CN219280507U CN202320267598.5U CN202320267598U CN219280507U CN 219280507 U CN219280507 U CN 219280507U CN 202320267598 U CN202320267598 U CN 202320267598U CN 219280507 U CN219280507 U CN 219280507U
Authority
CN
China
Prior art keywords
elevation
plate
bridge deck
deck pavement
clamping plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320267598.5U
Other languages
Chinese (zh)
Inventor
同伟军
李兴华
盛雅楠
吕建强
严峻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge East China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge East China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge East China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN202320267598.5U priority Critical patent/CN219280507U/en
Application granted granted Critical
Publication of CN219280507U publication Critical patent/CN219280507U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a bridge deck pavement elevation zone elevation control device which comprises a clamp, wherein the clamp comprises a top plate and a bottom plate which are arranged in parallel, the distance between the top plate and the bottom plate is equal to the thickness of a bridge deck pavement elevation zone pouring template, one side of the top plate and one side of the bottom plate are welded with a side plate, the outer side wall of the side plate is welded with two clamping plates, the two clamping plates are perpendicular to the side plate, the top plate and the bottom plate, a certain distance is reserved between the two clamping plates, and opposite threaded holes are formed in the two clamping plates and a positioning bolt is arranged in a penetrating mode. The utility model can utilize the existing limit ribs on the outer side of the template to quickly and accurately adjust the height of the template and position the template, thereby ensuring the construction quality of the bridge deck pavement elevation band.

Description

Bridge deck pavement elevation belt elevation control device
Technical Field
The utility model belongs to the technical field of bridge construction, relates to construction of bridge deck pavement elevation bands, and particularly relates to a bridge deck pavement elevation band elevation control device.
Background
As shown in fig. 1, before bridge deck pavement construction, an elevation belt 2 with the width of 50cm is required to be respectively poured on two sides of a beam slab 1 and used for installing a travelling rail of a three-roll-shaft paver. The elevation belt layer thickness is thinner, generally square steel or channel steel is adopted as a side template 3, and a limiting rib 4 is anchored on the top surface of the beam body along the outer side of the template at certain intervals, so that the template is prevented from moving outwards to cause die expansion during pouring. The height of the template is set to be consistent with the elevation of the elevation band, and the template is poured to be flush with the top surface of the side template during concrete pouring, but the following problems exist in construction: because the bridge is provided with the transverse slope and the longitudinal slope, the elevation of the bridge deck pavement elevation band at different positions is changed, the heights of the templates also need to be correspondingly adjusted, one method is to replace templates with different heights in construction at present, but inconvenience is brought to construction, and the other method is to adjust the heights of the templates 3 by adopting the cushion blocks 5, but the adjustment precision is poor, the elevation precision of the elevation band is affected, and the installation of the paver track and the bridge deck pavement quality are further affected.
Disclosure of Invention
The utility model aims to solve the problems and provide a bridge deck pavement elevation band elevation control device which ensures the construction quality of a bridge deck pavement elevation band.
The technical scheme of the utility model is as follows:
the utility model provides a bridge deck pavement elevation area elevation controlling means which characterized in that: the fixture comprises a fixture body, wherein the fixture body comprises a top plate and a bottom plate which are arranged in parallel, the distance between the top plate and the bottom plate is equal to the thickness of the bridge deck pavement elevation tape casting template, a side plate is welded on one side of the top plate and one side of the bottom plate, two clamping plates are welded on the outer side wall of the side plate and are perpendicular to the side plate, the top plate and the bottom plate, a certain distance is reserved between the two clamping plates, and a pair of threaded holes are formed in the two clamping plates and are penetrated by a positioning bolt.
The utility model utilizes the existing limit ribs on the outer side of the template to quickly and accurately adjust the height of the template and position the template, thereby ensuring the construction quality of the bridge deck pavement elevation band. The utility model has simple structure, can be processed by adopting the steel residual materials on the construction site, and has low manufacturing cost.
Drawings
FIG. 1 is a schematic diagram of an existing deck pavement elevation band template mounting structure;
FIG. 2 is an elevation view of the present utility model;
FIG. 3 is a plan view of the present utility model;
FIG. 4 is a transverse bridge elevational view of the present utility model in use;
fig. 5 is a plan view of the use state of the present utility model.
Detailed Description
As shown in fig. 2 and 3, the utility model comprises a fixture, the fixture comprises a top plate 6 and a bottom plate 7 which are arranged in parallel, the distance between the top plate 6 and the bottom plate 7 is equal to the thickness of a bridge deck pavement elevation belt pouring template, a side plate 8 is welded on one side of the top plate and one side of the bottom plate, two clamping plates 9 are welded on the outer side wall of the side plate, the two clamping plates 9 are perpendicular to the side plate 8, the top plate 6 and the bottom plate 7, a certain distance is reserved between the two clamping plates, and opposite screw holes are formed in the two clamping plates 9 and a positioning bolt 10 is arranged in a penetrating mode.
When the utility model is implemented, the distance between the two clamping plates of the clamp is larger than or equal to the diameter of the limit rib at the outer side of the bridge deck pavement elevation belt pouring template; the distance between the screw holes on the two clamping plates and the clamp side plate is smaller than the diameter of the limiting rib.
As shown in fig. 4 and 5, when the utility model is used, the positioning bolts are not installed at first, the limiting ribs 4 at the outer side of the bridge deck pavement elevation belt pouring template 3 are tightly attached to the outer wall of the clamp side plate 8 and the inner wall of one clamp plate and are inserted between the two clamp plates 9, the height of the bottom surface of the clamp top plate 6 is adjusted to be consistent with the design elevation of the bridge deck pavement elevation belt, then the positioning bolts 10 are penetrated into the other clamp plate, the front ends of the positioning bolts 10 are tightly abutted against the limiting ribs 4, the limiting ribs are tightly pressed on the inner wall of the other clamp plate, at the moment, the clamp is fixed on the positioning ribs by virtue of friction force with the positioning ribs, and then the template 3 is inserted between the clamp top plate 6 and the bottom plate 7, so that the installation and the positioning of the template are completed. The bridge deck pavement elevation band 2 concrete placement flushes with the top surface of the template 3, and the design elevation precision can be met.

Claims (1)

1. The utility model provides a bridge deck pavement elevation area elevation controlling means which characterized in that: the fixture comprises a fixture body, wherein the fixture body comprises a top plate and a bottom plate which are arranged in parallel, the distance between the top plate and the bottom plate is equal to the thickness of the bridge deck pavement elevation tape casting template, a side plate is welded on one side of the top plate and one side of the bottom plate, two clamping plates are welded on the outer side wall of the side plate and are perpendicular to the side plate, the top plate and the bottom plate, a certain distance is reserved between the two clamping plates, and a pair of threaded holes are formed in the two clamping plates and are penetrated by a positioning bolt.
CN202320267598.5U 2023-02-09 2023-02-09 Bridge deck pavement elevation belt elevation control device Active CN219280507U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320267598.5U CN219280507U (en) 2023-02-09 2023-02-09 Bridge deck pavement elevation belt elevation control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320267598.5U CN219280507U (en) 2023-02-09 2023-02-09 Bridge deck pavement elevation belt elevation control device

Publications (1)

Publication Number Publication Date
CN219280507U true CN219280507U (en) 2023-06-30

Family

ID=86925026

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320267598.5U Active CN219280507U (en) 2023-02-09 2023-02-09 Bridge deck pavement elevation belt elevation control device

Country Status (1)

Country Link
CN (1) CN219280507U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116905810A (en) * 2023-07-28 2023-10-20 中冶天工集团有限公司 Novel post-pouring constructional column construction template and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116905810A (en) * 2023-07-28 2023-10-20 中冶天工集团有限公司 Novel post-pouring constructional column construction template and construction method

Similar Documents

Publication Publication Date Title
US20040182946A1 (en) Method for the continuous laying of a rail on a rigid track in addition to an alignment device and a rigid track
CN112064425B (en) A servo track suitable for a railway tunnel across an active fault and a control method thereof
CN219280507U (en) Bridge deck pavement elevation belt elevation control device
SK287688B6 (en) Pre-assembled reinforced-concrete plate and the method to make a prefabricated structure of pre-assembled reinforced-concrete plates
CN101522991A (en) Trackway and method for manufacturing a trackway
CN116356614B (en) Longitudinal track panel structure and construction method thereof
CN218291464U (en) Control device is pour to self-compaction concrete layer of prefabricated plate-type ballastless track
CN117507127B (en) Precast PC beam abutment for curved bridges and its wedge block adjustment device and construction method
CN118756956A (en) A positioning structure and method for casting dense rib shell formwork
CN217419302U (en) Assembled modulus formula bridge expansion joint
CN216616346U (en) A leveling construction device for positioning steel plates under a seismic isolation bearing
CN209369380U (en) A kind of raising finished product wind/flue installation quality constructing device
CN117431787A (en) Large-capacity ballastless track bed and its construction method
CN224001965U (en) Slope lattice transverse beam clamping components
CN223446024U (en) An adjustable bracket for a subway integral roadbed ditch template
CN220241818U (en) Prefabricated Liang Xiexing piece pedestal with adjustable
CN219311601U (en) Precast beam wedge positioning adjustment and anti-cracking device
CN219430461U (en) Adjustable concrete pavement template
CN216616862U (en) A consolidate frock for construction of balcony inverted beam hanging mould
CN223781320U (en) Fastener device at flood gate is prevented in interval for urban rail transit
CN221481063U (en) Box-shaped adjustable prefabricated stair pin key installation device
CN220394792U (en) Drainage ditch construction template device
CN118461440B (en) Prefabricated UHPC bridge guardrail permanent formwork and construction method thereof
CN217974375U (en) Positioning jig frame device for pre-embedded steel bars of cover plate culvert foundation
CN219099697U (en) Sleeve type ballastless pillow-free fastener system for cast-in-situ ballast bed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant