板14,稳定钢板14的右侧与H形槽钢5固定连接,通过稳定钢板14的设置,能够进一步提高预制墙板安装的稳定性,连接块3内壁的底壁固定安装有导向槽15,导向槽15与齿板4滑动连接且适配,在齿板4与导向槽15的滑动作用下,实现了对预制墙板和预制梁之间距离的调节,从而能够保证多个预制墙板的平整度。As shown in Figures 1-4, a prefabricated wallboard and prefabricated beam installation and connection structure according to an embodiment of the present invention includes a
实施例三Embodiment Three
如图1- 4所示,根据本实用新型实施例的一种预制墙板和预制梁安装连接结构,包括梁本体1,梁本体1的右侧设有安装板2,安装板2的右侧中间固定安装有连接块3,连接块3的内部且靠近其底部设有齿板4,齿板4的右端穿出连接块3固定连接有H形槽钢5,连接块3内壁的顶部且靠近其右侧固定安装有支撑杆6,支撑杆6的内侧且靠近其底部通过转轴转动连接有连接杆7,连接杆7的顶部且靠近其左端通过铰接件活动连接有按压杆,按压杆的顶端穿出连接块3固定连接有按压块8,连接杆7的右侧底端固定安装有卡接块9,卡接块9与齿板4相互卡接且适配,H形槽钢5的上下两侧设有墙板本体10。H形槽钢5的外侧且靠近其上下两侧设有旋钮16,旋钮16的内侧固定安装有螺杆17,螺杆17的另一端穿过H形槽钢5通过轴承转动连接有固定板18,固定板18的内侧固定安装有防滑条,固定板18能够对预制墙板进行夹持固定,从而能够提高墙板的稳定性,避免墙板发生晃动,防滑条能够增大固定板18与预制墙板之间的摩擦,从而能够防止预制墙板发生滑动的情况,墙板本体10的上下两侧固定安装有滑块19,H形槽钢5内部的上下两侧开设有滑轨20,滑块19与滑轨20滑动连接且适配,在滑块19与滑轨20的滑动作用下,方便了工作人员对预制墙板之间的缝隙进行调整,从而提高了预制墙面的整齐性。As shown in Figures 1-4, a prefabricated wallboard and prefabricated beam installation and connection structure according to an embodiment of the present invention includes a
综上,借助于本实用新型的上述技术方案,安装预制墙板时,工作人员能够通过固定螺栓12和螺纹块将安装板2固定在预制梁的一侧,并且实现了对预制墙板上下位置的调节,当需要对预制墙板和预制梁之间的距离进行调整时,工作人员能够按压挤压块,按压挤压块能够对连接杆7的左端进行挤压,从而能够使得连接杆7的另一端抬起,进而能够使卡接块9脱离齿板4,并且在齿板4与导向槽15的滑动作用下,实现了对预制墙板和预制梁之间距离的调节,从而能够保证多个预制墙板的平整度,提高施工的质量,并且墙板本体10的上下两侧固定安装有滑块19,H形槽钢5内部的上下两侧开设有滑轨20,在滑块19与滑轨20的滑动作用下,方便了工作人员对预制墙板之间的缝隙进行调整,从而提高了预制墙面的整齐性,缝隙调整完成后,工作人员能够转动旋钮16,旋钮16能够带动螺纹杆进行转动,螺纹杆在转动的同时能够带动固定板18进行移动,固定板18能够对预制墙板进行夹持固定,从而能够提高墙板的稳定性,避免墙板发生晃动。To sum up, with the help of the above technical solution of the present utility model, when installing the prefabricated wallboard, the staff can fix the
以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in the Within the protection scope of the present utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223340423.7U CN219316128U (en) | 2022-12-14 | 2022-12-14 | Prefabricated wallboard and precast beam installation connection structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223340423.7U CN219316128U (en) | 2022-12-14 | 2022-12-14 | Prefabricated wallboard and precast beam installation connection structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219316128U true CN219316128U (en) | 2023-07-07 |
Family
ID=87025994
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202223340423.7U Expired - Fee Related CN219316128U (en) | 2022-12-14 | 2022-12-14 | Prefabricated wallboard and precast beam installation connection structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219316128U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN121251047A (en) * | 2025-12-04 | 2026-01-02 | 中国电建集团华东勘测设计研究院有限公司 | Assembled shear wall structure and construction method thereof |
-
2022
- 2022-12-14 CN CN202223340423.7U patent/CN219316128U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN121251047A (en) * | 2025-12-04 | 2026-01-02 | 中国电建集团华东勘测设计研究院有限公司 | Assembled shear wall structure and construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN219316128U (en) | Prefabricated wallboard and precast beam installation connection structure | |
| CN209620319U (en) | A kind of half built-in exterior wall board mounting structure of assembled architecture | |
| CN219157975U (en) | A multi-angle connection component of architectural glass curtain wall | |
| CN115874811B (en) | Keel structure | |
| CN217756484U (en) | Building pipe laying auxiliary device | |
| CN117868309A (en) | A prefabricated building structure and construction method thereof | |
| CN213898254U (en) | Floor board strutting arrangement for assembly type structure | |
| CN217630680U (en) | Connection structure that crack control light gauge steel partition wall was used among architectural decoration | |
| CN210857740U (en) | A new type of steel composite beam support structure | |
| CN208934214U (en) | A kind of stone curtain wall fixed structure | |
| CN220301818U (en) | Woodworking beam auxiliary control thin-wall concrete linear device | |
| CN223410690U (en) | Assembled bay window structure | |
| CN220598820U (en) | A kind of prefabricated building wall panel connection and fixing device | |
| CN221741852U (en) | A wall tile fixer | |
| CN211007091U (en) | Be used for precast concrete component board seam to adjust structure | |
| CN220133201U (en) | Pre-installation structure based on adjustable wall body and beam connection | |
| CN219011792U (en) | Wallboard hanging piece | |
| CN113293961A (en) | Assembly type tile bottom plate splicing structure and method | |
| CN222065769U (en) | Steel structure base | |
| CN213741823U (en) | Descending plate and steel beam connecting structure in prefabricated building | |
| CN223577592U (en) | A prefabricated wall panel support assembly | |
| CN216840121U (en) | A unitized curtain wall hanging assembly and unitized curtain wall | |
| CN220469410U (en) | Plate fastener for building construction | |
| CN220953851U (en) | Reserved arch starting value adjusting device for steel cantilever construction | |
| CN116733141B (en) | Vertical keel mounting structure of assembled wall body |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230707 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |